ESBD_File_331667_Exhibit 5 BEC MEP.xlsx
XLSX spreadsheet 7 MB Posted
- Solicitation number
- RFP2023-0253
- Issued by
- Mclennan County, Waco City, Texas
About this file
This document is a Request for Proposal (RFP) issued by Baylor University ('University') to solicit proposals from qualified and experienced firms ('Proposers') to provide facility operations and maintenance services related to the Baylor Energy Complex (BEC) and campuswide Mechanical, Electrical, and Plumbing (MEP) services. The services will cover the jurisdictions of McLennan County and the City of Waco, Texas. The RFP outlines the scope of work, key deliverables, response requirements, and the contract term, which may include renewal options.
The RFP does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information. Respondents will need to review the full RFP document to understand the complete requirements, evaluation criteria, and submission process for this contract opportunity.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Exhibit 5 - MEP Annual Work Order Summary | |
| Welder WO Types | |
| Row Labels | Count of WO Type Description |
| Corrective | 122 |
| PM | 12 |
| Grand Total | 134 |
| Welder Trades | |
| Row Labels | Count of Trade |
| Baylor Energy Complex-BEC | 1 |
| Electrician-E | 1 |
| General Mechanics-GM | 1 |
| HVAC Shop-HS | 3 |
| Kitchen Maintenance-KM | 2 |
| Life Safety-LS | 4 |
| Preventive Maintenance-PM | 12 |
| Welder-W | 97 |
| Zone 1 | 6 |
| Zone 2 | 3 |
| Zone 3 | 1 |
| Zone 4 | 3 |
| Grand Total | 134 |
Export
| WO # | Requested | Task Closed | Client | Building | Area | Department | Task Code-Description | Type-Description | Tag # | Description | Item Type | Shop | Trade | Supervisor | Priority | Status | Project | Project Name | Request | WO Type Description | WO Task Posted Hours | Chargeable | Item SubLocation | Task Comments | Labor Costs |
| 0263-616658 | 05/11/2022 08:36 | 05/19/2022 09:07 | Baylor University | 801 Washington Tower-Zone 1-1070 | 263SER-Z1 | 4000 - General HVAC Repair | 4000 - HVAC | 801WSH-1070 | 801 Washington Tower-Zone 1-1070 | Building | Welder-W | Michael Heroux | 4 Routine-10d | Completed | Fabricate Ladder on side of building 821 for roof access | Corrective | 0.51 | FALSE | Gabriel Garcia-This will have to be contracted out | 11.48 | |||||
| 0263-617987 | 05/17/2022 11:20 | 06/20/2022 09:37 | Baylor University | Umphrey Law Center-Zone 2-1070 | LAW-1070-319 | 263SER-Z2 | 1510 - Replace Ceiling Tile | 1500 - Carpentry | LAW-1070-319 | Faculty Office | Area | Life Safety - 0263 | Life Safety-LS | Shannon Girard | 4 Routine-10d | Completed | Replace ceiling tiles, HVAC issue has been fixed |
RM # 319, Investigate possible HVAC leak and update requester Terri Kroll.
The ceiling tile with the sprinkler still needs to be replaced. It has a wet spot.
Also, the tile outside of his office with the Exit sign has stain spots that are getting bigger and needs to be replaced. Check to make sure there are no leaks.
Account #: 380 38001 100 1000000 101 0000 Corrective 3.55 FALSE Replaced 2 hose bibs caps on above exit sign checked 319 no leaks and called Arthur about replacing tiles Per Marshall, ceiling tile needs to be replaced at the exit sign. Replacement tile is is waiting near the sign..reassigned to Gabe and called Gabe...MO
| Gabriel Garcia-Complete | 79.21 | |||||||||||||||||||||||
| 0263-618072 | 05/18/2022 09:01 | 05/18/2022 15:55 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Michael Heroux | 4 Routine-10d | Completed | I'm in need of a welder to weld two eye bolts to the head of chiller 4 at the BEC, as soon as possible. | Corrective | 2.54 | FALSE | Gabriel Garcia-Welded two eye bolts to plate for lifting | 57.18 | ||||
| 0263-618676 | 05/23/2022 15:59 | 05/25/2022 07:35 | Baylor University | Ferrell Center-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | FRLCTR-1070 | Ferrell Center-Zone 1-1070 | Building | Welder-W | Michael Heroux | 4 Routine-10d | Completed | KIPSU: This chain near Mack's parking spot at the football practice fields needs to be re-welded onto the gate-Pic attached | Corrective | 17.85 | FALSE | Gabriel Garcia-There were only 2hours on this work order rest are no count for got to stop clock. | 401.80 | ||||
| 0263-619344 | 06/01/2022 07:00 | 06/29/2022 20:36 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220265 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.47 | FALSE | Gabriel Garcia-VFD running and in good condition | 10.66 | |||
| 0263-619351 | 06/01/2022 07:00 | 06/30/2022 16:20 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220435 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.20 | FALSE | Gabriel Garcia-VFD running and in good condition | 4.50 | |||
| 0263-619352 | 06/01/2022 07:00 | 06/30/2022 16:21 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220264 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.23 | FALSE | Gabriel Garcia-VFD running and in good condition | 5.18 | |||
| 0263-619353 | 06/01/2022 07:00 | 06/30/2022 16:22 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220266 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.23 | FALSE | Gabriel Garcia-VFD running and in good condition | 5.18 | |||
| 0263-619354 | 06/01/2022 07:00 | 06/29/2022 20:35 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220277 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.26 | FALSE | Gabriel Garcia-VFD running and in good condition | 5.85 | |||
| 0263-619356 | 06/01/2022 07:00 | 06/29/2022 20:32 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220275 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.27 | FALSE | Gabriel Garcia-VFD running and in good condition | 6.16 | |||
| 0263-619357 | 06/01/2022 07:00 | 06/29/2022 22:24 | Baylor University | Truett Seminary-Zone 3-1070 | B001 | 0263P40349 - Truett Seminary VFD | P - zPlanned | 220276 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Truett Seminary VFD | PM | 0.24 | FALSE | Gabriel Garcia-VFD RUNNING AND IN GOOD CONDITION | 5.40 | |||
| 0263-620352 | 06/01/2022 07:00 | 06/29/2022 18:32 | Baylor University | McLane Student Life Center-Zone 2-1070 | B005 | 0263P40272 - McLane Student Life Center VFD | P - zPlanned | 221842 | VFD | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | McLane Student Life Center VFD | PM | 0.19 | FALSE | 201 | 5.96 | |||
