ESBD_533979_1782938198934_Attachment 1-Section 28 02 00 – Basic Materials and Methods for Safety and Security Systems.pdf
PDF 324 KB Posted
- Attached to
- Control Panel - Sally Port Replacement
- Solicitation number
- 644-26-062926
- Issued by
- Texas
About this file
Summary Not Available
The provided file reference indicates a technical specification document (Section 28 02 00 – Basic Materials and Methods for Safety and Security Systems) related to a Control Panel - Sally Port Replacement project in Texas. However, the actual content of the PDF document was not included in the submission, only the file metadata and related contract opportunity information. Without access to the document's text or images, a comprehensive summary of key contract details, procurement requirements, pricing terms, timeline, and other salient information cannot be accurately provided. Please provide the actual document content to enable a detailed professional summary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_533979_1782938136685_RFP_644-26-062926.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evins State Juvenile Correctional Facility - Control Panel - Sally Port Replacement
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 1
SECTION 28 02 00
BASIC MATERIALS AND METHODS FOR SAFETY AND SECURITY SYSTEMS
PART 1 - GENERAL
1.1 GENERAL REQUIREMENTS
A. The requirements of the General Conditions and Supplementary Conditions apply to all Work herein.
B. The Contract Drawings indicate the extent and general arrangement of the systems. If any departure from the Contract Drawings are deemed necessary by the Contractor, details of such departures and the reasons therefore, shall be submitted to the Architect and Engineer for approval as soon as practicable. No such departures shall be made without the prior written approval of the Architect and Engineer.
1.2 SCOPE OF WORK
A. The Work included under this Contract consists of the furnishing and installation of all labor, material, tools, equipment and services necessary and required to form the complete and functioning electronic safety and security systems in all of its various phases, all as shown on the accompanying Drawings and/or described in these Specifications. The contractor shall review all pertinent drawings, including those of other contracts prior to commencement of Work.
B. This Division requires the furnishing and installing of all items Specified herein, indicated on the Drawings or reasonably inferred as necessary for safe and proper operation; including every article, device or accessory (whether or not specifically called for by item) reasonably necessary to facilitate each system's functioning as indicated by the design and the equipment specified. Elements of the work include, but are not limited to, materials, labor, supervision, transportation, storage, equipment, utilities, all required permits, licenses and inspections. All work performed under this Section shall be in accordance with the Project Manual, Drawings and Specifications and is subject to the terms and conditions of the Contract.
C. The approximate locations of Security items are indicated on the Drawings. These Drawings are not intended to give complete and accurate details in regard to location of outlets, apparatus, etc. Exact locations are to be determined by actual measurements at the building, and will in all cases be subject to the Review of the Owner or Engineer, who reserves the right to make any reasonable changes in the locations indicated without additional cost to the Owner.
D. Items specifically mentioned in the Specifications but not shown on the Drawings and/or items shown on Drawings but not specifically mentioned in the Specifications shall be installed by the Contractor under the appropriate section of work as if they were both specified and shown.
E. Any discrepancies within the Contract Documents or between the Contract Documents and actual job-site conditions shall be reported to the Owner or Engineer so that they will be resolved prior to bidding. Where this cannot be done at least 7 working days prior to bid, the greater or more costly of the discrepancy shall be bid. All labor and materials required to perform the work described shall be included as part of this Contract.
F. It is the intention of this Section of the Specifications to outline minimum requirements to furnish the Owner with a turn-key and fully operating system in cooperation with other trades.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 2
G. It is the intent of the above "Scope" to give the Contractor a general outline of the extent of the Work involved; however, it is not intended to include each and every item required for the Work. Anything omitted from the "Scope" but shown on the Drawings, or specified later, or necessary for a complete and functioning Safety and Security system shall be considered a part of the overall "Scope".
H. Coordinate with other contractors on items required for the proper functioning of Safety Security system and indicated as provided by others, such as power, backboxes, conduits, sleeves, air conditioning, structural support, etc..
I. Contractor shall participate in the commissioning process; including but not limited to meeting attendance, completion of checklists and participation in functional testing.
1.3 RELATED SECTIONS
A. Div 1 and conditions of the contract B. Section 08 71 00 - Door Hardware C. DIv 26 Electrical D. Div 27 Communications
1.4 REFERENCES
A. Americans with Disabilities Act (ADA) B. Building Codes (UBC) (IBC), latest editions C. National Electrical Code (NEC) D. American Society for Testing and Materials (ASTM) E. Underwriter's Laboratories, Inc. (UL) F. Insulated Cable Engineer's Association (ICEA).
G. National Electrical Manufacturer's Association (NEMA).
H. Institute of Electrical and Electronics Engineers (IEEE).
I. American National Standards Institute (ANSI).
J. National Fire Protection Association (NFPA).
K. International Energy Conservation Code (IECC).
L. BICSI (Building Industry Consulting Services International) M. Owner’s Design Guidelines and Construction Standards N. Local, county, state and federal regulations and codes in effect as of date of installation.
