ESBD_556297_1790194454880_Attachment 5 - Project Drawings.pdf
PDF 1 MB Posted
- Attached to
- Trinity 242T CCEL Office Buildout
- Solicitation number
- 3202700028
- Issued by
- Texas
About this file
This document comprises architectural project drawings and specifications for the Trinity Building located at 1117 Trinity Street, Austin, Texas, prepared for the Texas Workforce Commission. The project involves office buildout work on the first floor, specifically for space 242T, with detailed plans for demolition, new construction, mechanical systems, electrical infrastructure, and reflective ceiling modifications. The drawings include a cover sheet, general information, finish schedule, demolition plan, new construction plan with an alternative option, mechanical plans for existing and new work, electrical plan, and reflective ceiling plans. The scope encompasses wall construction using galvanized steel framing with gypsum drywall, door and frame installation in specified finishes (birch clear and cherry walnut), transom windows, paint applications with zero-VOC latex finishes, baseboard installation, and coordination of mechanical, electrical, and HVAC systems. Construction notes require contractors to visit the site, verify all dimensions prior to construction, provide product certificates and shop drawings, protect existing surfaces against dust and damage, coordinate with all trades, and maintain daily security sign-in procedures. Electrical work includes relocation of duplex receptacles and data connections at 15 inches above finished floor, switch adjustments, and occupancy sensor modifications. Mechanical work involves disconnecting and reconnecting diffusers, balancing airflow zones, adding return air, and programming additional HVAC sensors.
The finish schedule specifies materials including Armstrong acoustical ceiling tiles (#755B, 24" x 28"), Mohawk carpet (to be specified by client), Acuity Controls sensor switches in white, Hubbell duplex receptacles in white, Door Controls USA door swing systems in bronze anodized finish, PPG/Monarch field paint in Abbey White (511-3), PPG Commercial trim paint in Black-Brown (AC-4524), and ROPPE 700 Series rubber base in black-brown. Paint specifications require PVA primer with two coats of either Sherwin Williams ProMar 200 Zero VOC interior latex for offices and interior walls or PPG Speedhide Zero Interior Zero VOC latex for corridor walls. All construction materials, fixtures, and finishes must be installed per manufacturer specifications, and contractors must provide mock-ups of paint colors for project manager approval. General contractor responsibilities include coordinating blocking, layout dimensions, and penetrations; verifying manufacturer specifications for all installed equipment; and ensuring compliance with applicable codes and safety provisions. The project drawings indicate multiple rooms and spaces including offices (252A, 252D, 252E), mechanical room (221), janitorial (209), telephone room (215), and restrooms (211, 213), with mechanical plans showing VAV zones, supply and return air distribution, and electrical panels requiring coordination during construction.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
REVISION # SHEET # DRAWING TITLE
A-0.00 COVER SHEET
A-0.01 GENERAL INFORMATION
A-0.02 FINISH SCHEDULE
A-1.00 DEMOLITION PLAN (ENLARGED)
A-2.00 NEW CONSTRUCTION PLAN (ENLARGED)
A-2.01 NEW CONSTRUCTION PLAN (ENLARGED) ALTERNATIVE 01
M-1.00 MECHANICAL PLAN (ENLARGED) EXISTING
M-1.01 MECHANICAL PLAN (ENLARGED) NEW WORK
E-1.00 ELECTRICAL PLAN (ENLARGED)
R-1.00 REFLECTIVE CEILING PLAN (ENLARGED) EXISTING
R-1.01 REFLECTIVE CEILING PLAN (ENLARGED) NEW WORK
TYPICAL ROOM FINISHES,
U.N.O.
ACT-1
PT-1
RB-1
FT-1
GENERAL NOTES
G1. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE PROJECT SITE & HAVING ASCERTAINED PERTINENT LOCAL CONDITIONS, SUCH AS LOCATION, ACCESSIBILITY, & GENERAL CHARACTER OF THE SITE & BUILDING. ALL CONTRACTORS SHALL THOROUGHLY UNDERSTANDS THE
CHARACTER & EXTENT OF PROPOSED WORK WITHIN & ADJACENT TO THE SITE.
G2. GENERAL CONTRACTOR TO COORDINATE ALL BLOCKING; LAYOUT DIMENSIONS & PENETRATIONS AS REQUIRED.
G3. ALL CONSTRUCTION MATERIALS, FIXTURES, FINISHES, ETC. ARE TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
G4. CONTRACTOR TO PROVIDE PRODUCT CERTIFICATES & SHOP DRAWINGS OF ALL MILLWORK/CASEWORK & SAMPLES OF FINISHES & ARCHITECTURAL
SPECIALTY ITEMS FOR APPROVAL.
G5. CONTRACTOR TO PROVIDE WOOD BLOCKING BEHIND ALL WALL MOUNTED ITEMS.
G6. THESE DRAWING SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. IN THE EVENT OF AN INCORRECT OR AN OMISSION OF NECESSARY
DIMENSIONS, CONTRACTOR SHALL NOTIFY PROJECT MANAGER.
G7. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS PRIOR TO CONSTRUCTION & NOTIFY PROJECT MANAGER OF ANY
DISCREPANCIES THAT COULD EFFECT THE DESIGN AND FINISH OUT OF THE PROJECT.
G8. DO NOT SUSPEND ANY ITEMS FROM METAL ROOF DECKS, HORIZONTAL BRIDGING, X-BRACING, PIPES, CONDUITS, OR ANY OTHER WORK BY OTHER
TRADES.
G9. EACH CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF ALL APPLICABLE LAWS CODES ORDERS OF PUBLIC OFFICIALS WITH JURISDICTION
FOR SAFETY, PERSON, AND/OR PROPERTY.
G10. VERIFY WITH MANUFACTURER OR SUPPLIER THE SIZE, LOCATION. AND CHARACTERISTICS OF ALL WORK AND EQUIPMENT THAT IS TO BE INSTALLED BY CONTRACTOR AND/OR OTHER CONTRACTORS & FURNISHED BY OWNER PRIOR TO ANY CONSTRUCTION PERTAINING TO THE SAME IS
BEGUN.
