ESBD_489524_1772492511058_Addendum 2 LSB 95915.pdf
PDF 7 MB Posted
- Attached to
- Life Science Building - Civil Repairs
- Solicitation number
- 753-26-95915
- Issued by
- Van Zandt County, Texas
About this file
This is Addendum No. 2 to a Request for Proposals issued by Sam Houston State University in Huntsville, Texas for a General Contractor to perform civil repairs to the Life Science Building (RFP No. 753-26-95915). The original RFP was posted on February 12, 2026, and this addendum was issued on March 2, 2026, by Chuck Jones, Director of Facilities Planning and Construction. The addendum addresses five key questions submitted by respondents on February 26, 2026, and provides clarifications on project scope and specifications. The work includes storm drainage system modifications with an overflow inlet detail for a rain garden, cleaning and jetting of existing 12-inch HDPE pipe, reconstruction of existing asphalt street corners with concrete pavement, removal and replacement of retaining walls, and site hardscape improvements including concrete paving, curbs, and site features. The addendum confirms that irrigation repairs damaged by project work are excluded from the scope and will be completed separately.
The addendum clarifies that the bioretention overflow inlet detail represents base bid work involving the connection of a storm line to existing overflow drains currently draining to nothing. Existing retaining wall repair and replacement details are addressed through as-built drawings provided as an attachment. The document includes a site hardscape layout plan showing various design elements such as concrete paving types, retaining walls, stairs, ramps, bollards, site lighting, and drainage features. All site elements and signage require approval from the architect/engineer prior to installation. No pricing information, set-asides, or contract term details are specified in this addendum, which functions solely as a clarification document addressing respondent inquiries regarding project scope and technical specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(i) (ii)
REQUEST FOR PROPOSALS
FOR
GENERAL CONTRACTOR
FOR
SAM HOUSTON STATE UNIVERSITY
HUNTSVILLE, TEXAS
Life Science Building – Civil Repairs
RFP No.:
753-26-95915
Notice To All Respondents:
The following is Addendum No. 2 to the Request for Proposals (RFP)
ESBD Posting No. 753-26-95915 which was posted on February 12, 2026
Prepared By:
Chuck Jones
Director, Facilities Planning and Construction Sam Houston State University
2424 S. Sam Houston Ave.
Addendum No. 2 Issued March 2, 2026
I. Attachments:
a. Question and Responses submitted 02/26/2026
b. As-Built Drawings of Existing Footings
-END OF ADDENDUM NO. 2 -
Life Science Building – Civil Repairs
Questions 02/26/2026
Response: 03/02/2026
1. Detail 3 on Sheet C501 - Bioretention w/overflow inlet
a. Please confirm that this detail will only be used in the case that Alternate 1 is chosen and that there is no work related to it in the base bid.
i. If there is work related to it in the base bid, please describe the work.
GE_Response: The detail does not detail a bio swale, it is a overflow storm system for the rain garden. This work is based bid, it is labeled on the plans as overflow drains to be adjusted. We are adding a storm line and connecting it to the existing overflow drain that are currently draining to nothing.
ii. This detail reference 18" Pipe, however the plan sheets show the existing pipe to be 12". Please confirm what size the pipe is.
GE_Response: The alternate storm pipe should be 12” HDPE.
2. Sheet C100 calls for the existing streets that are removed to be reconstructed with 7" Concrete pavement. However, the site visit noted the existing streets appear to be asphalt. Should the repairs be concrete or asphalt pavement?
GE_Response: We are replacing the existing asphalt street corner with concrete. The Repairs will be all concrete.
3. The plans indicate that the base bid is to include cleaning and videoing of the existing pipe. Please indicate exactly which pipes are to be cleaned and videoed and the extent of the work.
GE_Response: The existing 12” line as apart of the add alternate, need to be attempted to be cleaned and jetted. See image below depicting the line to be cleaned and jetted.
4. There are several locations noted on the to remove and replace or extend existing retaining walls.
Please provide details for the walls and footings (or provide the as-builts from the construction of the existing walls).
Owner Response: see attached Drawings.
5. Please confirm that repair/replace of irrigation damaged by the work of the project is excluded from the scope as discussed in the pre-bid.