| 0263-620353 | 06/01/2022 07:00 | 06/29/2022 18:51 | Baylor University | McLane Student Life Center-Zone 2-1070 | SLC-1070-310 | B005 | 0263P40272 - McLane Student Life Center VFD | P - zPlanned | 222227 | VFD-AHU-4 | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | McLane Student Life Center VFD | PM | 0.30 | FALSE | 9.41 | |||
| 0263-620354 | 06/01/2022 07:00 | 06/29/2022 19:09 | Baylor University | McLane Student Life Center-Zone 2-1070 | SLC-1070-310 | B005 | 0263P40272 - McLane Student Life Center VFD | P - zPlanned | 222226 | VFD-AHU-3 | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | McLane Student Life Center VFD | PM | 0.29 | FALSE | 9.10 | |||
| 0263-620359 | 06/01/2022 07:00 | 06/29/2022 18:17 | Baylor University | Rogers Engineering and Computer Science-Zone 2-1070 | B001 | 0263P40468 - Filter Tank | P - zPlanned | 219586 | Filter Tank | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Filter Tank | PM | 0.65 | FALSE | 20.39 | ||||
| 0263-620371 | 06/01/2022 07:00 | 06/28/2022 18:31 | Baylor University | Castellaw Communications Center-Zone 4-1070 | B011 | 0263P8553 - Sump Pump Inspection | P - zPlanned | 219094 | Sump Pump-1, 2, 3 and 4 | Equipment | Prev Maintenance-0263 | Preventive Maintenance-PM | Michael Heroux | 1 Emergency-24h-Tier 1 PM | Completed | Sump Pump Inspection | PM | 0.42 | FALSE | All working | 13.18 | |||
| 0263-621515 | 06/02/2022 09:23 | 06/20/2022 10:13 | Baylor University | Umphrey Law Center-Zone 2-1070 | 263SER-Z2 | 1510 - Replace Ceiling Tile | 1500 - Carpentry | LAW-1070-Level 3 | Level 3 | Floor | Life Safety - 0263 | Life Safety-LS | Michael Heroux | 4 Routine-10d | Completed | In the hallway outside of 319 there is a ceiling tile with an exit sign that needs replaced please. | Corrective | 0.58 | FALSE | Gabriel Garcia-Complete | 13.06 | |||
| 0263-621928 | 06/06/2022 10:12 | 06/10/2022 12:35 | Baylor University | McMullen-Connally Faculty Center-Zone 4-1070 | 263SER-Z4 | 6010-1070 - Kitchen Maintenance | 6000 - Mechanical | FACCTR-1070 | McMullen-Connally Faculty Center-Zone 4-1070 | Building | Kitchen Maintenance-KM | Jeff Houghlin | 4 Routine-10d | Completed | KIPSU | |||||||||
| Tara Rosecrants McMullen Faculty Center downstairs kitchen dish machine needs to be tightened down please and thank you. Have a wonderful day!. See attached photo. | Corrective | 3.00 | FALSE | Per Eric, added Gabe G...MO | 70.18 | |||||||||||||||||||
| 0263-622121 | 06/07/2022 15:38 | 06/13/2022 09:15 | Baylor University | Clyde Hart Track and Field Stadium-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | HARTTF-1070 | Clyde Hart Track and Field Stadium-Zone 1-1070 | Building | Welder-W | Michael Heroux | 4 Routine-10d | Completed | Weld a new latch box at the track | Corrective | 5.41 | FALSE | 121.78 | |||||
| 0263-622330 | 06/09/2022 11:05 | 06/24/2022 14:34 | Baylor University | Jay and Jeanie Allison Indoor Practice-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | ALLISN-1070 | Jay and Jeanie Allison Indoor Practice-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU | |||||||||
| Can we get this gate fixed please, it is on the east side of Allison and the angle iron for the wheel to ride on needs to be replaced and welded back down. See 2 attached photos. | Corrective | 6.99 | FALSE | Re-opened and resent per Gabe...MO | ||||||||||||||||||||
| Gabriel Garcia-Cut out old track and replaced it with new one | 157.35 | |||||||||||||||||||||||
| 0263-623188 | 06/16/2022 10:05 | 06/21/2022 13:43 | Baylor University | Dutton Office and Parking Facility-Zone 3-1070 | 263SER-Z3 | 9501-1070 - Correct safety concern | 9500 - Safety/Security | PKGDTN-1070 | Dutton Office and Parking Facility-Zone 3-1070 | Building | CL&L & Student Services-0263 | Zone 3 | Brandon Martin | 2 Urgent-48h-Tier 2 PM | Completed | Officer on site and is reporting a sign hanging down at the main entrance on the Uparks side. Sign reads " Dutton Counseling Center". The sign is pulled down for safety and has been set aside. | Corrective | 3.69 | FALSE | Gabriel Garcia-The bracket for the sign was broken and needed repair work done. | 83.06 | |||
| 0263-623254 | 06/16/2022 14:51 | 06/17/2022 13:06 | Baylor University | McLane Stadium-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | MCLSTA-1070 | McLane Stadium-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Please cut 1 3/4 inched from all the rollers in welding shop. | Corrective | 5.30 | FALSE | Gabriel Garcia-Cut 1- 7/8 inch off of 100peices of pipe for ringo kitchen tech | 119.30 | ||||
| 0263-623284 | 06/17/2022 06:57 | 06/17/2022 15:09 | Baylor University | Beauchamp Athletic Nutrition Center-Zone 1-1070 | 6010 - General Equipment Repair | 6000 - Mechanical | BANC-1070 | Beauchamp Athletic Nutrition Center-Zone 1-1070 | Building | Kitchen Maintenance-KM | Jeff Houghlin | 4 Routine-10d | Completed | KIPSU | ||||||||||
| The banc dish machine release lever broke and cannot be reattached. See attached photo. | Corrective | 3.61 | FALSE | Per Eric D - add Gabe...MO |
Eric Deleon-Lever removed and taken to gane García for welding job Waiting for repair Eric Deleon-Lever picked up from the plant and installed
| Gabriel Garcia-Repaired latch handle | 90.78 | ||||||||||||||||||||
| 0263-624490 | 06/28/2022 12:55 | 08/02/2022 09:25 | Baylor University | Campus Wide-1070 | 1610 - Miscellaneous | 1500 - Carpentry | CW-1070 | Campus Wide-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Dumpster inspection and repair | Corrective | 9.12 | FALSE | Gabriel Garcia-Will create work orders for ones that need repair | 205.30 | ||
| 0263-628457 | 07/17/2022 17:58 | 08/03/2022 13:17 | Baylor University | Bill Daniel Historic Village-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | BDHV-1070 | Bill Daniel Historic Village-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | The large iron gate next to |
the dumpsters has sheared it's mount and fallen off. Note that this is the Fire Lane and the most used access to the village. It is currently hung back up to secure the Village but not operable. Please check and repair ASAP. Thanks, Tom Corrective 20.57 FALSE Terron Sauceda-The pins that hold the gate up need to be replaced. I will get with my foreman about replacement parts.