G11. WHERE MULTIPLE FINISHES ARE LISTED IN THE SAME ROOM, OR ON THE SAME WALL, REFER TO NEW CONSTRUCTION PLANS AND/OR ELEVATIONS
FOR APPLICATION.
G12. ELEC. SWITCH/OUTLET & COVER PLATE COLOR TO BE WHITE, U.N.O.
G13. REFER TO COVER SHEET FOR ALL TYPICAL ROOM FINISHES.
G14. ALL KEYED NOTES MAY NOT BE USED ON EVERY SHEET.
G15. THE PROJECT MANAGER IS TO BE NOTIFIED OF ALL CEILING HEIGHT CHANGES OR CONFLICTS THAT DO NOT COMPLY WITH THESE DRAWINGS.
G16. ALL WORKERS MUST BE SIGNED IN WITH SECURITY DAILY. THE CONTRACTOR, THEIR EMPLOYEES, & SUB-CONTRACTORS ARE CONFINE WORK ACTIVITY ONLY TO WORK AREAS AS NOTED. ALL OTHER AREAS WITHIN TWC FACILITIES ARE PROHIBITED.
G17. WORK WILL REQUIRE COORDINATION WITH EXISTING ELEMENTS; INCLUDING CARPET, LIGHT FIXTURES, HVAC DUCTS, WIRING, AND PIPING. SOME
ELEMENTS MAY REQUIRE RELOCATION TO ACCOMMODATE NEW CONSTRUCTION.
TYPICAL OFFICE
Texas Workforce Commission
BUILDING AREA KEY PLAN
KEYED CONSTRUCTION NOTES
1. PROVIDE & INSTALL 3'-0" X 7'-0" TIMELY, OR EQUAL, DARK BRONZE PRE-FINISHED KD DOOR FRAME AND SOLID CORE MOHAWK DOOR IN BIRCH CLEAR. USE HAGER, OR EQUAL, 4.5X4.5 HINGES. USE BEST 7K SERIES GRADE CYLINDRICAL LOCK, THAT ACCEPTS BEST 7-PIN INTERCHANGEABLE CORES.
USE AB-FUCTION 15D LEVELR, 626 FINISH. USE DOOR STOP TRI 1211 STOP 613. ALL COMPONENTS TO
MATCH EXISTING.
2. CONSTRUCT NEW WALLS, UP 6" ABOVE EXISTING CEILING, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM
DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4
FINISH. TEXTURE AND PAINT TO MATCH EXISTING ADJACENT SURFACES. PROVIDE & INSTALL 1'-0" x 4'-0" TRANSOM WINDOWS, EQUAL TO EXISTING ADJACENT WALL SECTION, ALL COMPONENTS TO
MATCH EXISTING.
3. PAINT ALL WALL SURFACES WITHIN ESTABLISHED WORK AREA. ONE COAT PRIME OF PVA PRIMER.
FOR INTERIOR WALLS AND OFFICES: USE TWO COATS OF SHERWIN WILLIAMS FINISH COAT, PROMAR 200, ZERO VOC INTERIOR LATEX PAINT. FOR CORRIDOR WALLS: USE TWO COATES OF PPG FINISH
COAT, SPEEDHIDE ZERO INTERIOR ZERO VOC LATEX PAINT.
4. INSTALL NEW BASEBOARD AT NEW OR REPAIRED WALLS.
5. PROVIDE & INSTALL 3'-0" X 7'-0" TIMELY, OR EQUAL, DARK BRONZE PRE-FINISHED KD DOOR FRAME AND SOLID CORE MOHAWK DOOR IN CHERRY WALNUT. USE HAGER, OR EQUAL, 4.5X4.5 HINGES. USE BEST 7K SERIES GRADE CYLINDRICAL LOCK, THAT ACCEPTS BEST 7-PIN INTERCHANGEABLE CORES.
USE AB-FUCTION 15D LEVELR, 626 FINISH. USE DOOR STOP TRI 1211 STOP 613. ALL COMPONENTS TO MATCH EXISTING. CONTRACTOR TO PROVIDE AND INSTALL TRANSOM AND LITE (SECURITY) BOX TO
MATCH SURROUNDING FINISHES.
6. CONSTRUCT NEW WALLS, DECK TO DECK, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4 FINISH. TEXTURE
AND PAINT TO MATCH EXISTING ADJACENT SURFACES. ALL COMPONENTS TO MATCH EXISTING.
7. CONSTRUCT NEW WALLS, UP 6" ABOVE EXISTING CEILING, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM
DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4
FINISH. TEXTURE AND PAINT TO MATCH EXISTING ADJACENT SURFACES. ALL COMPONENTS TO
MATCH EXISTING.
PRIOR TO DEMOLITION
DUST PROOF ALL OWNER'S EQUIPMENT LOCATED IN AREA EFFECTED.
KEYED DEMOLITION NOTES
1. REMOVE AND SALVAGE EXISTING DOOR AND FRAME. PATCH AND PAINT
ALL EFFECTED SURFACE TO MATCH ADJACENT FINISHES.
2. DEMOLISH WALL SECTION. PATCH AND PAINT EFFECTED SURFACES TO
MATCH ADJACENT FINISHES.
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text A-0.00
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text Property Name and Address:
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
AutoCAD SHX Text
AUSTIN, TEXAS 78701-1919
SYMBOLS LEGENDABBREVIATIONS
A.D.A.
A.F.F.
ALUM.
CL
CLG
CLR
CG
CONC.
CONT.
CORR(S).
DIA
DIM
DWG
EA.
ELEV.
EQ.
EXP.
FIXT.
FLR
F.D.
F.E.
FIN. FL
FMS
GALV.
GYP.
HDWD
HVAC
IN.
INSUL.
INT.
MAX.
MTL.
MIN.