Owner Response: Yes, irrigation repairs will be done outside this project.
B1
W1
W1
DROP-OFF
FIELD EQUIPMENT
WASH DOWN
LOADING DOCK
WEST ENTRY
P3
C1
C1
R2
R1
SEE ARCH. DWGS.
FOR WALL
B2
B2
C2
C2
P1
P5
B2
Be2
SITE LIGHTING, TYP.
SEE ELEC. DWGS.
W4
Si1
W2
W1
CONCRETE JOINT
SPACING; MATCH
WALK WIDTH, TYP.
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
2016-03-25
Original Issue
Sheet Number
Sheet Name
Project Status
DD Review1
SAM HOUSTON
STATE UNIVERSITY
SHSU BIOLOGY LAB
CONSTRUCTION DOCUMENTS
2000 Avenue I, Huntsville, TX 77340
HDR. Architecture, Inc.
264175
10/20/15 -
1801 Main Street | Suite 1000 Houston, Texas 77002-8102 713.335.1900
MARK DATE DESCRIPTION
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
WALTER P. MOORE
SHAH SMITH & ASSOCIATES, INC.
2016-05-202
2016-06-023
2016-07-014
2016-07-155
LS100
SITE HARDSCAPE
LAYOUT PLAN
01020 20
GRAPHIC SCALE IN FEET
N
HARDSCAPE KEY
4/9P1 STANDARD CONCRETE PAVING - PEDESTRIAN
SCORED CONCRETE PAVEMENT
2' WIDE CONCRETE MOW STRIP
HEAVY DUTY CONCRETE - VEHICULAR
MECHANICAL PAD
BULL ROCK; 1" - 3" RIVER STONE
GRAY TO BUFF IN COLOR
P2
PAVING
A5W1 10" WIDE RETAINING WALL
18" WIDE RETAINING/SEAT WALL
BURNISHED BLOCK SCREEN WALL/
RETAINING WALL
BURNISHED BLOCK SCREEN WALL
W2
WALLS
B1S1 STANDARD STAIRS
ACCESSIBLE RAMP WITH HAND RAILS
ACCESSIBLE CURB RAMP
A1R1
STAIRS & RAMPS
10P3
1B1 REMOVABLE BOLLARDS; PAINTED
YELLOW PER SHSU STDS.
ORNAMENTAL BOLLARD; PAINTED
YELLOW PER SHSU STDS.
* INDICATES SURFACE MOUNTED BOLLARD
SITE FEATURES
1P4
12/15R2
20B2
C3Bi1
G1
1. CONTRACTOR SHALL LAYOUT ALL SITE
ELEMENTS FOR A/E APPROVAL PRIOR
TO INSTALLATION.
2. CONTRACTOR SHALL LAYOUT ALL
SIGNAGE & STRIPING FOR A/E
APPROVAL PRIOR TO INSTALLATION.
3. SEE SHEETS CG-300 THROUGH CG-303
FOR GRADING DRAINAGE AND
STORMWATER.
4. SEE SHEETS CS-200 THROUGH CS-203
FOR CIVIL SITE LAYOUT PLAN.
5. SEE ELECTRICAL DRAWINGS FOR SITE
LIGHTING INFORMATION.
6. SEE DETAIL E1/LS520 FOR SITE LIGHTING
BASES AT VARYING SITE CONDITIONS.
LAYOUT NOTES
6" CONCRETE CURB AND GUTTER
ROLLOVER CURB
DOWELED CURB
18C1
3C2
CURBS
19P5
C4Be1
A5P6
A1W3
A3
A3W4
C4Si1
T1
4/9
7C3
WOOD BENCH APPLICATION AT SEAT WALL
WOOD BENCH APPLICATION AT
FREESTANDING SEAT WALL
BICYCLE RACK
DRAINAGE DISTRIBUTION CHANNEL
SEE SHEET CS404
MONUMENT SIGN; SEE SIGNAGE PACKAGE
TRASH RECEPTACLE; SEE SPECIFICATION
D1Be2
6 2016-08-04
7 2017-05-05
8 2017-06-30
7/17/17
REISSUED AS PART OF ASI 15.2 10/13/17
- REPLACING ASI 15
EXISTING WALL
TO REMAIN
CONC. SCULPTURE PEDESTAL;
SEE STRUCT. DWGS.;
SCULPTURE BY OTHERS /
C P4 S52
AP1
<A
S1
P1 mP1 W
P1 SITE LIGHTING, TYP.