The client has asked that we weld new brackets to the fence. get with jim fau he has more info on the gate.
| Gabriel Garcia-Installed new hinges on two gates complete. | 461.18 | ||||||||||||||||||||
| 0263-628510 | 07/18/2022 09:30 | 08/04/2022 11:51 | Baylor University | Baylor Ballpark-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | BALLPK-1070 | Baylor Ballpark-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | I need this done asap please. I need a piece of metal fencing welded to pole out in the right outfield. Please call me 254-424-8181. | Corrective | 8.13 | FALSE | Gabriel Garcia-Ball park is at camp. Will repair Monday morning. 7/25/22 on my birthday haha. | ||
| Gabriel Garcia-Repaired railing | 183.01 | ||||||||||||||||||||
| 0263-628618 | 07/19/2022 07:50 | 07/26/2022 14:55 | Baylor University | LL Sams Annex (Grounds)-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | LLSANX-1070 | LL Sams Annex (Grounds)-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | The safety latch on the Roll dumpster at the grounds area broke off and needs to be re welded | Corrective | 6.38 | FALSE | Gabriel Garcia-Rebuilt safety latch for roll off. | 143.61 | |
| 0263-629618 | 07/27/2022 07:17 | 07/29/2022 11:17 | Baylor University | Waco Hall-Zone 4-1070 | 263SER-Z4 | 6012-1070 - Welding Work | 6000 - Mechanical | WACOHL-1070-BASE | CL&L - BASEMENT | Floor | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Repair steam tank in basement. Welding | Corrective | 3.33 | FALSE | Gabriel Garcia-Tank is repaired and back on line | 74.96 | |
| 0263-629686 | 07/27/2022 12:27 | 07/28/2022 16:09 | Baylor University | Martin Residence Hall-Zone 3-1070 | 263SER-Z3 | 2000 - General Electrical Repair | 2000 - Electrical | MARTIN-1070-Level 1 | Level 1 | Floor | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Remove exit signs | Corrective | 6.96 | FALSE | Gabriel Garcia-Removed the exit signs so the damaged tile can be replaced. New tile in and exit signs re installed. | 156.67 | |
| 0263-633096 | 08/09/2022 09:13 | 08/10/2022 15:34 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU |
| If we can please have our welding shop attempt to repair one of our carts. Jonathan Martinez Martinez-Jonathan5@aramark.com (picture included) | Corrective | 1.36 | FALSE | Gabriel Garcia-Repaired pipe inserts on cart for handle to slip in and out of frame | 30.62 | ||||||||||||
| 0263-633324 | 08/10/2022 10:27 | 08/11/2022 08:30 | Baylor University | Baylor Facility Services-Zone 2-1070 | B002 | 6012-1070 - Welding Work | 6000 - Mechanical | ZC34 | Yamaha Concierge | Vehicle | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KISPU |
| Cart 34 has a broken metal bar in the back that needs to be welded back. This is Joel's cart so any questions please get with him. (picture included) | Corrective | 1.09 | FALSE | Parking Lot | Gabriel Garcia-Welded bracket for over head. Complete | 24.53 | ||||||||||||||||
| 0263-633767 | 08/12/2022 08:08 | 08/12/2022 12:43 | Baylor University | Leuschner-Zone 4-1070 | 263SER-Z4 | 6012-1070 - Welding Work | 6000 - Mechanical | LEUSCH-1070 | Leuschner-Zone 4-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU | |||||||
| Repair or replace stair rails both sides call me any ?s please Welding shop. Leuschner Building. See 2 attached photos. | Corrective | 3.76 | FALSE | Gabriel Garcia-Straightened hand rails and welded back in place | 84.64 | |||||||||||||||||
| 0263-634146 | 08/15/2022 08:16 | 08/18/2022 08:36 | Baylor University | University Parks Apartments-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | UPKAPT-1070 | University Parks Apartments-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Please try to straighten out the side exit gate facing La Salle. | Corrective | 1.54 | FALSE | Gabriel Garcia-This job is contracted out | 34.66 | ||
| 0263-634762 | 08/17/2022 08:15 | 08/17/2022 12:28 | Baylor University | Pat Neff Hall-Zone 4-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | PNEFF-1070 | Pat Neff Hall-Zone 4-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Please weld 5 set poles to a metal plate | Corrective | 4.12 | FALSE | Gabriel Garcia-Done and complete | 92.74 | |||
| 0263-636398 | 08/24/2022 09:15 | 08/25/2022 12:41 | Baylor University | Simpson Athletic and Academic Complex-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | SAAC-1070 | Simpson Athletic and Academic Complex-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU | |||||||
| We have some padlocks at the Simpson practice fields that we would like welded to the chain. | Corrective | 5.30 | FALSE | 119.31 | ||||||||||||||||||
| 0263-637370 | 08/29/2022 11:47 | 08/31/2022 12:51 | Baylor University | Kensington Place-Zone 4-1070 | KPLACE-1070-206 | 263SER-Z4 | 1550 - Repair desk/table/chair/shelf | 1500 - Carpentry | KPLACE-1070-206 | Apt. 206 | Area | Zone 4 | JonL Steele | 4 Routine-10d | Completed and Closed | One of the chairs in the dining room |
is broken and needs to be repaired.