1.5 COMPLETE FUNCTIONING OF WORK
A. All work fairly implied as essential to the complete functioning of the electrical systems shown on the Drawings and Specifications shall be completed as part of the work of this Division unless specifically stated otherwise. It is the intention of the Drawings and Specifications to establish the types of the systems, but not set forth each item essential to the functioning of the system. In case of doubt as to the work intended, or in the event of amplification or clarification thereof, the Contractor shall call upon the Architect for supplementary instructions, Drawings, etc.
B. Contractor shall review all pertinent Drawings and adjust his work to all conditions shown there on. Discrepancies between Plans, Specifications, and actual field conditions shall be brought to the prompt attention of the Architect.
1. Approximate location of Security devices, equipment cabinets, conduits and sleeves, etc. are indicated on the Drawings. However, the Drawings, do not give complete and accurate detailed locations of such items and exact locations must be determined by actual field measurement. Such locations will, at all times, be subject to the approval of the Architect.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 3
2. Communicate with the Architect and secure his approval of any location about which there may be the least question. Outlets obviously placed in a location not suitable to the finished room or without specific approval, shall be removed and relocated when so directed by the Architect. Location of ceiling devices shall be coordinated with reflected ceiling plans.
C. Additional coordination with mechanical, electrical, plumbing contractor may be required to allow adequate clearances for all building components. Contractor to notify Architect and Engineer of unresolved clearances, conflicts or equipment locations.
1.6 DESCRIPTION OF SYSTEM WORK
A. Furnish and install all materials, tools, equipment, and services for all electronic security devices to provide functioning systems in accordance with performance requirements specified and any modifications resulting from reviewed shop and field coordinated drawings.
B. RACKS AND ENCLOSURES
1. Wall mounted enclosures, data gathering panels, and power supply panels shall be installed as per manufacturer’s requirements.
a. Coordinate pathways and power with Electrical and Telecommunications
Contractors
b. Furnish all labor, materials, tools, equipment, and services for all control consoles, equipment racks, cabinets, and enclosures not provided by others in accordance with contract documents.
c. Completely coordinate with work of other trades to avoid duplication in purchasing.
d. Although such work is not specifically indicated, furnish and install all supplementary or miscellaneous items, and devices incidental to or necessary for a sound, secure and complete installation.
2. Coordinate with rack/cabinet provider if it’s indicated to be provided by others.
Include them in scope of work if no other contractor is available or no indication that it is to be provided by others.
a. Coordinate with G.C.
3. Provide all supplementary or miscellaneous items and devices incidental to or necessary for a sound and complete installation.
4. Drawings are representative and show general arrangement of systems and equipment, except when dimensioned or detailed.
a. For exact locations refer to dimensioned architectural drawings.
1) Field measurements take precedence over dimensioned drawings.
2) Field verify locations and arrangement of all systems and equipment.
3) Coordinate all work with other trades and Contractor.
5. Circuit Supervision
a. Supervise all signal and data transmission lines, links with other systems, and sensors.
1) Indicate circuit and detection device faults with both protected zone and trouble signals.
2) Initiate an alarm in response to opening, closing, or shorting of a signal or data transmission line.
6. Electronic Safety and Security work as specified in this Section and sub sections shall include but not limited to:
a. A project kick-off/pre-submittal meeting with the Architect, Designer, and
Contractor to review security design package.
1) Additional participants shall include:
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 4
(a) Division 8 subcontractors
(b) Division 26 subcontractors
b. Preparation of pre-installation submittals, including point-to-point wiring information for security equipment to interface to work by others prior to start of any installation work. Include lock permit requests in submittals for review.
c. Furnishing and installation of all devices, components and accessories.
d. The furnishing and coordination on installation of special back boxes for equipment and field devices as required.
e. Furnishing, installation and termination of all wiring and cabling including any special purpose wire and cable for electronic safety and security systems.
1) Coordinate all phone, network and fiber optic cable interface provided by telecommunications subcontractor or carriers.
f. Coordinate raceway and power distribution systems provided by Division 26.
g. Provide and install 12/24 VAC/DC input power to all field devices as required.
h. Coordination with other trades and Owner required to facilitate the installation of the safety and security equipment including:
1) Division 08 (doors)
2) Division 26 (power, raceways, and fire alarms)
3) Division 27 (telecommunications network interface).
i. Wiring and termination of electrified door hardware by security subcontractor shall be concurrent with the installation of these electrified components by the door hardware subcontractor.
j. Programming of all security control equipment and prior coordination with the Owner’s security and telecommunications personnel, unless noted otherwise.
k. Preparation of “As-Built” documentation.
l. Warranty service for completed work.