N.I.C.
N.T.S.
O.C.
O.H.
U.N.O.
OFCI
PREFAB.
PLYD
RCP
SCHED.
SIM.
SQ.
TYP.
W W/
W/O V.I.F.
VWC
VTC
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED FLOOR
ALUMINUM
CENTERLINE
CEILING
CLEAR
CORNER GUARD
CONCRETE
CONTINUOUS
CORRIDOR(S)
DIAMETER
DIMENSION
DRAWING
EACH
ELEVATION
EQUAL
EXPANSION
FIXTURE
FLOOR
FLOOR DRAIN
FIRE EXTINGUISHER
FINISHED FLOOR
FACILITY MANAGEMENT SYSTEM
GALVANIZED
GYPSUM BOARD
HARDWOOD
HEATING VENTILATION AIR CONDITIONING
INCH
INSULATION
INTERIOR
MAXIMUM
METAL
MINIMUM
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
UNLESS NOTED OTHERWISE
OWNER FURNISHED CONTRACTOR INSTALLED
PREFABRICATED
PLYWOOD
REFLECTED CEILING PLAN
SCHEDULED
SIMILAR
SQUARE
TYPICAL
WIDTH
WITH/
WITHOUT/
VERIFY IN FIELD
VINYL WALL COVERING
VINYL COMPOSITION TILE
NOTE:
1. ALL ABBREVIATIONS LISTED ABOVE MAY NOT BE USED ON
THIS PROJECT.
2. ABBREVIATIONS FOR FINISHES CAN BE FOUND ON THE
FINISH SCHEDULE.
CEILING FINISH
WALL FINISH
BASE FINISH
FLOOR FINISH
COUNTERTOP/CABINET FINISH
APPLICABLE KEYED NOTES
DENOTES EXTENT OF A
SPECIFIC WALL FINISH
REVISION TAG
SECTION/DETAIL TAG
ELEVATION TAGS
KEYED NOTE TAG;
RE: KEYED NOTES LEGEND
ON SAME SHEET
DEMOLITION NOTE TAG;
RE: DEMOLITION NOTES
LEGEND ON SAME SHEET
DOOR NUMBER TAG
GENERAL CONSTRUCTION NOTES
GC1. CONTRACTOR TO PROTECT ALL EXISTING SURFACES & EQUIPMENT AGAINST DAMAGE AND DUST. PROVIDE POLY BARRIERS & MAINTAIN NEGATIVE
AIR ATMOSPHERE WITHIN CONTAINED WORK ARE AT ALL TIMES.
GC2. FINISHED WALLS TO MATCH EXISTING USING STANDARD ACCESSORIES; GALVANIZED STEEL OR ROLLED ZINC CORNERBEAD, 2" WIDE PAPER TAPE BEDDED WITH READY-MIXED, VINYL-BASED JOINT COMPOUND & FINISHED WITH READY-MIXED, VINYL-BASED JOINT COMPOUND TO LEVEL 4 FINISH.
GC3. PROVIDE INDIVIDUAL, PRINTED LABELS AT NEW RECEPTICLES & SWITCHES INDICATING THE CONNECTED CIRCUIT.
GC4. LABEL NEW, ABOVE CEILING JUNCTION BOXES, INDICATING THE CONNECTED CIRCUIT USING PERMANENT MARKER.
GC5. CONTRACTOR TO PROVIDE BLANK FACEPLATES FOR UNUSED RECEPTACLES.
PAINT
P1. CONTRACTOR SHALL PROVIDE 0'-6"X0'-6" MOCK UPS OF EACH PAINT COLOR AND SEND TO PROJECT MANAGER TO CONFIRM EACH PRIOR TO
APPLICATION.
P2. MECHANICAL GRILLES AND WALL DIFFUSERS, ELECTRICAL PANELS, ACCESS PANELS, ETC. WHICH ARE EXPOSED IN FINISHED SPACES SHALL BE
PAINTED, IN PROPER PAINT FORMULATION, TO MATCH THE SURFACE ON WHICH THEY OCCUR.
P3. TYPICAL OVERALL PAINT FINISHES (U.N.O.):
WALLS: EGGSHELL /SATIN
TRIM: SEMI-GLOSS
CEILING: FLAT
CMU: SEMI-GLOSS
DOORS & FRAME: SEMI-GLOSS
P4. ALL TOILET WALLS, AND CEILING PAINTS SHALL BE WASHABLE, SEMI-GLOSS FINISH.
P5. CONTRACTOR TO ENSURE THAT PAINT FORMULATION IS APPROPRIATE TO SUBSTRATE WHICH IT IS APPLIED.
P6. ALL GYPSUM BOARD SOFFITS AND CEILINGS SHALL BE PAINTED PT-2 U.N.O. IN ELEVATIONS.
WOOD
W1. ALL HARDWOOD TO BE ALDER OR APPROVED EQUAL. IF ALDER IS UNAVAILABLE, SAMPLE OF ALTERNATE WITH STAIN APPLIED TO BE PROVIDED TO
PROJECT MANAGER.
W2. ALL WOOD DIMENSIONS SHOWN ARE NOMINAL.
W3. ALL STAIN GRADE CUSTOM MILLWORK TO BE WD-1, U.N.O.
TRIM
TR1. PROVIDE INSIDE AND OUTSIDE CORNER TRIM PIECES AT ALL COVE TILE BASE SPECIFICATIONS.
TR2. ALL HOLLOW METAL DOORS AND FRAMES SHALL BE PAINTED TO MATCH THE ADJACENT WALL COLOR IN PROPER PAINT FORMULATION U.N.O.
TR3. ALL VINYL OR RUBBER BASE SHALL BE ADHERED AT TOP, BOTTOM, AND ANY SEAMS.
TR4. ALL STANDING & RUNNING MILLWORK TRIM SHALL BE PAINTED PT-2, U.N.O.
FLOORING
F1. ALL FLOORING MATERIAL TRANSITIONS SHALL OCCUR AT CENTER OF OPENING DEPTH.
