ESBD_496561_1774646925833_PCS 121 Solicitation Addendum Acknowledgement.pdf

PDF 6 MB Posted

Attached to
Handrail Installation and Additions San Antonio State Hospital
Solicitation number
HHS0017062
Issued by
Texas

About this file

This Solicitation Addendum Acknowledgement document pertains to an Invitation for Bids (IFB) issued by the Texas Health and Human Services Commission (HHSC) for handrail installation and additions at San Antonio State Hospital. The project involves the installation of approximately 800 to 1600 linear feet of Ligature Resistant Inpro 1000BH vinyl wall-mounted handrailing system on the second and third floors of Building 817, Section "B," Geriatric Ward, with specifications including tamper-resistant fasteners, anti-pick caulk, vinyl end caps, and adherence to ADA standards. The work also requires extension of magnetic door holder brackets on four fire doors, painting, patching, and caulking of all new and repair work. Two mandatory on-site visits were scheduled for March 23 and 24, 2026, at 9:00 AM at San Antonio State Hospital (6711 S New Braunfels Ave., San Antonio, TX 78223), with attendance required at the Maintenance Building 640. The question submission deadline was March 25, 2026, at 10:30 AM, responses to questions were posted March 27, 2026, and the courtesy HUB Subcontracting Plan review deadline was March 31, 2026. Bids were due April 8, 2026, at 10:30 AM, with an anticipated contract start date upon award and an initial contract term through August 31, 2026, with an optional extension of up to one year available at HHSC's sole discretion.

Pricing is structured as firm, fixed prices submitted on the Pricing Sheet covering all labor, equipment, materials, supplies, and related expenses, with price adjustments permitted only at HHSC's discretion using the Consumer Price Index formula. The IFB requires a Historically Underutilized Business (HUB) Subcontracting Plan, indicating subcontracting opportunities are probable. The contractor must have a minimum of five years' relevant experience, maintain an office within a 20-mile radius of the San Antonio Metroplex, provide three verifiable references for similar services, and possess appropriate licensure and insurance. Services are to be performed Monday through Friday between 8:00 AM and 5:00 PM Central Time, with a four-hour response requirement for service calls and one-hour response for emergencies. The contractor is responsible for all labor, tools, transportation, equipment, materials, background checks on personnel, and compliance with federal, state, and local laws, including E-Verify requirements. The document includes standard contract clauses regarding independent contractor status, personnel conduct, uniform and identification requirements, and performance monitoring by the HHS Agency Contract Manager throughout the contract term.

View the file

Other files

File Type Posted
ESBD_496561_1773774946726_HHS0017062_Exhibit C Pricing Sheet.xlsx XLSX spreadsheet
ESBD_496561_1773774731162_HHS0017062_Solicitation.pdf PDF
ESBD_496561_1773774991840_HHS0017062_Exhibit E-1 PCS Map.pdf PDF
ESBD_496561_1774646901140_HHS0017062_Exhibit I Site Plans.pdf PDF
ESBD_496561_1773774898574_HHS0017062_Exhibit A HHS Solicitation Affirmations.pdf PDF
ESBD_496561_1773775011164_HHS0017062_Exhibit F HUB HSP.pdf PDF
ESBD_496561_1774646999351_HHS0017062_Solicitation Addendum.pdf PDF
ESBD_496561_1773774961098_HHS0017062_Exhibit D Bidder References & Contractor Qualifications Form.docx DOCX document
ESBD_496561_1773774929829_HHS0017062_Exhibit B Contract Affirmations and UTCs.pdf PDF
ESBD_496561_1773775031918_HHS0017062_Exhibit G Form 4109 Application for Texas Identification Number.pdf PDF
ESBD_496561_1773775100065_HHS0017062_Exhibit H Site Map.pdf PDF
ESBD_496561_1773774976581_HHS0017062_Exhibit E Online Bid Room Instructions.docx DOCX document
ESBD_496561_1774647031016_PCS 134 HHS Responses to Questions.pdf PDF
ESBD_496561_1773774898574_HHS0017062_Exhibit A HHS Solicitation Affirmations.pdf PDF
ESBD_496561_1774646925833_PCS 121 Solicitation Addendum Acknowledgement.pdf PDF
ESBD_496561_1773775031918_HHS0017062_Exhibit G Form 4109 Application for Texas Identification Number.pdf PDF
ESBD_496561_1773775100065_HHS0017062_Exhibit H Site Map.pdf PDF
ESBD_496561_1773774731162_HHS0017062_Solicitation.pdf PDF
ESBD_496561_1773774929829_HHS0017062_Exhibit B Contract Affirmations and UTCs.pdf PDF
ESBD_496561_1773774976581_HHS0017062_Exhibit E Online Bid Room Instructions.docx DOCX document
ESBD_496561_1774646999351_HHS0017062_Solicitation Addendum.pdf PDF
ESBD_496561_1774647031016_PCS 134 HHS Responses to Questions.pdf PDF
ESBD_496561_1773774946726_HHS0017062_Exhibit C Pricing Sheet.xlsx XLSX spreadsheet
ESBD_496561_1774646901140_HHS0017062_Exhibit I Site Plans.pdf PDF
ESBD_496561_1773775011164_HHS0017062_Exhibit F HUB HSP.pdf PDF
ESBD_496561_1773774961098_HHS0017062_Exhibit D Bidder References & Contractor Qualifications Form.docx DOCX document
ESBD_496561_1773774991840_HHS0017062_Exhibit E-1 PCS Map.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

HC AIRBORNE

ISOLATION

ROOM

HC PATIENT

PATIENT

TOILET

1499A

1498A

1496A

1493A

1495A

1494A

1492A

PATIENT ROOM

1482A

1484A

1489A

1487A

1485A

1483A

QUIET /

ACTIVITY

1478A

1476A

1472A

1474A

1473A

1475A

1477A

1479A

SECLUSION

1453A

ACTIVITY /

RECREATION

GROUP

THERAPY

MULTI-PURPOSE

INTERVIEW /

CONSULT

EQUIPMENT

STORAGE

PROPERTY

COMFORT

HOUSEKEEPING

ARTS

CLINICAL

STAFF OFFICE

1241 FILES/

STAFF ENTRY

SALLYPORT

1600C

1600B

1600A

STAFF SUITE

1122A

CARE STATION

1469A

STAIR

12D

14D

14B

ACTIVITY/

PORCH

1490A

1470A

1480A

1486A

1497A

FILES/

1441 COPY

LOBBY

CORRIDOR

1490B

1470B

PNA

SUPERVISOR

SUITE

1437 EXIT

PASSAGE

OT TECH SUITE

140C

140A

1480B

1453B

ANTE ROOM

TUB ROOM

EXAM

STAFF

RESPITE

ELECTRICAL

1469B

SOILED

HOLDING

LAUNDRY

HC STAFF

MEDS

DINING

14A

CHARTING

CLEAN

1400.1

DATA

VISIT /

ELEV 4

1400A

HUDDLE

FOOD SERVICE

1451A

TEAM

CONFERENCE/

PLANNING

LS1

LS2

LS2 LS2

LS2 LS2

LS6 LS6

LS3

LS6

COURTYARD

COURTYARD

LS8

LS5

LS4

LS3 LS3

14C

14E

P4

P4 P4

P7

P11

P5P5P5

P6

P9

P2

P1 1 P11 P1

P11 P1 1 P11

1P11

P11P1 1P11 P1

P8

LS2LS2LS2

SEE SHEET A5.18 FOR PORCH MATERIALS AND DETAILS.