Thank you. Corrective 6.25 FALSE Richard Cervantez-And up to welding department for k p apartment 206 Please call Richard at two 540 274880 when completed
KIPSU
Gabe: Can W/O # 637370 be sent to my phone. I need to get time on it. ...MO Gabriel Garcia-Welding anchor bracket to arms for chairs Richard Cervantez-Rewelded leg and installed
| 140.37 | ||||||||||||||||||||
| 0263-637696 | 08/30/2022 14:52 | 09/14/2022 10:03 | Baylor University | Equestrian Center-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | EQSTRN-1070 | Equestrian Center-Zone 1-1070 | Building | Welder-W | Frank Nevarez | 4 Routine-10d | Completed | I would like to put a work order in at Equestrian for the portable bleachers to be moved and put into place in the outdoor arena before September 16th, preferably sooner rather than later. Also, pls let me know when someone is coming to do that so we can be out there too and tell them exactly where to place it. | Corrective | 1.77 | FALSE | Gabriel Garcia-Moved portable bleachers to different location and set in place | 39.84 |
| 0263-637696 | 08/30/2022 14:52 | 09/14/2022 08:40 | Baylor University | Equestrian Center-Zone 1-1070 | 263SER-Z1 | 3215 - Deliveries | 3000 - Grounds | EQSTRN-1070 | Equestrian Center-Zone 1-1070 | Building | Zone 1 | Frank Nevarez | 4 Routine-10d | Completed | I would like to put a work order in at Equestrian for the portable bleachers to be moved and put into place in the outdoor arena before September 16th, preferably sooner rather than later. Also, pls let me know when someone is coming to do that so we can be out there too and tell them exactly where to place it. | Corrective | FALSE | Hand off to Gabe (Welder) per Terron. | ||
| 0263-640743 | 09/09/2022 07:28 | 09/23/2022 08:33 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU |
| If we could have this dumpster right next to the BEC repaired. When it gets emptied leaves a lot of unbagged trash laying on the concrete. The bottom needs to be repaired, required welding. Grounds can supply the material but he will need to fix. | Corrective | 10.46 | FALSE | Gabriel Garcia-Closing work order will create new one when I can get to it to repair | 235.45 | ||||||||||||||||||
| 0263-640787 | 09/09/2022 09:17 | 09/09/2022 14:31 | Baylor University | Penland Crossroads (Dining)-Zone 3-1070 | 263SER-Z3 | 6012-1070 - Welding Work | 6000 - Mechanical | 112 | 2013 Chevy Express Van | Vehicle | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU | ||||||||
| Good morning, this is Conde from Baylor Catering, can you please set a work order to our van 112 be fixed , the lift arm need to be welded back on to the lift gate, thank you | Corrective | 1.98 | FALSE | Gabriel Garcia-Repaired broken bracket for lift gate. | 44.57 | ||||||||||||||||||
| 0263-642722 | 09/20/2022 16:02 | 09/21/2022 13:27 | Baylor University | McLane Stadium-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | MCLSTA-1070 | McLane Stadium-Zone 1-1070 | Building | Welder-W | Shannon Girard | 2 Urgent-48h-Tier 2 PM | Completed | Cut off rollers for hot dog cookers | Corrective | 5.63 | FALSE | Gabriel Garcia-Cut 60ea rollers to size for hot dog coolers. | 126.73 | |||
| 0263-643101 | 09/22/2022 14:45 | 09/23/2022 13:01 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU | ||||||||
| Have welding shop come take a look at weld o in the attached photo. | Corrective | 4.43 | FALSE | Gabriel Garcia-Built new hinges and welded back on to cover plate | 99.72 | ||||||||||||||||||
| 0263-643914 | 09/28/2022 07:58 | 09/29/2022 14:32 | Baylor University | McLane Stadium-Zone 1-1070 | MCLSTA-1070-130 | 263SER-Z1 | 4000 - General HVAC Repair | 4000 - HVAC | MCLSTA-1070-130 | CENTRAL ICE ROOM | Area | HVAC Shop-0263 | HVAC Shop-HS | Shannon Girard | 4 Routine-10d | Completed | Exhaust fan not working in 130 | Corrective | 6.76 | FALSE | Per Joe, added Gabe...MO |
Gabriel Garcia-Bracket broke loose from motor cleaned and welded bracket back to motor
| Checked gfci outlets found 2 were bad replaced checked motor legs were broken off took to get welded back on and put motor back on exhaust fan working good now | 150.47 | ||||||||||||||||||||||
| 0263-643937 | 09/28/2022 09:56 | 10/20/2022 10:33 | Baylor University | Campus Wide-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CW-1070 | Campus Wide-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Cover plate for water meters needs repair work done | Corrective | 17.94 | FALSE | Gabriel Garcia-Done with inspections. Will do another round later | 403.82 | ||||
| 0263-644034 | 09/28/2022 14:53 | 12/16/2022 13:26 | Baylor University | Eastland Lakes-Zone 2-1070 | EASTLK-1070-102 | B005 | 9501-1070 - Correct safety concern | 9500 - Safety/Security | 499067 | Frog Eye | Equipment | Electric Shop-0263 | Electrician-E | Frank Nevarez | 2 Urgent-48h-Tier 2 PM | Completed | KIPSU | ||||||
| Eastland Lakes Frog eye 499067 In janitors closet beside men's restroom not working at all. | Corrective | 0.80 | FALSE | Storage | KIPSU |
Per Tiffany - Please add gabe to 644034..MO
| Frog eye has been replaced and working. | 17.73 | |||||||||||||||||||
| 0263-644119 | 09/29/2022 09:34 | 12/15/2022 15:09 | Baylor University | Armstrong Browning Library-Zone 4-1070 | 263SER-Z4 | 1610 - Miscellaneous | 1500 - Carpentry | ABL-1070 | Armstrong Browning Library-Zone 4-1070 | Building | Zone 4 | JonL Steele | 4 Routine-10d | Completed and Closed | Email: Roof hatch in room 314 ladder bolts are loose at top | Corrective | 8.21 | FALSE | Per Richard, add Gabe the welder...MO |
Gabriel Garcia-Built two brackets to mount to wall to secure ladder.
Richard Cervantez-Drilling holes having to go get parts
| Richard Cervantez-Install plates and put anchors in wall completed | 183.71 | ||||||||||||||||||||||
| 0263-644170 | 09/29/2022 13:19 | 10/03/2022 13:08 | Baylor University | East Campus Parking Garage-Zone 2-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | PKGEC-1070 | East Campus Parking Garage-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Cut anchor bolts with torch at East Campus parking garage for General Mechanics so they can fix the pole that was hit | Corrective | 3.20 | FALSE | Gabriel Garcia-Cut anchor bolts so Ballard can be removed | 72.03 | ||||
| 0263-646124 | 10/03/2022 12:19 | 10/04/2022 14:44 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU | ||||||||
| ave gave take another look at this door. Hinges came off again. At the BEC . See attached photo. | Corrective | 4.32 | FALSE | Gabriel Garcia-Cut cover loose and repaired hinges set back in place and welded hinges. | 97.24 | ||||||||||||||||||
| 0263-646301 | 10/04/2022 10:43 | 10/25/2022 14:43 | Baylor University | Mayborn Museum Complex-Zone 1-1070 | 263SER-Z1 | 7520 - Repair Gates/Access Barriers | 7500 - Parking Lot | MMC-1070 | Mayborn Museum Complex-Zone 1-1070 | Building | HVAC Shop-0263 | HVAC Shop-HS | Shannon Girard | 4 Routine-10d | Completed | Village Wide village gate will not open completely from the new hinge install. will need to have them adjusted new hinges were not welded on to allow both doors to fully open, making it difficult for vehicles to enter/exit Spoke to Darrel about the issue and he will have the guys fix it.Jim is the POC at 715-0667 | Corrective | 10.36 | FALSE | Gabriel Garcia-Cut hinges and adjusted to where gates will open wider. Welded back in place | 233.20 | ||
| 0263-646311 | 10/04/2022 11:14 | 10/04/2022 16:00 | Baylor University | Campus Grounds-1070 | 1610 - Miscellaneous | 1500 - Carpentry | CG-1070 | Campus Grounds-1070 | Building | Paint Shop-0263 | General Mechanics-GM | Jeff Houghlin | 4 Routine-10d | Completed | EMAIL: Good Tuesday morning! |
Can we have someone fix / remove the sign post base at the following location?
