ESBD_File_335332_UNT Clark Hall - MEP - 100% CD Set.pdf
PDF 3 MB Posted
- Solicitation number
- RFCSP752-24-979ER
- Issued by
- Denton County, Denton City, Texas
About this file
This document contains the 100% Construction Documents for the Clark Hall Dormitory MEP (Mechanical, Electrical, Plumbing) Upgrades project for the University of North Texas, located at 1717 West Maple Street in Denton, Texas. The project involves the replacement and upgrade of the building's AHUs (Air Handler Units), ductwork, controls, piping, and electrical systems within the AHU mechanical rooms. Additionally, the project will include the replacement of heating and hot water boilers, building exhaust fans, horizontal sanitary waste piping, and HW, CHW, and CDW pumps. The project will need to be phased over a two-year period to accommodate the heavy use of the building, with construction periods of no more than two months at a time, primarily during the summer and winter breaks.
The project does not provide specific pricing terms, set-asides, incumbent information, or funding sources. However, it does state that the goal is to complete all construction by December 2025 through a phased approach that will keep the building in operation for the majority of the year.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR
O
JE
C
T
TI
TL
E:
C
LA
R K
H A
LL
D
O R
M
IT
O R
Y
PROJECT NUMBER:
R
EV
IS
IO
N S
C H
ED
U
LE
N o.
D at e
D es cr ip tio n
Is su ed b y
D R
A W
IN
G
T
IT
LE
ISSUE DATE: 05/09/2023
100% CONSTRUCTION DOCUMENTS
DRAWN BY / CHECKED BY / APPROVED BY:
M A
PL
E
ST
R
EE
T, D
EN
TO
N
, T X
U N
IV
ER
SI
TY
O F
N O
R
TH
T
EX
AS
PR
O
JE
C
T
AD
D R
ES
S:
C
LI
EN
T
N
AM
E:
CAMPOS:
PLOT STAMP:
3" =1
1/ 2"
'-0
1"
'-0
3/ 4"
'-0
1/ 2"
'-0
1/ 4"
'-0
1/ 8"
'-0
1/
'-0
03/ 8"
'-0
A
B
C
D
E
F
2 3 4 5 6 7 8
A
B
C
D
E
F
1 2 3 4 5 6 7 8
PR
O
JE
C
T D
IR
EC
TO
R
Y:
C
AM
PO
S
EN
G
IN
EE
R
IN
G
R
IV
ER
B
EN
D D
R
IV
E D
AL
LA
S, T
X
4-
6-
JE
FF
R
EY
S
TR
O H
, P .E
M
EC
H A
N
IC
A L, E
LE
C
TR
IC
A
L
P
LU
M B
IN
G
R
EN
O
VA
TI
O
N
D22-2995.00
1331 River Bend Drive Dallas, Texas 75247
(214) 696-6291 campos@camposengineering.com Registration No. F-001731 Project Number: D22-2995.00
CAMPOS
E N G I N E E R I N G
MC JS JS
MEP0.00
M
EP
C O
VE
R
S H
EE
T
CLARK HALL MEP UPGRADES
1717 MAPLE STREET
DENTON, TEXAS 76201
PROJECT TEAM
OWNER
UNIVERSITY OF NORTH TEXAS
CONTACT: CARL PARSONS, PE, LEED AP
1155 UNION CIRCLE
DENTON, TEXAS 76203
MEP ENGINEER
CAMPOS ENGINEERING
1331 RIVER BEND DRIVE
DALLAS, TEXAS 75247
P: 214.696.6291
COST ESTIMATOR
DRAWING INDEX
100% CONSTRUCTION DOCUMENTS UNIVERSITY OF NORTH TEXAS CLARK HALL
MEP0.00
MEP0.01
MEP0.02
MEP0.03
DP2.00
MEP2.00
MEP2.01
MEP2.10
MEP2.20
MEP COVER SHEET
PLUMBING SYMBOL LEGEND AND GENERAL NOTES
MECHANICAL SYMBOL LEGEND
MECHANICAL GENERAL NOTES
BASEMENT/UNDER FLOOR MEP PLAN
BASEMENT/UNDER FLOOR MEP PLAN
BASEMENT/UNDER FLOOR MECHANICAL PLAN
FIRST FLOOR MEP PLAN
SECOND FLOOR MEP PLAN
Sheet Name
SUNLAND GROUP
85 NE LOOP 410, SUITE 570
SAN ANTONIO, TEXAS 78216
P: 210.395.2687
Sheet Number
05/09/2023
MEP2.30
MEP2.40
MEP5.01
MEP5.02
MEP5.03
MEP7.01
MEP9.01
THIRD FLOOR MECHANICAL PLAN
ROOF MECHANICAL PLAN
MEP ENLARGED PLANS
MEP ENLARGED PLANS
MEP ENLARGED PLANS
MEP SCHEDULES
MEP CONTROLS
MEP9.02 MEP CONTROLS
P: 940.369.5788
CODES / STANDARDS
NFPA CODES / STANDARDS:
- 2018 Edition NFPA1 Fire Code
- 2018 Edition NFPA101 Life Safety Code
- 2013 Edition NFPA 13 Standard for the Installation of [Fire] Sprinkler Systems
- 2013 Edition NFPA 13R Standard for the Installation of [Fire] Sprinklers in Low-Rise Residential Buildings
- 2013 Edition NFPA 14 Standards for the Installation of Standpipe and Hose Systems
- 2013 Edition NFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection
- 2013 Edition NFPA 24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances
- 2020 Edition NFPA 70 National Electrical Code
- 2013 Edition NFPA 72 National Fire Alarm Signaling Code
INTERNATIONAL CODE CONFERENCE (ICC):
- 2018 Edition International Building Code (IBC)
- 2018 Edition International Mechanical Code (IMC)
- 2018 Edition International Plumbing Code (IPC)
- 2018 Edition International Fire Code (IFC)
- 2018 Edition International Fuel Gas Code (IFGC)
- 2018 Edition International Energy Conservation Code (IECC)
MEP9.03
MEP9.04
MEP CONTROLS
MEP CONTROLS
MEP9.05 MEP CONTROLS
MEP6.01
MEP6.02
MAIN BUILDING VENTILATION AIR RISER DIAGRAM
HYDRONIC RISER DIAGRAMS
MEP0.04 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
5/9/2023
VALVE SYMBOLS
GATE VALVE
PIPE & FITTING SYMBOLSGRAPHIC SYMBOLS
PIPING DESIGNATIONS
4" SAN
XXX-1
SYSTEM SERVICE ABBREVIATION
NOMINAL PIPE SIZE
MISCELLANEOUS SYMBOLS
EQUIPMENT DESIGNATION
(IN INCHES)
SINGLE LINE PIPE BREAK
KEYED NOTE
POINT OF DISCONNECTION
POINT OF CONNECTION (NEW TO EXISTING)
(D)
(R)
(E)
(N)
LIMIT OF EXISTING ITEMS TO BE REMOVED
NEW ITEM (NOTATION SHOWN AS NECESSARY
FOR CLARIFICATION)
EXISTING ITEM TO REMAIN (NOTATION SHOWN
AS NECESSARY FOR CLARIFICATION)
EXISTING ITEM TO BE RELOCATED (NOTATION
SHOWN AS NECESSARY FOR CLARIFICATION)
EXISTING ITEM TO BE DEMOLISHED (NOTATION
SHOWN AS NECESSARY FOR CLARIFICATION)
EXISTING ITEMS TO BE DEMOLISHED
EXISTING ITEMS TO REMAIN
NEW ITEMS (PIPING/EQUIPMENT)
STANDARD BREAK
SINGLE LINEDOUBLE LINE
PIPE
WELDED JOINT
SCREWED JOINT
GROOVED END JOINT
FLANGED JOINT
GROOVED END ADAPTER FLANGE
FLANGED COUPLING ADAPTER
UNION
TEE FITTING
REDUCER - ECCENTRIC
REDUCER - CONCENTRIC
CAP
ANCHOR
BLIND FLANGE
FLOW ORIFICE PLATE
ELBOW, 90 DEGREE -
CHANGE IN DIRECTION
TOWARD VIEWER
ELBOW, 90 DEGREE -
CHANGE IN DIRECTION
AWAY FROM VIEWER
LATERAL
NOTE:
WELDED FITTINGS ARE SHOWN FOR DOUBLE LINE PIPING.
FITTINGS WITH OTHER END CONDITIONS ARE SIMILAR.
PRESSURE GAUGE WITH
GAUGE COCK
ELBOW, 90 DEGREE
(LONG RADIUS UON)
ELBOW, 45 DEGREE
(LONG RADIUS UON)
VENTURI FLOW METER
(F) FUTURE ITEM (NOTATION SHOWN AS
NECESSARY FOR CLARIFICATION)
4"
SECTION NO.
DIRECTION OF CUTTING PLANE
SHEET NO. ON WHICH THE
SECTION IS DRAWN
A P5.01
DRAWING TITLE
DETAIL NO. AND SHEET NO.
SCALE OF FLOOR PLAN, SECTION
OR DETAIL
P3.01
AREA OF ENLARGED PLAN OR DETAIL
SHEET NO. ON WHICH
ENLARGED DETAIL IS
DRAWN
SCALE:
TOP TITLE
BOTTOM TITLE1
SHEET 1/8" = 1'-0"
SAN
DOUBLE LINE PIPE BREAK
NEW CONNECTION TO EXISTING ITEM
1 REVISION DELTA
STUB END OR FLANGE
ADAPTER W/ FLANGE RING
GENERIC FLEXIBLE COUPLING
(REFER TO SPECIFICATIONS)
4"SAN
- OR -
TEE FITTING,
BRANCH TOWARD VIEWER
TEE FITTING,
BRANCH AWAY FROM VIEWER
COCO
PIPING WITH INSULATION
(WHEN SHOWN FOR CLARITY)
THERMOWELL WITH
THERMOMETER
STRAINER - "Y" TYPE
WITH BLOW DOWN
WATER METERMM
PUMP, ARROW INDICATES FLOW
DESCRIPTION
DESCRIPTION
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
DIAPHRAGM VALVE
GLOBE VALVE
PLUG VALVE
PRESSURE REDUCING VALVE
BALANCING VALVE
DIRECTION OF FLOW / SLOPE
AUTOMATIC AIR VENT
MANUAL AIR VENT
SOLENOID VALVE
S S
MOTOR OPERATED VALVE
M M
SINGLE LINEDOUBLE LINE
PLUMBING GENERAL NOTES
1. THE PLUMBING CONTRACTOR SHALL VISIT AND CAREFULLY
EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE
AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, SO
AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND
DIFFICULTIES THAT WILL AFFECT PRICING AND EXECUTION OF
THE WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED
AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE AND
LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS
REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT
BE RECOGNIZED. UTILITIES AND SERVICES INDICATED ARE
TAKEN FROM VARIOUS SURVEYS, AS-BUILT DRAWINGS AND
FIELD INVESTIGATIONS. IT IS TO BE UNDERSTOOD THAT
UNFORSEEN CONDITIONS PROBABLY EXIST AND NEW WORK
MAY NOT BE FIELD LOCATED EXACTLY AS SHOWN ON THE
DRAWINGS. COOPERATION WITH OTHER TRADES AND EXISTING
CONDITIONS IN ROUTING, AS DIRECTED BY THE OWNER AND
ARCHITECT/ENGINEER, MAY BE NECESSARY AND IT IS INTEDED
THAT SUCH DEVIATIONS SHALL BE CONSIDERED AS PART OF
THIS CONTRACT. IT IS ALSO UNDERSTOOD THAT THE PLANS
ARE NOT COMPLETELY TO SCALE. THIS CONTRACTOR IS TO
FIELD VERIFY DIMENSIONS OF ALL SITE UTILITIES, ETC., PRIOR
TO BID, AND INCLUDE ANY DEVIATIONS IN THE PROPOSAL.
