ESBD_571340_1792776758493_G.4 Pricing Schedule.pdf
PDF 755 KB Posted
- Attached to
- CAMP MABRY BLDG. 10 MAKE READY
- Solicitation number
- TMD27-CFMO-0046745
- Issued by
- Texas
About this file
This is a Pricing Schedule for a construction project at Camp Mabry Building 10 in Texas, classified as non-residential office building construction under Class 909-22. The project encompasses six line items presented as lump sum quantities, including restroom repairs covering tile, flooring, hardwood, and carpet; drywall, ceiling, insulation, trim, and painting work; furnishing and installation of new Daikin mini-split HVAC systems; repair of existing Daikin VRV HVAC systems; furnishing and installation of dehumidifiers and UV-C systems; and haul-off and disposal of construction debris. The contractor must complete all work no later than January 29, 2027, in accordance with the Statement of Work. The solicitation emphasizes that the pricing provided is for evaluation and payment purposes only, with contractors responsible for delivering a complete, turnkey project as described in the Scope of Work regardless of cost allocation across line items.
Award will be made to the lowest responsive and responsible bidder based on the Total Base Bid in accordance with solicitation requirements, contingent upon funding availability. The pricing schedule includes a section for bidders to identify pricing assumptions; however, such assumptions do not modify or take exception to the solicitation documents. Specific unit prices for each line item are not disclosed in this document, indicating they are to be provided by bidders during the proposal submission process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Class and Item: 909-22 Building Construction, Non-Residential, Office Bldg., etc.
TMD27-CFMO-0046745 Camp Mabry Building 10 Make Ready
Item No. Description Unit
Qty Total Price
1 Restroom tile, flooring, hardwood, and carpet repairs LUMP SUM
2 Drywall, ceilings, insulation, trim, and painting LUMP SUM
3 Furnish and install new Daikin mini-split HVAC systems LUMP SUM
4 Repair existing Daikin VRV HVAC systems LUMP SUM
5 Furnish and install dehumidifiers and UV-C systems LUMP SUM
6 Haul Off and Disposal of Construction Debris LUMP SUM
TOTAL BASE BID $
Project Completion: The Contractor shall complete the project no later than January 29, 2027, in accordance with the Statement of Work.
Note: This cost breakdown is for evaluation and payment purposes only. The Contractor is responsible for providing a complete, turnkey project as described in the Scope of Work, regardless of how costs are allocated.
Basis of Award: Award will be made to the lowest responsive and responsible bidder based on the Total Base Bid, in accordance with the solicitation requirements. Award is contingent upon the availability of funding.
Table 2: Pricing Assumptions
Bidder may identify pricing assumptions below. Assumptions do not modify or take exception to the Solicitation Documents.
# Assumption
Attachment G.4 - Pricing Schedule