1.7 SCHEMATIC NATURE OF CONTRACT DOCUMENTS
A. The contract documents are schematic in nature in that they are only to establish scope and a minimum level of quality. They are not to be used as actual working construction drawings. The actual working construction drawings shall be the approved shop drawings.
1.8 QUALITY ASSURANCE
A. Contractor shall have a complete working knowledge of the Security system being installed.
B. Maintain a valid Type B license from the Texas Private Security Bureau.
C. Contractor shall have installed similar-sized systems in at least ten (10) other projects in the last five (5) years prior to this bid and be regularly engaged in the business of installation of the types of systems specified in this document and maintain manufacturer certification for the system to be installed.
D. The contractor shall maintain a spare parts inventory necessary to resolve component failures of the system.
1. Refer to individual specification section for a list of specifically required parts provided to the owner and stored on site. These parts will become the property of the owner.
2. At the end of the warranty period the Safety and Security integrator shall test the owner’s spare parts and repair or replace as needed to bring the parts up to proper operation.
E. Contractor shall obtain Safety and Security system product manufacturer’s certification if applicable.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 5
F. Refer to General Conditions for other requirements.
1.9 CONTRACTOR REQUIREMENTS
A. In order to accomplish the conditions of this agreement, the Contractor shall perform the specific duties listed herein.
B. Contractor shall provide and pay for all labor, supervision, tools, equipment, test equipment, tests and services to provide and install a complete Safety and system.
Pay all required sales, gross receipts, and other taxes.
C. Insurance
1. The Contractor shall procure, submit for review, and maintain for the duration of this agreement, insurance against claims for injuries to persons or damages to property which may arise from, or in connection with, the performance of work hereunder by the Contractor, his agents, representatives, employees or subcontractor. The Contractor shall pay the cost of such insurance.
2. The Owner, its directors, officers, representatives, agents and employees, respectively, shall have no responsibility to the Contractor with respect to any insurance in accordance with the provisions set forth herein.
D. Regulatory Requirements
1. Safety and Security Contractor shall supply all city, county, and state telecommunication cabling permits required by Authority Having Jurisdiction
(AHJ).
2. Safety and Security Contractor shall be licensed and/or bonded as required for Safety and Security systems.
E. Privacy and Confidentiality
1. The Contractor will respect and protect the privacy and confidentiality of Owner, its employees, processes, products, and intellectual property to extent necessary, consistent with the legal responsibilities of the Owner policies.
2. Contractors shall sign a non-disclosure agreement and abide by the requirements to keep confidential all information concerning bid documents and this project.
F. Use of Subcontractors
1. Successful bidder shall inform the Owner’s contact and General Contractor in writing about the intention to use Subcontractors and the scope of work for which they are being hired.
2. The Owner or Owner’s designated contact must approve the use of Subcontractors in writing prior to the Subcontractor’s hiring and start of any work.
G. The Contractor’s designated Project Manager will be recognized as the single point of contact. The Project manager shall oversee all work performed to ensure compliance with specifications as outlined in bid documents (which includes all specifications, references, and drawings) to ensure a quality installation and attend project meetings with the telecommunication consultant, the Owner and others.
H. Coordination
1. Coordinate installation work with other trades (examples include ceiling grid contractors, HVAC and sheet metal contractors, etc.) to resolve procedures and installation placement for cable trays and cable bundle pathways.
2. The goal of this coordination will be to establish priority pathways for critical data/voice network cable infrastructure, materials, associated hardware, as well as mitigate delays to the project and to allow service access for Safety and Security components.
3. Exchange information and agree on details of equipment arrangements and installation interfaces.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 6
4. Coordinate with electrical contractors and plan for the pathway routes used Safety and Security cabling to minimize cable lengths.
5. Record agreements with other trades and distribute record to other participants, Owner and telecommunication consultant.
1.10 GENERAL REQUIREMENTS
A. Upon completion of commissioning testing and Owner acceptance, DBR bears no liability or responsibility for the continued proper operation of the installed systems.
B. The Items described herein shall not be modified or substituted without consent of DBR and/or the Owner.
C. Electronic Safety and Security systems integrator (Safety and Security subcontractor) manager/supervisor shall attend meetings arranged by the Contractor, Architect, Owner or other parties affected by the work of this Section.
D. If the manufacturer of Safety and Security devices or connecting hardware has supplied post manufacture performance data, copies of such are to be kept for inclusion in the documentation and made available to the Owner upon request.
E. All materials are to be new unused and of the latest series of model number, unless otherwise indicated by the Owner or Safety and Security system designer.
F. All Safety and Security integrator personnel must be manufacturer certified and capable of an installation that falls under the manufacturer's guidelines necessary to obtain a manufacturer warranty.
1. The integrator shall provide all components/materials essential for a complete and functional Safety and Security access and surveillance system.
