ESBD_496561_1774646901140_HHS0017062_Exhibit I Site Plans.pdf
PDF 4 MB Posted
- Solicitation number
- HHS0017062
- Issued by
- Texas
About this file
This document is a site plan and finish plan for the San Antonio State Hospital, a healthcare facility project in Texas overseen by the Texas Health & Human Services Commission. The plans detail the interior layout and material specifications for Area 03 of the facility, which comprises multiple levels including patient care units, clinical staff areas, support services, and administrative spaces. The facility includes extensive psychiatric and patient care infrastructure with numerous patient rooms, bathrooms, therapy rooms, dining facilities, and staff areas distributed across main, upper, and top levels. The finish plans specify flooring materials (flocked flooring, linoleum, porcelain tile, rubber flooring, epoxy systems, and carpet tiles in multiple colors), wall and ceiling treatments (gypsum board with various specifications, paint finishes in designated colors P1 through P12, and cementitious wood fiber plank ceilings), and safety features including vinyl corner guards, handrails, and crash rails throughout the facility.
The document references construction documentation dated from June 2020 through December 2021, with revisions tracked through multiple addendums and project submissions. The project design team included HKS, Inc. as the architect and interior designer, with Walter P Moore as the structural engineer, Shah Smith & Associates as the MEP engineer, Vaughn Construction as the general contractor, and various specialized consultants for landscape, telecommunications, medical equipment, food service, graphics, commissioning, and cost estimating. The specifications emphasize contractor coordination requirements for flooring installation, fire-retardant wood blocking at partitions, grab bar preparation with 16-gauge metal studs, and careful sequencing around hollow metal door frames. Multiple finish notes and legends provide detailed guidance on material selections, installation standards, and adherence to referenced detail sheets and specifications throughout the construction documentation package.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
HC AIRBORNE
ISOLATION
ROOM
HC PATIENT
PATIENT
TOILET
1499A
1498A
1496A
1493A
1495A
1494A
1492A
PATIENT ROOM
1482A
1484A
1489A
1487A
1485A
1483A
QUIET /
ACTIVITY
1478A
1476A
1472A
1474A
1473A
1475A
1477A
1479A
SECLUSION
1453A
ACTIVITY /
RECREATION
GROUP
THERAPY
MULTI-PURPOSE
INTERVIEW /
CONSULT
EQUIPMENT
STORAGE
PROPERTY
COMFORT
HOUSEKEEPING
ARTS
CLINICAL
STAFF OFFICE
1241 FILES/
STAFF ENTRY
SALLYPORT
1600C
1600B
1600A
STAFF SUITE
1122A
CARE STATION
1469A
STAIR
12D
14D
14B
ACTIVITY/
PORCH
1490A
1470A
1480A
1486A
1497A
FILES/
1441 COPY
LOBBY
CORRIDOR
1490B
1470B
PNA
SUPERVISOR
SUITE
1437 EXIT
PASSAGE
OT TECH SUITE
140C
140A
1480B
1453B
ANTE ROOM
TUB ROOM
EXAM
STAFF
RESPITE
ELECTRICAL
1469B
SOILED
HOLDING
LAUNDRY
HC STAFF
MEDS
DINING
14A
CHARTING
CLEAN
1400.1
DATA
VISIT /
ELEV 4
1400A
HUDDLE
FOOD SERVICE
1451A
TEAM
CONFERENCE/
PLANNING
LS1
LS2
LS2 LS2
LS2 LS2
LS6 LS6
LS3
LS6
COURTYARD
COURTYARD
LS8
LS5
LS4
LS3 LS3
14C
14E
P4
P4 P4
P7
P11
P5P5P5
P6
P9
P2
P1 1 P11 P1
P11 P1 1 P11
1P11
P11P1 1P11 P1
P8
LS2LS2LS2
SEE SHEET A5.18 FOR PORCH MATERIALS AND DETAILS.
P11P11
P11P11 P11 P11
P12
2'
5/
8" 6'
0"
EQ. 12' - 0" EQ.
3' - 11 3/4"
1'
8"
REF. A9.12/ 01
REF. A9.15/ 01 REF. A9.14/ 01
1. CONTRACTOR SHALL PROVIDE CEMENTITIOUS FLASH PATCHING AS
REQUIRED AT NEW CONCRETE SLABS, TO ENSURE A SMOOTH & LEVEL
SURFACE ADEQUATE FOR INSTALLATION OF FLOOR FINISH MATERIALS.