F2. ALL TRANSITIONS AT DOORS SHALL OCCUR AT CENTERLINE OF DOOR THICKNESS U.N.O.
F3. ALL VINYL AND FLOOR TILE PATTERNS SHALL BE CENTERED ON ROOM U.N.O. NOTED ON NEW CONSTRUCTION PLANS.
CASEWORK
C1. ALL EXPOSED INTERIOR SURFACED OF ALL CABINETRY TO BE FINISHED TO MATCH EXTERIOR, U.N.O.
C2. ALL SEMI-EXPOSED SURFACES TO BE CLEAR FINISH.
C3. ALL CABINETS WITH ADJUSTABLE SHELVES TO HAVE 6MM Ø HOLES AT 64MM ON CENTER VERTICALLY FOR SHELF SUPPORTS.
C4. ALL DRAWER GLIDES TO HAVE A MINIMUM 100 LBS CAPACITY AND FULL EXTENSION, U.N.O.
C5. ALL CABINETRY HINGES TO BE CONCEALED SELF CLOSING HINGES, U.N.O.
C6. HARDWARE PULLS AT ALL FRONT OF HOUSE COMMON AREAS:
EQ-1 (REFER TO LIST OF FINISHES FOR EXACT SPECIFICATION)
HARDWARE PULLS AT ALL BACK OF HOUSE COMMON AREAS:
EQ-2 (REFER TO LIST OF FINISHES FOR EXACT SPECIFICATION)
Texas Workforce Commission
AutoCAD SHX Text
PT-3
AutoCAD SHX Text
XX
AutoCAD SHX Text
CF-X.XX
AutoCAD SHX Text
XX
AutoCAD SHX Text
CF-X.XX
AutoCAD SHX Text
ENLARGED PLAN TAG
AutoCAD SHX Text
XX-X
AutoCAD SHX Text
XX-X
AutoCAD SHX Text
XX-X
AutoCAD SHX Text
XX-X
AutoCAD SHX Text
XX-X/XX-X
AutoCAD SHX Text X, X, X
AutoCAD SHX Text
XX/CF-X.XX
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text A-0.01
AutoCAD SHX Text
GENERAL INFORMATION
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
FINISH SCHEDULE
DATE:
REVISED: --
LEGEND:
ACT
CG
CPT
EQ
FT
FWP
GL
MR
Acoustical Ceiling Tile Corner Guard Carpet (BL OR Modular) Equipment Floor Tile Fabric Wrapped Panel Glass Mirror
PL
PT
RB
RV
SC
STC
TB
TR
Plastic Laminate Paint Rubber Base Reveal Sealed Concrete Stained Concrete Tile Base Trim
VCT
VF
VWC
WB
WC
WF
WP
WT
Vinyl Composition Tile Vinyl Flooring (Tile, Plank, Sheet, etc.)
Vinyl Wallcovering Wood Base Wood Finish Wood Floor Wall Protection Wall Tile
KEY DESCRIPTION MANUFACTURER STYLE COLOR REMARKS REVISIONS
ACT-1 Acoustical Ceiling Tile Armstrong #755B 24" x 28" White -- --
CPT-1 New Carpet Mohawk TO BE SPEC. BY CLIENT TO BE SPEC. BY CLIENT -- --
EQ-1 Sensor Switch Acuity Controls LTH WSD-PDT-WH White Switches to be placed at height consistent with existing throughout. --
EQ-2 Duplex Receptacles Hubbell CR20WHI White
See Electrical Plans for locations. Provide wire mold raceways at existing walls to match existing. To be place 15" A.F.F.
high. Connect to existing circuits as required.
EQ-3 Door Swing Equipment Door Controls USA DC7000 Door Swing System Bronze anodized finish -- --
PT-1 Field Paint PPG/Monarch -- 511-3
Abbey White -- --
PT-2 Trim Paint PPG COMMERCIAL -- AC-4524 Black-Brown -- --
RB-1 Rubber Base ROPPE 700 Series Toe 4"
P193
BLACK BROWN -- --
Texas Workforce Commission
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text A-0.02
AutoCAD SHX Text
FINISH SCHEDULE
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
Elev.
Elev.
Elev.
Mechanical
226T214T212T
221T
219T
242T
215T
213T
234T
211T
209T
3T
7T
234BT
4A
T
234CT
234DT234ET242DT242CT
242BT
2A
T
Texas Workforce Commission
BUILDING AREA KEY PLAN
PRIOR TO DEMOLITION
DUST PROOF ALL OWNER'S EQUIPMENT LOCATED IN AREA EFFECTED.
KEYED DEMOLITION NOTES
1. REMOVE AND SALVAGE EXISTING DOOR AND FRAME. PATCH AND PAINT
ALL EFFECTED SURFACE TO MATCH ADJACENT FINISHES.
2. DEMOLISH WALL SECTION. PATCH AND PAINT EFFECTED SURFACES TO
MATCH ADJACENT FINISHES.
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 1st Floor Plan - Trinity Building
AutoCAD SHX Text A-1.00
AutoCAD SHX Text
1ST FLOOR DEMOLITION PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
Elev.
Elev.
Mechanical
226T214T212T
221T
219T
242T
215T
213T
234T
211T
209T
3T
7T
242DT242CT
242BT
2A
T
0T
234AT234BT
234ET242ET 234CT234DT
230AT 230BT23
0T
230BT230AT
242ET 234ET 234DT
234AT
Texas Workforce Commission
KEYED CONSTRUCTION NOTES
1. PROVIDE & INSTALL 3'-0" X 7'-0" TIMELY, OR EQUAL, DARK BRONZE PRE-FINISHED KD DOOR FRAME AND SOLID CORE MOHAWK DOOR IN BIRCH CLEAR. USE HAGER, OR EQUAL, 4.5X4.5 HINGES. USE BEST 7K SERIES GRADE CYLINDRICAL LOCK, THAT ACCEPTS BEST 7-PIN INTERCHANGEABLE CORES.
USE AB-FUCTION 15D LEVELR, 626 FINISH. USE DOOR STOP TRI 1211 STOP 613. ALL COMPONENTS TO
MATCH EXISTING.
2. CONSTRUCT NEW WALLS, UP 6" ABOVE EXISTING CEILING, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM
DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4
FINISH. TEXTURE AND PAINT TO MATCH EXISTING ADJACENT SURFACES. PROVIDE & INSTALL 1'-0" x 4'-0" TRANSOM WINDOWS, EQUAL TO EXISTING ADJACENT WALL SECTION, ALL COMPONENTS TO
MATCH EXISTING.
3. PAINT ALL WALL SURFACES WITHIN ESTABLISHED WORK AREA. ONE COAT PRIME OF PVA PRIMER.
FOR INTERIOR WALLS AND OFFICES: USE TWO COATS OF SHERWIN WILLIAMS FINISH COAT, PROMAR 200, ZERO VOC INTERIOR LATEX PAINT. FOR CORRIDOR WALLS: USE TWO COATES OF PPG FINISH
COAT, SPEEDHIDE ZERO INTERIOR ZERO VOC LATEX PAINT.
4. INSTALL NEW BASEBOARD AT NEW OR REPAIRED WALLS.
5. PROVIDE & INSTALL 3'-0" X 7'-0" TIMELY, OR EQUAL, DARK BRONZE PRE-FINISHED KD DOOR FRAME AND SOLID CORE MOHAWK DOOR IN CHERRY WALNUT. USE HAGER, OR EQUAL, 4.5X4.5 HINGES. USE BEST 7K SERIES GRADE CYLINDRICAL LOCK, THAT ACCEPTS BEST 7-PIN INTERCHANGEABLE CORES.
USE AB-FUCTION 15D LEVELR, 626 FINISH. USE DOOR STOP TRI 1211 STOP 613. ALL COMPONENTS TO MATCH EXISTING. CONTRACTOR TO PROVIDE AND INSTALL TRANSOM AND LITE (SECURITY) BOX TO
MATCH SURROUNDING FINISHES.
6. CONSTRUCT NEW WALLS, DECK TO DECK, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4 FINISH. TEXTURE
AND PAINT TO MATCH EXISTING ADJACENT SURFACES. ALL COMPONENTS TO MATCH EXISTING.
7. CONSTRUCT NEW WALLS, UP 6" ABOVE EXISTING CEILING, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM
DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4
FINISH. TEXTURE AND PAINT TO MATCH EXISTING ADJACENT SURFACES. ALL COMPONENTS TO
MATCH EXISTING.
2 2
7 7 7
BUILDING AREA KEY PLAN
5 1 7
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 1st Floor Plan - Trinity Building
AutoCAD SHX Text A-2.00
AutoCAD SHX Text
1ST FLOOR NEW CONSTRUCTION PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
Elev.
Elev.
Mechanical
226T214T212T
221T
219T
242T
215T
213T
234T
211T
209T
3T
7T
230AT 230BT
242DT242CT
242BT
2A
T
0T
234AT234BT
234ET242ET 234CT234DT242FT
0T
230BT230AT
242ET 234ET 234DT
234AT
KEYED CONSTRUCTION NOTES
1. PROVIDE & INSTALL 3'-0" X 7'-0" TIMELY, OR EQUAL, DARK BRONZE PRE-FINISHED KD DOOR FRAME AND SOLID CORE MOHAWK DOOR IN BIRCH CLEAR. USE HAGER, OR EQUAL, 4.5X4.5 HINGES. USE BEST 7K SERIES GRADE CYLINDRICAL LOCK, THAT ACCEPTS BEST 7-PIN INTERCHANGEABLE CORES.
USE AB-FUCTION 15D LEVELR, 626 FINISH. USE DOOR STOP TRI 1211 STOP 613. ALL COMPONENTS TO
MATCH EXISTING.
2. CONSTRUCT NEW WALLS, UP 6" ABOVE EXISTING CEILING, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM
DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4
FINISH. TEXTURE AND PAINT TO MATCH EXISTING ADJACENT SURFACES. PROVIDE & INSTALL 1'-0" x 4'-0" TRANSOM WINDOWS, EQUAL TO EXISTING ADJACENT WALL SECTION, ALL COMPONENTS TO
MATCH EXISTING.
3. PAINT ALL WALL SURFACES WITHIN ESTABLISHED WORK AREA. ONE COAT PRIME OF PVA PRIMER.
FOR INTERIOR WALLS AND OFFICES: USE TWO COATS OF SHERWIN WILLIAMS FINISH COAT, PROMAR 200, ZERO VOC INTERIOR LATEX PAINT. FOR CORRIDOR WALLS: USE TWO COATES OF PPG FINISH
COAT, SPEEDHIDE ZERO INTERIOR ZERO VOC LATEX PAINT.
4. INSTALL NEW BASEBOARD AT NEW OR REPAIRED WALLS.
5. PROVIDE & INSTALL 3'-0" X 7'-0" TIMELY, OR EQUAL, DARK BRONZE PRE-FINISHED KD DOOR FRAME AND SOLID CORE MOHAWK DOOR IN CHERRY WALNUT. USE HAGER, OR EQUAL, 4.5X4.5 HINGES. USE BEST 7K SERIES GRADE CYLINDRICAL LOCK, THAT ACCEPTS BEST 7-PIN INTERCHANGEABLE CORES.
USE AB-FUCTION 15D LEVELR, 626 FINISH. USE DOOR STOP TRI 1211 STOP 613. ALL COMPONENTS TO MATCH EXISTING. CONTRACTOR TO PROVIDE AND INSTALL TRANSOM AND LITE (SECURITY) BOX TO
MATCH SURROUNDING FINISHES.
6. CONSTRUCT NEW WALLS, DECK TO DECK, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4 FINISH. TEXTURE
AND PAINT TO MATCH EXISTING ADJACENT SURFACES. ALL COMPONENTS TO MATCH EXISTING.
7. CONSTRUCT NEW WALLS, UP 6" ABOVE EXISTING CEILING, USING GALVANIZED STEEL TRACK & STUDS @ 16" O.C., PROVIDE MINIMUM R-11 FIBERGLASS BATT INSULATION AND 5/8" TYPE X GYPSUM
DRYWALL ON EITHER SIDE. TAPE & FLOAT USING VINYL BASED JOINT COMPOUND TO LEVEL 4
FINISH. TEXTURE AND PAINT TO MATCH EXISTING ADJACENT SURFACES. ALL COMPONENTS TO
MATCH EXISTING.
Texas Workforce Commission
3 4
2 2
BUILDING AREA KEY PLAN
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 1st Floor Plan - Trinity Building (ALTERNATE 01)
AutoCAD SHX Text A-2.01
AutoCAD SHX Text
1ST FLOOR NEW CONSTRUCTION PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
Elev.
Elev.
Mechanical
6D
T
226T
6C
T
6A
T
214T212T
221T
219T
242T
215T
213T
234T
2A
T
2D T
2E
T
211T
209T
3T
7T
234BT
4A
T
234CT
234DT234ET242DT242CT
242BT
2A
T
Elevator 2
LOBBY
234A
OFFICE
252A
OFFICE
252E
OFFICE
252D
OFFICE
MECHANICALSTAIR
JAN
TELEPHONE
WOMEN
MEN
CORR
Ø
P
SA
C
Ø
P
SA
H
Ø
P
SA
H
Ø
P
SA
C
18Ø SA 14Ø SA
16Ø PSAC 18Ø PSAC
14Ø PSAH
VAV-2-4 VAV-2-2
VAV-2-16 VAV-2-15 VAV-2-14
VAV-2-12
DDVAV-2-9
DDVAV-2-10
DDVAV-2-11
DDVAV-2-12
DDVAV-2-13
VAV-2-13
VAV-2-3
VAV-2-1
DDVAV-2-13
DDVAV-2-12
DDVAV-2-11
DDVAV-2-10
VAV-2-12
VAV-2-13
VAV-2-2
VAV-2-3
VAV-2-4
VAV-2-16 VAV-2-15 VAV-2-14
VAV-2-(9&10)
x1
R
A
14x12 RA
14x12
16x16 RA
14Ø SA 16Ø SA
16x16 RA 18x18 RA 14x12 12x12 RA x1
R
A x1
SA
x1
SA
x1
SA
12x12 SA 10x10 SA 8x10 SA
12x10 SA 8x8 SA
12x10 SA8x8 SA 8x8 SA
14x12 RA 16x16 RA
Ø
S A x1
R
A
FSD FSDFSD FSD
FSD FSD FSD FSD
DDVAV-2-9
16Ø PSAH
20Ø PSAC
8x8 SA x1
6x
SA
x1 x1
SA
6x
R A
10x8 RA
12x12 RA
6Ø SA
6x6 RA 10x10 RA x1
SA
8x
SA
6x
SA
x8
R A
10Ø PSAH
14Ø 10Ø PSAC
12Ø
14x12 RA
12Ø SA
FSD
12x10 RA
14x14 RA
Ø
S A x1
R
A
FSD
10x10
14x10 SA
8Ø
Ø
Ø 14 Ø
Ø 12Ø
10Ø 10 x8 8x x8
10x8 x1 x1 x8 x88x
6x
6x
6x x1 x8
6Ø
6Ø
Ø
Ø
Ø8Ø x1 x1 x1
8x x1 x1
6x
6x x1
0 6Ø S
A
8Ø
Texas Workforce Commission
KEYED MECHANICAL NOTES
1. DISCONNECT DIFFUSERS AND CAP (DDVAV-2-11) AT LOCATION SHOWN.
2. RECONNECT DIFFUSERS TO ZONE (DDVAV-2-10).
3. ADJUST DIFFUSERS
4. BALANCE AND ADJUST ZONE (DDVAV-2-10) AND (DDVAV-2-11) TO UPDATE
AIRFLOW.
5. ADD RETURN
6. ADD AND PROGRAM ADDITIONAL HVAC SENSOR TO (DDVAV 2-9). UPDATE
HVAC CONTROLS PROGRAMMING ALLOWING FOR TEMPERATURE AVERAGING.
UPDATING BAS GRAPHICS ACCORDINGLY.
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 2nd Floor Plan - Trinity Building
AutoCAD SHX Text M-1.00
AutoCAD SHX Text
1ST FLOOR NEW CONSTRUCTION PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING
AutoCAD SHX Text
1117 TRINITY STREET
AutoCAD SHX Text
AUSTIN, TEXAS 78701-1919
(EXISTING)
Elev.
Elev.
Mechanical
6D
T
226T
6C
T
6A
T
214T212T
221T
219T
242T
215T
213T
234T
2A
T
2D T
2E
T
211T
209T
3T
7T
230AT 230BT
242DT242CT
242BT
2A
T
0T
234AT234BT
234ET242ET 234CT234DT242FT
0T
230BT230AT
242ET 234ET 234DT
234AT
Elevator 2
LOBBY
252A
OFFICE
252E
OFFICE
252D
OFFICE
MECHANICALSTAIR
JAN
TELEPHONE
WOMEN
MEN
CORR
Ø
P
SA
C
Ø
P
SA
H
Ø
P
SA
H
Ø
P
SA
C
18Ø SA 14Ø SA
16Ø PSAC 18Ø PSAC
14Ø PSAH
VAV-2-4 VAV-2-2
VAV-2-16 VAV-2-15 VAV-2-14
VAV-2-12
DDVAV-2-9
DDVAV-2-10
DDVAV-2-11
DDVAV-2-12
DDVAV-2-13
VAV-2-13
VAV-2-3
VAV-2-1
DDVAV-2-13
DDVAV-2-12
DDVAV-2-11
DDVAV-2-10
VAV-2-12
VAV-2-13
VAV-2-2
VAV-2-3
VAV-2-4
VAV-2-16 VAV-2-15 VAV-2-14
VAV-2-(9&10)
x1
R
A
14x12 RA
14x12
16x16 RA
14Ø SA 16Ø SA
6x
16x16 RA 18x18 RA 14x12 12x12 RA x1
R
A x1
SA
x1
SA
x1
SA
12x12 SA 10x10 SA 8x10 SA
12x10 SA 8x8 SA
12x10 SA8x8 SA 8x8 SA
14x12 RA 16x16 RA
Ø
S A x1
R
A
FSD FSDFSD FSD
FSD FSD FSD FSD
DDVAV-2-9
16Ø PSAH
20Ø PSAC
8x8 SA x1
6x
SA
x1 x1
SA
6x
R A
10x8 RA
12x12 RA
6Ø SA
6x6 RA 10x10 RA x1
SA
8x
SA
6x
SA
x8
R A
10Ø PSAH
14Ø 10Ø PSAC
12Ø
14x12 RA
12Ø SA
FSD
12x10 RA
14x14 RA
Ø
S A x1
R
A
FSD
10x10
14x10 SA
8Ø
Ø
Ø 14 Ø
Ø 12Ø
10Ø 10 x8 8x x8
10x8 x1 x8 x88x
6x
6x
6x x1 x8
6Ø
6Ø
Ø
Ø
Ø8Ø x1 x1 x1
8x x1 x1
6x
6x x1
0 6Ø S
A
8Ø
DDVAV-2-9
Texas Workforce Commission
KEYED MECHANICAL NOTES
1. DISCONNECT DIFFUSERS AND CAP (DDVAV-2-11) AT LOCATION SHOWN.
2. RECONNECT DIFFUSERS TO ZONE (DDVAV-2-10).
3. ADJUST DIFFUSERS
4. BALANCE AND ADJUST ZONE (DDVAV-2-10) AND (DDVAV-2-11) TO UPDATE
AIRFLOW.
5. ADD RETURN
6. ADD AND PROGRAM ADDITIONAL HVAC SENSOR TO (DDVAV 2-9). UPDATE
HVAC CONTROLS PROGRAMMING ALLOWING FOR TEMPERATURE AVERAGING.
UPDATING BAS GRAPHICS ACCORDINGLY.
2 33
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 2nd Floor Plan - Trinity Building
AutoCAD SHX Text M-1.01
AutoCAD SHX Text
2ND FLOOR MECHANICAL PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING
AutoCAD SHX Text
1117 TRINITY STREET
AutoCAD SHX Text
AUSTIN, TEXAS 78701-1919
(NEW WORK)
Elev.
Elev.
Mechanical
226T214T212T
221T
219T
242T
215T
213T
234T
211T
209T
3T
7T
242DT242CT
242BT
2A
T
0T
234AT234BT
234ET242ET 234CT234DT
230AT 230BT23
0T
230BT230AT
242ET 234ET 234DT
234AT
Texas Workforce Commission
BUILDING AREA KEY PLAN GENERAL ELECTRICAL NOTES
1. THIS PLAN IS ISSUED WITH THE INTENT OF PROVIDING THE CONTRACTOR WITH DESIGN
INFORMATION AVAILABLE AT THIS PHASE. THIS PLAN DOES NOT COVER ALL CONSTRUCTION ISSUES.
ADDITIONAL INFORMATION WILL BE SUBMITTED THROUGHOUT THE COURSE OF THE
CONSTRUCTION PROCESS.
2. ELECTRICAL AND DATA CONNECTIONS TO BE AT 15" A.F.F. U.N.O.
3. CROSSED OUT DATA DROPS AND ELECTRICAL RECEPTACLES ARE TO BE CAREFULLY RELOCATED
TO NEW WALL LOCATIONS AS SHOWN.
4. ALL NEW DATA DROPS AND ELECTRICAL RECEPTACLES SHALL BE RELOCATED INSIDE NEW
WALLS OR INFILLS.
LEGEND
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 1st Floor Plan - Trinity Building
AutoCAD SHX Text E-1.00
AutoCAD SHX Text
1ST FLOOR ELECTRICAL PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
DUPLEX ELEC. RECEPTACLE
AutoCAD SHX Text
DUPLEX ELEC. RECEPTACLE (EXISTING)
AutoCAD SHX Text
DATA CONNECTION
AutoCAD SHX Text
DATA CONNECTION (EXISTING)
AutoCAD SHX Text Fire Alarm Strobe
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
TRINITY BUILDING - 1ST FLOOR
AutoCAD SHX Text
1117 TRINITY STREET
AutoCAD SHX Text
AUSTIN, TEXAS 78701-1919
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
E
Elev.
Elev.
Mechanical
6D
T
226T
6C
T
6A
T
214T212T
221T
219T
242T
215T
213T
234T
2A
T
2D T
2E
T
211T
209T
3T
7T
234BT
4A
T
234CT
234DT234ET242DT242CT
242BT
2A
T
Elevator 1
Elevator 2 Elevator 3
LOBBY
CORR
252E
OFFICE
252D
OFFICE
ELEC
IT
MECHANICAL
STAIR
STAIR
JAN
TELEPHONE
WOMEN
MEN
CORR
ELEC BUSS RISER
XFMR T3-1
XFMR T-3
PANEL 20L1 (2 SEC.)
PANEL 20H1
PANEL 10L3 (2 SEC.)