P11P11

P11P11 P11 P11

P12

2'

5/

8" 6'

0"

EQ. 12' - 0" EQ.

3' - 11 3/4"

1'

8"

REF. A9.12/ 01

REF. A9.15/ 01 REF. A9.14/ 01

1. CONTRACTOR SHALL PROVIDE CEMENTITIOUS FLASH PATCHING AS

REQUIRED AT NEW CONCRETE SLABS, TO ENSURE A SMOOTH & LEVEL

SURFACE ADEQUATE FOR INSTALLATION OF FLOOR FINISH MATERIALS.

2. CONTRACTOR SHALL CAREFULLY COORDINATE FLOORING INSTALLATION

AROUND ALL WALLS AND DOOR FRAMES. RESILIENT FLOORING SHALL BE

INSTALLED TIGHT UNDER DOOR FRAMES (HOLLOW METAL FRAMES ARE

TO BE INSTALLED 1/8" HIGH TO ALLOW RESILIENT FLOORING TO BE

INSTALLED UNDER FRAMES).

3. SEE FINISH LEGEND FOR QUANTITY AND COLOR CHOICES OF FLOORING

MATERIALS TO BE PROVIDED. SEE FINISH PLAN FOR FLOOR MATERIAL

DESIGNATION.

4. CONTRACTOR SHALL PROVIDE VINYL CORNER GUARDS AS SHOWN IN

THE FINISH FLOOR PLANS AND PER DETAILS.

5. GYPSUM BOARD SOFFITS AND CEILINGS SHALL TYPICALLY BE PAINTED

'CEILING WHITE.'

6. WALL FINISH THROUGHOUT THE PROJECT SHALL BE FIELD PAINT P1

U.N.O.

7. CEMENTITIOUS WOOD FIBER PLANK CEILING THROUGHOUT THE

PROJECT SHALL BE PAINT P2.

8. PROVIDE (10) ACCENT PAINT SOFFIT COLORS THROUGHOUT PROJECT.

9. PRIME AND FINISH PAINT ALL INTERIOR EXPOSED MISCELLANEOUS

STEEL. PROVIDE ONE (1) PAINT COLOR FOR ALL SUCH ITEMS. SEE

DRAWINGS AND SPECIFICATIONS FOR EXTERIOR STEEL OR METAL

ITEMS.

10. SEE FINISH PLANS FOR ACCENT PAINT LOCATIONS.

11. HOLLOW METAL FRAMES THROUGHOUT PROJECT SHALL BE PAINT P3.

12. PAINT (3) NICHE WALLS LEADING INTO PATIENT BEDROOMS P11, TYP.

13. WAYFINDING ACCENT PAINT AT LOBBY IPU ARCH SHALL NOT GO PAST

CROSS CORRIDOR DOORS, TYP. SEE FINISH PLANS FOR ACCENT PAINT

COLORS.

14. CONTRACTOR SHALL PROVIDE FIRE-RETARDANT WOOD BLOCKING AT

ALL PARTITIONS SCHEDULED TO RECEIVE VINYL CONTOUR BASE. SEE

DETAILS ON SHEET A3.70.

15. PROVIDE UP TO ONE (1) VINYL CONTOUR BASE COLOR THROUGHOUT

PROJECT. COLOR TO BE SELECTED BY ARCHITECT.

16. PROVIDE UP TO TWO (2) VINYL BASE COLORS THROUGHOUT PROJECT.

COLORS TO BE SELECTED BY ARCHITECT.

17. PROVIDE THE SAME CEILING HEIGHTS AND FINISHES IN CLOSETS AS

SCHEDULED FOR THEIR ADJACENT ROOMS.

18. SEE INTERIOR ELEVATIONS FOR CERAMIC WALL TILE TYPES AND

CONFIGURATIONS.

GENERAL FINISH NOTES

1. CEILING TYPE AND HEIGHT VARY. SEE REFLECTED CEILING PLANS FOR

TYPES AND HEIGHTS.

2. PAINT STRUCTURAL DECK AND MEMBERS FOR EXPOSED CEILING.

3. PROVIDE 16 GAUGE METAL STUDS ON WALLS INDICATED TO RECEIVE

GRAB BARS.

4. PROVIDE REGULAR (NON VHI OR AR) GYPSUM BOARD AT PARTITIONS

AND/OR CEILINGS/SOFFITS.

5. PROVIDE VHI GYPSUM BOARD ON PARTITIONS.

6. PROVIDE ABUSE RESISTANT GYPSUM BOARD ON CEILINGS/SOFFITS.

7. PROVIDE ACOUSTIC BATT INSULATION ALL ENCLOSING PARTITIONS IN

THIS ROOM.

8. SEE SHEET A5.18 FOR PORCH MATERIALS AND DETAILS.

9. SEE FINISH PLANS FOR HS LOCATIONS

10. SEE SHEETS A3.55, A3.56 & A3.60 FOR LIMESTONE VENEER LOCATIONS.

11. AMV WALLS SHALL HAVE PT6 WALL BASE.

12. STAIRS WITH RUBBER FLOORING SHALL HAVE RUBBER ON TREADS,

RISERS, LANDINGS AND NOSINGS.

13. SEE SHEET A3.64 FOR ACCENT PAINT ABOVE WPP AND SHEET A9.14

FOR GYMNASIUM VWG. VWG IN GRAPHICS PACKAGE.

14. STRUCTURE AND PLUMBING LINES SHALL BE PAINTED WHITE.

FINISH PLAN NOTES

FLOCKED FLOORING, COLOR 1 (FF)

LINOLEUM (COLOR 1)

LINOLEUM (COLOR 3)

FLOOR FINISH PLAN LEGEND

FLOCKED FLOORING, COLOR 2 (FF)

FLOCKED FLOORING, COLOR 3 (FF)

FLOCKED FLOORING, COLOR 4 (FF)

LINOLEUM (COLOR 2)

LINOLEUM (COLOR 4)

LINOLEUM (COLOR 5)

LINOLEUM (COLOR 6)

LINOLEUM (COLOR 7)

LINOLEUM (COLOR 8)

LINOLEUM (COLOR 9)

PORCELAIN TILE (PT2)

PORCELAIN TILE (PT1)

RUBBER FLOOR (RF)

EPOXY FLOOR SYSTEM, COLOR 2 (EF)

EPOXY FLOOR SYSTEM, COLOR 1 (EF)

URETHANE FLOOR SYSTEM (UF)

ATHLETIC FLOOR, TYPE 1 (AF1)

VINYL ATHLETIC GYM FLOOR, COLOR 1 (AGF)

CARPET TILE, COLOR 1 (CP1)

CARPET TILE, COLOR 2 (CP2)

FLOOR GRILL (FG)

CONCRETE

LUXURY VINYL TILE (LVT)

STATIC DISSIPATIVE FLOOR (SD)

LS7

LS9

VINYL HAND RAIL (VHR)

PROTECTION PADDING SYSTEM (PPS)

P#

FULL HEIGHT VINYL CORNER GUARD (CG1)

HALF HEIGHT VINYL CORNER GUARD (CG1)

ACCENT PAINT COLOR

ATHLETIC FLOOR, TYPE 2 (AF2)

VINYL CRASH RAIL (VCR)

VINYL ATHLETIC GYM FLOOR, COLOR 2 (AGF)

FULL HEIGHT STAINLESS STEEL CORNER GUARD (CG2)

MOSAIC TILE (PT5)

PORCELAIN TILE (PT7)

MOSAIC TILE (PT9)

WALK OFF CARPET TILE (WCP)

4a

HKS, INC.