2. CONTRACTOR SHALL CAREFULLY COORDINATE FLOORING INSTALLATION
AROUND ALL WALLS AND DOOR FRAMES. RESILIENT FLOORING SHALL BE
INSTALLED TIGHT UNDER DOOR FRAMES (HOLLOW METAL FRAMES ARE
TO BE INSTALLED 1/8" HIGH TO ALLOW RESILIENT FLOORING TO BE
INSTALLED UNDER FRAMES).
3. SEE FINISH LEGEND FOR QUANTITY AND COLOR CHOICES OF FLOORING
MATERIALS TO BE PROVIDED. SEE FINISH PLAN FOR FLOOR MATERIAL
DESIGNATION.
4. CONTRACTOR SHALL PROVIDE VINYL CORNER GUARDS AS SHOWN IN
THE FINISH FLOOR PLANS AND PER DETAILS.
5. GYPSUM BOARD SOFFITS AND CEILINGS SHALL TYPICALLY BE PAINTED
'CEILING WHITE.'
6. WALL FINISH THROUGHOUT THE PROJECT SHALL BE FIELD PAINT P1
U.N.O.
7. CEMENTITIOUS WOOD FIBER PLANK CEILING THROUGHOUT THE
PROJECT SHALL BE PAINT P2.
8. PROVIDE (10) ACCENT PAINT SOFFIT COLORS THROUGHOUT PROJECT.
9. PRIME AND FINISH PAINT ALL INTERIOR EXPOSED MISCELLANEOUS
STEEL. PROVIDE ONE (1) PAINT COLOR FOR ALL SUCH ITEMS. SEE
DRAWINGS AND SPECIFICATIONS FOR EXTERIOR STEEL OR METAL
ITEMS.
10. SEE FINISH PLANS FOR ACCENT PAINT LOCATIONS.
11. HOLLOW METAL FRAMES THROUGHOUT PROJECT SHALL BE PAINT P3.
12. PAINT (3) NICHE WALLS LEADING INTO PATIENT BEDROOMS P11, TYP.
13. WAYFINDING ACCENT PAINT AT LOBBY IPU ARCH SHALL NOT GO PAST
CROSS CORRIDOR DOORS, TYP. SEE FINISH PLANS FOR ACCENT PAINT
COLORS.
14. CONTRACTOR SHALL PROVIDE FIRE-RETARDANT WOOD BLOCKING AT
ALL PARTITIONS SCHEDULED TO RECEIVE VINYL CONTOUR BASE. SEE
DETAILS ON SHEET A3.70.
15. PROVIDE UP TO ONE (1) VINYL CONTOUR BASE COLOR THROUGHOUT
PROJECT. COLOR TO BE SELECTED BY ARCHITECT.
16. PROVIDE UP TO TWO (2) VINYL BASE COLORS THROUGHOUT PROJECT.
COLORS TO BE SELECTED BY ARCHITECT.
17. PROVIDE THE SAME CEILING HEIGHTS AND FINISHES IN CLOSETS AS
SCHEDULED FOR THEIR ADJACENT ROOMS.
18. SEE INTERIOR ELEVATIONS FOR CERAMIC WALL TILE TYPES AND
CONFIGURATIONS.
GENERAL FINISH NOTES
1. CEILING TYPE AND HEIGHT VARY. SEE REFLECTED CEILING PLANS FOR
TYPES AND HEIGHTS.
2. PAINT STRUCTURAL DECK AND MEMBERS FOR EXPOSED CEILING.
3. PROVIDE 16 GAUGE METAL STUDS ON WALLS INDICATED TO RECEIVE
GRAB BARS.
4. PROVIDE REGULAR (NON VHI OR AR) GYPSUM BOARD AT PARTITIONS
AND/OR CEILINGS/SOFFITS.
5. PROVIDE VHI GYPSUM BOARD ON PARTITIONS.
6. PROVIDE ABUSE RESISTANT GYPSUM BOARD ON CEILINGS/SOFFITS.
7. PROVIDE ACOUSTIC BATT INSULATION ALL ENCLOSING PARTITIONS IN
THIS ROOM.