Along the north side of 4th Street, across from the Speight parking garage.
A sign post base is sticking up out of the ground. It appears the sign post might have broken off from the base? The sign and post are gone, but the base is still present. (Potential safety hazard if someone trips / steps on the base.)
Photos are attached.
Please let me know if you have any comments, questions, or concerns.
Many thanks. Corrective 4.52 FALSE Per Eric B - add Gabe Welder...MO Completed as requested
| Completed as requested | 80.41 | |||||||||||||||||||
| 0263-646362 | 10/04/2022 13:51 | 10/19/2022 15:47 | Baylor University | Equestrian Center-Zone 1-1070 | 263SER-Z1 | 1610 - Miscellaneous | 1500 - Carpentry | EQSTRN-1070 | Equestrian Center-Zone 1-1070 | Building | Zone 1 | Frank Nevarez | 4 Routine-10d | Completed | I would like to Request the Portable Bleachers at Equestrian are moved back to the right sport and put down on October 18th late day or 19th. It needs to be done then because they have a meet the next day. They are leaving for the HOT fair and coning back on the 18th so they need to be placed back down. Thank you | Corrective | 2.90 | FALSE | Gabriel Garcia-Decided to leave in location | |
| Terron Sauceda-Helped setup bleachers. | 62.34 | |||||||||||||||||||
| 0263-646673 | 10/06/2022 10:09 | 10/06/2022 15:26 | Baylor University | Penland Crossroads (Dining)-Zone 3-1070 | 263SER-Z3 | 6012-1070 - Welding Work | 6000 - Mechanical | PENLK-1070 | Penland Crossroads (Dining)-Zone 3-1070 | Building | Welder-W | 2 Urgent-48h-Tier 2 PM | Completed | KIPSU |
| Please come and fix the lift gate at Penland's back dock, the chain to lift it is broken at the O-ring. Cell 254-723-7973. We are hand carrying everything for the events. Please assist. | Corrective | 5.20 | FALSE | Gabriel Garcia-Did some repair welding work on dock plate | 117.05 | |||||||||||||||||
| 0263-648173 | 10/17/2022 08:11 | 10/17/2022 19:18 | Baylor University | Russell Gym-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | RUSGYM-1070 | Russell Gym-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Fabricate vent plates | Corrective | 4.90 | FALSE | 110.30 | |||
| 0263-648321 | 10/17/2022 15:23 | 10/18/2022 11:49 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | PLANT-1070 | Baylor Facility Services-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Please have Gabriel weld plumbing hand tool for the plumbing department | Corrective | 4.00 | FALSE | Gabriel Garcia-Built tool for plumbers to remove drain caps | 90.04 | ||
| 0263-648322 | 10/17/2022 15:25 | 11/02/2022 14:24 | Baylor University | LL Sams Annex (Grounds)-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | LLSANX-1070 | LL Sams Annex (Grounds)-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | The grounds trailer tail gate needs welding. Gabriel is aware. | Corrective | 20.74 | FALSE | Gabriel Garcia-Completed welding repair work on trailer for grounds. | 466.86 | ||
| 0263-648388 | 10/18/2022 08:40 | 10/18/2022 15:22 | Baylor University | 801 Washington Tower-Zone 1-1070 | 263SER-Z1 | 1610 - Miscellaneous | 1500 - Carpentry | 801 WSH-1070-ROOF | Academic - ROOF | Floor | Zone 1 | Frank Nevarez | 4 Routine-10d | Completed | Check safety issue on top level of parking garage. Part of fencing has broken off leaving open area without fall protection. | Corrective | 4.31 | FALSE | Johnny Yarborough-Contacted Gabriel Garcia to weld up fencing. I assisted as well. Had to locate some material to make this work. This piece of fencing was previously held up by wire ties to hold it in place in which had broken and let fencing fall. It is now welded in place for Securement. |
Gabriel Garcia-Repaired the hand rail on top floor of parking garage. Welded it back to the frame work
| Johnny Yarborough-This task is completed | 96.40 | ||||||||||||||||
| 0263-648403 | 10/18/2022 09:30 | 11/16/2022 10:01 | Baylor University | Penland Crossroads (Dining)-Zone 3-1070 | 263SER-Z3 | 9501-1070 - Correct safety concern | 9500 - Safety/Security | PENLK-1070 | Penland Crossroads (Dining)-Zone 3-1070 | Building | Life Safety - 0263 | Life Safety-LS | Shannon Girard | 2 Urgent-48h-Tier 2 PM | Completed | Annual Fire Inspection - Penland Dining Hall. Missing Directional Arrows or Improperly Labeled Exit Sign. Location(s): Kitchen (see pic) and contact Kevin Merrit or myself with questions. Required Corrective Actions: Ensure arrows reflect/point direction of egress. | |
| See 2 attached photos. | Corrective | 3.40 | FALSE | KIPSU |
These need to be given to me Tiffany Allen 648402 648403 648419 648420 Work order 648405 to mel pls...MO Talked to Kevin to see when a good time would be to come fix exit lights. Will be doing so Tuesday at 3.
Scheduled to be done Monday between 2-3pm.
KIPSU
Per Tiffany - Could you please add gabe to work# 648403 ...MO Exit light removed that was not needed. Faceplates/arrows have been fixed. All is completed.
| Gabriel Garcia-Done and complete | 75.86 | |||||||||||||||||||
| 0263-649175 | 10/22/2022 18:29 | 10/26/2022 14:48 | Baylor University | McLane Stadium-Zone 1-1070 | 263SER-Z3 | 1610 - Miscellaneous | 1500 - Carpentry | MCLSTA-1070 | McLane Stadium-Zone 1-1070 | Building | Zone 1 | Frank Nevarez | 4 Routine-10d | Completed | @1700 10/22 near baylor line : broken gate caster needs to be chain locked ok, edward ramos responding | Corrective | 3.20 | FALSE | On call complete. Turn over to welder | |
| Gabriel Garcia-Complete | 72.03 | |||||||||||||||||||
| 0263-649554 | 10/25/2022 13:30 | 11/17/2022 09:10 | Baylor University | Hankamer Academic Building-Zone 4-1070 | 263SER-Z4 | 6012-1070 - Welding Work | 6000 - Mechanical | HANKAC-1070 | Hankamer Academic Building-Zone 4-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Email: |
Hankamer/Cashion See 4 attached photos.