SEE ELEC. DWGS.P1
P1
Boulevard 50’ R.O.W.
A P1 A2P1■e- P1 R1B1
P12\R2 P 4P1 □ □ □ □P1
=7 S1
0)SITE LIGHTING, TYP
SEE ELEC. DWGS Sc\ S1
01 f pSw P1
/b\ G1 S1 S1S1 4:
Bowers Bou levard Cal led 50’ R.O.W.
S1C1 □
P2 Z J □ a
3fc P1 O O o oSITE L
SEE
GHTING, TYP
ELEC. DWGS
T1 C oBi1 c
S1T1 S52 o rl
PROP. BUILDING
F.F.E. 442.00
\P3 R2
P4
\C1 T1 D4 wP1 \B 1 w
GREEN HOUSE \\o \CD ^ o C lO \ wP1o 2 GREENHOUSE P3> / w< =
\u
P1P5 P2GENERATOR
<fKC1 \UTILITY YARD
(EGEN & TRANS)
\ \\4 V
P6 R1
3TRANSF
0RMER
SWITCH SITE LIGHTING, TYP.
SEE ELEC. DWGS. \R2
w pi
T wDUMPSTER o o f — f
GAS METER LOCATION5' CLR.
TYP.
REVISED EDGE OF
EXISTING PARKING
EXISTING PARKINGP4
R2 C3 w C1 \\
SITE HARDSCAPE LAYOUT PLAN - OVERALL
SCALE: 1"=20'
B
CS501
CS501
CS501
CS500
LS520
LS521
LS520
LS521
LS521
CS502
CS501
A
CS501
CS501
CS501
LS520
LS520
CS501
LS520
LS521
LS520
CS404
LS521
Sam Houston State University
BP 2 (Civil / Structl / Elevators) For Review
BP 2 (Civil / Structl / Elevators) For Bidding BP 3 (ENVELOPE/FINISH/MEP) 90% CDs - FOR
REVIEW
BP 3100% CDs - FOR CONSTRUCTION
BP 3 - ADDENDUM 02
ASI #05
ASI #15
D.
c4 7aV 4.
oo: 73
Revision History
Add. 03 Retaining Wall Finish
LS520
SITE DETAILS
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
2016-03-25
Original Issue
Sheet Number
Sheet Name
Project Status
DD Review1
SAM HOUSTON
STATE UNIVERSITY
SHSU BIOLOGY LAB
CONSTRUCTION DOCUMENTS
2000 Avenue I, Huntsville, TX 77340
HDR. Architecture, Inc.
264175
10/20/15 -
1801 Main Street | Suite 1000 Houston, Texas 77002-8102 713.335.1900
MARK DATE DESCRIPTION
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
WALTER P. MOORE
SHAH SMITH & ASSOCIATES, INC.
2016-05-202
2016-06-023
2016-07-014
2016-07-155
BULL ROCK;
2" - 3" RIVER STONE
COMPACTED
SUBGRADE
OR STRUCTURAL FILL
FINISHED
GRADE
METHOD OF
CONTAINMENT
VARIES; SEE PLANS
SEE PLANS
FOR DIMENSIONS
NOTES:
1. NO FILTER FABRIC TO
BE USED, PER SHSU.
6" 6"SEE PLANS
3"
6x6 W1.4xW1.4 WWF
IN TOP 1/3 OF SLAB
1 1/2" O.D. ANODIZED ALUMINUM HANDRAIL
SET IN CAST-IN-PLACE SLEEVE &
FILLED WITH NON-SHRINK GROUT.
SET POSTS MIN. 6" INTO CONCRETE
SIMILAR TO B1/LS520 HANDRAIL
CONCRETE SIDEWALK
DET. 14/CS501
3" O.D. ESCUTCHEON PLATE
SEE PLANS
6" CRUSHED STONE OR
STRUCTURAL FILL
FINISHED GRADE
3/8" X 6" ANOD. ALUM. KICK PLATE
4' MAX.