350 N. SAINT PAUL STREET, SUITE 100

DALLAS, TX 75201

ARCHITECTURE PLUS

297 RIVER STREET

TROY, NY 12180

ARCHITECT / INTERIOR DESIGN

REVISION

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PL

O

T D

AT

E:

ISSUE

© 2021 HKS, INC.

TE

M

E

VE

R

SI

N

KEY PLAN

SHAH SMITH & ASSOCIATES, INC.

2825 WILCREST DRIVE, SUITE 350

HOUSTON, TX 77042

MEPF ENGINEER

STRUCTURAL ENGINEER

CIVIL ENGINEER

GENERAL CONTRACTOR

WALTER P MOORE

500 NORTH AKARD, SUITE 2300

OWNER

SA

A

TO

IO

ST

H

SP

IT

L

VICKREY & ASSOCIATES

12940 COUNTRY PARKWAY

SAN ANTONIO, TX 78216

VAUGHN CONSTRUCTION

1400 UNIVERSAL CITY BOULEVARD

UNIVERSAL CITY, TX 78148

TEXAS HEALTH & HUMAN SERVICES COMMISSION

4900 N. LAMAR BOULEVARD

AUSTIN, TX 78751

LANDSCAPE ARCHITECT

BENDER WELLS CLARK DESIGN

830 N. ALAMO STREET

SAN ANTONIO, TX 78215

COMBS CONSULTING GROUP

8200 IH-10 W, SUITE 103

SAN ANTONIO, TX 78230

TELECOMMUNICATIONS / SECURITY

MAZZETTI + GBA

5840 INTERSTATE 20 W, SUITE 150

ARLINGTON, TX 76017

MEDICAL EQUIPMENT

SYSTEMS DESIGN INTERNATIONAL, INC.

5200 DTC PARKWAY, SUITE 500

GREENWOOD VILLAGE, CO 80111

FMG DESIGN

101 CRAWFORD, STUDIO 1A

HOUSTON, TX 77002

GRAPHICS / WAYFINDING

CLEARY ZIMMERMANN ENGINEERS, LLC

1344 S. FLORES, SUITE 101

SAN ANTONIO, TX 78204

COMMISSIONING

RIB U.S. COST

1200 ABERNATHY ROAD NE, BLDG 600, SUITE 950

ATLANTA, GA 30328

COST ESTIMATING

UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER

AT SAN ANTONIO

CAPITAL PROJECTS OFFICE

8403 FLOYD CURL DRIVE, BLDG 205,

MAIL CODE 7955

SAN ANTONIO, TX 78229-3900

PERFORMING AGENCY / PROGRAM MANAGER

HH

SC

: 1 8-

5-

SH

UT

HS

CS

: 4

-1

/1

7/

:2 4:

P

A9.13

MAIN LEVEL

FINISH PLAN -

AREA 03

06/22/2020

22288.000

CONSTRUCTION

DOCS - BP2 / BP3

3.

0.

1/8" = 1'-0"01 01_MAIN LEVEL FINISH PLAN - AREA 03

NO. DESCRIPTION DATE

1 ADD-007 09/30/2020

2 PR-011 01/08/2021

3 ADD-010 06/23/2021

4 PR-18 12/17/2021

SEPTEMBER 30, 2020SEPTEMBER 30, 202006/22/2020

RFI

2489A

2488A

2486A

2487A

2485A

2483A

2482A QUIET /

NURSE ED.

DIRECTOR

2218E

ED. & TRAIN.

DATA MGR.

2218F

24D STAIR

22D

24B

2488A

2486A

2487A

2485A

2483A

2482A QUIET /

24D STAIR

22D

24B

24C

2484 PATIENT

2484A

2480A

2479A

2478A

2476A

2477A

2475A

2473A

2472A

2474A

2470A

2499A

2497A

2495A

2493A

2492A

2494A

2490A

2469A

2496A

2441 COPY

2480B

2470B

2490B

EXIT PASSAGE

200F

2453A

2453B

24A

2400.1

2451A

200E

HALLWAY

200F

LACTATION

P7 P11 P1

ED. & TRAIN.

DIRECTOR

2218G

24E

P11 P11 P11

REF. A9.22/ 01

REF. A9.24/ 01REF. A9.25/ 01

EDUCATION &

TRAINING

INSTALLED TIGHT UNDER DOOR FRAMES (HOLLOW METAL FRAMES ARE

CAPITAL PROJECTS OFFICE

8403 FLOYD CURL DRIVE, BLDG 205,

/2

:5 1:

A9.23

UPPER LEVEL

FINISH PLAN -

AREA 03

1/8" = 1'-0"01 02_UPPER LEVEL FINISH PLAN - AREA 03

2 ADD-010 06/23/2021

3 PR-18 12/17/2021

4 PR-23 05/13/2022

082520150909201511132015APRIL 23, 2022

3489A

3488A

3486A

3487A

3485A

3483A

3482A

3484A

3480A

3479A

3478A

3476A

3477A

3475A

3473A

3472A

3474A

3470A

3499A

3497A

3495A

3493A

3492A

3494A

3490A

COPY

3469A

34D

34B

3496A

32D

34C

3480B

3490B

3470B

EXIT

PASSAGE

340A

3453A

3453B

34A

3400.1

3451A

HALLWAY

LS6 LS6

34E

ELEV ELEC

3400B

P11 P11 P11 P11

INSTALLED TIGHT UNDER DOOR FRAMES (HOLLOW METAL FRAMES ARE

CAPITAL PROJECTS OFFICE

8403 FLOYD CURL DRIVE, BLDG 205,

/1

7/

:2 9:

P

A9.33

TOP LEVEL FINISH

PLAN - AREA 03

1/8" = 1'-0"01 03_TOP LEVEL FINISH PLAN - AREA 03

2 ADD-010 06/23/2021

3 PR-18 12/17/2021

PCS 137 - SERVICES

Version 1.90 Page 1 of 40 Revised 01/21/2026

Stephanie Muth , Executive Commissioner

Invitation for Bids (IFB) for

Handrail Installation and Additions San Antonio State Hospital

IFB No. HHS0017062

NIGP Class/Item No(s): 910-52 Maintenance and Repair Services, Building

(Not Otherwise Classified) Addendum 1

Procurement Schedule - All Times are Central Time Reference Section 2 for further information

IFB Date Posted to ESBD March 17, 2026

Mandatory On-Site Visits March 23, 2026, 9:00 AM

March 24, 2026, 9:00 AM

Questions or Clarifications Submission Deadline March 25, 2026, 10:30 AM

Responses to Questions or Clarifications - Addendum posted on the ESBD March 27, 2026

Courtesy Review of HUB Subcontracting Plan (HSP) Submission Deadline March 31, 2026, 10:30 AM