| Please fix the rusted out holes at the bottom of all the dumpsters at the Hankamer dumpster enclosures. The area smells and looks bad. Thanks | Corrective | 7.10 | FALSE | Gabriel Garcia-Will get back to this repair at a later time. Will have to get materials ordered. Will create new work order at that time. | 159.82 | |||||||||||
| 0263-650022 | 10/28/2022 07:33 | 11/09/2022 15:54 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU |
| This bollard on the umphreys Bridge by the law school needs to get fixed asap, it cannot lock without it being fixed (picture included) | Corrective | 7.29 | FALSE | Gabriel Garcia-Repaired Ballard at bridge | 164.10 | |||||||||||
| 0263-652226 | 11/01/2022 08:58 | 11/09/2022 08:35 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU |
See attached photo
| Please have the welder repair the bench at Bear Park across from Penland kitchen entrance . | Corrective | 7.53 | FALSE | Gabriel Garcia-This table was removed due to non repairable | 169.49 | ||||||||||||
| 0263-652464 | 11/02/2022 14:16 | 11/10/2022 14:05 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | KIPSU |
| Need the welding department to come to the BEC to weld this footing structure to the chilled water pipe in the chiller eight Bay. | Corrective | 5.87 | FALSE | Gabriel Garcia-Brackets welds broke loose for piping. Cleaned up brackets and welded them back in place to support piping. | 132.13 | ||||||||||||
| 0263-652995 | 11/06/2022 15:49 | 11/08/2022 14:27 | Baylor University | East Village Teal Hall-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | EVTEAL-1070 | East Village Teal Hall-Zone 2-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | The steel bench on the sidewalk |
just outside the main doors has
| a broken leg. | Corrective | 10.84 | FALSE | Gabriel Garcia-Bench is repaired. Welded leg back to frame work. | 244.01 | ||||||||||||
| 0263-653020 | 11/07/2022 08:19 | 12/07/2022 12:41 | Baylor University | Paul L. Foster Campus for Business & Innovation-Zone 2-1070 | 263SER-Z2 | 1610 - Miscellaneous | 1500 - Carpentry | FOSTER-1070 | Paul L. Foster Campus for Business & Innovation-Zone 2-1070 | Building | Zone 2 | Shannon Girard | 4 Routine-10d | Completed | Foster |
3rd street side of the building.
The hand rail outside of the service door on the 3rd street side
| has become detached from its base. Thank you, Barbara | Corrective | 13.63 | FALSE | Gabriel Garcia-Repaired the broken hand rail outside of building. | 306.81 | |||||||||||||||||
| 0263-653780 | 11/11/2022 09:56 | 11/15/2022 14:52 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Fabricate safety stops for cylinders on back door of trash truck | Corrective | 20.22 | FALSE | Gabriel Garcia-Made safety latches for trash trucks. | 455.16 | |||
| 0263-653881 | 11/12/2022 16:23 | 11/16/2022 15:34 | Baylor University | McLane Stadium-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | MCLSTA-1070 | McLane Stadium-Zone 1-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | [4:15 PM] Rodman, DJ | |||||||
| ochoa-michelle@aramark.com (Guest) the lock plate of the bollard behind the chiller needs repair to secure the bollard. Per Terry welding will need to be done on hinge | Corrective | 5.52 | FALSE | Gabriel Garcia-Repaired Ballards locking caps at stadium. | 124.26 | |||||||||||||||||
| 0263-654217 | 11/14/2022 12:16 | 11/14/2022 15:26 | Baylor University | Campus Wide-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CW-1070 | Campus Wide-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Torch off lock at the La Salle storage, get with Adrian for location | Corrective | 2.89 | FALSE | Gabriel Garcia-Cut off three locks for Adrian at storage building. | 65.05 | |||
| 0263-654732 | 11/17/2022 09:10 | 11/18/2022 14:10 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Building new cylinder locks | Corrective | 4.65 | FALSE | Gabriel Garcia-Built and complete cylinder locks | 104.67 | |||
| 0263-654855 | 11/18/2022 07:49 | 11/18/2022 13:27 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | PLANT-1070-GROUNDS | Administrative - GROUNDS/OUTSIDE | Floor | Welder-W | Shannon Girard | 4 Routine-10d | Completed | Repaired work on 4- wheeler | Corrective | 5.52 | FALSE | Gabriel Garcia-Repaired all welding work. Also replaced burn out head lights | 124.26 | ||
| 0263-655183 | 11/21/2022 08:36 | 12/08/2022 13:21 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | The middle bollard at MP Daniels and 5th st has a broken lock | Corrective | 25.24 | FALSE | Hand off to welder. Need latch plate welded per Gary B - locksmith...MO | ||||
| Gabriel Garcia-Built new locking plates for ballards | 568.15 | |||||||||||||||||||||
| 0263-658458 | 12/05/2022 11:31 | 12/07/2022 15:23 | Baylor University | Bill Daniel Student Center Kitchen-Zone 4-1070 | 263SER-Z4 | 6012-1070 - Welding Work | 6000 - Mechanical | BDSCK-1070 | Bill Daniel Student Center Kitchen-Zone 4-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | At the back dock, there is a stainless steel cart that needs welding work for a broken weld. Please assist. | Corrective | 2.57 | FALSE | Gabriel Garcia-Welds broke at bottom of frame. Cleaned up and welded where needed to repair. | 57.85 | ||
| 0263-658557 | 12/06/2022 07:59 | 12/06/2022 15:06 | Baylor University | Campus Wide-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CW-1070 | Campus Wide-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Repair bollard plate on circle on 5th st | Corrective | 6.98 | FALSE | Gabriel Garcia-Fabricated locking plates for Ballards | 157.12 | |||
| 0263-658855 | 12/07/2022 15:06 | 01/06/2023 15:20 | Baylor University | Baylor Ballpark-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | BALLPK-1070 | Baylor Ballpark-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Please have this work-order re-opened. The work has not been completed. I am more than happy to meet the welders at the Ballpark if they have questions about the project. This is a safety concern. |
Baylor Ballpark - Expanded steel On the first row of the grandstands, the expanded steel inside the railing has become detached/broken in several places. Please reattached the material to the inside of the rails to prevent injury to student-athletes and fans as well as prevent to netting from ripping. Work should be completed before the baseball season begins in February
| pictures included | Corrective | 37.13 | FALSE | Gabriel Garcia-Repaired all loose expanded metal along grand stand. | |||||||||||||||||
| Gabriel Garcia-Expanded metal repaired at the grandstand area. Had Mr berry look it over said looks good | 835.79 | ||||||||||||||||||||
| 0263-659688 | 12/14/2022 10:20 | 01/11/2023 15:27 | Baylor University | LL Sams Annex (Grounds)-Zone 1-1070 | B002 | 6012-1070 - Welding Work | 6000 - Mechanical | 225736 | John Deere-Z Trak 60" Mower | Equipment | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | 225736 Frame needs wielding get with Alan from grounds and he will show you. | Corrective | 13.48 | FALSE | Gabriel Garcia-Closing this work order out at this time Allen does not have this riding mower ready for welding repair work. Will create new work order when ready for repair | 303.43 | |
| 0263-659953 | 12/16/2022 09:42 | 12/22/2022 13:20 | Baylor University | Campus Wide-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CW-1070 | Campus Wide-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Building plates for Ballards | Corrective | 13.86 | FALSE | Gabriel Garcia-Complete | 311.99 | ||
| 0263-660469 | 12/21/2022 08:02 | 12/27/2022 10:23 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | PLANT-1070 | Baylor Facility Services-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Building tool to remove flanges from piping out in the field. | Corrective | 11.39 | FALSE | Gabriel Garcia-Complete | 256.39 | |
| 0263-662768 | 01/04/2023 09:16 | 01/09/2023 14:23 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Campus dumpster repair | Corrective | 17.99 | FALSE | 404.96 | |||
| 0263-662811 | 01/04/2023 13:44 | 01/27/2023 14:12 | Baylor University | Baylor Ballpark-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | BALLPK-1070 | Baylor Ballpark-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU |
See attached photo
| Baylor Ballpark- Bent railing on the top of the aluminum bleachers. | Corrective | 5.66 | FALSE | Gabriel Garcia-Got most of the bent part of the railing out. | 127.41 | ||||||||||||
| 0263-662822 | 01/04/2023 14:28 | 01/09/2023 08:53 | Baylor University | Hurd Tennis Center-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | TENNIS-1070 | Hurd Tennis Center-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU |
See 2 attached photos.