SEE PLAN VIEW
12" 12"
SEE PLAN
FIN.
GRADE
6" DENSE COMPACTED AGGREGATE SUBBASE
COMPACTED SUBGRADE
CHEEK WALL, BEYOND
WHERE APPLICABLE; SEE PLANS
2-1/4" O.D. GALV.
STEEL SLEEVE SET IN
NON-SHRINK GROUT
AND TOP WITH 4" DIA.
ESCUTCHEON.NOTES:
1. SUBMIT SHOP DRAWINGS FOR APPROVAL.
2. PROVIDE HANDRAILS AT EACH SIDE OF THE STEPS. PROVIDE ADDITIONAL
RAIL AT CENTER OF STEPS WHERE INDICATED ON PLANS.
3. STAIR NOSING SHALL HAVE AN ANGLED RISER OF NO GREATER THAN 30°.
4. SEE STRUCTURAL DRAWINGS FOR REINFORCING, FOOTING SIZES AND
STRUCTURAL INFORMATION.
R3"
1 1/2" O.D. ANODIZED
ALUMINUM HANDRAIL
SEE NOTE 2
34.00
47.00
60.00
3.00
1.50
3.96
SECTION
PLAN
2" SCH 40 STEEL PIPE
ADJ. SURFACE
CONC.
FOOTING
18.00
12.00
NOTES:
INSTALLATION TO BE
COMPLETED IN
ACCORDANCE WITH
MANUFACTURER'S
SPECIFICATIONS.
SEE STRUCTURAL DRAWINGS
FOR REINFORCING AND FOOTING
DIMENSIONS.
1" RADIUS;
BOTH SIDES
ADJACENT SURFACE, SEE PLANS
TOPSOIL PLANTING MEDIUM;
SEE SPECS FOR DEPTHS
1'-6"
COMPACTED
SUBGRADE
NOTES:
1. ALL EXPOSED CONCRETE SURFACES TO
HAVE 'SMOOTH RUBBED FINISH' PER
SPEC SECTION 03 30 00.
2. SEE CG300 FOR DRAINAGE.
3. SEE STRUCTURAL DRAWINGS (S-311) FOR
REINFORCING AND FOOTING DIMENSIONS
SEE NOTE 2
1" RADIUS;
BOTH SIDES
CONCEALED
MOUNTING
BRACKET, TYP.
RETAINING WALL; SEE
DETAIL A3/LS520
1 X 4 IPE
1'-6"
SECTION
ELEVATIONBASE OF WALL
1 X 4 IPE
SEE NOTE 1
SEE
NOTE 1
NOTES:
1. ALL EXPOSED WALL
SURFACES SHALL
RECEIVE A SMOOTH
RUBBED FINISH.
CL
LIGHT POST, SEE ELEC. DWGS.
1-1/4" LEVELING GAP TO BE
FILLED WITH GROUT, TO ASSIST
IN PREVENTING MOISTURE
FROM ENTERING THE POLE;
CHAMFER GROUT AT 45°
CONCRETE FOOTING, SET
TOP 2" ABOVE GRADE, 1"
CHAMFER EDGE @ 45°
2" MULCH LAYER
FINISH GRADE @
ADJACENT PLANTING OR
LAWN, SEE PLAN
ANCHOR BOLTS AS
RECOMMENDED BY
MANUFACTURER
CONCRETE FOOTING,
SEE ELEC. DWGS.
CONDUIT, SEE
ELEC. DWGS.
@ TYPICAL PLANTING
SECTION
CL
LIGHT POST, SEE
ELEC. DWGS.
1-1/4" LEVELING GAP TO BE
FILLED WITH GROUT, TO
ASSIST IN PREVENTING
MOISTURE FROM ENTERING
THE POLE; CHAMFER GROUT
AT 45°
2" MULCH LAYER
FINISH GRADE @
ADJACENT BIORETENTION
PLANTING, SEE PLAN
ANCHOR BOLTS AS
RECOMMENDED BY
MANUFACTURER
CONCRETE FOOTING,
SEE ELEC. DWGS.
CONDUIT, SEE
ELEC. DWGS.
