ESBD_496561_1774647031016_PCS 134 HHS Responses to Questions.pdf
PDF 82 KB Posted
- Solicitation number
- HHS0017062
- Issued by
- Texas
About this file
This document is a responses to questions file issued by the Texas Health and Human Services Commission (HHS) for the Handrail Installation and Additions project at San Antonio State Hospital, Solicitation Number HHS0017062. The project involves the installation of wall-mounted handrail systems across two floors of the facility, with a total of 1,600 linear feet (800 linear feet per floor on the second and third floors). The work scope includes removal of existing high-impact sheetrock, installation of new wood blocking for support, installation of new two layers of reinforced drywall, patching, sanding, and painting, followed by installation of the wall-mounted handrail system. Contractors must provide both labor and materials for the project. The bid due date is April 8, 2026 at 10:30 AM. Dust protection from floor to ceiling is required in work areas, and only one wing may be worked on at a time. Contractors must maintain an office location within a 20-mile radius of the San Antonio Metroplex. A site visit was conducted to allow bidders to assess project requirements and conduct material and labor takeoffs.
The handrail finish color and sheen specified is Pumice #858 by Construction Specialties, with the wall construction consisting of metal studs and high-impact sheetrock. Builder's risk insurance is required; however, bid bonds and performance/payment bonds are not required for bid submission, though the HHS Agency may request additional insurance or bonds coverage at its discretion. Floor plans and detailed drawings have been provided as Exhibit I to assist contractors in determining exact quantities of materials needed, including the number of right and left end caps. The project specifications require that wall-backing support be installed per manufacturer recommendations for the handrails, and a 200-pound dead weight test must be performed per the Scope of Work standards. Background checks are not required at bid stage but may be requested later if deemed necessary.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PCS 134 HHS Responses to Questions
Effective Date 06/26/2015 Page 1 of 4 Reviewed Date 09/18/2025
Solicitation Title: Handrail Installation and Additions San Antonio State Hospital
Solicitation Number: HHS0017062
# Reference Question Response
1. Can a floorplan be provided in areas where new handrails are to be installed?
Floor plans can be provided – please see attached Exhibit I
2.
During the site visit, it was mentioned that dust protection must be provided from floor to ceiling in areas that work is being performed. Please confirm.
That is correct.
3.
After attending the site visit, it was made aware that the total LF required for the new railing will exceed the 800 LF notated on the original solicitation. Could you provide a set of drawings to conduct an accurate take-off for the material and labor needed for the second and third floors?
Drawings can be provided – please see attached Exhibit I
4.
In the IFB it states bid due date is April 8, but in TXsmartbuy it states bid due date is May 8, can you please confirm which date is the correct bid due date?
April 8, 2026 at 10:30 AM is the due date.
5. Please confirm whether we are to provide both labor and materials, or labor only for this project?
Both labor and materials are to be provided by the vendor.
6.
Please clarify the extent of wall preparation: Is sheetrock removal required only at locations where solid backing is needed or is removal required along the entire handrail run?
Sheetrock will need to be removed at the areas where the blocking will need to go to support the handrails
7.
Noted that contractor must have an office located within 20 miles of the facility. Can you verify if this is a requirement please?
Office must be located within a 20-mile radius of the San Antonio Metroplex
Effective Date 06/26/2015 Page 2 of 4 Reviewed Date 09/18/2025
8. How to do wall backing support? Per manufacturers recommendation for the handrails
9.
Will the Owner and Vendor conduct a 200 lb. Dead weight test? If yes, please provide the process of the test.
No weight test will be conducted, but needs to be done per SOW.
10. What is the total linear feet of new handrails? 800 LF for each floor
11.
In the current SOW it state 800 LF, but at the bid site visit it was mentioned 1,600 LF of new handrail system for two floors, please confirm? Therefore, it would be 800 LF on the second floor and an additional 800 LF on the third floor, making a total of 1,600 LF?
Total of 1,600 LF for both floors.
12. How many right and left end caps?
That can be done off the drawings that can be provided
– please see attached Exhibit I
13. Can a Floor Plan please be provided? Yes – please see attached Exhibit I
14. How many wings can a vendor work on at the same time?
One wing at a time.
15. Is Builder’s risk insurance required? Yes
16. How old is the building? 2 years old.
Effective Date 06/26/2015 Page 3 of 4 Reviewed Date 09/18/2025
17. Is a bid bond required? No.
18. Are payment and performance bonds required?
No. A payment and/or performance bond is not required with the bid submission. The HHS Agency, in its sole discretion, may request additional evidence of insurance or bonds coverage as deemed necessary.
Reference PCS 137 IFB Solicitation, section 14 Insurance Requirements.
19. Will background checks be required, such as Identogo?
No. Background checks may be required if requested.
Please see Section 7.1.10.
20.
If there are any fire alarm unit, light switch, mechanical, electrical, or plumbing in the way – plwase advise what to do in these situations?
That can be addressed during the project, but none should be in the way
21. How are the exiting walls constructed (metal studs, drywall, etc)?
Metal studs and high impact sheetrock
22. Are there two layers of existing drywall, please confirm?
Only in some of the areas
23.
What type of drywall is installed? And what type of drywall needs to be installed? For example: drywall with reinforcements?
All high impact sheetrock
24.
Please confirm that the First stage will be removal of two layers of drywall, install new wood blocking, new two layers of reinforced drywall, patch, sand and paint wall?
Yes
Effective Date 06/26/2015 Page 4 of 4 Reviewed Date 09/18/2025
25. Please confirm that the second state will be to install a wall mounted hand rail system?
Yes
26. Please provide color and sheen? Pumice #858 By Construction Specialties
File details come from the government source that posted it. Updated .