Response Deadline: Responses to this IFB must be received April 8, 2026, 10:30 AM

Anticipated Contract Start Date Upon Award

Version 1.90 Page 2 of 40 Revised 01/21/2026

Table of Contents 1 Introduction and Purpose of IFB

1.1 Authority

1.2 No Guarantee of Volume, Usage or Compensation

1.3 Negotiation, Exceptions or Assumptions

1.4 IFB Components

2 Procurement Schedule 3 Withdrawal or Amendment of Response 4 HHSC Overview 5 Definitions 6 General IFB Information

6.1 Sole Point of Contact and Communications

6.2 Exception to the Sole Point of Contact

6.3 Binding Offer Period

6.4 Costs Incurred

6.5 Changes, Modifications and Cancellation

6.6 Ambiguity, Conflict, Discrepancy

6.7 IFB Questions or Clarifications

6.8 Notification of Addenda or Cancellation

6.9 Pre-Bid Meeting ADA Accommodations

7 Scope of Work (SOW)

7.1 Scope of Services to be Performed

8 HUB Subcontracting Plan (HSP) Requirements

8.1 HUB Subcontracting Plan (HSP)

8.2 Courtesy Review of HSP

9 Pricing Information

9.1 Pricing Structure

9.2 Price Adjustments

10 Changes to The Contract 11 Contract Term

11.1 Term of Contract

11.2 Initial Contract Term:

11.3 Extension Option

12 Contract Administration/ Purchase Order Administration

12.1 Contract Manager/Program Lead

12.2 Performed Services Monitoring

Version 1.90 Page 3 of 40 Revised 01/21/2026

12.3 Performance Reporting

12.4 Contractor Response to Notification of Non-Material Deficiency

12.5 Corrective Action Plan (The Plan)

12.6 Performance Issues

12.7 Public Information Act – Bidder Requirements Regarding Disclosure

12.8 Bidder Waiver – Intellectual Property

13 Invoicing and Payment

13.1 Bill-to Address

13.2 Invoice Information

13.3 Payment

13.4 Invoice Submission

13.5 Disputed Invoice(s)

14 Insurance Requirements

14.1 Specific Insurance Requirements

14.2 Alternative Insurability

15 Screening of Responses

15.1 Administrative Screening

15.2 Irregularities

16 Evaluation

16.1 Evaluation of Responses

16.2 Conformance with State Law for Evaluation

16.3 Specific Evaluation Criteria

17 Award 18 Standards of Conduct for Vendors 19 Disclosure of Interested Parties 20 Protest Procedures Appendix A – Submission Instructions and Response Checklist

Version 1.90 Page 4 of 40 Revised 01/21/2026

1 Introduction and Purpose of IFB The Texas Health and Human Services Commission (HHSC) is an agency within the Texas Health and Human Services (HHS) system. The Procurement and Contracting Services (PCS) division of HHSC administers IFBs for HHS.

HHSC PCS is seeking competitive bids to establish contract(s) for handrail installation and handrail additions at the San Antonio State Hospital.

Both HHS Agencies, HHSC and DSHS, will be entitled to use any contract awarded as a result of this IFB.

To be considered for award, Bidders must submit a comprehensive Response which includes all required information and documentation as outlined in this IFB to ensure the Bidder meets all requirements, possesses the required experience and qualifications, and has the capacity to provide the services described in this IFB. See Appendix A, Submission Instructions and Response Checklist.

1.1 Authority

[HHSC] [HHSC or DSHS] [HHSC or DFPS] is soliciting the services stated in this IFB under Texas Government Code 2156.063.

1.2 No Guarantee of Volume, Usage or Compensation

HHS Agency does not guarantee any volume, usage, or compensation to be paid to any Contractor under any Contract resulting from this IFB. Additionally, all HHS Agency contracts are subject to appropriations, the availability of funds, and termination.

1.3 Negotiation, Exceptions or Assumptions

Negotiations are prohibited under the IFB procurement method under most circumstances, and even then, the scope of permissible negotiations is limited and may not result in a material change to the scope of work or specifications as advertised in this IFB.

Bidders should NOT submit exceptions to this IFB which could result in disqualification of a Response. No changes to a Response can be made after the submission deadline.

No assumptions should be included in a Response. The inclusion of assumptions could result in disqualification of a Response. Instead, a Bidder should advance assumptions and seek clarification of a section of this IFB, any Exhibits or attachments, in the form and manner required in Section 6.7 IFB Questions or Clarifications.

1.4 IFB Components

This IFB includes the following items:

Version 1.90 Page 5 of 40 Revised 01/21/2026

• PCS 137 IFB (this document)

• Exhibit A – HHS Solicitation Affirmations

• Exhibit B – PCS 111-Contract Affirmations and HHS Uniform Terms and Conditions (UTCs)

• Exhibit C – Pricing Sheet

• Exhibit D – Bidder Reference and Contractor Qualifications Form

• Exhibit E – HHS Online Bid Room Information

• Exhibit E-1- PCS Map

• Exhibit F – Historically Underutilized Business (HUB) Subcontracting Plan (HSP) and Requirements

• Exhibit G – Form 4109 Application for Texas Identification Number

• Exhibit H – Site Map

• Exhibit I – Site Plan

2 Procurement Schedule The Procurement Schedule dates on the cover page of this IFB are subject to change. HHSC reserves the right to modify these dates at any time by issuing an addendum. Any events listed in the Procurement Schedule after the Response Deadline will occur at the discretion of HHSC.

Responses must be received by HHSC prior to the Response Deadline as indicated in the Procurement Schedule. Every Bidder is solely responsible for ensuring its Response is received by HHSC before the Response Deadline in accordance with all requirements regarding submission. HHSC is not responsible for lost, misdirected or late Responses.

By submitting a Response, the Bidder represents and warrants that the individual submitting the Response, inclusive of the documents made part of the Response, is authorized to sign on behalf of the Bidder, and to bind the Bidder under any Contract that may result from this IFB.

3 Withdrawal or Amendment of Response Bidders may withdraw or amend their Responses at any time prior to the Response Deadline by e-mailing the point of contact listed in Section 6.1 (Sole Point of Contact and Communications).

The e-mail subject line for withdrawal or response amendment should contain the IFB number as indicated on the cover page of this IFB. The Bidder is solely responsible for ensuring the email is received by HHSC before the Response Deadline. HHSC is not responsible for lost or misdirected e-mails.

Version 1.90 Page 6 of 40 Revised 01/21/2026

4 HHSC Overview The Health and Human Services Commission (HHSC) was created in 1991 to oversee and coordinate the planning and delivery of health and human services in Texas. It is established pursuant to Chapter 531, Texas Government Code and is responsible for oversight of Texas Health and Human Services agencies.

PCS administers the procurement process, which includes IFB announcement and publication, Bidder communications, receipt of Responses, screening of timely received responses, and facilitating the evaluation of qualified Responses. PCS, in coordination with each HHS program, manages the execution of the award, through issuance of Purchase Order(s) or other Contract document, resulting from this IFB.