G. Safety and Security integrator shall issue a 2-year warranty on installation and workmanship.
H. These Specifications and Drawings are intended for bidding purposes only; no part shall be copied or used for any purpose other than bidding on this project.
1. This package shall be contractual upon bid award.
I. Drawings and Specifications are to be used in conjunction with one another and to supplement one another.
1. In general Specifications determine the nature and quality of the materials and tests, and drawings establish the quantities, details and give characteristics of performance that should be adhered to in the installation of the Safety and Security system components.
2. If there is an apparent conflict between the drawings and specifications, or within the specifications themselves, the items with greater quantity or quality shall be estimated and installed.
3. Clarification with the Owner/Designer about these items shall be made prior to purchase and installation.
4. Questions regarding the Specification or system requirements should be directed in writing to DBR or the Owner.
J. Safety and Security integrator shall adhere to Division 1 general requirements and written Safety and Security Specifications and Drawings within this construction package and shall be responsible for complying with all local, state and federal laws or regulations applicable to the work being performed, even though said law, rule or regulation is not identified herein.
K. Safety and Security integrator shall arrange and pay for any inspections required by the public agencies having jurisdiction in the area.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 7
L. The Safety and Security contractor shall procure and maintain for the duration of this agreement, insurance against claims for injuries to persons or damages to property which may arise from, or conjunction with, the performance of the work hereunder by the Safety and Security integrator, his agents, representatives, or employees.
1. The Safety and Security integrator shall pay the cost of such insurance.
M. The Safety and Security integrator will respect and protect the privacy and confidentiality of the Owner, his employees, processes, products, and intellectual property to the extent necessary, consistent with the legal responsibilities of the State of Texas and the Owner.
N. If required the Safety and Security integrator shall sign a non-disclosure agreement and abide by its requirements to keep confidential all information concerning bid documents and this Project.
O. Furnish submittals and manuals in accordance with Division 1.
P. Furnish a detailed material list complete with suppliers (distributors) list of components and distributors name, address, and phone number.
Q. Refer to Specifications issued by Architect, Division 1, for Project and cost payments.
1.11 DATE OF FINAL ACCEPTANCE
A. The date of final acceptance shall be the date of owner occupancy, or the date all punch list items have been completed or final payment has been received. Refer to Division One for additional requirements.
B. The date of final acceptance shall be documented in writing and signed by the architect, owner and contractor.
1.12 DEFINITIONS AND SYMBOLS
A. General Explanation: A substantial amount of construction and Specification language constitutes definitions for terms found in other Contract Documents, including Drawings which must be recognized as diagrammatic and schematic in nature and not completely descriptive of requirements indicated thereon. Certain terms used in Contract Documents are defined generally in this article, unless defined otherwise in Division 1.
B. Definitions and explanations of this Section are not necessarily either complete or exclusive, but are general for work to the extent not stated more explicitly in another provision of the Contract Documents.
C. Indicated: The term "Indicated" is a cross-reference to details, notes or schedules on the Drawings, to other paragraphs or schedules in the Specifications and to similar means of recording requirements in Contract Documents. Where such terms as "Shown", "Noted", "Scheduled", "Specified" and "Detailed" are used in lieu of "Indicated", it is for the purpose of helping the reader locate cross-reference material, and no limitation of location is intended except as specifically shown.
D. Directed: Where not otherwise explained, terms such as "Directed", "Requested", "Accepted", and "Permitted" mean by the Architect or Engineer. However, no such implied meaning will be interpreted to extend the Architect's or Engineer's responsibility into the Contractor's area of construction supervision.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 8
E. Reviewed: Where used in conjunction with the Engineer's response to submittals, requests for information, applications, inquiries, reports and claims by the Contractor the meaning of the term "Reviewed" will be held to limitations of Architect's and Engineer's responsibilities and duties as specified in the General and Supplemental Conditions. In no case will "Reviewed" by Engineer be interpreted as a release of the Contractor from responsibility to fulfill the terms and requirements of the Contract Documents.
F. Furnish: Except as otherwise defined in greater detail, the term "Furnish" is used to mean supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, etc., as applicable in each instance.
G. Install: Except as otherwise defined in greater detail, the term "Install" is used to describe operations at the project site including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protection, cleaning and similar operations, as applicable in each instance.
H. Provide: Except as otherwise defined in greater detail, the term "Provide" is used to mean "Furnish and Install", complete and ready for intended use, as applicable in each instance.
I. Installer: Entity (person or firm) engaged by the Contractor or its subcontractor or Sub-contractor for performance of a particular unit of work at the project site, including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protection, cleaning and similar operations, as applicable in each instance. It is a general requirement that such entities (Installers) be expert in the operations they are engaged to perform.
J. Imperative Language: Used generally in Specifications. Except as otherwise indicated, requirements expressed imperatively are to be performed by the Contractor.