2. PROVIDE ISOLATION VALVES IN ALL BRANCH PIPING AND AT
EQUIPMENT CONNECTIONS. ( NOT A PLUMBING FIXTURE )
3. PROVIDE QUARTER TURN STOPS IN THE HOT AND COLD WATER
SUPPLIES TO EACH PLUMBING FIXTURE.
4. PROVIDE ISOLATION VALVES IN THE HOT AND COLD WATER
PIPING TO EACH GROUP OF PLUMBING FIXTURES. ( WATER
CLOSET, URINALS, LAVATORIES AND/OR SINKS)
5. PIPING CONNECTIONS TO ALL EQUIPMENT SHALL BE
FABRICATED WITH THE ISOLATION VALVES, FLANGES AND/OR
UNIONS POSITIONED TO ALLOW REMOVAL AND SERVICE OF THE
COMPONENT PARTS.
6. ROUTE PIPING IN AN ORDERLY MANNER AND MAINTAIN PROPER
GRADES. INSTALL TO CONSERVE HEADROOM AND TO CREATE
MINIMUM INTERFERENCE WITH USE OF SPACE. ROUTE ALL
PIPING PARALLEL TO BUILDING LINES UON. GROUP PIPING AT
COMMON BOP ELEVATIONS WHENEVER PRACTICAL. PIPES
LOCATED IN CONCEALED SPACES SHALL BE ROUTED CLOSE TO
BUILDING STRUCTURE UON.
7. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
8. INSTALL VALVES WITH STEMS UPRIGHT OR HORIZONTAL, NOT
INVERTED.
9. INSTALL VALVES AND EQUIPMENT IN ACCESSIBLE LOCATIONS.
INSTALL ACCESS DOORS IN PARTITIONS OR CEILINGS WHERE
VALVES AND EQUIPMENT WOULD OTHERWISE BE INACCESSIBLE.
10. WHEN SOCKET WELD OR SOLDER END VALVES ARE INSTALLED,
SPECIAL CARE SHALL BE TAKEN TO AVOID OVERHEATING AND
DAMAGING THE VALVE BODY, TRIM OR PACKING. DAMAGED
VALVES SHALL BE REPLACED AT CONTRACTOR'S EXPENSE.
11. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY
SPECIFICATIONS.
12. SLEEVE ALL PIPING THAT PENETRATES FIRE RATED WALLS,
FLOORS AND PARTITIONS. PENETRATIONS SHALL BE SEALED
WITH A U.L. LISTED ASSEMBLY TO PROVIDE A RATING EQUAL TO
OR GREATER THAN THAT OF THE PENETRATED WALL, FLOOR OR
PARTITION.
13. SLEEVE ALL PIPING THAT PENETRATES EXTERIOR BUILDING
WALLS AND GRADE BEAMS. SEAL PENETRATIONS WATERTIGHT.
14. COORDINATE WITH OTHER TRADES BEFORE FABRICATION OR
INSTALLATION OF ANY SYSTEMS.
15. EXISTING PIPING AND EQUIPMENT SHOWN ON THESE DRAWINGS
INDICATES THE GENERAL LOCATION AND ROUTING. THE
ACTUAL LOCATION SHALL BE DETERMINED BY THE
CONTRACTOR WHO SHALL COORDINATE ALL WORK WITH ALL
TRADES NECESSARY TO INSTALL NEW PIPING OR EQUIPMENT
AS SHOWN ON THE DRAWING.
16. THESE DRAWINGS DO NOT NECESSARILY SHOW ALL OFFSETS
OR ELEVATION DIFFERENCES WHICH MAY BE NECESSARY FOR
THE COMPLETE INSTALLATION. THESE SHALL BE PROVIDED AS
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONAL SYSTEM
AT NO ADDITIONAL COST TO THE CONTRACT.
17. COORDINATE ALL REMODEL WORK WITH NEW CONSTRUCTION
AND OTHER TRADES.
18. NOTIFY AND COORDINATE WITH THE OWNER AT LEAST SEVEN
DAYS PRIOR TO SHUTDOWN OF ANY BUILDING SERVICES OR
EQUIPMENT. SHUTDOWN TIME SHALL BE KEPT TO A MINIMUM.
19. ANY ITEMS DAMAGED DURING DEMOLITION SHALL BE REPLACED
WITH NEW MATERIALS TO MATCH EXISTING.
20. CONTRACTOR SHALL PROVIDE TEMPORARY ELECTRICAL
SERVICE, PIPING OR OTHER BUILDING SERVICES AS REQUIRED
TO KEEP OTHER AREAS IN OPERATION DURING REMODELING.
NOTIFY OWNER PRIOR TO SHUT-DOWN FOR ANY TEMPORARY
SERVICE REQUIREMENTS. ALL TEMPORARY WORK SHALL BE
COMPLETELY REMOVED ONLY AFTER NEW SERVICES ARE
COMPLETELY INSTALLED AND FUNCTIONAL.
21. ABANDONED PIPING SHALL BE REMOVED WHERE INDICATED ON
THE DRAWINGS. PIPING REMAINING IN PLACE SHALL BE
CAPPED, SEALED AIR TIGHT AT POINT(S) OF DEMOLITION, AND
INSULATED TO MATCH EXISTING.
22. NEW HOLES THROUGH EXISTING FLOORS SHALL BE CORE
DRILLED. ALL CORES SHALL BE X-RAYED PRIOR TO CORING.
23. THE OWNER SHALL HAVE THE OPTION TO DESIGNATE ANY
MATERIALS REMOVED OR DEMOLISHED DURING THIS WORK AS
"RECYCLABLE" AND SHALL HAVE FINAL DISPOSITION OVER THE
DISPOSAL OF THESE MATERIALS. ALL MATERIALS
REMOVED/DEMOLISHED BY THE CONTRACTOR FOR THIS JOB
AND NOT RETAINED BY THE OWNER FOR RECYCLING OR OTHER
PURPOSES SHALL BE DISPOSED OFF-SITE BY THE
CONTRACTOR.
24. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL OF ANY
EQUIPMENT DESIGNATED FOR REMOVAL. THE OWNER SHALL
PROVIDE A LIST OF ITEMS THEY REQUIRE TO BE SALVAGED
PRIOR TO THE START OF DEMOLITION. THE CONTRACTOR SHALL
REMOVE THESE ITEMS USING REASONABLE CARE TO MINIMIZE
DAMAGE.
25. ANY AND ALL WATER CONNECTIONS MADE FOR THE PURPOSE
OF CLEANING TOOLS OR THE WORK AREA OR FOR ANY OTHER
CONSTRUCTION-RELATED PURPOSES SHALL BE MADE ONLY TO
DOMESTIC WATER HOSE BIBBS OR TO CONTRACTOR-SUPPLIED
WATER SOURCES. APPROVED BACKFLOW PREVENTION
DEVICES SHALL BE USED AS REQUIRED BY THE AUTHORITY
HAVING JURISDICTION. CONNECTIONS SHALL NOT BE MADE TO
FIRE WATER, CHILLED WATER, CONDENSER WATER, HEATING
HOT WATER, DOMESTIC HOT WATER OR ANY OTHER TREATED
WATER SOURCE UNLESS REQUIRED AS PART OF WORK ON
THESE SYSTEMS.
26. EXCEPT WHERE REQUIRED AT EQUIPMENT NOZZLES, FLANGES
SHALL BE RAISED FACE WELD-NECK.
27. INSTALL DIELECTRIC FITTINGS AT ALL FERROUS PIPE
CONNECTIONS TO NON-FERROUS METALLIC PIPE OR
EQUIPMENT.
28. PROVIDE CHROME PLATED, OR ARCHITECT APPROVED COLOR,
ESCUTCHEON PLATES WHERE PIPES EXPOSED TO VIEW
PENETRATE FINISHED WALLS, FLOORS AND CEILINGS.
SPLIT-RING ESCUTCHEON PLATES SHALL NOT BE USED UON.
29. PROVIDE CAPPED DRAIN VALVES AT LOW POINTS OF PIPING
SYSTEMS AND AT EQUIPMENT CONNECTIONS. PROVIDE HOSE
BIBB CONNECTIONS WITH CAPS AT DRAIN VALVES WHICH DO
NOT DISCHARGE DIRECTLY OVER OR ARE NOT PIPED DIRECTLY
TO AN APPROPRIATE DRAIN.
30. PIPING OR EQUIPMENT CONNECTIONS OPENED BY DEMOLITION
OR RENOVATION SHALL BE TEMPORARILY SEALED TO KEEP OUT
FOREIGN MATTER UNTIL SUCH TIME AS RECONNECTIONS ARE
MADE.
31. ALL PIPING SHALL BE SLOPED PER THE PLUMBING CODE AND
THE AUTHORITY HAVING JURISDICTION.
32. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF EXISTING
SANITARY PIPING TO WHICH NEW SEWER DRAINS ARE TO BE
CONNECTED BEFORE INSTALLATION OF NEW SEWER LINE.
33. PROVIDE CLEANOUTS IN ACCORDANCE WITH THE PLUMBING
CODE, NO MORE THAN 100 FT. APART, AT CHANGES IN
DIRECTION GREATER THAN 45 DEGREES, AND AT THE BASE OF
STORM, SOIL AND WASTE STACKS.
34. REFER TO ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE
EXACT LOCATIONS, MOUNTING HEIGHTS AND DIMENSIONS.
35. ALL ADA COMPLIANT FIXTURES SHALL BE MOUNTED IN
ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT
(ADA).
36. INSTALL WATER HAMMER SHOCK ARRESTORS AT EACH
BATTERY OF FIXTURES AND AS INDICATED ON RISER
DIAGRAMS/ISOMETRICS. ARRESTORS SHALL BE
FACTORY-FABRICATED. INSTALL ARRESTORS AND SIZE PER
PLUMBING AND DRAINAGE INSTITUTE STANDARD P.D.I. WH-201.
PROVIDE ACCESS PANELS FOR SERVICE AND MAINTENANCE.
37. DRAIN, WASTE, AND VENT PIPING LOCATED IN FIRE RATED WALL
ASSEMBLIES AND RETURN AIR PLENUMS SHALL BE SERVICE
WEIGHT CAST IRON WITH NO HUB FITTINGS.
38. UPON COMPLETION OF THE DOMESTIC WATER PIPING
INSTALLATION, THE ENTIRE BUILDING'S HOT WATER
RECIRCULATION SYSTEM SHALL BE CALIBRATED AND BALANCED
TO PROVIDE SATISFACTORY OPERATION UNDER MINIMUM AND
MAXIMUM EXPECTED FLOW CONDITIONS.