@ BIORETENTION PLANTING
SECTION
CL
@ CONCRETE PAVING
SECTION
LIGHT POST, SEE ELEC. DWGS.
1-1/4" LEVELING GAP TO BE
FILLED WITH GROUT, TO ASSIST
IN PREVENTING MOISTURE FROM
ENTERING THE POLE; CHAMFER
GROUT AT 45°
ANCHOR BOLTS AS
RECOMMENDED BY
MANUFACTURER
CONCRETE
FOOTING, SEE
ELEC. DWGS.
CONDUIT, SEE
ELEC. DWGS.
CONCRETE PAVING,
FINISH GRADE
EXPANSION
JOINT, TYP.
@ CONCRETE PAVING EDGE
SECTION
CL
1'-0" MIN.
LIGHT POST, SEE
ELEC. DWGS.
1-1/4" LEVELING GAP TO BE
FILLED WITH GROUT, TO
ASSIST IN PREVENTING
MOISTURE FROM ENTERING
THE POLE; CHAMFER GROUT
AT 45°
CONCRETE FOOTING, SET
TOP 4" ABOVE GRADE, 1"
CHAMFER EDGE @ 45°
FINISH GRADE @
ADJACENT PLANTING
OR LAWN, SEE PLAN
ANCHOR BOLTS AS
RECOMMENDED BY
MANUFACTURER
CONCRETE FOOTING,
SEE ELEC. DWGS.
CONDUIT, SEE
ELEC. DWGS.
CONCRETE PAVING,
FINISH GRADE
6 2016-08-04
Revision History
LS521
SITE DETAILS
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
2016-03-25
Original Issue
Sheet Number
Sheet Name
Project Status
DD Review1
SAM HOUSTON
STATE UNIVERSITY
SHSU BIOLOGY LAB
CONSTRUCTION DOCUMENTS
2000 Avenue I, Huntsville, TX 77340
HDR. Architecture, Inc.
264175
10/20/15 -
1801 Main Street | Suite 1000 Houston, Texas 77002-8102 713.335.1900
MARK DATE DESCRIPTION
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
WALTER P. MOORE
SHAH SMITH & ASSOCIATES, INC.
2016-05-202
2016-06-023
2016-07-014
2016-07-155
INVERTED BOND BEAM
AS WALL CAP
GROUT GAP SOLID
8" BURNISHED BLOCK
BACKUP WALL, SEE
SPECS FOR TYPE
STRUCT'L SLAB AT
UTILITY YARD
STEEL REINFORCED
BOND BEAM; SEE
STRUCT. (S-311)
GROUT GAP SOLID
8" BURNISHED BLOCK
BACKUP WALL, SEE
SPECS FOR TYPE
CONCRETE PAVEMENT AT
UTILITY YARD
BLOCK SHELF
FINISHED GRADE
VARIES
SCREEN WALL AT RETAINING CONDITION SCREEN WALL AT GRADE
SEE STRUCT. DWGS.
FOR WALL AND REINF.
(S-311)
SEE STRUCT. DWGS.
FOR WALL AND REINF.
(S-311)
SEE STRUCT. DWGS.
FOR WALL AND REINF.
(S-311)
SEE STRUCT. DWGS.
FOR WALL AND REINF.
(S-311)
STEEL REINFORCED
BOND BEAM; SEE
STRUCT. (S-311)
INVERTED BOND
BEAM AS WALL CAP
NOTES:
1. PROVIDE 2" GAP BETWEEN
WALL AND BUILDING WHERE
APPLICABLE.
2. SEE SPECIFICATIONS FOR
BLOCK TYPE, FINISH, AND
COLOR.
NOTES:
1. PROVIDE 2" GAP BETWEEN
WALL AND BUILDING WHERE
APPLICABLE.
2. SEE SPECIFICATIONS FOR
BLOCK TYPE, FINISH, AND
COLOR.
CANOPY ATTACHMENT
WHERE APPLICABLE;
SEE ARCH. AND
STRUCT. PLANS FOR
ATTACHMENT DETAILS
SEE STRUCTURAL DRAWINGS
FOR REINFORCING AND FOOTING
DIMENSIONS.