5 Definitions Unless the context clearly indicates otherwise, throughout this IFB, the definition given to a term below applies whenever the term appears in this IFB, in any Response (Bid) submitted in response to this IFB, and in any Contract awarded as a result of this IFB. All other terms have their ordinary and common meaning.

a) Addendum – A written clarification or revision to this IFB issued by HHSC.

b) Bidder – The entity or individual that submits a response to this IFB. Includes anyone acting on behalf of the entity or individual that submits a response, such as an agent, employee, or representative. See also Respondent below.

c) Contract –The signed Purchase Order or Signature Document, the Uniform Terms and Conditions, Affirmations, along with any Attachments, Exhibits and any Amendments, purchase orders, or Work Orders that may be issued by HHSC, to be incorporated by reference for all purposes as a result of this IFB.

d) Contractor - Each Bidder, business entity or individual, if any, awarded a Purchase Order or other Contract to provide the services or goods as a result of this IFB.

e) Contract Term – The period of time during which the Purchase Order or Contract is in effect from the start date through the end date and may include renewal or extension periods.

f) Debarment – An exclusion from contracting or subcontracting with state agencies on the basis of cause pursuant to Title 34, Part 1, Chapter 20, Subchapter G of the Texas Administrative Code, and the Federal System for Award Management (SAM).

g) Deliverables – The services or goods specified in this IFB and any resulting Contract that the Contractor shall perform or deliver to the HHS Agency.

h) Electronic State Business Daily (ESBD) - The electronic online directory, administered by the Comptroller of Public Accounts, Statewide Procurement Division (SPD), for publishing procurement opportunities which exceed $25,000 in total estimated value http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.531.htm

Version 1.90 Page 7 of 40 Revised 01/21/2026 and for providing public notice of contract awards. The ESBD may be accessed through the CPA web site at: https://www.txsmartbuy.gov/esbd.

Note: The Texas Comptroller of Public Accounts (CPA) recommends utilizing Google Chrome when navigating CPA websites.

i) Exhibit – A document, included as an attachment to this IFB, which provides terms and conditions, additional requirements and information related to this IFB.

j) HHS Agency - HHSC or any of the agencies of the State of Texas that are overseen by HHSC under authority granted under state law and the officers, employees, authorized representatives, and designees of those agencies. These agencies include: HHSC and the Department of State Health Services (DSHS), separately or combined. May also be referred to as System Agency.

k) IFB - This document, including all exhibits, attachments, appendices, or Addenda (if applicable). May also be referred to as Invitation for Bids.

l) NIGP (The National Institute of Governmental Purchasing (NIGP) Commodity Book) – The Class-Item numbering and descriptions used by state agencies to properly code services or products for a procurement.

m) Purchase Order – A legally enforceable agreement issued by HHSC indicating types, quantities, and agreed pricing for services and goods the Contractor will provide under any Contract resulting from this IFB.

n) Response – All information and materials submitted by a Bidder in response to this IFB.

May also be referred to as Bid or Bid Response.

o) Respondent – A term interchangeable with Bidder.

p) Scope of Work – The description of requirements, services, specifications for goods which may be required, and deliverables as provided in this IFB and any resulting Contract which the Contractor is required to provide.

q) Subcontractor - Any entity or individual that enters into a contract with the Contractor to perform part or all of the obligations of the Contractor under the Contract.

r) Texas Identification Number (TIN) – The 11-digit identification number set up through the Texas Comptroller of Public Accounts which is required for any entity or individual to receive payment under a Contract with the State of Texas. Also known as Texas Payee ID Number. Further information regarding this number may be accessed via the CPA Fiscal Management TexPayment Resource web page at:

https://fmx.cpa.texas.gov/fm/pubs/payment/gen_prov/index.php?s=payee_numreq&p =payee_numreq.

s) Unit of Measure – The set unit of measure (UOM), included on the Pricing Sheet, used for payment of the services under the Contract or Purchase Order. May be hourly, daily, weekly, monthly, etc.

http://www.txsmartbuy.com/sp https://www.txsmartbuy.gov/esbd https://fmx.cpa.texas.gov/fm/pubs/payment/gen_prov/index.php?s=payee_numreq&p=payee_numreq https://fmx.cpa.texas.gov/fm/pubs/payment/gen_prov/index.php?s=payee_numreq&p=payee_numreq

Version 1.90 Page 8 of 40 Revised 01/21/2026

t) Unit Rate – The set rate per the unit of measure (UOM) used for payment of the services, included on the Price Sheet, under the Contract or Purchase Order. May be hourly, daily, weekly, monthly, etc.

u) Vendor – A business entity or individual that supplies services or goods and may be a potential Bidder to this IFB.

6 General IFB Information

6.1 Sole Point of Contact and Communications

The HHSC PCS Sole Point of Contact for inquiries concerning this IFB is:

Gilbert Munoz, CTCD, CTCM

Procurement and Contracting Services Building 1100 W 49th St. MC: 2020 Austin, TX 78756

512-406-2473

Gilbert.Munoz@hhs.texas.gov

Bidders shall NOT use the e-mail address above for submission of a Response to this IFB. See Appendix A for submission requirements.

Bidders shall direct all communications, including questions or clarifications relating to this IFB, by e-mail to the HHSC PCS Sole Point of Contact named in Section 6.1 (Sole Point of Contact and Communications); communications by phone will not be accepted except for purposes such as instructing a potential Respondent through an IT system or website referenced in this Solicitation.

All other communications between a Bidder and HHS agency staff concerning this IFB are prohibited. In no instance is a Bidder to discuss cost information regarding this IFB with the HHSC PCS Sole Point of Contact or any other HHS staff. Failure to comply with these requirements may result in disqualification of the Response.

The Sole Point of Contact will authorize a secondary Sole Point of Contact in the event of their absence and, in such an event, will include the contact information for the secondary Sole Point of Contact in their automatic reply out-of-office e-mail message. See also Section 6.2 (Exception to Sole Point of Contact) below.

This restriction (as to only communicating in writing with the HHSC Sole Point of Contact identified above) does not preclude discussions between Bidder and agency personnel for the purposes of conducting business unrelated to this IFB.

mailto:Gilbert.Munoz@hhs.texas.gov

Version 1.90 Page 9 of 40 Revised 01/21/2026

6.2 Exception to the Sole Point of Contact

The only exceptions to the Sole Point of Contact are the HUB Coordinator, or, if expressly directed by the Sole Point of Contact, another designated System Agency representative.

Should Bidders have questions regarding proper completion of the HUB Subcontracting Plan, the HUB Coordinator may be contacted at Bob.McCurdy@hhs.texa.gov. The Sole Point of Contact, Section 6.1, must be copied on the e-mail.

6.3 Binding Offer Period

By submitting a Response to this IFB, Bidder agrees that its Response will remain a firm and binding offer for 240 days, as stated in the HHS Solicitation Affirmations (Exhibit A).

Bidder may extend the time for which its Response will be firm and binding and include the extended period in the Response.

6.4 Costs Incurred

Bidder understands that issuance of this IFB or retention of responses in no way constitutes a commitment by HHSC to award a Contract. HHSC accepts no obligations for costs incurred in preparing and submitting a response, including, but not limited to, preparing for or participating in a vendor conference or site visit.

Responses shall be submitted at the sole expense of the Bidder. All responses shall be prepared simply and economically, providing a straightforward, concise delineation of the Bidder’s capabilities to satisfy the requirements of this IFB.