ABBREVIATIONS
PHASEPH
FOOT, FEET
FOOT-POUND
FT
FT LB
PREHEAT COIL
PARTS PER MILLION
PHC
PRV
PPM
PRESSURE
PRESSURE SWITCH
PRESS
PS
PSF
PLUMBINGPLBG
POUNDS PER SQUARE FOOT
PRESSURE REDUCING VALVE
PSIG
PVC
QUART
RELIEF, THERMAL RESISTANCE
QT
R
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCHPSI
GALLON
GENERATOR
GAUGE, GAGE
GLOBE VALVE
GALVANIZED GALV
GAL
GEN
GLV
GA
GATE VALVE
GALLONS PER HOURGPH
GTV
GALLONS PER DAYGPD
REFRIGERATIONREFR
RETURN
REDUCER
REVOLUTIONS
RELATIVE HUMIDITY
REFERENCE
RET
REV
RED
RH
REF
REHEAT VALVERHV
RPM
RPS
RL
ROOF TOP UNIT
RELIEF VALVE
SANITARY
SUPPLY AIR
SECOND, SINK
RTU
RV
SAN
SA
S
REFRIGERANT LIQUID
REVOLUTIONS PER MINUTE
REVOLUTIONS PER SECOND
HEAT GAIN
HEIGHT
HORSEPOWER
HOUR
HG
HGT
HP
HR
HOT WATER (POTABLE)
HOT WATER RETURN (POTABLE)
HOT WATER PUMP
HOT WATER CIRCULATING PUMP
HOT WATER COIL
HOT WATER BOILER
HWR
HWP
HWCP
HWC
HWB
HW
HVAC HEATING, VENTILATION AND A/C
SPECIFIC GRAVITY, STEAM GAUGE
SHOWER
SG
SH
SHUT OFF VALVE
SUMP PUMP
SPECIFICATION
SOV
SP
SPEC
SQUARE
STAINLESS STEEL
SQ
SSP
SST
SPS STATIC PRESSURE SENSOR
STAINLESS STEEL PIPE
SOLV SOLENOID VALVE
INPUT/OUTPUT
HERTZ (FREQUENCY)
HOT WATER TANK
INVERT
INSIDE DIAMETER
INCHES WATER COLUMN
ID
I/O
HZ
HWT
INV
IN WC
INFRARED
KELVIN, THERMAL CONDUCTIVITY
IRON PIPE THREADED
IRON PIPE SIZE, INCHES PER SECOND
KILOWATT
POUNDS
THOUSAND FOOT-POUNDS
LAVATORY
KILOWATT HOUR
THOUSAND POUNDS
IR
K
KIP
KIP FT
LB
L
KWh
KW
IPT
IPS
IRON PIPEIP
SF SQUARE FEET
RETURN AIRRA
HEAD/HUB DRAINHD
A (0.5)
AAV
AC
AP
AD
AFF
AHU
AMB
AMP
APD
APPROX
ASC
AHJ
AS
ALT
AVG
B/B B&S
AWG
BAL
BFC
BFV
BBR
BLDG
BFW
BFBP
B
BLW
BHP
BO
BOD
BOS
BOP
BTU
BV
BTUH
°C C/C
BYP
CAP
CD
CF
CFS
CH
CHW
CFM
CELSIUS [DEGREES]
COMPRESSED AIR (WORKING PRESS.)
AIR ADMITTANCE VALVE
ACCESS PANEL
ACCESS DOOR, AREA DRAIN
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
AMBIENT
AIR PRESSURE DROP
AIR SEPARATOR
ABOVE SUSPENDED CEILING
AUTHORITY HAVING JURISDICTION
AVERAGE
BELL & SPIGOT
BACK TO BACK
BALANCE
ALTERNATING CURRENT
ALTITUDE
AMERICAN WIRE GAUGE
AMPERE
APPROXIMATE
BELOW FINISHED CEILING
BLOWOFF
CAPACITY
COOLING COIL
BYPASS
BALL VALVE
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF STEEL
BOTTOM OF PIPE
BOTTOM OF DUCT
BELOW
BOILER
BUILDING
BRAKE HORSEPOWER
BOILER FEED WATER
BOILER FEED BOOSTER PUMP
BUTTERFLY VALVE
CONDENSATE DRAIN
CHEMICAL FEED
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
CHILLER
CHILLED WATER
BASE BOARD RADIATOR
STANDARD
STRAINER
STEAM
STD
STR
SWP
STM
SUCTION
SUPPLY
SAFETY VALVE
SUCT
SUP
SV
T T&P
STEAM WORKING PRESSURE
TEMPERATURE SENSOR
TEMPERATURE AND PRESSURE
TEMPERATURE
TCV
TEMP
TD
TEMPERATURE CONTROL VALVE
TEMPERATURE DIFFERENCE
LINEAR FEET
LENGTH
LATENT HEAT GAIN
LATENT HEAT
LOW PRESSURE
LF
LG
LP
LHG
LH
LOW TEMPERATURE HOT WATER
MAXIMUM
LEAVING WATER TEMPERATURE
MAX
LWT
LTHW TRANSFER
UNIT HEATER
THERMOSTAT
TRANS
U or UR
UH
TSTAT
VARIABLE
VENT/VOLTS
VELOCITY
VAR
V
VEL
URINAL
WATT
VENT THROUGH ROOF
VFD
W
VTR
WATER HEATER, WALL HYDRANTWH
VARIABLE FREQUENCY DRIVE
VERTICALVERT
MINIMUM
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMPACITY
MEDIUM PRESSURE
MOTOR OPERATED VALVE
MCC
MCA
MOCP
MP
MOV
MIN
NOT APPLICABLE
NO HUB
MAKE-UP WATER
NORMALLY OPEN, NUMBER
NON-POTABLE WATER
NOT TO SCALE
NOT IN CONTRACT
NPW
NTS
NO
NA
NIC
NH
MU
MALE PIPE THREADMPT
MAXIMUM OVERCURRENT PROTECTION
TOP TOP OF PIPE
WELDED
WATER LINE
WATER METER
WATER PUMP, WEATHERPROOF
WL
WLD
WM
WPD
WPR
WP
YARD, YARD DRAIN
WEIGHT
YEAR
YD
WT
YR
WATER PRESSURE DROP
WORKING PRESSURE DROP
Z ZONE
OUTSIDE AIR
OUTSIDE DIAMETEROD
OA
PUMP
OUNCE
PERCENT
PUMPED CONDENSATE
POSITIVE
PRESSURE DROP
P
PC
PD
POS
OZ
PRESSURE GAUGEPG
CKT
CIP
CKV
CL
CONN
CPD
CT
CU
CRP
CUH
Cv
CU IN
CW
CWR
CU FT
DDC
DCW
DEG
DF
DIA
DOV
DPT
D
DWV
DPS
EFF
DIP
EOV
ENT
EL
ET
EW
EWC
EVAP
EXP
EXH
EXCH
FCO
FD
FLG
FPM
°F
FRP
FPS
CONNECTION
CONDENSATE PUMP DISCHARGE
CONDENSATE RETURN PUMP
COOLING TOWER
CONDENSING UNIT
CABINET UNIT HEATER
COLD WATER (POTABLE)
COLD WATER RETURN (POTABLE)
COEFFICIENT - VALVE FLOW
CUBIC FEET
CUBIC INCH
CIRCUIT
CAST IRON PIPE
CHECK VALVE
DOMESTIC COLD WATER
DIRECT DIGITAL CONTROL
DEGREES [CELSIUS OR FAHRENHEIT]
DUCTILE IRON PIPE
DRAIN OFF VALVE
DIFFERENTIAL PRESSURE SENSOR
DIFFERENTIAL PRESSURE TRANSMITTER
DRAIN
DRAIN, WASTE & VENT
DRINKING FOUNTAIN
DIAMETER
ELECTRONICALLY OPERATED VALVE
EXPANSION TANK
ELECTRIC WATER COOLER
EMERGENCY EYE WASH
EXPANSION
EFFICIENCY
ENTERING
ELEVATION
EVAPORATOR
EXCHANGER
EXHAUST
FLOOR CLEANOUT
FLOOR DRAIN
FLANGE
FEET PER MINUTE
FEET PER SECOND
FIBERGLASS REINFORCED PLASTIC
FAHRENHEIT [DEGREES]
UON UNLESS OTHERWISE NOTED
NOMINAL PIPE SIZENPS
LEAVING TEMPERATURELT
FULL LOAD AMPSFLA
GALLONS PER MINUTEGPM
INDIRECT WASTEIW
INVERT ELEVATIONIE
ABOVEABV
DIRECT CURRENTDC
VAC VOLTS ALTERNATING CURRENT
VOLTS DIRECT CURRENTVDC
MILLIAMPERESmA
ELECTRIC PNEUMATICE/P
P/E PNEUMATIC ELECTRIC
SCH SCHEDULE
WELD NECK FLANGEWNF
QTY QUANTITY
RECT RECTANGULAR
EXHAUST AIREA
AI ANALOG INPUT
AO ANALOG OUTPUT
BFG BELOW FINISHED GRADE
DS DISCONNECT SWITCH
EF EXHAUST FAN
OVERFLOW STORM DRAINOSD
FMS FACILITY MANAGEMENT SYSTEM
U/G UNDERGROUND
CRAC COMPUTER ROOM A/C UNIT
A/C AIR CONDITIONING
CENTER LINE ( )
DETAIL NUMBER
PLUMBING SYMBOL LEGEND
GW
SAN
CW
HW
HWR
ANGLE VALVE
GAS COCK
TEMPERATURE AND
PRESSURE RELIEF VALVE
SHUT-OFF VALVE IN VALVE BOX
BACKWATER VALVE
GAS PRESSURE REGULATOR
EQUIPMENT SYMBOLS
FLOOR/HUB DRAIN
FLOOR SINK
TRAP PRIMER
P-TRAP
FLOOR CLEANOUT
CLEANOUT TO GRADE
AQUASTAT
WATER HAMMER
ARRESTOR
NOTE:
WELDED FITTINGS ARE SHOWN FOR DOUBLE LINE PIPING.
FITTINGS WITH OTHER END CONDITIONS ARE SIMILAR.
PIPE & FITTING SYMBOLS
SINGLE LINEDOUBLE LINE DESCRIPTION
A(0.5)
GREASE WASTEGW
STORM DRAINSD
GAS (WORKING PRESSURE)G (0.5)
V
SD
OSD
NOTE:
WELDED FITTINGS ARE SHOWN FOR DOUBLE LINE PIPING.
FITTINGS WITH OTHER END CONDITIONS ARE SIMILAR.
G(0.5)
ROOF DRAIN / OVER-
FLOW ROOF DRAIN
BACKFLOW PREVENTER
HOSE BIBB / FROST-
PROOF HOSE BIBB
CLEANOUT PLUG /
WALL CLEANOUT
THIS IS A STANDARD LEGEND SHEET. SOME INFORMATION ON
THIS SHEET MAY NOT NECESSARILY APPLY TO THIS PROJECT.
SSD SUB-SOIL DRAIN
SSD
DFU DRAINGE FIXTURE UNIT
ES EMERGENCY SHOWER
FCU FAN COIL UNIT
FLOOR SINKFS
FLUSHOMETER VALVEFV
GREASE INTERCEPTORGI
HOSE BIBBHB
MANHOLEMH
MOP SINKMS
NORMALLY CLOSEDNC
NON-FREEZE HOSE BIBBNFHB
OUTSIDE SCREW AND YOKEOS&Y
REQUIREDREQ
RPZ REDUCED PRESSURE PRINCIPLE
BACKFLOW PREVENTER
RD ROOF DRAIN
WALL CLEANOUTWCO
WATER CLOSETWC
YARD HYDRANTYH
UNDERWRITERS LABATORYUL
TYPICALTYP
CWP COLD WORKING PRESSURE
NON-RISING STEMNRS
CPVC CHLORONATED POLYVINYL CHLORIDE
PW POTABLE WATER
NATIONAL FIRE PROTECTION NFPA
ASSOCIATION
GAS WATER HEATERGWH
PR
O
JE
C
T
TI
TL
E:
C
LA
R K
H A
LL
D
O R
M
IT
O R
Y
PROJECT NUMBER:
R
EV
IS
IO
N S
C H
ED
U
LE
N o.