For clarity of reading at certain locations, contrasting subjective language is used to describe responsibilities that must be fulfilled indirectly by the Contractor, or when so noted by other identified installers or entities.
K. Minimum Quality/Quantity: In every instance, the quality level or quantity shown or specified is intended as minimum quality level or quantity of work to be performed or provided. Except as otherwise specifically indicated, the actual work may either comply exactly with that minimum (within specified tolerances), or may exceed that minimum within reasonable tolerance limits. In complying with requirements, indicated or scheduled numeric values are either minimums or maximums as noted or as appropriate for the context of the requirements. Refer instances of uncertainty to Owner or Engineer via a request for information (RFI) for decision before proceeding.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 9
L. Abbreviations and Symbols: The language of Specifications and other Contract Documents including Drawings is of an abbreviated type in certain instances, and implies words and meanings which will be appropriately interpreted. Actual word abbreviations of a self-explanatory nature have been included in text of Specifications and Drawings. Specific abbreviations and symbols have been established, principally for lengthy technical terminology and primarily in conjunction with coordination of Specification requirements with notations on Drawings and in Schedules. These are frequently defined in Section at first instance of use or on a Legend and Symbol Drawing. Trade and industry association names and titles of generally recognized industry standards are frequently abbreviated. Singular words will be interpreted as plural and plural words will be interpreted as singular where applicable and where full context of Contract Documents so indicate. Except as otherwise indicated, graphic symbols and abbreviations used on Drawings and in Specifications are those recognized in construction industry for indicated purposes. Where not otherwise noted symbols and abbreviations are defined by 1993 ASHRAE Fundamentals Handbook, chapter 34 "Abbreviations and Symbols", ASME and ASPE published standards.
1.13 DELIVERY, STORAGE, AND HANDLING
A. Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification.
B. Deliver products to the project at such time as the project is ready to receive the equipment, pipe or duct properly protected from incidental damage and weather damage.
C. Damaged equipment shall be promptly removed from the site and new, undamaged equipment shall be installed in its place promptly with no additional charge to the Owner.
1.14 SUBMITTALS
A. Coordinate with Division 01 for submittal timetable requirements, unless noted otherwise within thirty (30) days after the Contract is awarded. The Contractor shall submit an electronic copy of a complete set of shop drawings and complete data covering each item of equipment or material. The submittal of each item requiring a submittal must be received by the Architect or Engineer within the above thirty day period. The Architect or Engineer shall not be responsible for any delays or costs incurred due to excessive shop drawing review time for submittals received after the thirty (30) day time limit. The Architect and Engineer will retain a copy of all shop drawings for their files. All literature pertaining to items subject to Shop Drawing submittal shall be submitted at one time. Submittals shall be placed in one electronic file in PDF format and bookmarked for individual specification sections. Individual electronic files of submittals for individual specifications shall not be permitted. Each submittal shall include the following items:
1. A cover sheet with the names and addresses of the Project, Architect, MEP
Engineer, General Contractor and the Subcontractor making the submittal. The cover sheet shall also contain the section number covering the item or items submitted and the item nomenclature or description.
2. An index page with a listing of all data included in the Submittal.
3. Product Data and Shop Drawings shall be submitted in separate submittals, to avoid rejection of one due to errors in the other.
B. Shop Drawings
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 10
1. Safety and Security Contractor shall submit, for approval, floor plans that identify all device locations, device ID, cable routes and quantities, cable types, riser locations, and references to installation details and diagrams.
2. A functional description of each system.
3. All cable and wiring types for each device type used.
4. Certification that lock wiring and access control systems requirements have been coordinated with electrified door hardware, fire alarm systems, automatic door controls, and overhead door controls specified in other sections and other packages.
5. Riser diagram showing routes between floors or other areas that are not easily identified on the floor plans.
6. Safety and Security One-line diagrams showing all input and output points of the system.
a. The Contractor shall make any corrections required by the consultant team, file with him two corrected copies and furnish such other copies as may be needed.
7. Power supply points listing with devices and maximum loads to prevent overloading.
8. Equipment schedules listing all system components, manufacturer, model number and quantities of each.
9. Safety and Security Contractor shall submit, for approval, diagrams that show
Safety and Security equipment layouts, rack layouts (including wall and rack elevations), cabling riser and interconnection diagrams, etc.
10. Safety and Security Contractor shall submit, for approval, labelling scheme for all Safety and Security devices and cabling components (faceplates, horizontal cables, riser cables, inter-building cables, racks, patch panels, etc.) installed.
11. The Contractor shall make any corrections as required by the Engineer and submit revised shop drawings to the team for approval.
12. Approval by the Engineer of such drawings or schedules shall not relieve the Contractor from responsibility for deviations from the drawings or specifications, nor shall it relieve the Contractor from responsibility for errors of any sort in shop drawings or schedules. Requests to deviate shall be submitted in writing to the Architect.