8. SEE SHEET A5.18 FOR PORCH MATERIALS AND DETAILS.
9. SEE FINISH PLANS FOR HS LOCATIONS
10. SEE SHEETS A3.55, A3.56 & A3.60 FOR LIMESTONE VENEER LOCATIONS.
11. AMV WALLS SHALL HAVE PT6 WALL BASE.
12. STAIRS WITH RUBBER FLOORING SHALL HAVE RUBBER ON TREADS,
RISERS, LANDINGS AND NOSINGS.
13. SEE SHEET A3.64 FOR ACCENT PAINT ABOVE WPP AND SHEET A9.14
FOR GYMNASIUM VWG. VWG IN GRAPHICS PACKAGE.
14. STRUCTURE AND PLUMBING LINES SHALL BE PAINTED WHITE.
FINISH PLAN NOTES
FLOCKED FLOORING, COLOR 1 (FF)
LINOLEUM (COLOR 1)
LINOLEUM (COLOR 3)
FLOOR FINISH PLAN LEGEND
FLOCKED FLOORING, COLOR 2 (FF)
FLOCKED FLOORING, COLOR 3 (FF)
FLOCKED FLOORING, COLOR 4 (FF)
LINOLEUM (COLOR 2)
LINOLEUM (COLOR 4)
LINOLEUM (COLOR 5)
LINOLEUM (COLOR 6)
LINOLEUM (COLOR 7)
LINOLEUM (COLOR 8)
LINOLEUM (COLOR 9)
PORCELAIN TILE (PT2)
PORCELAIN TILE (PT1)
RUBBER FLOOR (RF)
EPOXY FLOOR SYSTEM, COLOR 2 (EF)
EPOXY FLOOR SYSTEM, COLOR 1 (EF)
URETHANE FLOOR SYSTEM (UF)
ATHLETIC FLOOR, TYPE 1 (AF1)
VINYL ATHLETIC GYM FLOOR, COLOR 1 (AGF)
CARPET TILE, COLOR 1 (CP1)
CARPET TILE, COLOR 2 (CP2)
FLOOR GRILL (FG)
CONCRETE
LUXURY VINYL TILE (LVT)
STATIC DISSIPATIVE FLOOR (SD)
LS7
LS9
VINYL HAND RAIL (VHR)
PROTECTION PADDING SYSTEM (PPS)
P#
FULL HEIGHT VINYL CORNER GUARD (CG1)
HALF HEIGHT VINYL CORNER GUARD (CG1)
ACCENT PAINT COLOR
ATHLETIC FLOOR, TYPE 2 (AF2)
VINYL CRASH RAIL (VCR)
VINYL ATHLETIC GYM FLOOR, COLOR 2 (AGF)
FULL HEIGHT STAINLESS STEEL CORNER GUARD (CG2)
MOSAIC TILE (PT5)
PORCELAIN TILE (PT7)
MOSAIC TILE (PT9)
WALK OFF CARPET TILE (WCP)
4a
HKS, INC.
350 N. SAINT PAUL STREET, SUITE 100
DALLAS, TX 75201
ARCHITECTURE PLUS
297 RIVER STREET
TROY, NY 12180
ARCHITECT / INTERIOR DESIGN
REVISION
HKS PROJECT NUMBER
DATE
SHEET TITLE
SHEET NO.
PL
O
T D
AT
E:
ISSUE
© 2021 HKS, INC.
TE
M
E
VE
R
SI
N
KEY PLAN
SHAH SMITH & ASSOCIATES, INC.
2825 WILCREST DRIVE, SUITE 350
HOUSTON, TX 77042
MEPF ENGINEER
STRUCTURAL ENGINEER
CIVIL ENGINEER
GENERAL CONTRACTOR
WALTER P MOORE
500 NORTH AKARD, SUITE 2300
OWNER
SA
A
TO
IO
ST
H
SP
IT
L
VICKREY & ASSOCIATES
12940 COUNTRY PARKWAY
SAN ANTONIO, TX 78216
VAUGHN CONSTRUCTION
1400 UNIVERSAL CITY BOULEVARD
UNIVERSAL CITY, TX 78148
TEXAS HEALTH & HUMAN SERVICES COMMISSION
4900 N. LAMAR BOULEVARD
AUSTIN, TX 78751
LANDSCAPE ARCHITECT
BENDER WELLS CLARK DESIGN
830 N. ALAMO STREET
SAN ANTONIO, TX 78215
COMBS CONSULTING GROUP
8200 IH-10 W, SUITE 103
SAN ANTONIO, TX 78230
TELECOMMUNICATIONS / SECURITY
MAZZETTI + GBA
5840 INTERSTATE 20 W, SUITE 150
ARLINGTON, TX 76017
MEDICAL EQUIPMENT
SYSTEMS DESIGN INTERNATIONAL, INC.