D at e
D es cr ip tio n
Is su ed b y
D R
A W
IN
G
T
IT
LE
ISSUE DATE: 05/09/2023
100% CONSTRUCTION DOCUMENTS
DRAWN BY / CHECKED BY / APPROVED BY:
M A
PL
E
ST
R
EE
T, D
EN
TO
N
, T X
U N
IV
ER
SI
TY
O F
N O
R
TH
T
EX
AS
PR
O
JE
C
T
AD
D R
ES
S:
C
LI
EN
T
N
AM
E:
CAMPOS:
PLOT STAMP:
3" =1
1/ 2"
'-0
1"
'-0
3/ 4"
'-0
1/ 2"
'-0
1/ 4"
'-0
1/ 8"
'-0
1/
'-0
03/ 8"
'-0
A
B
C
D
E
F
2 3 4 5 6 7 8
A
B
C
D
E
F
1 2 3 4 5 6 7 8
PR
O
JE
C
T D
IR
EC
TO
R
Y:
C
AM
PO
S
EN
G
IN
EE
R
IN
G
R
IV
ER
B
EN
D D
R
IV
E D
AL
LA
S, T
X
4-
6-
JE
FF
R
EY
S
TR
O H
, P .E
M
EC
H A
N
IC
A L, E
LE
C
TR
IC
A
L
P
LU
M B
IN
G
R
EN
O
VA
TI
O
N
D22-2995.00
1331 River Bend Drive Dallas, Texas 75247
(214) 696-6291 campos@camposengineering.com Registration No. F-001731 Project Number: D22-2995.00
CAMPOS
E N G I N E E R I N G
MEP0.01
PL
U
M B
IN
G
S
YM
B O
L
LE
G
EN
D A
N D
G
EN
ER
A
L N
O
TE
S
MC JS JS
SCOPE HAS BEEN DIVIDED INTO BASE BID AND ADD ALTERNATES. THE BASE BID AND ALTERNATE REPRESENTS COMPLETE WORKING SYSTEMS INCLUDING DEMOLITION, INSTALLATION, TEST AND BALANCING, COMMISSIONING AND CONTROLS FOR ALL
TRADES.
ROUGH DESCRIPTION OF ADD ALTERNATES:
ADD ALT 1 - HYDRONIC HEATING BOILER REPLACEMENT
ADD ALT 2 - HEATING WATER PUMP REPLACEMENT
ADD ALT 3 - SANITARY SEWER REPLACEMENT
ADD ALT 4 - DOMESTIC WATER HEATER REPLACEMENT
ADD ALT 5 - CHILLED WATER CONDENSER PUMP REPLACEMENT
ADD ALT 6 - EXHAUST FAN REPLACEMENT AND REBALANCE
DUCTWORK SYMBOLSVALVE SYMBOLS
GATE VALVE
PIPE & FITTING SYMBOLS
MANUAL VOLUME DAMPER
GRAPHIC SYMBOLS
CONTROL SYMBOLS
VERTICAL RUN ON PLAN
READ LEFT TO RIGHT
4" CWS
H W
R C
W R
H W
S 2" HWS
2" HWR
4" CWR
READ TOP TO BOTTOM
4" CHWS
3" PCD(F) *
2" HPS
2" LPS
4" CHWR
C W
S
3" PCD(F) *
2" HPS
2" LPS
4" CHWR
4" CHWS
LP
S
C H
W R
C H
W S
PC
D
(F
CHWS
CHWR
LPS
PCD(F) *HWS
HWR
CWR
H
PS
HPSCWS
PIPING DESIGNATION
2" CHWS
XXX-1
SYSTEM SERVICE ABBREVIATION
NOMINAL PIPE SIZE
MISCELLANEOUS SYMBOLS
EQUIPMENT DESIGNATION
(IN INCHES)
SINGLE LINE PIPE/DUCTWORK BREAK
KEYED NOTE
POINT OF DISCONNECTION
POINT OF CONNECTION (NEW TO EXISTING)
HORIZONTAL RUN ON PLAN
MULTI-LINE KEY
4" CWR
4" CWS
2" HWS
2" HWR
(D)
(R)
(E)
(N)
LIMIT OF EXISTING ITEMS TO BE REMOVED
NEW ITEM (NOTATION SHOWN AS NECESSARY
FOR CLARIFICATION)
EXISTING ITEM TO REMAIN (NOTATION SHOWN
AS NECESSARY FOR CLARIFICATION)
EXISTING ITEM TO BE RELOCATED (NOTATION
SHOWN AS NECESSARY FOR CLARIFICATION)
EXISTING ITEM TO BE DEMOLISHED (NOTATION
SHOWN AS NECESSARY FOR CLARIFICATION)
EXISTING ITEMS TO BE DEMOLISHED
EXISTING ITEMS TO REMAIN
NEW ITEMS (PIPING/DUCTWORK/EQUIPMENT)
RECTANGULAR DUCT/STANDARD BREAK
* - (F) INDICATES FUTURE PIPING ON RACK
BOP 12'-6" AFF
LOWER PIPE
RACK
BOP 13'-6" AFF
UPPER PIPE
RACK
BOP 12'-6" AFF
LOWER PIPE
RACK
BOP 13'-6" AFF
UPPER PIPE
RACK
SINGLE LINEDOUBLE LINE
PIPE
WELDED JOINT
SCREWED JOINT
GROOVED END JOINT
FLANGED JOINT
GROOVED END ADAPTER FLANGE
FLANGED COUPLING ADAPTER
UNION
TEE FITTING
REDUCER - ECCENTRIC
REDUCER - CONCENTRIC
CAP
ANCHOR
BLIND FLANGE
FLOW ORIFICE PLATE
ELBOW, 90 DEGREE -
CHANGE IN DIRECTION
TOWARD VIEWER
ELBOW, 90 DEGREE -
CHANGE IN DIRECTION
AWAY FROM VIEWER
LATERAL
NOTE:
WELDED FITTINGS ARE SHOWN FOR DOUBLE LINE PIPING.
FITTINGS WITH OTHER END CONDITIONS ARE SIMILAR.
PRESSURE GAUGE WITH
GAUGE COCK
STEAM TRAP, TYPE AS NOTED
IB = INVERTED BUCKET
F&T = FLOAT & THERMOSTATIC
TH = THERMODYNAMIC
BP = BALANCED PRESSURE
AIR SEPARATOR
ELBOW, 90 DEGREE
(LONG RADIUS UON)
ELBOW, 45 DEGREE
(LONG RADIUS UON)
VENTURI FLOW METER
CONTROL VALVES
CLEANOUT
(F) FUTURE ITEM (NOTATION SHOWN AS
NECESSARY FOR CLARIFICATION)
2"
SECTION NO.
DIRECTION OF CUTTING PLANE
SHEET NO. ON WHICH THE
SECTION IS DRAWN
A M5.01
DRAWING TITLE
DETAIL NO. AND SHEET NO.
SCALE OF FLOOR PLAN, SECTION
OR DETAIL
M3.01
AREA OF ENLARGED PLAN OR DETAIL
SHEET NO. ON WHICH
ENLARGED DETAIL IS
DRAWN
SCALE:
TOP TITLE
BOTTOM TITLE1
SHEET 1/8" = 1'-0"
CHWS
DOUBLE LINE PIPE/ROUND DUCTWORK BREAK
COOLING ONLY VAV TERMINAL UNIT
EXISTING EQUIPMENT (COOLING ONLY VAV SHOWN)
NEW CONNECTION TO EXISTING ITEM
1 REVISION DELTA
STUB END OR FLANGE
ADAPTER W/ FLANGE RING
GENERIC FLEXIBLE COUPLING
(REFER TO SPECIFICATIONS)
2"CHWS
- OR -
TEE FITTING,
BRANCH TOWARD VIEWER
TEE FITTING,
BRANCH AWAY FROM VIEWER
COCO
PIPING WITH INSULATION
(WHEN SHOWN FOR CLARITY)
THERMOWELL WITH
THERMOMETER
STRAINER - "Y" TYPE
WITH BLOW DOWN
S
WATER METERMM
F&T
PUMP, ARROW INDICATES FLOW
F&T
SINGLE LINEDOUBLE LINEDESCRIPTION DESCRIPTION
CHECK VALVE
BUTTERFLY VALVE
BALL VALVE
DIAPHRAGM VALVE
GLOBE VALVE
PLUG VALVE
PRESSURE REDUCING VALVE
BALANCING VALVE
DIRECTION OF FLOW / SLOPE
PRESSURE RELIEF VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
SINGLE LINEDOUBLE LINE DESCRIPTION
TWO-WAY, TWO POSITION
CONTROL VALVE W/ SOLENOID
S S
TWO-WAY, MODULATING
CONTROL VALVE
M M
TWO-WAY, TWO POSITION
CONTROL VALVE
THREE-WAY, TWO POSITION
CONTROL VALVE
THREE-WAY, MODULATING
CONTROL VALVE
M M
WALL MOUNTED DEVICES
H HUMIDITY SENSOR/HUMIDISTAT
TEMPERATURE SENSOR/THERMOSTATT
CARBON DIOXIDE SENSORCO2
MOTION SENSOR
OVERRIDE SWITCH
M
R
CARBON MONOXIDE SENSORCO
VARIABLE FREQUENCY DRIVEVFD
EQUIPMENT SYMBOLS
ROOFTOP EXHAUST FAN (ROOF PLAN VIEW)
ROOFTOP EXHAUST FAN (FLOOR PLAN VIEW)
WALL LOUVER WITH POSITIVE OR NEGATIVE AIRFLOW
DOOR UNDERCUT (SPECIFY CFM IF REQUIRED)UC
DOOR LOUVER (SPECIFY CFM IF REQUIRED)
LD
AxB
RECTANGULAR OR SQUARE DUCT,
DIMENSIONS ARE IN INCHES, MIN.
INSIDE CLEAR, A = WIDTH, B= HEIGHT
AxB
A"Ø
ROUND DUCT DIMENSIONS ARE IN
INCHES, MIN. INSIDE CLEAR,
A = DIAMETER
A"Ø
AxBØ
FLAT OVAL DUCT DIMENSIONS ARE
IN INCHES, MIN. INSIDE CLEAR,
A = WIDTH, B= HEIGHT
AxBØ
DUCTWORK RISE (R) OR DROP (D)
RELATIVE TO DIRECTION OF
AIRFLOW
DIRECTION OF AIR FLOW
SUPPLY AIR OR POSITIVE PRESSURE
DUCTWORK, SECTION
TOWARDS/AWAY VIEWER
RETURN AIR OR NEGATIVE
PRESSURE DUCTWORK, AIRFLOW
TOWARDS VIEWER
EXHAUST AIR DUCTWORK,
AIRFLOW TOWARDS VIEWER
R D R D
RIGID ROUND DUCTWORK,
AIRFLOW TOWARDS VIEWER
FIRE DAMPER
FD
FIRE/SMOKE DAMPER
FSD
SMOKE DAMPER
SD
BACKDRAFT DAMPER
FD
SD
BDD BDD
SMOKE DETECTOR
FSD
STATIC PRESSURE SENSOR
SPSP
S S
MOTORIZED DAMPER
M M
TEMPERATURE SENSOR
DESCRIPTIONSINGLE LINEDOUBLE LINE
T T
HUMIDITY SENSOR
H H
CARBON DIOXIDE SENSOR
CO2 CO2
BAROMETRIC DAMPER
B B
DIFFERENTIAL PRESSURE SENSOR
DP DP
DIFFERENTIAL PRESSURE
SAFETY SHUT-DOWN RELAY
DPS DPS
AIRFLOW PROOF SWITCH
AFAF
ACCESS PANEL/CLEANOUT
SUPPLY AIR OR POSITIVE PRESSURE
DUCTWORK, AIRFLOW AWAY FROM
VIEWER
RETURN AIR OR NEGATIVE
PRESSURE DUCTWORK, AIRFLOW
AWAY FROM VIEWER
EXHAUST AIR DUCTWORK,
AIRFLOW AWAY FROM VIEWER
RIGID ROUND DUCTWORK,
AIRFLOW AWAY FROM VIEWER
TRANSITION - ECCENTRIC REDUCER
TRANSITION - CONCENTRIC REDUCER
TRANSITION - SQUARE TO ROUND
90° ELBOW WITHOUT TURNING VANES
(RETURN OR EXHAUST DUCTWORK
ONLY)
90° ELBOW WITH TURNING VANES
(REQUIRED ON SUPPLY DUCTWORK)
45° ELBOW WITHOUT TURNING VANES
(RETURN OR EXHAUST DUCTWORK
ONLY)
45° ELBOW WITH TURNING VANES
(REQUIRED ON SUPPLY DUCTWORK)
RADIUS 90° ELBOW (R = 1.5W)
RW
RADIUS 45° ELBOW (R = 1.5W)
RW
SPIN-IN FITTING WITH FLEXIBLE
DUCTWORK, DIMENSIONS ARE IN
INCHES, MIN. INSIDE CLEAR,
A = DIAMETER
AIR DISTRIBUTION
CRD
CEILING RADIATION DAMPER
LINEAR SLOT DIFFUSER
ROUND SUPPLY AIR DIFFUSER
SIDEWALL REGISTER
AIR DISTRIBUTION CALLOUT
RETURN AIR OR TRANSFER AIR GRILLE
A"ØA"Ø
INLINE EXHAUST FAN (EF), AIR HANDLING UNIT (AHU),
CONDENSING UNIT (CU)
VAV TERMINAL WITH ELECTRIC OR HYDRONIC HEAT
SERIES FAN POWERED VAV TERMINAL UNIT
PARALLEL FAN POWERED VAV TERMINAL UNIT
BRANCH TAKE-OFF WITH MVD
CONICAL TAKE-OFF WITH MVD
DUCTWORK SYMBOLS
SINGLE LINEDOUBLE LINE DESCRIPTION
SUPPLY AIR DIFFUSER
EXHAUST AIR GRILLE
REFER TO SCHEDULE FOR ADDITIONAL INFORMATION
DUCT MOUNTED GRILLE
DETAIL NUMBER
MECHANICAL SYMBOL LEGEND
THIS IS A STANDARD LEGEND SHEET. SOME INFORMATION ON
THIS SHEET MAY NOT NECESSARILY APPLY TO THIS PROJECT.