13. Drawings shall show the proposed firestop systems and locations, (stamped/embossed by the PE) to restore/maintain the designed fire rating of the building structure (walls, ceilings, floors, etc.).
14. Shop Drawings shall be newly prepared and not reproduced from the Contract Documents. Drawings shall be prepared by a draftsman skilled in this type of work.
Submitting copy of the engineering drawings or engineering drawings with contractor's markup as shop drawings is NOT ACCEPTABLE.
15. Shop drawings shall be developed in coordination with other trades (MEP, Architecture, Structural, etc.) to avoid any collision or conflict and to meet all industry standards best practices, codes and regulation requirements. By submitting shop drawings on the project, this Contractor is indicating that all necessary coordination has been completed and that the systems, products and equipment submitted can be installed in the building and will operate as specified
16. Additional coordination with other trade contractors may be required to allow adequate clearances and meet code requirements. All transitions, offsets and relocations as required by actual field conditions shall be performed by the contractor at no additional cost to the owner
C. Product Data Submittals
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 11
1. Safety and Security Contractor shall submit catalogue cut-sheets that include manufacturer, trade name, and complete model number for each product specified. Model number shall be handwritten and/or highlighted to indicate exact selection.
2. Safety and Security Contractor shall identify applicable specification section reference for each product performance for each component specified for approval prior to purchase and installation.
3. Inlcude battery backup calculations to show load and back-up times for UPS and power supplies with batteries.
4. Include licenses and permit required, and qualifications and proof of work history (with references).
5. All data sheets shall be organized by specification sections and provided with table of contents. All products required shall be included in one submittal.
6. All product substitutions shall be submitted in advance for review and approval before being included in product submittal package.
7. Specification variations pages with a listing of all variations, including unfurnished or additional required accessories, items or other features, between the submitted equipment and the specified equipment. If there are no variations, then the specification page shall state "NO VARIATIONS". Where variations affect the work of other Contractors, then the Contractor shall certify on this page that these variations have been fully coordinated with the affected Contractors and that all expenses associated with the variations will be paid by the submitting Contractor.
This page will be signed by the submitting Contractor.
8. Equipment information including manufacturer's name and designation, size, performance and capacity data as applicable. All applicable Listings, Labels, Approvals and Standards shall be clearly indicated.
9. Dimensional data and scaled drawings as applicable to show that the submitted equipment will fit the space available with all required Code and maintenance clearances clearly indicated and labeled at a minimum scale of 1/4" = 1'-0", as required to demonstrate that the alternate or substituted product will fit in the space available.
10. Identification of each item of material or equipment matching that indicated on the Drawings.
11. Sufficient pictorial, descriptive and diagrammatic data on each item to show its conformance with the Drawings and Specifications. Any options or special requirements or accessories shall be so indicated. All applicable information shall be clearly indicated with arrows or another approved method.
12. Certification by the General Contractor and Subcontractor that the material submitted is in accordance with the Drawings and Specifications, signed and dated in long hand. Submittals that do not comply with the above requirements shall be returned to the Contractor and shall be marked "REVISE AND RESUBMIT”.
D. Warranty
1. The Safety and Security Contractor shall submit appropriate documentation from the certifying manufacturer showing the project is registered and qualified for the System Assurance Warranty.
2. All subsequent work shall be in accordance with approved submittals. The Safety and Security Contractor shall not perform any portion of the work requiring approval of the System Assurance Warranty manufacturer’s warranty registration qualification procedures that would disqualify any part or all of the system from that warranty qualification.
E. Qualifications
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 12
1. Safety and Security Contractor shall submit a list of the Contractor’s previous projects that demonstrate qualification for this project. This list shall include, but not be limited to:
a. At least ten (10) other projects in the last five (5) years
b. Name and location of project
c. Project contacts, email addresses, and phone numbers
d. Total square footage
e. Total number of devices
f. Types of system platform
2. Safety and Security Contractor shall submit an up-to-date and valid statement of qualifications for those assigned to perform the work specified herein at time of bid submission.
a. Safety and Security Contractor Employees
b. Subcontractors
3. Manufacturer certifications for Contractor and installers.
F. Refer to Division 1 for additional information on shop drawings and submittals.
G. Equipment and materials submittals and shop drawings will be reviewed for compliance with design concept only. It will be assumed that the submitting Contractor has verified that all items submitted can be installed in the space allotted. Review of shop drawings and submittals shall not be considered as a verification or guarantee of measurements or building conditions.
H. Where shop drawings and submittals are marked "REVIEWED", the review of the submittal does not indicate that submittals have been checked in detail nor does it in any way relieve the Contractor from his responsibility to furnish material and perform work as required by the Contract Documents.