6.5 Changes, Modifications and Cancellation

HHSC reserves the right to change, amend, or modify this IFB prior to the Response Deadline indicated in the Procurement Schedule (cover page of this IFB). Changes, amendments, and modifications will be processed through one or more Addendum. The notification for any Addendum will be processed in accordance with Section 6.8.

HHSC reserves the right to cancel this IFB at any time. The notice of cancellation will be in accordance with Section 6.8.

6.6 Ambiguity, Conflict, Discrepancy

Bidders must notify the Sole Point of Contact, Section 6.1, of any ambiguity, conflict, discrepancy, exclusionary specification, omission, or other error in the IFB in the manner and by the deadline for submitting questions.

If Bidder fails to properly and timely notify the Sole Point of Contact, Section 6.1, of any ambiguity, conflict, discrepancy, exclusionary specification, omission or other error in the IFB, the Bidder, whether awarded a contract or not:

mailto:Bob.McCurdy@hhs.texa.gov

Version 1.90 Page 10 of 40 Revised 01/21/2026

a) shall have waived any claim of error or ambiguity in the IFB and any resulting contract,

b) shall not contest the interpretation by HHSC of such provision(s), and

c) shall not be entitled to additional compensation, relief, or time by reason of ambiguity, conflict, discrepancy, exclusionary specification, omission, or other error or its later correction.

6.7 IFB Questions or Clarifications

HHSC will allow questions and requests for clarification regarding this IFB if submitted by e-mail to the Sole Point of Contact, Section 6.1, by the deadline established in the Procurement Schedule (cover page of this IFB) or deadlines established in subsequent Addenda. Responses to questions or other written requests for clarification will not be provided individually to requestors but will be consolidated in one or more Addenda.

HHSC reserves the right to amend the answers to questions or clarifications prior to the Response Deadline (cover page of this IFB) through a new Addendum. The notification will be processed in accordance with Section 6.8 (Notification of Addenda or Cancellation).

6.7.1 Submission of Questions or Clarifications

All questions and requests for clarification must be submitted by e-mail and include the following information:

a) IFB Number and Title of IFB (cover page of this IFB) must be included in the e-mail subject line and in the e-mail body;

b) Section or Paragraph number from this IFB;

c) Page Number of this IFB;

d) Exhibit name, Section or Paragraph, page number from the Exhibit;

e) Language, Topic, Section Heading being questioned or requested for clarification;

f) Requestor Contact Information must be included in the body of the e-mail.

Questions or requests for clarification received after the deadline set in the Procurement Schedule (cover page of this IFB), or deadlines established in subsequent Addenda, may be reviewed by HHSC but will not be answered.

6.8 Notification of Addenda or Cancellation

6.8.1 Addenda Notification

All addenda will be posted to the ESBD. It is the responsibility of each potential Bidder to monitor the ESBD for any Addenda affecting this IFB. Failure to check the ESBD will in no way release any potential Bidder or awarded Contractor from the requirements of posted Addenda.

Version 1.90 Page 11 of 40 Revised 01/21/2026

No HHS Agency will be responsible or liable in any regard for the failure of any Bidder or awarded Contractor to stay informed of all postings to the ESBD. If the Bidder fails to monitor the ESBD for any changes or modifications to this IFB, such failure will not relieve the Bidder or Contractor of its obligation to fulfill the requirements as posted.

Bidder must acknowledge receipt of any addenda by signing and returning SOLICITATION ADDENDUM ACKNOWLEDGEMENT FORM posted to the ESBD with your solicitation response in accordance with the submission options outlined in the solicitation.

6.8.2 Cancellation Notification

HHSC reserves the right to cancel this IFB at any time. Notice of the cancellation will be posted on the ESBD. Bidders are responsible for monitoring the ESBD frequently for notices regarding

6.9 Pre-Bid Meeting ADA Accommodations

People who require ADA accommodations and wish to attend or participate in the pre-bid meetings and require auxiliary aids or services should contact the Sole Point of Contact identified in Section 6.1 (Sole Point of Contact and Communications), at least seventy-two (72) hours before the meeting in order to have reasonable accommodations made by HHSC.

6.9.1 Attendance Log

Attendees, in person, are required to sign an attendance log at the conference or on-site visit.

HHSC will not be held responsible for an attendee’s failure to sign in on the attendance log.

For conference calls and webinars, participants will be added to the attendance log and should have the following information ready and properly announced or submitted:

a) Legal business entity name or name of individual which will be used if submitting a response to this IFB or subcontractor acting on behalf of the legal business entity;

b) Name and title of each representative on the call or webinar; and

c) E-mail address for the point of contact.

6.9.2 On-Site Visit

HHSC will conduct two (2) mandatory on-site visits at the location specified below on the date and time identified in the Procurement Schedule (cover page of this IFB) or on the date and time established in subsequent Addenda.

The on-site visit will include a review of the IFB requirements as well as a walk-through of the facility.

Attendance at one site visit is mandatory. Failure to attend in person will result in the disqualification of a Bidder. Bidders not listed on the attendance log will not be permitted to submit a Response.

Version 1.90 Page 12 of 40 Revised 01/21/2026

6.9.2.1 Location for On-Site Visit:

a) San Antonio State Hospital

b) 6711 S New Braunfels Ave., San Antonio, TX 78223

c) Onsite contact: Bobby Bustillos, Bobby.Bustillos@hhs.texas.gov, Robert Hernandez, Robert.Hernandez1@hhs.texas.gov, or LeRoy Fuentes, LeRoy.Fuentes@hhs.texas.gov.

Bidders must notify the one (1) of the on-site contacts listed above regarding attendance.

Site Visit Instructions: Bidders attending the mandatory on-site visit shall meet at Maintenance Building 640. Please see the attached Exhibit H – Site Map for location.

7 Scope of Work (SOW)

7.1 Scope of Services to be Performed

The required services to be provided are for the installation of new Ligature Resistant Inpro 1000BH vinyl wall mounted handrail system at San Antonio State Hospital, Building 817, Section “B”, Geriatric Ward.

Contractors shall install approximately 800 1600 linear feet of vinyl wall mounted handrailing system on the second and third floors of Building 817, along with all associated end caps supports and corners as required for completion.

The addition of wall mounted handrails shall require minor wall modifications with no structural work beyond the addition of wall backing support for the handrails. Sheetrock removal will be required for solid backing supports in the locations for the new handrails.

Handrails are to match existing first floor handrails.

Contractors shall extend magnetic door holder brackets on four (4) fire doors. Painting, patching and caulking shall apply to all new completed work and any repair work due to installation. ADA standards shall be strictly followed for height, strength and safety requirements.

Specifications to include but not limited to the following:

a) 1000BH Ligature Resistant Vinyl Handrail System.

b) 1000BH Vinyl Handrail to be Chino in color (or equal).

c) Anti-Pick Caulk, Surebond Everseal SB-190 (or equal).

d) 1000HB Vinyl End Caps as required.

e) Exposed Fasteners to tamper resistant.

f) All handrail installations must support 200 lb. dead weight test.

g) Installation shall be per manufacturer’s recommendations.

mailto:Bobby.Bustillos@hhs.texas.gov mailto:Robert.Hernandez1@hhs.texas.gov mailto:LeRoy.Fuentes@hhs.texas.gov https://www.tdlr.texas.gov/ab/2012abtas5.htm

Version 1.90 Page 13 of 40 Revised 01/21/2026

h) Use of toggle or expansion anchors in Gypsum board shall not be permitted.