8"Ø
TYP OF 2
S1
PR
O
JE
C
T
TI
TL
E:
C
LA
R K
H A
LL
D
O R
M
IT
O R
Y
PROJECT NUMBER:
R
EV
IS
IO
N S
C H
ED
U
LE
N o.
D at e
D es cr ip tio n
Is su ed b y
D R
A W
IN
G
T
IT
LE
ISSUE DATE: 05/09/2023
100% CONSTRUCTION DOCUMENTS
DRAWN BY / CHECKED BY / APPROVED BY:
M A
PL
E
ST
R
EE
T, D
EN
TO
N
, T X
U N
IV
ER
SI
TY
O F
N O
R
TH
T
EX
AS
PR
O
JE
C
T
AD
D R
ES
S:
C
LI
EN
T
N
AM
E:
CAMPOS:
PLOT STAMP:
3" =1
1/ 2"
'-0
1"
'-0
3/ 4"
'-0
1/ 2"
'-0
1/ 4"
'-0
1/ 8"
'-0
1/
'-0
03/ 8"
'-0
A
B
C
D
E
F
2 3 4 5 6 7 8
A
B
C
D
E
F
1 2 3 4 5 6 7 8
PR
O
JE
C
T D
IR
EC
TO
R
Y:
C
AM
PO
S
EN
G
IN
EE
R
IN
G
R
IV
ER
B
EN
D D
R
IV
E D
AL
LA
S, T
X
4-
6-
JE
FF
R
EY
S
TR
O H
, P .E
M
EC
H A
N
IC
A L, E
LE
C
TR
IC
A
L
P
LU
M B
IN
G
R
EN
O
VA
TI
O
N
D22-2995.00
1331 River Bend Drive Dallas, Texas 75247
(214) 696-6291 campos@camposengineering.com Registration No. F-001731 Project Number: D22-2995.00
CAMPOS
E N G I N E E R I N G
MEP0.02
M
EC
H A
N
IC
A L
SY
M
B O
L
LE
G
EN
D
MC JS JS
SCOPE HAS BEEN DIVIDED INTO BASE BID AND ADD ALTERNATES. THE BASE BID AND ALTERNATE REPRESENTS COMPLETE WORKING SYSTEMS INCLUDING DEMOLITION, INSTALLATION, TEST AND BALANCING, COMMISSIONING AND CONTROLS FOR ALL
TRADES.
ROUGH DESCRIPTION OF ADD ALTERNATES:
ADD ALT 1 - HYDRONIC HEATING BOILER REPLACEMENT
ADD ALT 2 - HEATING WATER PUMP REPLACEMENT
ADD ALT 3 - SANITARY SEWER REPLACEMENT
ADD ALT 4 - DOMESTIC WATER HEATER REPLACEMENT
ADD ALT 5 - CHILLED WATER CONDENSER PUMP REPLACEMENT
MECHANICAL GENERAL NOTES
1. ISOLATION VALVES SHALL BE PROVIDED IN ALL BRANCH PIPING
AND AT EQUIPMENT CONNECTIONS.
2. PIPING CONNECTIONS TO ALL EQUIPMENT SHALL BE
FABRICATED WITH THE ISOLATION VALVES, FLANGES AND/OR
UNIONS POSITIONED TO ALLOW REMOVAL AND SERVICE OF THE
COMPONENT PARTS.
3. INSTALL MANUAL AIR VENTS AT THE HIGH POINTS OF THE PIPING
SYSTEMS.
4. ROUTE PIPING IN AN ORDERLY MANNER AND MAINTAIN PROPER
GRADES. INSTALL TO CONSERVE HEADROOM AND TO CREATE
MINIMUM INTERFERENCE WITH USE OF SPACE. ROUTE ALL
PIPING PARALLEL TO BUILDING LINES UON. GROUP PIPING AT
COMMON BOP ELEVATIONS WHENEVER PRACTICAL. PIPES
LOCATED IN CONCEALED SPACES SHALL BE ROUTED CLOSE TO
BUILDING STRUCTURE UON.
5. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION
WITHOUT STRESSING PIPE OR EQUIPMENT CONNECTED.
6. INSTALL VALVES WITH STEMS UPRIGHT OR HORIZONTAL, NOT
INVERTED.
7. INSTALL VALVES AND EQUIPMENT IN ACCESSIBLE LOCATIONS.
INSTALL ACCESS DOORS IN PARTITIONS OR CEILINGS WHERE
VALVES AND EQUIPMENT WOULD OTHERWISE BE INACCESSIBLE.
8. WHEN SOCKET WELD OR SOLDER END VALVES ARE INSTALLED,
SPECIAL CARE SHALL BE TAKEN TO AVOID OVERHEATING AND
DAMAGING THE VALVE BODY, TRIM OR PACKING. DAMAGED
VALVES SHALL BE REPLACED AT CONTRACTOR'S EXPENSE.
9. IDENTIFY EACH PIPE WITH LABELING AS REQUIRED BY
SPECIFICATIONS.
10. SLEEVE ALL PIPING THAT PENETRATES FIRE RATED WALLS,
FLOORS AND PARTITIONS. PENETRATIONS SHALL BE SEALED
WITH A U.L. LISTED ASSEMBLY TO PROVIDE A RATING EQUAL TO
OR GREATER THAN THAT OF THE PENETRATED WALL, FLOOR OR
PARTITION.
11. SLEEVE ALL PIPING THAT PENETRATES EXTERIOR BUILDING
WALLS AND GRADE BEAMS. SEAL PENETRATIONS WATERTIGHT.
12. COORDINATE WITH OTHER TRADES BEFORE FABRICATION OR
INSTALLATION OF ANY SYSTEMS.
13. EXISTING DUCTWORK, PIPING AND EQUIPMENT SHOWN ON
THESE DRAWINGS INDICATES THE GENERAL LOCATION AND
ROUTING. THE ACTUAL LOCATION SHALL BE DETERMINED BY
THE CONTRACTOR WHO SHALL COORDINATE ALL WORK WITH
ALL TRADES NECESSARY TO INSTALL NEW DUCTWORK, PIPING
OR EQUIPMENT AS SHOWN ON THE DRAWING.
14. THESE DRAWINGS DO NOT NECESSARILY SHOW ALL OFFSETS
OR ELEVATION DIFFERENCES WHICH MAY BE NECESSARY FOR
THE COMPLETE INSTALLATION. THESE SHALL BE PROVIDED AS
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONAL SYSTEM
AT NO ADDITIONAL COST TO THE CONTRACT.
15. ALL NEW DUCTWORK SHALL BE EXTERNALLY INSULATED PER
THE SPECIFICATIONS.
16. ALL NEW HYDRONIC PIPING SHALL BE INSULATED PER THE
SPECIFICATIONS.
17. WHERE REMOVAL OF EXISTING DUCTWORK OR PORTIONS OF
ANY AIR SYSTEM IS NECESSARY, THE DUCT SHALL BE PATCHED
AND SEALED AIRTIGHT USING PATCH OF SAME MATERIAL AND
EQUAL OR GREATER THICKNESS AS EXISTING. PATCHES SHALL
BE ATTACHED WITH SHEET METAL SCREWS OR OTHER MEANS
OF POSITIVE ATTACHMENT (WELDING, BONDING, ETC.) AS
SPECIFIED FOR THE PARTICULAR DUCT SYSTEM. NEW
INSULATION SHALL BE EQUAL TO OR BETTER THAN EXISTING
AND SHALL BE PATCHED AND SEALED TO MATCH EXISTING
INSULATION AND MAINTAIN VAPOR BARRIER.
18. THE CONTRACTOR SHALL ADJUST AND BALANCE ALL
MECHANICAL SYSTEMS TO DESIGN SETTINGS AS SHOWN AND
SHALL REBALANCE TO RESTORE SETTINGS OF SYSTEMS
TEMPORARILY ALTERED FOR THE PURPOSES OF COMPLETING
THE WORK OF THIS PROJECT.
19. NOTIFY AND COORDINATE WITH THE OWNER AT LEAST SEVEN
DAYS PRIOR TO SHUTDOWN OF ANY BUILDING SERVICES OR
EQUIPMENT. SHUTDOWN TIME SHALL BE KEPT TO A MINIMUM.
20. ANY ITEMS DAMAGED DURING DEMOLITION SHALL BE REPLACED
WITH NEW MATERIALS TO MATCH EXISTING.
21. CONTRACTOR SHALL PROVIDE TEMPORARY DUCTWORK,
ELECTRICAL SERVICE, PIPING OR OTHER BUILDING SERVICES
AS REQUIRED TO KEEP OTHER AREAS IN OPERATION DURING
REMODELING. NOTIFY OWNER PRIOR TO SHUT-DOWN FOR ANY
TEMPORARY SERVICE REQUIREMENTS. ALL TEMPORARY WORK
SHALL BE COMPLETELY REMOVED ONLY AFTER NEW SERVICES
ARE COMPLETELY INSTALLED AND FUNCTIONAL.
22. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
LOCATIONS OF CEILING-MOUNTED HVAC DEVICES AND
EQUIPMENT.
23. DUCT ROUTING CHANGES MADE BY THE CONTRACTOR FOR THE
PURPOSE OF ACCOMMODATING FIELD CONDITIONS SHALL
INCLUDE FIRE DAMPERS AND COMBINATION FIRE/SMOKE
DAMPERS IN RATED PARTITIONS AS SHOWN IN ORIGINAL
ROUTING ARRANGEMENTS.
24. FURNISH AND INSTALL ACCESS DOORS (AD) IN THE DUCTWORK
IMMEDIATELY ADJACENT TO EACH FIRE DAMPER AND EACH
FIRE/SMOKE DAMPER. PARTITIONS SHALL BE PROVIDED WITH
ACCESS DOORS TO PROVIDE SERVICE AND ACCESS TO DAMPER
ACCESS DOORS.