I. Submittals shall be reviewed and returned to the Contractor with one of the following categories indicated:
1. REVIEWED: Contractor does not need to take further submittal action, shall include this submittal in the O&M manual, and verify with Architects and other parties (Owner, etc) reviewing the submittals that no other correction is required before placing orders and starting installations.
2. REVIEWED AS NOTED: Contractor shall submit a letter verifying that required exceptions to the submittal have been received and complied with including additional accessories or coordination action as noted, and shall include this submittal and compliance letter in the O&M manual. The contractor may order the equipment submitted on at the time of the returned submittal providing the Contractor complies with the exceptions noted, and verifed with Architects and other parties (Owner, etc) reviewing the submittals that no other correction is required before placing orders and starting installations.
3. NOT APPROVED: Contractor shall resubmit new submittal on material, equipment or method of installation when the alternate or substitute is not approved, the Contractor will automatically be required to furnish the product, material or method named in the Specifications and/or drawings. Contractor shall not order equipment that is not approved. Repetitive requests for substitutions will not be considered.and/or drawings. Contractor shall not order equipment that is not approved. Repetitive requests for substitutions will not be considered.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 13
4. REVISE AND RESUBMIT: Contractor shall resubmit new submittal on material, equipment or method of installation when the alternate or substitute is marked revise and resubmit, the Contractor will automatically be required to furnish the product, material or method named in the Specifications and/or provide as noted on previous shop drawings. Contractor shall not order equipment marked revise and resubmit. Repetitive requests for substitutions will not be considered.
5. CONTRACTOR’S CERTIFICATION REQUIRED: Contractor shall resubmit submittal on material, equipment or method of installation. The Contractor’s stamp is required stating the submittal meets all conditions of the contract documents.
The stamp shall be signed by the General Contractor. The submittal will not be reviewed if the stamp is not placed and signed on all shop drawings.
6. MANUFACTURER NOT AS SPECIFIED: Contractor shall resubmit new submittal on material, equipment or method of installation when the alternate or substitute is marked manufacturer not as specified, the Contractor will automatically be required to furnish the product, material or method named in the specifications.
Contractor shall not order equipment where submittal is marked manufacturer not as specified. Repetitive requests for substitutions will not be considered.
J. Materials and equipment which are purchased or installed without shop drawing review shall be at the risk of the Contractor and the cost for removal and replacement of such materials and equipment and related work which is judged unsatisfactory by the Owner or Engineer for any reason shall be at the expense of the Contractor. The responsible Contractor shall remove the material and equipment noted above and replace with specified equipment or material at his own expense when directed in writing by the Architect or Engineer.
K. Shop Drawing Submittals shall be complete and checked prior to submission to the Engineer for review.
L. Furnish detailed shop drawings, descriptive literature, physical data and a specification critique for each section indicating "compliance" and/or "variations" for the following items:
1. Fire Alarm System
2. Access Control System
3. Video Surveillance System
4. Intrusion Detection System
M. Refer to each specification section for additional requirements.
1.15 COORDINATION DRAWINGS
A. Before submit shop drawings, Contractor shall prepare coordination drawings to a scale of 1/4"=1'-0" or larger; detailing major elements, components, and systems of mechanical equipment and materials in relationship with other systems, installations, and building components. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following:
1. Indicate the proposed locations of Safety and Security conduits/sleeves, pullboxes, equipment, cabinet and other materials. Include the following:
a. Wall and type locations.
b. Clearances from other building structure and MEP equipment.
c. Clearances for servicing and maintaining equipment and cabling, and space for equipment disassembly required for periodic maintenance.
d. Equipment connections and support details.
e. Exterior wall and foundation penetrations.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 14
f. Fire-rated wall and floor penetrations.
g. Sizes and location of required concrete pads and bases.
h. Structural floor, wall and roof opening sizes and details.
2. Indicate scheduling, sequencing, movement, and positioning of large equipment into the building during construction.
3. Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations.
4. Prepare reflected ceiling plans to coordinate and integrate installations, air distribution devices, light fixtures, communication systems components, and other ceiling-mounted items.
B. This Contractor shall be responsible for coordination of all items that will affect the installation of the work of this Division. This coordination shall include, but not be limited to: cable routing, equipment location, clearance, space requirements, sequence of construction, building requirements and special conditions.
C. By submitting shop drawings on the project, this Contractor is indicating that all necessary coordination has been completed and that the systems, products and equipment submitted can be installed in the building and will operate as specified and intended, in full coordination with all other Contractors and Subcontractors.
1.16 OPERATION AND MAINTENANCE MANUALS
A. Prepare maintenance manuals in accordance with Division 1 and in addition to the requirements specified in Division 1, include the following information for equipment items:
1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts.
2. Manufacturer's printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions.
3. Maintenance procedures for routine preventative maintenance and troubleshooting;
disassembly, repair, and reassembly; aligning and adjusting instructions.
