About this file
This is Addendum No. 2 to a Request for Qualifications (RFQ) issued by the Texas State University System for Architect/Engineer (A/E) professional services on behalf of Sul Ross State University for the design of Multi-Purpose Building One at the university's Eagle Pass campus. The RFQ (No. 758-26-07022) was originally posted on April 7, 2026, with Addendum No. 1 issued on April 20, 2026, and Addendum No. 2 issued on April 24, 2026. An optional pre-submittal conference was scheduled for April 16, 2026, with qualifications submissions due by May 5, 2026, at 2:00 p.m. Central Daylight Time to Sam Houston State University's Procurement & Business Services office. The three-story, 40,000 gross square foot inaugural building will serve as the first permanent structure on the 43-acre Eagle Pass Campus and will include student services, administrative offices, instructional spaces, labs, library/learning commons, faculty offices, and supporting infrastructure. The Owner expects to select the most qualified Respondent by May 22, 2026, with Schematic Design commencing June 22, 2026, and final completion targeted for December 15, 2028.
Addendum No. 2 addresses seven clarifying questions submitted by respondents regarding submission requirements, past performance qualifications, HUB coordination, commissioning services procurement, and union membership. Key clarifications include confirmation that electronic submissions are not permitted and all submittals must be made in hard copy per Section 1.5 of the RFQ; affirmation that team members may utilize past performance from previous employers if clearly identified and explained; establishment of a 2 percent VetHUB subcontracting goal; identification of Sam Houston State University's HUB Coordinator contact information for HSP inquiries; notification that "TBD" entries are no longer accepted in the Approximate Dollar Amount column of the HSP; confirmation that all project information and addenda are available through the Electronic State Business Daily; clarification that union membership is not required; and specification that the university will procure commissioning services directly at a later date rather than through the A/E contract. Respondents are directed to contact Donna Bryce, Senior Contract Administrator at the Texas State University System (Donna.Bryce@tsus.edu, 512-463-1808), for additional information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(i)
(ii)
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECT/ENGINEER
PROFESSIONAL SERVICES
FOR
SUL ROSS STATE UNIVERSITY
EAGLE PASS, TEXAS
Multi-Purpose Building One
RFQ No.:
758-26-07022 Notice To All Respondents:
The following is Addendum No. 2 to the Request for Qualifications (RFQ) Addendum No. 1 was posted on April 20, 2026
ESBD Posting No. 758-26-07022 was posted on April 7, 2026
Prepared By:
Donna Bryce, Senior Contract Administrator
The Texas State University System
601 Colorado Street
Austin, Texas 78701 - 512-463-1808
Donna.Bryce@tsus.edu
Addendum No. 2 Issued April 24, 2026
Addendum No. 2 - RFQ for Architect/Engineer Professional Services (posted 04/24/2026) Multi-Purpose Building One at Sul Ross State University in Eagle Pass, Texas
RFQ No. 758-26-07022
I. GENERAL:
A. Below are the questions that were presented along with answers to each in relation to this RFQ as of April 24, 2026, 12:00 p.m.:
1. Question: VetHUB goal percentages are for the project.
Answer: The current VetHUB goal is 2%.
2. Question: Does the RFQ response need to be uploaded to the portal as well as delivered in person?
Answer: All Qualification submittals must be made in compliance with Section
1.5. of the RFQ, specifically Paragraphs 1.5.1 and 1.5.2. Electronic submittals are not permitted, per Paragraph 1.5.6.
3. Question: Can we utilize a team member past performance at another firm for our project experience in section 3.4.1 and or 3.4.4?
Answer: Yes, so long as the as that team member is identified and their past performance is clearly explained and stated.
4. Question: Contact information for the VetHUB Coordinator.
Answer: Questions regarding the HSP and/or to review the HSP as a courtesy can be directed to Sam Houston State University's HUB Coordinator, Cynthia
Guajardo, at (936) 294-1991 or shsuhub@shsu.edu. All such inquiries must be made PRIOR to the RFQ closing date and time stated under Paragraph 1.5.2.
Note that the acronym “TBD” (to be determined) will no longer be accepted in the column marked Approximate Dollar Amount in the HSP.
5. Question: I am working on Beck Architecture’s response for RFQ #758-26-
07022. We are pursuing GFE Method B for Texas State University System.
This is my first time completing this method for the System. Does the HUB
Coordinator have availability for a meeting today to confirm I am sending our opportunity notification and completing the tracking correctly? Any information or availability you can provide would be appreciated.
Answer: See Answer to Question No. 4.
6. Question: ConstructConnect: writing to request a copy of the pre-bid meeting attendance sheet, any addenda that have been released to date and the plan holders list if available. I would also like to know if Union is required for all your bids.
Answer: The information requested and all addenda issued for this project are posted in the Electronic State Business Daily at:
https://www.txsmartbuy.com/esbd
Union membership or representation is not a requirement for The Texas State
University solicitations.
Addendum No. 2 - RFQ for Architect/Engineer Professional Services (posted 04/24/2026) Multi-Purpose Building One at Sul Ross State University in Eagle Pass, Texas
RFQ No. 758-26-07022 mailto:shsuhub@shsu.edu https://www.txsmartbuy.com/esbd
7. Question: We were reviewing this Multi-Purpose Building One RFQ for Sul
Ross University and wanted to know how you will procure commissioning services for this project. Is this something the University oversees/hires directly or do you leave that decision to a project leader (e.g. architect)?
Answer: The university will be responsible for procuring commissioning services. Procurement of these services will occur at a later date, once the preferred MEP systems have been selected.
- END OF ADDENDUM NO. 2 -
Addendum No. 2 - RFQ for Architect/Engineer Professional Services (posted 04/24/2026) Multi-Purpose Building One at Sul Ross State University in Eagle Pass, Texas
RFQ No. 758-26-07022
File details come from the government source that posted it. Updated .