25. PROVIDE FIRE AND COMBINATION FIRE/SMOKE DAMPERS
WHERE REQUIRED BY CODE. FIRE, SMOKE, AND COMBINATION
FIRE/SMOKE DAMPERS SHALL BE UL LISTED, SHALL BEAR THE
UL LABEL AND SHALL COMPLY WITH NFPA BULLETIN NO. 90A.
FULLY-OPEN DAMPERS SHALL NOT HAVE ANY PROJECTIONS
INTO THE AIRSTREAM.
26. ABANDONED DUCT SHALL BE REMOVED WHERE INDICATED ON
THE DRAWINGS. DUCT REMAINING IN PLACE SHALL BE CAPPED,
SEALED AIR TIGHT AT POINT(S) OF DEMOLITION, AND INSULATED
TO MATCH EXISTING..
27. NEW HOLES THROUGH EXISTING FLOORS SHALL BE CORE
DRILLED. ALL CORES SHALL BE X-RAYED PRIOR TO CORING.
28. ALL DUCT SIZES SHOWN HEREIN REPRESENT INSIDE CLEAR
DIMENSIONS. EXTERNAL SHEET METAL DIMENSIONS OF
DUCTWORK THAT IS SPECIFIED TO BE INTERNALLY LINED SHALL
BE ADJUSTED BY THE CONTRACTOR TO ALLOW FOR THICKNESS
OF LINING.
29. THE OWNER SHALL HAVE THE OPTION TO DESIGNATE ANY
MATERIALS REMOVED OR DEMOLISHED DURING THIS WORK AS
"RECYCLABLE" AND SHALL HAVE FINAL DISPOSITION OVER THE
DISPOSAL OF THESE MATERIALS. ALL MATERIALS
REMOVED/DEMOLISHED BY THE CONTRACTOR FOR THIS JOB
AND NOT RETAINED BY THE OWNER FOR RECYCLING OR OTHER
PURPOSES SHALL BE DISPOSED OFF-SITE BY THE
CONTRACTOR.
30. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL OF ANY
EQUIPMENT DESIGNATED FOR REMOVAL. THE OWNER SHALL
PROVIDE A LIST OF ITEMS THEY REQUIRE TO BE SALVAGED
PRIOR TO THE START OF DEMOLITION. THE CONTRACTOR SHALL
REMOVE THESE ITEMS USING REASONABLE CARE TO MINIMIZE
DAMAGE.
31. ANY AND ALL WATER CONNECTIONS MADE FOR THE PURPOSE
OF CLEANING TOOLS OR THE WORK AREA OR FOR ANY OTHER
CONSTRUCTION-RELATED PURPOSES SHALL BE MADE ONLY TO
DOMESTIC WATER HOSE BIBBS OR TO CONTRACTOR-SUPPLIED
WATER SOURCES. APPROVED BACKFLOW PREVENTION
DEVICES SHALL BE USED AS REQUIRED BY THE AUTHORITY
HAVING JURISDICTION. CONNECTIONS SHALL NOT BE MADE TO
FIRE WATER, CHILLED WATER, CONDENSER WATER, HEATING
HOT WATER, DOMESTIC HOT WATER OR ANY OTHER TREATED
WATER SOURCE UNLESS REQUIRED AS PART OF WORK ON
THESE SYSTEMS.
32. EXCEPT WHERE REQUIRED AT EQUIPMENT NOZZLES, FLANGES
SHALL BE RAISED FACE WELD-NECK.
33. INSTALL DIELECTRIC FITTINGS AT ALL FERROUS PIPE
CONNECTIONS TO NON-FERROUS METALLIC PIPE OR
EQUIPMENT.
34. BULLHEAD TEES SHALL NOT BE USED TO JOIN CONVERGING
(RETURN) FLOWS, REGARDLESS OF ARRANGEMENT SHOWN ON
PLANS.
35. PROVIDE ESCUTCHEON PLATES WHERE PIPES EXPOSED TO
VIEW PENETRATE FINISHED WALLS, FLOORS AND CEILINGS.
SPLIT-RING ESCUTCHEON PLATES SHALL NOT BE USED UON.
36. PROVIDE CAPPED DRAIN VALVES AT LOW POINTS OF PIPING
SYSTEMS AND AT EQUIPMENT CONNECTIONS. PROVIDE HOSE
BIBB CONNECTIONS WITH CAPS AT DRAIN VALVES WHICH DO
NOT DISCHARGE DIRECTLY OVER OR ARE NOT PIPED DIRECTLY
TO AN APPROPRIATE DRAIN.
37. PIPING, DUCTWORK OR EQUIPMENT CONNECTIONS OPENED BY
DEMOLITION OR RENOVATION SHALL BE TEMPORARILY SEALED
TO KEEP OUT FOREIGN MATTER UNTIL SUCH TIME AS
RECONNECTIONS ARE MADE.
ABBREVIATIONS
PHASEPH
FOOT, FEET
FOOT-POUND
FT
FT LB
PREHEAT COIL
PARTS PER MILLION
PHC
PRV
PPM
PRESSURE
PRESSURE SWITCH
PRESS
PS
PSF
PLUMBINGPLBG
POUNDS PER SQUARE FOOT
PRESSURE REDUCING VALVE
PSIG
PTAC
QUART
RELIEF, THERMAL RESISTANCE
QT
R
PACKAGED TERMINAL A/C
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCHPSIFINS PER INCH
GALLON
GENERATOR
GAUGE, GAGE
GLOBE VALVE
GALVANIZED GALV
GAL
GEN
GLV
GA
FPI
GATE VALVE
GALLONS PER HOUR
HEATING COIL
GPH
HC
GTV
GALLONS PER DAYGPD REFRIGERATION
RAC
REFR
RETURN
REDUCER
REVOLUTIONS
RELATIVE HUMIDITY
REFERENCE
RET
REV
RED
RH
REF
ROOM AIR CONDITIONER
REHEAT COIL
REHEAT VALVE
RHC
RHG
RHV
RPM
RS
RPS
RL
ROOF TOP UNIT
RELIEF VALVE
SATURATION
SUPPLY AIR
SECOND
RTU
RV
SAT
SA
S
REFRIGERANT HOT GAS
REFRIGERANT LIQUID
REVOLUTIONS PER MINUTE
REFRIGERANT SUCTION
REVOLUTIONS PER SECOND
HEAT GAIN
HEIGHT
HEAT PUMP, HORSEPOWER
HOUR
HIGH PRESSURE STEAM (>100 PSI)
HG
HGT
HPS
HPC
HP
HR
HUMIDISTAT
HEATING WATER
HUMIDITY SENSOR
HEATING WATER RETURN
HEATING WATER PUMP
HEATING WATER CIRCULATING PUMP
HEATING WATER COIL
HEATING WATER BOILER
HSTAT
HWR
HWP
HWCP
HWC
HWB
HW
HVAC
HS
HIGH PRESSURE CONDENSATE
HEATING, VENTILATION AND A/C
SPECIFIC GRAVITY, STEAM GAUGE
SENSIBLE HEAT GAIN
SENSIBLE HEAT
SENSIBLE HEAT RATIO
SG
SHG
SH
SHR
SHUT OFF VALVE
STATIC PRESSURE, SUMP PUMP
SPECIFICATION
SUPPLY
SOV
SP
SPEC
SPLY
SQUARE
STAINLESS STEEL
SQ
SSP
SST
SPS STATIC PRESSURE SENSOR
STAINLESS STEEL PIPE
SOLV SOLENOID VALVE
INPUT/OUTPUT
HERTZ (FREQUENCY)
HEATING WATER TANK
INVERT
INSIDE DIAMETER
INCHES WATER COLUMN
ID
I/O
HZ
HWT
INV
IN WC
INFRARED
KELVIN, THERMAL CONDUCTIVITY
IRON PIPE THREADED
IRON PIPE SIZE, INCHES PER SECOND
KILOWATT
POUNDS
THOUSAND FOOT-POUNDS
LEAVING AIR TEMPERATURE
KILOWATT HOUR
THOUSAND POUNDS
IR
K
KIP
KIP FT
LB
LAT
KWh
KW
IPT
IPS
IRON PIPEIP
SF SQUARE FEET
HEATING WATER SUPPLYHWS
RETURN AIRRA
HEADHD
A (0.5)
AAV
AC
AP
AD
AFF
AHU
ACU
AMB
AMP
APD
APPROX
ASC
AHJ
AS
ALT
AVG
B/B B&S
AWG
BAL
BFC
BFV
BBR
BLDG
BFW
BFBP
BLR
BLW
BHP
BO
BOD
BOS
BOP
BTU
BV
BTUH
°C C/C
BYP
CAP
CD
CF
CFS
CH
CHW
CHWP
CHWPP
CFM
CELSIUS [DEGREES]
COMPRESSED AIR (WORKING PRESS.)