4. Servicing instructions and lubrication charts and schedules.
5. Prepare maintenance manuals in accordance with Special Project Conditions, in addition to the requirements specified in Division 28, include the following information for equipment items:
a. Identifying names, name tags designations and locations for all equipment.
b. Fault Current calculations and Coordination Study.
c. Reviewed shop drawing submittals with exceptions noted compliance letter.
d. Fabrication drawings.
e. Equipment and device bulletins and data sheets clearly highlighted to show equipment installed on the project and including performance curves and data as applicable, i.e., description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and model numbers of replacement parts.
f. Manufacturer's printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 15
g. Maintenance procedures for routine preventative maintenance and troubleshooting; disassembly, repair, and reassembly; aligning and adjusting instructions, servicing instructions and lubrication charts and schedules.
h. Equipment name plate data.
i. Wiring diagrams.
j. Exploded parts views and parts lists for all equipment and devices.
k. Color coding charts for all painted equipment and conduit.
l. Location and listing of all spare parts and special keys and tools furnished to the Owner.
m. Furnish recommended lubrication schedule for all required lubrication points with listing of type and approximate amount of lubricant required.
6. The Safety and Security Contractor shall deliver the Installer's Warranty and
Manufacturer's signed System Warranty.
a. Delivery shall be completed within two (2) weeks of the time of final punch list review.
b. Product Certificates shall be signed by manufacturers certifying that products furnished comply with requirements.
7. Testing Report Requirements
a. Submit certified test reports of Contractor-performed tests. Contractor shall submit the required Test Reports in the format and media specified, upon completion of testing the installed system.
b. The tests shall clearly demonstrate that the media and its components fully comply with the requirements specified herein.
c. Three (3) sets of electronic and hardcopy versions of test reports shall be submitted together and clearly identified with cable designations.
8. Supply Owner with training manuals with instructions on methods of adding or removing cabling to/from firestopped sleeves and chases.
1.17 RECORD DRAWINGS
A. Maintain a continuous record during the course of construction of all changes and deviations in the work from the contract drawings. Upon completion of the work, purchase a set of "Auto Positive Tracings" on vellum and make corrections as required to reflect the electrical systems as installed. Location and size of all conduit shall be accurately shown to dimension. Submit three prints of the tracings for approval. Make corrections to tracings as directed and deliver "Auto Positive Tracings" to the Architect.
Record drawings shall be furnished in addition to shop drawings. Symbols on the Record drawings shall correspond to the identification symbols on the contract drawings and equipment identification plates and tags.
B. The Contractor shall maintain a set of clearly marked black line record "AS-BUILT" prints on the job site on which he shall mark all work details, alterations to meet site conditions and changes made by "Change Order" notices. These shall be kept available for inspection by the Owner, Architect or Engineer at all times.
C. Refer to Division 1 for additional requirements concerning record drawings. If the Contractor does not keep an accurate set of as-built drawings, the pay request may be altered or delayed at the request of the Architect. Mark the drawings with a colored pencil. Delivery of as-built prints and reproducibles is a condition of final acceptance.
D. The record prints shall be updated on a daily basis and shall indicate accurate dimensions for all buried or concealed work, precise locations of all concealed device and cabling, and any deviations from the work shown on the Construction Documents which are required for coordination. All dimensions shall include at least two dimensions to permanent structure points.
Basic Materials and Methods for Safety and Security Systems 28 02 00 - 16
E. Submit three prints of the tracings for approval. Make corrections to tracings as directed and delivered "Auto Positive Tracings" to the architect. "As-Built" drawings shall be furnished in addition to shop drawings.
F. When the option described in paragraph E., above is not exercised then upon completion of the work, the Contractor shall transfer all marks from the submit a set of clear concise set of reproducible record "AS-BUILT" drawings and shall submit the reproducible drawings with corrections made by a competent draftsman and three (3) sets of black line prints to the Architect or Engineer for review prior to scheduling the final inspection at the completion of the work. The reproducible record "AS-BUILT" drawings shall have the Engineers Name and Seal removed or blanked out and shall be clearly marked and signed on each sheet as follows:
CERTIFIED RECORD DRAWINGS
DATE:
(NAME OF GENERAL CONTRACTOR)
BY:_______________________________
(SIGNATURE)
(NAME OF SUBCONTRACTOR)
BY:_______________________________
(SIGNATURE)
1.18 CERTIFICATIONS AND TEST REPORTS
A. Submit a detailed schedule for completion and testing of each system indicating scheduled dates for completion of system installation and outlining tests to be performed and schedule date for each test. This detailed completion and test schedule shall be submittal at least 90 days before the projected Project completion date.
B. Test result reporting forms shall be submitted for review no later than the date of the detailed schedule submitted.
C. Submit 4 copies of all…