7.1.1 Service Location(s)

HHS, at its sole discretion, with a 30 days’ advance written notice, reserves the right to change, consolidate, delete or add service locations.

a) Location(s) for Services

San Antonio State Hospital

6711 S New Braunfels Ave., San Antonio, TX 78223

HHS Region No. # 8

The Map (PDF) of the HHS Regions may be accessed at:

https://hhs.texas.gov/sites/default/files/documents/about-hhs/hhs-regional-map.pdf

b) Changes to service location(s) include but are not limited to: new office space within facility, office closure, consolidation of multiple offices increasing or decreasing square footage, expansion of an office into multiple offices, and relocation of office.

7.1.2 Performance Schedule

Contractor shall perform contracted services, including any minor adjustment call-back services, Monday through Friday between the hours of 8 a.m. and 5 p.m. (Central Time). Contractor shall not interfere with normal flow of HHS Agency business at the service location.

Contractor shall respond to all service calls within four (4) hours of HHS Agency request, unless the Response Deadline is extended by the HHS Agency Contract Manager.

7.1.3 Services Outside Regular Business Hours

Any services performed outside of regular business hours (8 a.m. to 5 p.m Central Time) must be requested and/or approved in writing by the HHS Agency Contract Manager and must be invoiced at the rate stated for Outside Regular Business Hours stated in Exhibit C – Pricing Sheet.

Services performed outside of the regular service hours without prior approval, will be at Contractor’s own risk and will be billed at the established Regular Business Hours service rate stated in Exhibit C – Pricing Sheet

Emergencies: The HHS Agency reserves the right to declare any necessary work within the Scope of Services to be an emergency during regular service hours or outside regular service hours, and will request emergency services in writing. Contractor shall respond on-site to a request for emergency services within one (1) hour of notification and continue work until the services requested are complete to the satisfaction of the HHS Agency.

7.1.4 State Holidays

https://hhs.texas.gov/sites/default/files/documents/about-hhs/hhs-regional-map.pdf

Version 1.90 Page 14 of 40 Revised 01/21/2026

The state holidays observed are maintained by the State Auditor’s Office and may be accessed at: https://hr.sao.texas.gov/Holidays. HHS Agency does not require services to be performed on the “All agencies closed” holidays and any exception will be provided in writing to the Contractor. HHS Agency requires services to be performed for “Optional Holidays” or “Skeleton Crew Required” holidays.

To fulfill the required services, as applicable, the Contractor may perform the services on a holiday observed by HHS at NO additional expense to the HHS Agency.

Authorized services performed by Contractor on a state holiday will be invoiced at the Contract rate for Outside Regular Hours.

7.1.5 Minimum Experience and Qualifications

These minimum requirements apply to the Contractor and Contractor’s personnel and any Subcontractor and Subcontractor’s personnel.

Bidder shall submit documentation of experience and qualifications with Response, if requested in Exhibit C– Pricing Sheet.

a) The Bidder shall have relevant experience required for the performance of the services as outlined in this IFB. The minimum experience required is five (5) years.

b) The Bidder’s personnel to be assigned to perform the services must be fully trained and, at minimum, have five (5) years’ relevant experience.

c) Required Licensure and Accreditation

d) All Contractor or Subcontractor personnel assigned to perform the services must be at least 18 years of age.

e) The Bidder must provide a minimum of three (3) verifiable references for current or previous contracts of the same size and for similar or same services within the last five

(5) years in Exhibit D – Bidder Reference Form and return with Response.

f) Contractor must have an office located within a 20-mile radius of the San Antonio Metroplex.

7.1.6 HHS Agency Responsibilities

a) The HHS Agency will provide reasonable access to the facility(s) and property where services are to be performed.

7.1.7 Contractor Responsibilities

The Contractor(s) is solely responsible for the performance of all services and requirements referenced in Section 7.1, Scope of Work and this IFB.

Contractor will not be relieved of its obligations for any nonperformance by its employees or Subcontractor(s).

https://hr.sao.texas.gov/Holidays

Version 1.90 Page 15 of 40 Revised 01/21/2026

a) The Contractor shall furnish all labor, tools, transportation, equipment, materials, and supplies, as necessary, to perform the services and/or provide the goods, as required.

b) The Contractor shall be responsible for supervision of its employees and Subcontractor employees, together with clean up and proper disposal of any site work waste.

c) The Contractor shall sign in daily at maintenance office.

The Contractor shall comply with all federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any court or administrative bodies or tribunals in any matter affecting the performance of the Contract including, if applicable, workers’ compensation laws, minimum and maximum salary and wage statutes and regulations, and licensing laws and regulations.

Training for Contractor Employees:

All Contractor employees, and Subcontractor’s employees, if applicable, assigned to perform the services must be trained and experienced in the type of work to be performed. The Contractor shall provide adequate training to all personnel assigned to perform the services on the roles, responsibilities, and technical aspects of the work.

The Contractor shall only provide and allow trained and qualified personnel to perform the required services under the Contract.

The Contractor is required to provide current copies of the completed training(s) and of the license or accreditation certificate related to the training upon request by the HHS Agency Contract Manager. This requirement also applies to Subcontractor(s) and Subcontractor’s personnel who may be used in the performance of services.

7.1.8 Independent Contractor

It is understood and agreed by the HHS Agency and the Contractor that the Contractor is retained as an independent Contractor and in no event shall any employee hired by the Contractor be considered an employee of the State.

a) The Contractor shall not allow any visitors, spouses, children or other relatives of the Contractor’s or Subcontractor’s employees to be on state property in connection with the Contract during working hours.

b) The Contractor shall be responsible for all employment taxes and other payroll withholding for its employees.

c) The Contractor shall be responsible and liable for the safety and health of its personnel while they are performing work for an HHS agency and while on the HHS Agency premises.

d) The Contractor shall be responsible for verifying that all of its employees assigned to perform services under the Contract are in compliance with all requirements of the Immigration Reform and Control Act of 1986, Public Law 99-603, which became effective November 6, 1986, and any subsequent amendments.

Version 1.90 Page 16 of 40 Revised 01/21/2026

e) The Contractor shall utilize the U.S. Department of Homeland Security’s E-Verify system during the term of the contract to determine eligibility of (A) all persons employed by the Contractor to perform duties within Texas; and (B) all persons, including subcontractors, assigned by the Contractor to perform work pursuant to the contract within the United States of America.

f) The Contractor and the assigned Contractor employees or the Contractor’s Subcontractor and Subcontractor employees assigned to perform the services must have all applicable permits, licenses, accreditations, and insurance coverage.

7.1.9 Contractor Equipment

The Contractor shall be responsible for the security, maintenance, loss or damage to its equipment or its Subcontractor’s equipment while on HHS Agency premises.

HHS Agency will NOT be responsible for damage to or loss of the Contractor’s or Subcontractor’s equipment.

7.1.10 Background Check for Personnel

The Contractor or an independent third party may need to conduct comprehensive, statewide Texas Department of Public Safety (DPS) criminal and sex offender background checks on all Contractor personnel (e.g., permanent and temporary personnel and/or Subcontractor and Subcontractor personnel) who will be assigned to perform the services under the Contract.

The Contractor shall be responsible for all background check expenses.