AUTOMATIC AIR VENT
ACCESS PANEL
ACCESS DOOR, AREA DRAIN
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
AMBIENT
AIR PRESSURE DROP
AIR SEPARATOR
ABOVE SUSPENDED CEILING
AUTHORITY HAVING JURISDICTION
AVERAGE
BELL & SPIGOT
BACK TO BACK
BALANCE
AIR CONDITIONING UNIT
ALTERNATING CURRENT
ALTITUDE
AMERICAN WIRE GAUGE
AMPERE
APPROXIMATE
BELOW FINISHED CEILING
BLOWOFF
CAPACITY
COOLING COIL
BYPASS
BALL VALVE
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF STEEL
BOTTOM OF PIPE
BOTTOM OF DUCT
BELOW
BOILER
BUILDING
BRAKE HORSEPOWER
BOILER FEED WATER
BOILER FEED BOOSTER PUMP
BUTTERFLY VALVE
CONDENSATE DRAIN
CHEMICAL FEED
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
CHILLER
CHILLED WATER
CHILLED WATER PUMP
CHILLED WATER PRIMARY PUMP
BASE BOARD RADIATOR
STANDARD
STRAINER
STEAM
STD
STR
STWP
STM
SUCTION
SUPPLY
SAFETY VALVE
SUCT
SUP
SV
T T&P
STEAM WORKING PRESSURE
TEMPERATURE SENSOR
TEMPERATURE AND PRESSURE
TEMPERATURE
TCV
TEMP
TD
TEMPERATURE CONTROL VALVE
TEMPERATURE DIFFERENCE
LINEAR FEET
LENGTH
LATENT HEAT GAIN
LATENT HEAT
LEAVING DRY BULB TEMPERATURE
LOW PRESSURE
LF
LG
LPC
LP
LHG
LH
LDBT
LOW TEMPERATURE HOT WATER
LOW PRESSURE STEAM (<15 PSI)
MAXIMUM
LEAVING WATER TEMPERATURE
LEAVING WET BULB TEMPERATURE
MAX
LWT
LWBT
LTHW
LPS
LOW PRESSURE CONDENSATE
TRANSFER
UNIT HEATER
THERMOSTAT
TRANS
U
UH
TSTAT
VARIABLE
VOLTS
VELOCITY
VENT, VENTILATION
VAR
V
VAV
VEL
VENT
HEAT TRANSFER COEFFICIENT
VARIABLE AIR VOLUME
WATT
WET BULB
VELOCITY PRESSURE
VFD
W
WB
VP
WATER COLUMN
WATER GAGE
WATER HEATER
WBT
WC
WG
WH
WET BULB TEMPERATURE
VARIABLE FREQUENCY DRIVE
VERTICALVERT
MINIMUM
MOTOR CONTROL CENTER
MINIMUM CIRCUIT AMPACITY
MEDIUM PRESSURE STEAM (16-99 PSI)
MEDIUM PRESSURE
MOTOR OPERATED VALVE
MCC
MCA
MOCP
MPS
MPC
MP
MOV
MIN
NOT APPLICABLE
NOISE CRITERIA, NORMALLY CLOSED
MAKE-UP WATER
NORMALLY OPEN, NUMBER
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NOT TO SCALE
NOT IN CONTRACT
NR
NRC
NTS
NO
NA
NIC
NC
MU
MALE PIPE THREADMPT
MAXIMUM OVERCURRENT PROTECTION
MEDIUM PRESSURE CONDENSATE
TOP TOP OF PIPE
WELDED
WATER LINE
WATER METER
WATER PUMP
WL
WLD
WM
WPD
WPR
WSP
WP
YARD, YARD DRAIN
WEIGHT
YEAR
YD
WT
YR
WATER PRESSURE DROP
WORKING PRESSURE DROP
WORKING STEAM PRESSURE
Z ZONE
OUTSIDE AIR
OUTSIDE DIAMETER
OUTSIDE AIR FAN
OD
OA
OAF
PUMP
OUNCE
PERCENT
PUMPED CONDENSATE
POSITIVE
PRESSURE DROP
PRECOOL COIL
P
PC
PCC
PD
POS
OZ
PRESSURE GAUGE
PUMPED RETURN
PG
PR
CHWR
CHWSP
CHWS
CKT
CIP
CKV
CI
CL
CONN
CPD
CT
CU
CRP
CUH
Cv
CU IN
CWP
CWR
CU FT
DBT
DB
DDC
dB
CW
DEG
DENS
DIA
DEWPT
DOV
DPT
D
DWV
DPS
EAT
ECON
EER
EFF
EDBT
ECU
DIP
CWS
EOV
ENT
EL
ESP
ET
EWT
EWBT
EVAP
EXP
EXH
EXCH
FCU
FD
FLG
FPM
°F
FRP
FPS
CONNECTION
CONDENSATE PUMP DISCHARGE
CONDENSATE RETURN PUMP
COOLING TOWER
CONDENSING UNIT
CABINET UNIT HEATER
CONDENSER WATER PUMP
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
COEFFICIENT - VALVE FLOW
CUBIC FEET
CUBIC INCH
CIRCUIT
CAST IRON PIPE
CHILLED WATER RETURN
CAST IRON
CHILLED WATER SECONDARY PUMP
CHILLED WATER SUPPLY
CHECK VALVE
DRY BULB TEMPERATURE
COLD WATER (POTABLE)
DIRECT DIGITAL CONTROL
DEGREES [CELSIUS OR FAHRENHEIT]
DUCTILE IRON PIPE
DRAIN OFF VALVE
DIFFERENTIAL PRESSURE SENSOR
DIFFERENTIAL PRESSURE TRANSMITTER
DRAIN
DRAIN, WASTE & VENT
DENSITY
DEW POINT TEMPERATURE
DIAMETER
DECIBEL
DRY BULB
ENTERING AIR TEMPERATURE
ECONOMIZER
EVAPORATIVE COOLING UNIT
ENTERING DRY BULB TEMPERATURE
ENERGY EFFICIENCY RATIO
ELECTRONICALLY OPERATED VALVE
EXTERNAL STATIC PRESSURE
EXPANSION TANK
ENTERING WET BULB TEMPERATURE
ENTERING WATER TEMPERATURE
EXPANSION
EFFICIENCY
ENTERING
ELEVATION
EVAPORATOR
EXCHANGER
EXHAUST
FAN COIL UNIT
FLOOR DRAIN
FLANGE
FEET PER MINUTE
FEET PER SECOND
FIBERGLASS REINFORCED PLASTIC
FAHRENHEIT [DEGREES]
UON UNLESS OTHERWISE NOTED
NOMINAL PIPE SIZENPS
LEAVING TEMPERATURELT
LOCKED ROTOR AMPSLRA
FULL LOAD AMPSFLA
GALLONS PER MINUTEGPM
INDIRECT WASTEIW
INVERT ELEVATIONIE
ABOVEABV
DIRECT CURRENTDC
VAC VOLTS ALTERNATING CURRENT
VOLTS DIRECT CURRENTVDC
MILLIAMPERESmA
Q TOTAL, TOTAL HEAT
P/E PNEUMATIC ELECTRIC
OUTSIDE AIR INTAKEOAI
SHGC SOLAR HEAT GAIN COEFFICIENT
SC SHADING COEFFICIENT
WELD NECK FLANGEWNF
QTY QUANTITY
FLAT ON TOP
FOB
FOT
FLAT ON BOTTOM
RECT RECTANGULAR
VARIABLE SPEED DRIVEVSD
VARIABLE REFRIGERANT FLOWVRF
EXHAUST AIREA
AI ANALOG INPUT
AO ANALOG OUTPUT
BFG BELOW FINISHED GRADE
DS DISCONNECT SWITCH
EF EXHAUST FAN
EDH ELECTRIC DUCT HEATER
FAN POWERED BOXFPB
MANUAL VOLUME DAMPERMVD
OPPOSED BLADE DAMPEROBD
WSHP WATER SOURCE HEAT PUMP
FMS FACILITY MANAGEMENT SYSTEM
U/G UNDERGROUND
EUH ELECTRIC UNIT HEATER
CRAC COMPUTER ROOM A/C UNIT
A/C AIR CONDITIONING
CENTER LINE ( )
SEER SEASONAL EER
DOAS DEDICATED OUTDOOR AIR SYSTEM
PR
O
JE
C
T
TI
TL
E:
C
LA
R K
H A
LL
D
O R
M
IT
O R
Y
PROJECT NUMBER:
R
EV
IS
IO
N S
C H
ED
U
LE
N o.
D at e
D es cr ip tio n
Is su ed b y
D R
A W
IN
G
T
IT
LE
ISSUE DATE: 05/09/2023
100% CONSTRUCTION DOCUMENTS
DRAWN BY / CHECKED BY / APPROVED BY:
M A
PL
E
ST
R
EE
T, D
EN
TO
N
, T X
U N
IV
ER
SI
TY
O F
N O
R
TH
T
EX
AS
PR
O
JE
C
T
AD
D R
ES
S:
C
LI
EN
T
N
AM
E:
CAMPOS:
PLOT STAMP:
3" =1
1/ 2"
'-0
1"
'-0
3/ 4"
'-0
1/ 2"
'-0
1/ 4"
'-0
1/ 8"
'-0
1/
'-0
03/ 8"
'-0
A
B
C
D
E
F
2 3 4 5 6 7 8
A
B
C
D
E
F
1 2 3 4 5 6 7 8
PR
O
JE
C
T D
IR
EC
TO
R
Y:
C
AM
PO
S
EN
G
IN
EE
R
IN
G
R
IV
ER
B
EN
D D
R
IV
E D
AL
LA
S, T
X
4-
6-
JE
FF
R
EY
S
TR
O H
, P .E
M
EC
H A
N
IC
A L, E
LE
C
TR
IC
A
L
P
LU
M B
IN
G
R
EN
O
VA
TI
O
N
D22-2995.00
1331 River Bend Drive Dallas, Texas 75247
(214) 696-6291 campos@camposengineering.com Registration No. F-001731 Project Number: D22-2995.00
CAMPOS
E N G I N E E R I N G
MEP0.03
M
EC
H A
N
IC
A L
G
EN
ER
A
L N
O
TE
S
MC JS JS
SCOPE HAS BEEN DIVIDED INTO BASE BID AND ADD ALTERNATES. THE BASE BID AND ALTERNATE REPRESENTS COMPLETE WORKING SYSTEMS INCLUDING DEMOLITION, INSTALLATION, TEST AND BALANCING, COMMISSIONING AND CONTROLS FOR ALL
TRADES.
ROUGH DESCRIPTION OF ADD ALTERNATES:
ADD ALT 1 - HYDRONIC HEATING BOILER REPLACEMENT
ADD ALT 2 - HEATING WATER PUMP REPLACEMENT
ADD ALT 3 - SANITARY SEWER REPLACEMENT
ADD ALT 4 - DOMESTIC WATER HEATER REPLACEMENT
ADD ALT 5 - CHILLED WATER CONDENSER PUMP REPLACEMENT
GENERAL POWER NOTES
A. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION
OF THE NATIONAL ELECTRICAL CODE AND ALL LOCAL, STATE CODES.
B. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN CODE
REQUIRED MINIMUM CLEARANCES AROUND ELECTRICAL EQUIPMENT FOR
WORKING SPACE, DEDICATED SPACE, ACCESSIBILITY FOR MAINTENANCE AND
OPERATION.
C. PROVIDE A TYPED DIRECTORY IN ALL PANELBOARDS CLEARLY DESCRIBING THE
LOCATION OF AND TYPE OF LOAD BEING SERVED FOR ALL CIRCUITS. PROVIDE
ENGRAVED PHENOLIC NAMEPLATES FOR ALL PANELBOARDS AND DISCONNECT
SWITCHES.
D. MINIMUM 20A BRANCH CIRCUIT SHALL BE 2#12, #12G, 3/4" C AND 2#10, #10G, 3/4" C
FOR 30A BRANCH CIRCUIT. ALL CONDUCTORS SHALL BE COPPER, 75 DEGREE C,
TYPE THHN/THWN EXCEPT WHERE OTHERWISE REQUIRED BY SPECIFICATION OR
CODES.
E. ALL 120V CIRCUITS LONGER THAN 70 FEET SHALL BE #10 AWG AND 277V
CIRCUITS LONGER THAN 150 FEET SHALL BE #10 AWG UNLESS NOTED
OTHERWISE.
F. PROVIDE A PULLWIRE FOR ALL EMPTY CONDUITS.
G. ALL ELECTRICAL EQUIPMENT SHALL BE RAINTIGHT (NEMA 3R) WHERE
EXPOSED TO THE WEATHER. ALL FLEX CONDUITS CONNECTED TO SUCH
EQUIPMENT SHALL BE LIQUIDTIGHT.
H. ALL CIRCUITS SHALL BE PROVIDED WITH INDEPENDENT GROUND AND NEUTRAL
WIRES. NO MULTIWIRE (SHARED NEUTRAL) BRANCH CIRCUITS SHALL BE
PERMITTED.
I. PROVIDE FIRE RETARDANT U.L. APPROVED SEALANT ON ALL PENETRATIONS,
WALLS, AND STRUCTURAL SLABS. IT SHALL BE THE RESPONSIBILITY OF THE
ELECTRICAL CONTRACTOR TO VERIFY PRIOR TO SUBMITTING BID, THE
LOCATIONS OF ALL SUCH FIRE RATED PARTITIONS, WALLS AND STRUCTURAL
SLABS.
J. WHERE CORE DRILLING OF FLOORS/WALLS IS REQUIRED, THE CONTRACTOR
SHALL SEAL OPENINGS WATERTIGHT AFTER UTILITIES HAVE BEEN INSTALLED.
LOCATION OF CORED HOLES SHALL COORDINATE WITH LOCATION OF
EQUIPMENT IN A MANNER THAT IS CLEAN AND FUNCTIONAL.
K. IT SHALL NOT BE THE INTENT OF THESE PLANS AND/OR SPECIFICATIONS TO
SHOW EVERY MINOR DETAIL OF CONSTRUCTION. THE CONTRACTOR SHALL BE
EXPECTED TO FURNISH AND INSTALL ALL ITEMS FOR A COMPLETE ELECTRICAL
SYSTEM AND PROVIDE ALL REQUIREMENTS NECESSARY FOR EQUIPMENT TO BE
PLACED IN PROPER WORKING ORDER. IT SHALL BE THE RESPONSIBILITY OF THE
ELECTRICAL CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS AND
SUPERVISION NECESSARY TO ACCOMPLISH THE WORK.