| Can we have the welder straighten the rod on the gate at Tennis. Gate on the Uparks side. | Corrective | 1.07 | FALSE | Gabriel Garcia-Straighten the safety bar for the gate. | 24.09 | ||||||||||||||||||
| 0263-663556 | 01/10/2023 08:40 | 01/10/2023 14:09 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 1250 - Miscellaneous | 2000 - Electrical | PLANT-1070-Level 1 | Level 1 | Floor | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Clean up HVAC weld shop | Corrective | 5.40 | FALSE | 121.55 | ||||
| 0263-663572 | 01/10/2023 09:50 | 01/11/2023 14:50 | Baylor University | LL Sams Annex (Grounds)-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | LLSANX-1070 | LL Sams Annex (Grounds)-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | John Deere E4 needs receiver on hitch welded | Corrective | 6.02 | FALSE | Gabriel Garcia-Receiver was broken and bent heated up and straighten it out and welded where it was broken. Repaired | 135.51 | |||
| 0263-663573 | 01/10/2023 09:52 | 01/13/2023 15:49 | Baylor University | LL Sams Annex (Grounds)-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | LLSANX-1070 | LL Sams Annex (Grounds)-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | John Deere backhoe front bucket needs to be fixed | Corrective | 9.74 | FALSE | Gabriel Garcia-Welded all cracks on bucket of backhoe | 219.25 | |||
| 0263-665043 | 01/18/2023 12:59 | 01/19/2023 16:17 | Baylor University | McLane Student Life Center-Zone 2-1070 | 263SER-Z2 | 8500 - General Plumbing Repairs | 8500 - Plumbing | SLC-1070-Level 1 | Level 1 | Floor | Zone 2 | Shannon Girard | 4 Routine-10d | Completed | Repair outside shower hose station, Hose connection broke off | Corrective | 0.79 | FALSE | Had hose wheel nozzle re welder .Attached back to outside shower station. Closing work order | 17.57 | |||
| 0263-665171 | 01/19/2023 08:09 | 02/03/2023 13:20 | Baylor University | Campus Wide-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CW-1070 | Campus Wide-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Campus wide dumpster check | Corrective | 26.15 | FALSE | Gabriel Garcia-Closing this work order will create new ones for repairs | 588.64 | ||||
| 0263-665196 | 01/19/2023 09:16 | 03/06/2023 15:32 | Baylor University | North Village Heritage House-Zone 3-1070 | 263SER-Z3 | 4000 - General HVAC Repair | 4000 - HVAC | NVHH-1070-Level 2 | Level 2 | Floor | Life Safety - 0263 | Life Safety-LS | Rami Alhmad | 4 Routine-10d | Completed | Changing 4 frog eye batteries and possibly replacing 3 exit signs in boys sides. Floors 1st,2 nd, 3rd, and 4th floor. | Corrective | 8.44 | FALSE | Waiting on batteries. |
Gabriel Garcia-Tiffany has all the comments on this work order Batteries came in.
4th floor elevator lobby- frog eye battery change bls# 02517 3rd floor lobby- frog eye battery change bls# 02527 2nd floor by rm.3222- new frog eye installed. Bls#02536
| 2nd floor by rm.3215- new frog eye installed. Bls#02542 | 189.28 | ||||||||||||||||||||
| 0263-665253 | 01/19/2023 12:57 | 01/23/2023 15:08 | Baylor University | Ferrell Center-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | FRLCTR-1070 | Ferrell Center-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Multiple chairs need to be welded and fixed, chairs will be brought to the Physical Plant | Corrective | 6.54 | FALSE | Gabriel Garcia-Repaired all chairs. Welds broke on bracket under seats | 147.22 | |
| 0263-666199 | 01/25/2023 08:57 | 01/26/2023 14:13 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | PLANT-1070 | Baylor Facility Services-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Building cover plates | Corrective | 12.61 | FALSE | Gabriel Garcia-Done with welding work on cover plates | 283.85 | |
| 0263-669103 | 02/03/2023 10:07 | 02/17/2023 16:13 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU |
Cover this grating with a steel plate. A safety trip hazard.