1" RADIUS; BOTH SIDES
(UNLESS TW IS FLUSH
WITH PAVEMENT)
ADJACENT SURFACE,
SEE PLANS
ADJACENT SURFACE
10"
COMPACTED
SUBGRADE
NOTES:
1. ALL EXPOSED CONCRETE SURFACES TO
HAVE 'SMOOTH RUBBED FINISH' PER
SPEC SECTION 03 30 00.
2. SEE CG300 FOR DRAINAGE.
3. SEE STRUCTURAL DRAWINGS (S-311) FOR
REINFORCING AND FOOTING DIMENSIONS
SEE NOTE 2
BRICK VENEER;
SEE NOTE 4
NOTES:
1. SIGN PANEL
1.1. SIGN UNIT TO BE PROVIDED BY OTHERS.
2. MOUNTING
2.1. PANEL TO BE MOUNTED TO MASONRY BASE. MOUNTING BRACKETS PROVIDED BY
OTHERS. BASE TO BE CONSTRUCTED OF BRICK TO MATCH CAMPUS STANDARD AND
CONSTRUCTED OVER REINFORCED CONCRETE FOOTING (SEE STRUCT'L DRAWINGS).
3. HEIGHT VARIES AS GRADE SLOPES. PROVIDE AN AVERAGE OF 3 COURSES OF BRICK PLUS
THE ROW LOCK CAP.
4. BRICK TYPE SHALL BE TYPE FB-1 TO MATCH ARCHITECTURAL.
5. CONFIRM FINAL SIZE OF SIGN BASE WITH SIGNAGE PACKAGE.
BRICK VENEER; DOVETAIL ANCHORS
EVERY OTHER COURSE; SEE NOTE 4
SEE STRUCT'L DWGS FOR
CONCRETE BASE
PLAN
SECTION - LONGITUDINAL SECTION
SEE STRUCT'L DWGS FOR
CONCRETE BASE
FINISHED GRADE
ROW LOCK BRICK CAP
MOUNT SIGN TO CONC. WALL
END ELEVATIONFRONT ELEVATION
BRICK ROW LOCK CAP
SIGN PANEL
BY OTHERS
BRICK VENEER;
SEE NOTE 4
BRICK ROW LOCK CAP
SIGN PANEL
BY OTHERS
MIN. 1 COURSE BELOW GRADE
SIGN UNIT; BY OTHERS
SIGN UNIT; BY OTHERS
GRADE
1" RADIUS;
BOTH SIDES
CONCEALED
MOUNTING
BRACKET, TYP.
WALL; SEE DETAIL
A3/LS520 (SIMILAR)
1 X 4 IPE
1'-10"
SECTION
ELEVATIONBASE OF WALL
1 X 4 IPE
SMOOTH RUBBED
FINISH (EXPOSED
WALL)
6 2016-08-04
A5
A1
A5
A3
A3
A3
A5
A5
LS522
SITE SECTIONS
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
2016-03-25
Original Issue
Sheet Number
Sheet Name
Project Status
DD Review1
SAM HOUSTON
STATE UNIVERSITY
SHSU BIOLOGY LAB
CONSTRUCTION DOCUMENTS
2000 Avenue I, Huntsville, TX 77340
HDR. Architecture, Inc.
264175
10/20/15 -
1801 Main Street | Suite 1000 Houston, Texas 77002-8102 713.335.1900
MARK DATE DESCRIPTION
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
WALTER P. MOORE
SHAH SMITH & ASSOCIATES, INC.
2016-05-202
2016-06-023
2016-07-014
2016-07-155
1. CONTRACTOR SHALL LAYOUT ALL SITE
ELEMENTS FOR A/E APPROVAL PRIOR
TO INSTALLATION.
2. SEE SHEETS CG-300 THROUGH CG-303
FOR GRADING DRAINAGE AND
STORMWATER.
3. SEE SHEETS CS-200 THROUGH CS-203
FOR CIVIL SITE LAYOUT PLAN.