5200 DTC PARKWAY, SUITE 500
GREENWOOD VILLAGE, CO 80111
FMG DESIGN
101 CRAWFORD, STUDIO 1A
HOUSTON, TX 77002
GRAPHICS / WAYFINDING
CLEARY ZIMMERMANN ENGINEERS, LLC
1344 S. FLORES, SUITE 101
SAN ANTONIO, TX 78204
COMMISSIONING
RIB U.S. COST
1200 ABERNATHY ROAD NE, BLDG 600, SUITE 950
ATLANTA, GA 30328
COST ESTIMATING
UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER
AT SAN ANTONIO
CAPITAL PROJECTS OFFICE
8403 FLOYD CURL DRIVE, BLDG 205,
MAIL CODE 7955
SAN ANTONIO, TX 78229-3900
PERFORMING AGENCY / PROGRAM MANAGER
HH
SC
: 1 8-
5-
SH
UT
HS
CS
: 4
-1
/1
7/
:2 4:
P
A9.13
MAIN LEVEL
FINISH PLAN -
AREA 03
06/22/2020
22288.000
CONSTRUCTION
DOCS - BP2 / BP3
3.
0.
1/8" = 1'-0"01 01_MAIN LEVEL FINISH PLAN - AREA 03
NO. DESCRIPTION DATE
1 ADD-007 09/30/2020
2 PR-011 01/08/2021
3 ADD-010 06/23/2021
4 PR-18 12/17/2021
SEPTEMBER 30, 2020SEPTEMBER 30, 202006/22/2020
RFI
2489A
2488A
2486A
2487A
2485A
2483A
2482A QUIET /
NURSE ED.
DIRECTOR
2218E
ED. & TRAIN.
DATA MGR.
2218F
24D STAIR
22D
24B
2488A
2486A
2487A
2485A
2483A
2482A QUIET /
24D STAIR
22D
24B
24C
2484 PATIENT
2484A
2480A
2479A
2478A
2476A
2477A
2475A
2473A
2472A
2474A
2470A
2499A
2497A
2495A
2493A
2492A
2494A
2490A
2469A
2496A
2441 COPY
2480B
2470B
2490B
EXIT PASSAGE
200F
2453A
2453B
24A
2400.1
2451A
200E
HALLWAY
200F
LACTATION
P7 P11 P1
ED. & TRAIN.
DIRECTOR
2218G
24E
P11 P11 P11
REF. A9.22/ 01
REF. A9.24/ 01REF. A9.25/ 01
EDUCATION &
TRAINING
INSTALLED TIGHT UNDER DOOR FRAMES (HOLLOW METAL FRAMES ARE
CAPITAL PROJECTS OFFICE
8403 FLOYD CURL DRIVE, BLDG 205,
/2
:5 1:
A9.23
UPPER LEVEL
FINISH PLAN -
AREA 03
1/8" = 1'-0"01 02_UPPER LEVEL FINISH PLAN - AREA 03
2 ADD-010 06/23/2021
3 PR-18 12/17/2021
4 PR-23 05/13/2022
082520150909201511132015APRIL 23, 2022
3489A
3488A
3486A
3487A
3485A
3483A
3482A
3484A
3480A
3479A
3478A
3476A
3477A
3475A
3473A
3472A
3474A
3470A
3499A
3497A
3495A
3493A
3492A
3494A
3490A
COPY
3469A
34D
34B
3496A
32D
34C
3480B
3490B
3470B
EXIT
PASSAGE
340A
3453A
3453B
34A
3400.1
3451A
HALLWAY
LS6 LS6
34E
ELEV ELEC
3400B
P11 P11 P11 P11
INSTALLED TIGHT UNDER DOOR FRAMES (HOLLOW METAL FRAMES ARE
CAPITAL PROJECTS OFFICE
8403 FLOYD CURL DRIVE, BLDG 205,
/1
7/
:2 9:
P
A9.33
TOP LEVEL FINISH
PLAN - AREA 03
1/8" = 1'-0"01 03_TOP LEVEL FINISH PLAN - AREA 03
2 ADD-010 06/23/2021
3 PR-18 12/17/2021
File details come from the government source that posted it. Updated .