| picture included | Corrective | 22.12 | FALSE | Gabriel Garcia-Filled in space for walkthrough at BEC | 497.92 | ||||||||||||
| 0263-669768 | 02/07/2023 09:18 | 02/07/2023 14:52 | Baylor University | Marina-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | MARINA-1070 | Marina-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU | ||
| W/O for welder to repair Ballard for Marina include me on work order please,I have to remount Ballard . Any questions please call me | Corrective | 5.38 | FALSE | Gabriel Garcia-Repaired base for light Ballard | 121.10 | ||||||||||||
| 0263-670150 | 02/09/2023 10:30 | 02/23/2023 14:05 | Baylor University | Equestrian Center-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | EQSTRN-1070 | Equestrian Center-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU | ||
| work order for the welder for equestrian I need him to weld a metal plate to the bottom of their dumpster. Have him call me when he comes out | Corrective | 22.27 | FALSE | Gabriel Garcia-Replaced the bottom of dumpster for horse barn | 501.31 | ||||||||||||
| 0263-671280 | 02/16/2023 13:14 | 03/07/2023 08:13 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU |
| May we please have Gabe the welder, check out this area to possibly fabricate a hand rail in place. Safety hazard, 2nd floor mezzanine. At the Baylor energy complex. Get with Jody Amick for additional info. | Corrective | 3.91 | FALSE | Gabriel Garcia-Going to close work order and will create new one when get a chance to measure and order materials to build and install hand rail. | 88.01 | ||||||||||||
| 0263-671719 | 02/20/2023 08:49 | 02/20/2023 14:23 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU |
See attached photo
| If we could please have Gabe come weld these eyebolts on to chiller 5s chill water head as soon as possible at the BEC | Corrective | 3.60 | FALSE | Gabriel Garcia-Welded two eye bolts to housing to lift it off chiller | 81.04 | ||||||||||||
| 0263-671835 | 02/20/2023 14:45 | 03/02/2023 14:56 | Baylor University | Bill Daniel Student Center-Zone 4-1070 | 263SER-Z4 | 1550 - Repair desk/table/chair/shelf | 1500 - Carpentry | BDSC-1070 | Bill Daniel Student Center-Zone 4-1070 | Building | Welder-W | Eric Serrato | 4 Routine-10d | Completed | Hello! |
Requesting two 8ft tables be repaired that are in Barfield's kitchen. I have showed Carlos where they are.
Thank you so much! Corrective 7.82 FALSE Per zone tech turn over to welder...MP Welder is going to take care of it
| Gabriel Garcia-Welding leg brackets that broke for 8ft tables. | 175.64 | ||||||||||||||||||||
| 0263-673000 | 02/28/2023 08:45 | 02/28/2023 14:14 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | PLANT-1070 | Baylor Facility Services-Zone 2-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Repair overhead on cart | Corrective | 5.39 | FALSE | Gabriel Garcia-Cut out bad pieces of metal and replaced with new pieces. | 121.33 | |
| 0263-674652 | 03/01/2023 08:32 | 03/01/2023 14:50 | Baylor University | Baylor Facility Services-Zone 2-1070 | 263SER-Z2 | 6012-1070 - Welding Work | 6000 - Mechanical | PLANT-1070-Level 1 | Level 1 | Floor | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Fabricate hasp for box | Corrective | 6.23 | FALSE | Gabriel Garcia-Completed building hasp for boxes | 140.24 | |
| 0263-675417 | 03/06/2023 11:12 | 03/09/2023 13:12 | Baylor University | McLane Stadium-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | MCLSTA-1070 | McLane Stadium-Zone 1-1070 | Building | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | KIPSU |
| The pole for the hammer net has broken the weld. Can we get a welder out to fix it please? It is the hammer throw nets in touch down alley. Pic attached. | Corrective | 4.84 | FALSE | Gabriel Garcia-Repaired broken welds on hammer net frame at tailgate area. | 108.95 | |||||||||||||||||||
| 0263-675454 | 03/06/2023 14:38 | 03/08/2023 13:13 | Baylor University | Facilities Annex Building-Zone 1-1070 | B008 | 6012-1070 - Welding Work | 6000 - Mechanical | UT-4 | Flatbed Trailer | Vehicle | Welder-W | Rami Alhmad | 4 Routine-10d | Completed | Need trailer jack welded onto UT-7 Athletics trailer at the FAB. | Corrective | 9.54 | FALSE | Physical Plant | 214.74 | ||||
| 0263-675573 | 03/07/2023 13:08 | 03/07/2023 14:16 | Baylor University | Campus Grounds-1070 | 6012-1070 - Welding Work | 6000 - Mechanical | CG-1070 | Campus Grounds-1070 | Building | Welder-W | Tim Keim | 4 Routine-10d | Completed | Repair deck on riding mower | Corrective | 1.03 | FALSE | Gabriel Garcia-Repaired the deck on riding mower for Allen at grounds | 23.19 | |||||
| 0263-675782 | 03/09/2023 13:12 | 03/09/2023 15:45 | Baylor University | Baylor Energy Complex-Zone 2-1070 | 263SER-BEC | 6012-1070 - Welding Work | 6000 - Mechanical | BEC-1070 | Baylor Energy Complex-Zone 2-1070 | Building | Welder-W | Tim Keim | 4 Routine-10d | Completed | Repair leak on water pipe | Corrective | 2.50 | FALSE | Gabriel Garcia-Repaired the leak on water line | 56.28 | ||||
| 0263-675879 | 03/10/2023 08:49 | 03/13/2023 10:10 | Baylor University | Dutton Office and Parking Facility-Zone 3-1070 | 263SER-Z3 | 6012-1070 - Welding Work | 6000 - Mechanical | PKGDTN-1070 | Dutton Office and Parking Facility-Zone 3-1070 | Building | Welder-W | Tim Keim | 4 Routine-10d | Completed | Cut some plating | Corrective | 1.90 | FALSE | Gabriel Garcia-Cut plates to fill in holes for exhaust fans. | 42.77 | ||||
| 0263-676205 | 03/13/2023 07:57 | 05/22/2023 08:40 | Baylor University | Dutton Office and Parking Facility-Zone 3-1070 | 263SER-Z3 | 4000 - General HVAC Repair | 4000 - HVAC | PKGDTN-1070-Level 1 | Level 1 | Floor | HVAC Shop-0263 | HVAC Shop-HS | Tim Keim | 4 Routine-10d | Completed | Remove exhaust fan cover hoe and install new air-conditioning unit | Corrective | 35.66 | FALSE | Per Ed R - add Gabe...MO |
Removed exhaust fan, cover the hole with sheet metal cover. The intake. Hose is sheet metal installed new air conditioning system hooked it up. Copper drains waiting although the trades to hook up the electrical so I can be started up and running.
| Install new AC unit complete fan coil unit. No ductwork lines. Drains condensing unit sitting outside filters 20 x 20 refrigerant level refrigerant is 410 did start up check refrigerant levels. Everything’s running fine on it right now. | 871.89 | |||||||||||||||||||||||
| 0263-676241 | 03/13/2023 09:22 | 03/29/2023 14:04 | Baylor University | Baylor Ballpark-Zone 1-1070 | 263SER-Z1 | 6012-1070 - Welding Work | 6000 - Mechanical | BALLPK-1070 | Baylor Ballpark-Zone 1-1070 | Building | Welder-W | Tim Keim | 4 Routine-10d | Completed | KIPSU |
This is the start of the file's text. The full file is on GovTribe.