L. ELECTRICAL CONTRACTOR SHALL COORDINATE THEIR WORK WITH ALL OTHER
CONTRACTORS AND TRADES BEFORE INSTALLATION OF THEIR WORK IN CHASES,
CEILING SPACES AND OTHER AREAS WHERE CONFLICT MAY OCCUR.
M. ARC-FLASH HAZARD WARNING LABELS SHALL BE PROVIDED AND APPLIED TO
SWITCHBOARD, PANELBOARDS, MOTOR CONTROL CENTER, DISCONNECT
SWITCHES AND EQUIPMENT CONTROLLERS PER NEC ARTICLE 110.16. THE LABEL
SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT AND SUFFICIENT
DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. ALSO, FOR SERVICE
EQUIPMENT RATED 1,200 AMPS OR MORE NOT SERVING DWELLING UNIT, THE
LABEL SHALL CONTAIN THE FOLLOWING INFORMATION:
- NOMINAL SYSTEM VOLTAGE.
- AVAILABLE FAULT CURRENT AT THE SERVICE OVERCURRENT PROTECTIVE
DEVICES.
- THE CLEARING TIME OF SERVICE OVERCURRENT PROTECTIVE DEVICES BASED
ON THE AVAILABLE FAULT CURRENT AT THE SERVICE EQUIPMENT.
- THE DATE THE LABEL WAS APPLIED.
A. DEMOLITION DRAWINGS ARE BASED ON EXISTING PLANS AND FIELD
INVESTIGATION PRIOR TO DEMOLITION. CONTRACTOR SHALL VISIT THE SITE
BEFORE BIDDING IN ORDER TO BECOME FAMILIAR WITH THE EXISTING
CONDITIONS AND AVOID CONFLICTS. THE CONTRACTOR SHALL NOTIFY THE
ENGINEER OF ANY DISCREPANCIES BETWEEN THE PLANS AND THE JOB SITE
CONDITION AND TAKE THOSE DISCREPANCIES INTO ACCOUNT WHEN BIDDING OR
SUBMIT BIDDING PROPOSAL.
B. ELECTRICAL CONTRACTOR SHALL COORDINATE SERVICE INTERRUPTION WITH
THE OWNER, ARCHIECT, UTILITY COMPANY AND SHALL NOT INTERRUPT POWER
WITHOUT THE OWNER/ARCHITECT’S PERMISSION.
C. LOCATE ALL EXISTING UTILITIES PRIOR TO STARTING THE WORK. PROTECT
EXISTING UTILITIES FROM DAMAGE.
D. WHERE REMOVED ITEM RESULTS IN DISCONTINUATION OF POWER TO
DOWNSTREAM DEVICES, THE CONTRACTOR SHALL PROVIDE ALL NECESSARY
REWIRING SO THAT THE EXISTING SYSTEM REMAINS IN GOOD OPERATION.
RELOCATE EXISTING ELECTRICAL POWER OR LIGHTING EQUIPMENT OR SYSTEMS
AS REQUIRED THAT INTERFERE WITH THEW NEW WORK AND TO ACCOMMODATE
THE WORK OF OTHER TRADES. ELECTRICAL DEVICES, LIGHTS, EQUIPMENTS AND
SYSTEMS LOCATED IN AREAS OUTSIDE THE AREA OF WORK SHALL REMAIN IN
SERVICE UNLESS OTHERWISE NOTED.
E. ELECTRICAL CONTRACTOR SHALL UPDATE AS-BUILT DRAWINGS WITH THE
EXACT CIRCUIT NUMBERS USED AND PROVIDE TYPEWRITTEN DIRECTORY CARD
INSIDE PAPERBOARD REFLECTING THE CORRECTION INSTALLATION. ALL UNUSED
EXISTING SPARE CIRCUITS SHALL BE IDENTIFIED. ALL SPARE BREAKERS SHALL
BE TURN TO THE“OFF” POSITION AND LABEL ‘SPARE’.
F. COORDINATE WITH OWNER FOR DISPOSITION OF ALL REMOVED ELECTRICAL
ITEMS. EXERCISE CARE IN REMOVAL OF DEMOLITION ITEMS, REPAIR AT NO
ADDITIONAL COST TO THE OWNER, ANY DAMAGE CAUSED TO EXISTING
CONSTRUCTION AND/OR EQUIPMENT TO REMAIN.
GENERAL DEMOLITION NOTES
J
M
EPO
A LIGHT FIXTURE TYPEXX/XX/XX/XX
FUSE SIZE
POLE(S)
FRAME SIZE
NEMA RATING
a
SWITCHING CONFIGURATION
OR LIGHTING CONTROL ZONE
CR
VERTICALVERT
SWGR SWITCHGEAR
MEDIUM VOLTAGEMV
MOUNTEDMTD
MEZZ MEZZANINE
MECHANICALMECH
LOW POWER FACTORLPF
INSTRUMENT/INSTRUMENTATIONINST
HORIZONTALHORIZ
HPF HIGH POWER FACTOR
FUTUREFUT
EQUIPMENTEQPT
ES ENERGY SAVING
ELECTRIC/ELECTRICALELEC
ELECTRICAL WATER HEATEREWH
EXH EXHAUST
CND CONDUCTOR
CONTINUATIONCONT
CATALOG NUMBERCAT NO.
BOTTOM OF TRAYBOT
BOD BOTTOM OF DUCT
LIGHTING SYMBOL LEGEND
(ALL SYMBOLS MAY NOT APPEAR ON DRAWINGS)
NIC
NFS
NO
POLE(S)
OVERHEADOH
NTS
P
PA
PL
PVC
PNL
RC
RCP
PF
SWITCH
REC
RVSS
RGS
SF
SPDT
SW
SS
SWBD
TA
TAS
SPST
SINGLE-POLE, DOUBLE-THROW
TRIP AMPERE(S)
SINGLE-POLE, SINGLE-THROW
SWITCHBOARD
START-STOP
RECEPTACLES(S)
SQUARE FOOT OR FEET
REDUCED VOLTAGE, SOLID STATE
RIGID GALVANIZED STEEL
REFLECTED CEILING PLAN
POLYVINYL CHLORIDE
REMOTE CONTROL
PUBLIC ADDRESS SYSTEM
POWER FACTOR
PANELBOARD
PILOT LIGHT
NOT TO SCALE
NORMALLY OPEN
NON-FUSIBLE SAFETY SWITCH
NOT IN CONTRACT
TEXAS ACCESSIBILITY STANDARDS
TYPICAL
TU
TEMP
TEL
TYP
TV
UL
UNO
UPS
V
VA
UG
WITH
WITHOUT
WATT(S)
DELTA
PHASE(S)
NUMBER
W
VFD
WP
W/ W/O
XP
XFMR
EXPLOSION-PROOF
TRANSFORMER
WEATHERPROOF
VOLTAGE OR VOLT(S)
VARIABLE FREQUENCY DRIVE
VOLT-AMPERE(S)
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
UNDERWRITERS LABORATORIES, INC.
TEXAS UTILITIES ELECTRIC
UNDERGROUND
TELEVISION
TEMPORARY
TELEPHONE
FS
FLEX
HERTZ
G
HVAC
HPS
HID
HP
HOA
GFI
FVR
FVNR
GS
HZ
KV
KWH
KW
KA
JBOX
IMC
IG
IES
KVA
AC
ACCU
A
AFC
AFF
ADA
AIC
AHU
ALT
ARCH
APPROX
AFG
ATS
AUX
AWG
BFG
BFC
C
CATV
CCTV
CB
CKT
BLDG
CLOSED-CIRCUIT TELEVISION
CIRCUIT BREAKER
CABLE TELEVISION
CONDUIT OR TUBING
BUILDING
BELOW FINISHED GRADE
AUTOMATIC TRANSFER SWITCH
APPROXIMATE OR APPROXIMATELY
AMPERE INTERRUPTING CAPACITY(ROOT
AMERICANS WITH DISABILITIES ACT
AIR-COOLED CONDENSING UNIT
BELOW FINISHED CEILING
AUXILIARY
AMERICAN WIRE GAGE
ARCHITECT
ALTERNATE
MEAN SQUARE ALTERNATE)
ABOVE FINISHED CEILING
AIR HANDLING UNIT
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR
ALTERNATING CURRENT
AMPERE(S)
CIRCUIT
m
MIC
MAX
MH
MCP
MCC
MCB
LTG
LPS
KVAR
MIN
NEMA
NEC
NC
MVAR
MW
MVA
MTS
MMS
mm
MLO
NFPA
PANELBOARD, SWITCHBOARD OR MOTOR CONTROL CENTER
CLG
CT(S)
DC
DISC
DIV
COMM
DPDT
DPST
EGS
EC
EHH
DWG(S)
ELEV
EMH
EWC
(E)
EMT
EMERG
F
FACP
FAAP
FBO
FLA
FL
CONDUIT
BRANCH CIRCUIT HOMERUN TO PANELBOARD,
2#12, #12G, 3/4"C., UNO.
LB-3
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
ELECTRICAL WATER COOLER
ELECTRICAL METALLIC TUBING
EMPTY CONDUIT OR TUBING
DOUBLE POLE, SINGLE THROW
DOUBLE-POLE, DOUBLE THROW
ENGINE-GENERATOR SET
FULL LOAD AMPERE(S)
FLOOR
FURNISHED BY OWNER
FUSE(S)
EXISTING
ELECTRICAL MANHOLE
EMERGENCY
ELEVATION
ELECTRICAL HANDHOLE
DRAWING(S)
DISCONNECT
CURRENT TRANSFORMER(S)
DIRECT CURRENT
COMMUNICATIONS
CEILING
DIVISION
DESIGNATION
MICROPHONE
ELECTRICAL CONVENTIONS
NATIONAL FIRE PROTECTION ASSOCIATION
ASSOCIATION
NATIONAL ELECTRICAL MANUFACTURER'S
NATIONAL ELECTRICAL CODE
NORMALLY CLOSED
MEGAWATT(S)
MEGAVOLT-AMPERE(S) REACTIVE
MEGAVOLT-AMPERE(S)
MANUAL TRANSFER SWITCH
MANUAL MOTOR STARTER
MILLIMETER(S)
MAIN LUGS ONLY
MINIMUM
METAL HALIDE
MOTOR CIRCUIT PROTECTOR
MOTOR CONTROL CENTER
MAIN CIRCUIT BREAKER
LOW PRESSURE SODIUM
MAXIMUM
METER(S)
LIGHTING
KILOVOLT-AMPERE(S) REACTIVE
KILOVOLT-AMPERE(S)
KILOWATT-HOUR(S)
KILOWATTS(S)
KILOAMPERE(S)
JUNCTION BOX
KILOVOLT(S)
INTERMEDIATE METALLIC CONDUIT
ISOLATED GROUND
OF NORTH AMERICA
ILLUMINATING ENGINEERING SOCIETY
CONDITIONING
HEATING, VENTILATION AND AIR
HIGH PRESSURE SODIUM
HORSEPOWER
HAND-OFF-AUTOMATIC
HIGH INTENSITY DISCHARGE
GROUND FAULT CIRCUIT INTERRUPT
FULL VOLTAGE, REVERSING
FULL VOLTAGE, NON-REVERSING
GROUND
FUSIBLE SAFETY SWITCH/FUSIBLE SWITCH
(ALL ABBREVIATIONS MAY NOT APPEAR ON DRAWINGS)
ELECTRICAL ABBREVIATIONS
FLEXIBLE
GALVANIZED STEEL
MTR MOTOR
CONDUIT CAPPED OFF
CONDUIT CONTINUED
CONDUIT RUN UP
CONDUIT RUN DOWN
DOWNLIGHT FIXTURE
2X2 LIGHT FIXTURE
2X4 LIGHT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .