ESBD_544349_1785357404922_G.4 Pricing Schedule EL PASO.pdf
PDF 932 KB Posted
- Attached to
- EL PASO VAULT DOOR REPLACEMENT
- Solicitation number
- TMD26-CFMO-0045489
- Issued by
- Texas
About this file
This is a pricing schedule document for the El Paso Vault Door Replacement project (TMD26-CFMO-0045489), issued by the Texas Facilities Commission (TMD) under building construction and doors and windows classifications. The project encompasses five primary work items: demolition, opening modifications, new vault door installation, lock installation, and testing. Each item is priced on a lump-sum basis with a total base bid representing a not-to-exceed amount. The contractor is responsible for completing all work as a turnkey project within a specified number of calendar days following issuance of the Notice to Proceed. The pricing schedule serves as the basis for bid evaluation and payment purposes only, with the final cost allocation at the contractor's discretion provided all deliverables are completed per contract requirements.
Award of the contract will be determined by selecting the most responsive and responsible bidder submitting the lowest price based on the base bid and any awarded options. TMD will apply best value analysis as directed by Texas Government Code Section 2155.074 when making the award decision. Contract award is contingent upon the availability of state and/or federal funding. TMD reserves the right to award all, none, or any sequence of bid alternates based on fund availability. Bidders are required to identify any pricing assumptions related to deliverable amounts or pricing conditions in the designated assumptions table.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Class and Item: 909-37 Doors and Windows; 909-30 Building Construction, (Not Otherwise Classified)
El Paso Vault Door Replacement - TMD26-CFMO-0045489
Description Unit Quantity Amount ($)
1. Demolition LS 1
2. Opening Modifications LS 1
3. New Vault Door Installation LS 1
4. Lock Installation LS 1
5. Testing LS 1
TOTAL BASE BID (NOT TO EXCEED)
Contractor estimates that the project will be completed within _________ calendar days following the Notice to Proceed.
The Total Base Bid shall include all labor, materials, equipment, supervision, permits, bonds, insurance, testing, commissioning, overhead, profit, and incidentals necessary to complete the project in accordance with the Contract Documents.
Note: This cost breakdown is for evaluation and payment purposes only. The Contractor is responsible for providing a complete, turnkey project as described in the Scope of Work, regardless of how costs are allocated.
* Award will be based on the most responsive, responsible Bidder and lowest price based on base bid and all options. TMD will award based on best value for the state as directed by Texas Government Code § 2155.074 when awarding a Contract. Award is contingent upon the availability of State and/or Federal funding. TMD reserves the right to award all, none, or any sequence of bid alternates contingent upon the availability of funds.
Table 2: Pricing Assumptions PRICING ASSUMPTIONS: Bidder shall provide any pricing amount assumptions for each Deliverable in reference to amounts and/or pricing conditions by outlining them (if any) in Table 2: Pricing Assumptions. Bidder may add additional rows as needed.
# Assumption
Attachment G.4 Page 1 of 1