A A AE A AE A A AE A A
A AE
A AE
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
AE
A
A A
A
AE
A A
A
A
A
AE
A
A
A
A A
A AE
A
AE
BE
BE
C C C
CE
C
C
A A A A A A
A
A G
G
A A
A A
G
E E E
X1 X1
X1
X1 X2
X1
S S
S
S
X1
CE
CE
X1
S
S
S
S S S S
S
5 Bd 2
B 6
B 6
B 6
B 6B 6
ALL 277V NORMAL BRANCH LIGHTING
IN THIS AREA SHALL BE CIRCUITED TO
20H1#9 U.N.O
DS
OS
S
Texas Workforce Commission
GENERAL RCP NOTES
1. THIS PLAN IS ISSUED WITH THE INTENT OF PROVIDING THE CONTRACTOR WITH DESIGN
INFORMATION AVAILABLE AT THIS PHASE. THIS PLAN DOES NOT COVER ALL CONSTRUCTION
ISSUES. ADDITIONAL INFORMATION WILL BE SUBMITTED THROUGHOUT THE COURSE OF THE
CONSTRUCTION PROCESS.
2. REMOVE AND RELOCATE SWITCH.
3.ADD SWITCH REF: FINISH SCHEDULE.
4. ADJUST OCCUPANCY SENSORS AND DAYLIGHT SENSORS.
5. LIGHT FIXTURES CAN BE ADJUSTED AS NEEDED DURING CONSTRUCTION.
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 2nd Floor Plan - Trinity Building
AutoCAD SHX Text R-1.00
AutoCAD SHX Text
2ND FLOOR REFLECTIVE CEILING PLAN (ENLARGED)
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING
AutoCAD SHX Text
1117 TRINITY STREET
AutoCAD SHX Text
AUSTIN, TEXAS 78701-1919
(EXISTING)
Elev.
Elev.
Mechanical
6D
T
226T
6C
T
6A
T
214T212T
221T
219T
242T
215T
213T
234T
2A
T
2D T
2E
T
211T
209T
3T
7T
230AT 230BT
242DT242CT
242BT
2A
T
0T
234AT234BT
234ET242ET 234CT234DT
Elevator 1
Elevator 2 Elevator 3
LOBBY
CORR
252E
OFFICE
252D
OFFICE
ELEC
IT
MECHANICAL
STAIR
STAIR
JAN
TELEPHONE
WOMEN
MEN
CORR
ELEC BUSS RISER
XFMR T3-1
XFMR T-3
PANEL 20L1 (2 SEC.)
PANEL 20H1
PANEL 10L3 (2 SEC.)
A A AE A AE A A AE A A
A AE
A AE
A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
A
A
A
A
A
AE
A
AE
A
AE
A
AA
A
AE
A A
A
A
A
AE
A
A
A
A A
A AE
A
AE
BE
BE
C C C
CE
C
C
A A A A A A
A
A G
G
A A
A A
G
E E E
X1 X1
X1
X1 X2
X1
S S
S
S
X1
CE
CE
X1
S
S
S
S S S S
S
B 6
B 6
B 6B 6
ALL 277V NORMAL BRANCH LIGHTING
IN THIS AREA SHALL BE CIRCUITED TO
20H1#9 U.N.O
DS
OS
OS OS OS
SS
S
S
S
S Texas Workforce Commission
GENERAL RCP NOTES
1. THIS PLAN IS ISSUED WITH THE INTENT OF PROVIDING THE CONTRACTOR WITH DESIGN
INFORMATION AVAILABLE AT THIS PHASE. THIS PLAN DOES NOT COVER ALL CONSTRUCTION
ISSUES. ADDITIONAL INFORMATION WILL BE SUBMITTED THROUGHOUT THE COURSE OF THE
CONSTRUCTION PROCESS.
2. REMOVE AND RELOCATE SWITCH.
3.ADD SWITCH REF: FINISH SCHEDULE.
4. ADJUST OCCUPANCY SENSORS AND DAYLIGHT SENSORS.
5. LIGHT FIXTURES CAN BE ADJUSTED AS NEEDED DURING CONSTRUCTION.
AutoCAD SHX Text Date
AutoCAD SHX Text Rev. No.
AutoCAD SHX Text
AutoCAD SHX Text 2nd Floor Plan - Trinity Building
AutoCAD SHX Text R-1.01
AutoCAD SHX Text
SCALE: N/A
AutoCAD SHX Text
PRINTED ON: 09/11/2026
AutoCAD SHX Text Project Name and Address:
AutoCAD SHX Text 101 East 15th Street Room 116 Austin, Texas 78778-0001 Phone (512) 463-6463 FAX (512) 463-4705
AutoCAD SHX Text
TRINITY BUILDING
AutoCAD SHX Text
1117 TRINITY STREET
AutoCAD SHX Text
AUSTIN, TEXAS 78701-1919
AutoCAD SHX Text
(NEW WORK)
2ND FLOOR REFLECTIVE CEILING PLAN (ENLARGED)
| Sheets and Views |
| CCEL_Trinity_A-0.00_COVER SHEET-A-0.00_11x17 |
| CCEL_Trinity_A-0.00_COVER SHEET-A-0.01_11x17 |
| CCEL_Trinity_A-0.00_COVER SHEET-A-0.02_11x17 |
| CCEL_Trinity_A-1.00_DEMOLITION PLAN ENLARGED_recover-Tablet - 11X17 |
| CCEL_Trinity_a-2.00_new construction plan_recover-Layout1-Tablet - 11X17 |
| CCEL_Trinity_a-2.00_new construction plan_recover-Layout1-Tablet - 11X17 (2) |
| CCEL_Trinity_MP-1_MECHANICAL PLANS-Layout1-Tablet - 11X17 (E) |
| CCEL_Trinity_MP-1_MECHANICAL PLANS-Layout1-Tablet - 11X17 (3) |
| CCEL_Trinity_E-1.00_ELECTRICAL PLAN ENLARGED_recover-Layout1-Tablet - 11X17 |
| CCEL_Trinity_R-1.00_REFLECTIVE CEILING PLAN ENLARGED_recover-Layout1-Tablet - 11X17 (E) |
| CCEL_Trinity_R-1.00_REFLECTIVE CEILING PLAN ENLARGED_recover-Layout1-Tablet - 11X17 (P) |
File details come from the government source that posted it. Updated .