The background checks must be conducted prior to any Contractor or Subcontractor personnel arriving on state property and beginning the required Contract services.

Supporting documentation confirming the completion of the background checks is subject to review upon request by the HHS Agency. Failure to produce the requested documentation, as with any violation of the Contract, constitutes grounds for termination of the Contract with cause.

The background checks shall include, but not be limited to, Social Security Number Verification.

Statewide criminal and sex offender records shall include, but not be limited to, all Texas counties and out-of-state counties based on the current and previous addresses of the key personnel for the last seven years.

Personnel with sex offender, child or adult abuse, or fraud convictions shall not be allowed to provide Contract services and shall not be allowed access to HHS Agency property, facilities, or documents in connection with the Contract.

Assigned personnel with misdemeanor convictions must receive prior approval by the HHS Agency before being allowed to work under this Contract.

7.1.11 Absenteeism and Vacation

Version 1.90 Page 17 of 40 Revised 01/21/2026

The Contractor shall provide substitutes for any of its employees or Subcontractor’s employees providing services at the HHS facility who may be absent for any reason. The Contractor shall provide relief personnel as necessary and/or work overtime at no cost to the HHS Agency, to ensure that the requirements of this Contract are performed and accomplished as required.

7.1.12 Telephone Service

The Contractor shall have an active telephone service answered during normal business hours.

Normal business hours are between 8 a.m. and 5 p.m. Monday through Friday, unless otherwise stated in the IFB.

7.1.13 24-Hour Contact The Contractor must provide the HHS Agency Contract Manager with 24-hour contact information for a minimum of two (2) Contractor personnel so the HHS Agency may communicate urgent performance issues that require immediate correction or any other issues that may occur. The Contractor’s 24-hour contact must always be available. Any urgent performance issues requiring immediate correction will be followed up in writing by the HHS Agency Contract Manager.

7.1.14 Contractor and Contractor Personnel Conduct

All personnel employed by the Contractor to fulfill the requirements and terms and conditions of the Contract remain under the Contractor’s sole direction and control.

The following applies to the Contractor, Contractor employees, and, if applicable, the Contractor’s Subcontractor and Subcontractor’s employees.

7.1.14.1 Performance Compliance

While performing the services, all Contractor and Subcontractor personnel must comply with all applicable state rules, regulations, and HHS Agency’s requests regarding personal and professional conduct applicable to the services being provided as well as the service locations.

All personnel must always conduct themselves in a businesslike and professional manner.

If the HHS Agency determines that an employee of the Contractor or Subcontractor is not conducting himself or herself in accordance with the conduct standards under this Contract, the HHS Agency may provide written notice to the Contractor. Upon receipt of such notice, Contractor must promptly investigate the matter and take appropriate action that may include:

a) Removing the employee from the project;

b) Providing the HHS Agency with written notice of such removal; and

c) Providing the HHS Agency with the information for the replacement employee, who must be qualified and trained, within the timeline designated by the HHS Agency.

7.1.14.2 Contractor Supervisor(s) and Performance Monitoring

Version 1.90 Page 18 of 40 Revised 01/21/2026

The Contractor shall provide competent supervisor(s) if the service location is at an HHS Agency facility. A Supervisor may be considered a roving Supervisor to monitor more than one location with approval from the HHS Agency Contract Manager.

All supervisors must be able to communicate in English verbally and in writing. The supervisor shall be knowledgeable of the Statement of Work (SOW) and requirements of the Contract.

The Contractor and the supervisors shall continuously monitor and maintain awareness, by personal inspection, of the quality and completeness of the work being performed. The Contractor and supervisor may be requested and required to inspect the HHS Agency facility with the HHS Agency Contract Manager or designee.

7.1.14.3 Personnel Removal and Replacement

a) Removal

The HHS Agency may request removal for cause of any Contractor or Subcontractor employee assigned to the Contract, including but not limited to:

1. poor or unacceptable work performance,

2. theft,

3. abusive language or behavior, or

4. improper attire, in accordance with the terms and conditions of the Contract.

Occurrences of this type may be cause for termination of the Contract.

b) Replacement

Replacement of Contractor or Subcontractor personnel will be subject to HHS Agency review and approval. At the request of the HHS Agency, the Contractor must replace any Contractor or Subcontractor personnel who are not adequately performing the required services or who are unable to work effectively with the HHS Agency Contract Manager or other HHS staff. The Contractor shall provide replacement personnel who have the required qualifications and training as outlined in this IFB and resulting Contract. The Contractor and HHS Agency Contract Manager will work together in the event of any such required replacement to prevent disruption in the services or performance schedule and will mutually agree upon the timeline for the replacement.

7.1.14.4 Intoxicants and Illegal Drugs Prohibited

The use or possession of any kind of intoxicants or illegal drugs by Contractor (or any of its Subcontractors) employees while on duty at HHS Agency premises, including the building and grounds, is prohibited. At the sole discretion of the HHS Agency, non-compliance with this requirement may result in termination of the Contract.

7.1.14.5 Smoking Prohibited

Version 1.90 Page 19 of 40 Revised 01/21/2026

All HHS Agency facilities are nonsmoking buildings. Contractor’s and Subcontractor’s employees are prohibited from smoking in all non-designated areas.

7.1.14.6 Contractor Uniforms and Identification

All Contractor and Subcontractor employees are required to wear company uniforms and identifying badges while providing services in or delivering to HHS Agency premises.

Uniforms may be company shirts or T-shirts, smocks, and pants or shorts. The Contractor shall contact the HHS Agency Contract Manager to request approval for the use of other apparel.

The Contractor’s or Subcontractor’s uniform apparel must be of one standard color or design.

The Contractor’s or Subcontractor’s on-site managers or supervisors may wear a distinguishing style of uniform but should strive to maintain a company “standard color” to aid in identification.

All Contractor and Subcontractor personnel must prominently display their company identification badges or the company name and employee’s name (first and/or last) must be on their shirt, T-shirt or smock.

8 HUB Subcontracting Plan (HSP) Requirements The Comptroller of Public Accounts (CPA), Statewide Procurement Division (SPD) administers the Historically Underutilized Business (HUB) Program in accordance with Chapter 2161, Texas Government Code, and Title 34,TAC Part 1, Chapter 20, Subchapter D, Division 1 Rules §20.281 to §20.298, . The HUB Program rules may also be accessed at:

https://comptroller.texas.gov/purchasing/vendor/hub/.

It is the policy of HHSC to promote and encourage contracting and subcontracting opportunities with State of Texas-certified Historically Underutilized Businesses (HUBs). Information regarding the HHSC Policy on Using HUBs may be accessed at: https://hhs.texas.gov/doing-business-hhs/contracting-hhs/historically-underutilized-business-opportunities-program.

8.1 HUB Subcontracting Plan (HSP)

The HHSC HUB Coordinator has reviewed the service requirements of this IFB and has determined that subcontracting opportunities are probable for part or all the required services.

Reference the following Exhibit included as a part of this IFB:

a) Exhibit F – Historically Underutilized Business (HUB) Subcontracting Plan (HSP) Requirements https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2161.htm https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2161.htm https://texas-sos.appianportalsgov.com/rules-and-meetings?chapter=20&division=1&interface=VIEW_TAC&part=1&subchapter=D&title=34…