LAYOUT NOTES
6 2017-05-05
7 2017-07-17
8 2017-08-02
7/17/178/2/17
REISSUED AS PART OF ASI 15.2 10/13/17
- REPLACING ASI 15.1
CONC. RETAINING
WALL
WALKWAY RAMP
W/ HANDRAILS
CONC. RETAINING
WALLLS520 CONC. RETAINING
LS5207 WALL CONC. RETAINING
WALL
VEGETATION; SEE
LANDSCAPE PLANS CONCRETE WALK LS520
CS501 LS521CONCRETE WALK
CS501 CONCRETE WALK
ILLUMINATED
BOLLARD, TYP.;
SEE ELEC.
CS501 CONCRETE WALK ^
CONCRETE
WALK
CS501
CS501m mmmmk
* LS520\r^ m
?■-I ■ ^gp. j , imm mi rap ■ ti A, r, r, .-*1 • V mmm M it ti- dH ti ll
•S'.
ah.m —%yj
ZiL \.i rWf. -WM■»5 mm
10-9 VEGETATED AREA 5-0 PONDING BASIN 5-0 PONDING BASIN 5-0 BIO-RETENTION 6-0 SLOPE AND BASIN 6-0 SLOPE AND BASIN 7* 7^ 7^ 7* 7^ * 7'-r-6" T-6"
D1 SITE SECTION AT STORMWATER TERRACE - EAST/WEST
SCALE: 1" = 10*
BUILDING
CONC. RETAINING
WALL
CONC. WALK
A5 CONC. RETAINING
WALLLS521 LS521
CONC. MOW
STRIPCS501
psisPSSSSM. W5&
: • 3SS!
CS501
sSPS;i m ■mmmm V
F (rafts* '-s
*..v
TTJfm mr'%
.-r/' mV1?
raattfr.* If*’Mir* is* lh liiiiiiiii
35-2 8-0 BIO-RETENTION AREA CONC. WALK
// 7£ 10"
C1 SITE SECTION AT STORMWATER TERRACE - NORTH/SOUTH
SCALE: 1" = 10’
A C4 SITE SECTION AT SCULPTURE PEDESTAL
SURFACE GRADE
SURFACE GRADE
CONC. RETAINING WALL
(10" WIDE)
ARCH. REVEAL-SEE D1/LS524 AND
STRUCT. DWGS.; SEE NOTE 5
SEE STRUCT. DWGS.
LS521
TW 441.93 TW 441 93
Z
NOTES:439.43 +
1.
2.TURN REVEAL DOWN TO GRADE
WHERE PEDESTAL MEETS WALL;
TYP. BOTH SIDES. 3.
4.
CONC. FOOTING
BELOW GRADE;
SEE STRUCT. DWGS.
SEE PLANS FOR WALL DIMENSIONS.
SEE CIVIL DRAWINGS FOR FULL
GRADING PLANS.
FIELD VERIFY ALL SPOT AND TOP OF
FOOTING ELEVATIONS. SEE
STRUCTURAL DETAILS.
ALL EXPOSED SURFACES SHALL HAVE
A 'SMOOTH RUBBED FINISH' PER
REVEAL SHALL CONTINUE AROUND
ENTIRE PERIMETER OF SCULPTURE
PEDESTAL.
SCALE: 1" = 4'
CONCRETE
STEPS (5 R)
WITH HANDRAIL
CONCRETE
STEPS (5 R)
WITH HANDRAIL
oop^TW 449.
TS47 50 447 30
TW 446 00
TS 444 20
h TW 444 00
TF 444 80
BS 441 70
F + 441.27TF 441 70
1I
TF 438.77 TF 438.77
SURFACE GRADE
CONC. RETAINING WALL
LS52V (10" WIDE)
NOTES:
1. SEE PLANS FOR WALL DIMENSIONS.
2. SEE CIVIL DRAWINGS FOR FULL
GRADING PLANS.
3. FIELD VERIFY ALL SPOT AND TOP OF
FOOTING ELEVATIONS. MAINTAIN 2'-6
COVER AT TOP OF FOOTING PER
STRUCTURAL DETAILS.
CONC. FOOTING
BELOW GRADE
HARDSCAPE GRADE
BEYOND WALL
TW 441.93
1 L / 1 L / 1 1
1" R., TYP.
CS501
A •
CONCRETE WALL;
SEE STRUCT. DWGS.
CONCRETE WALK
£0RK9H
V'.iT'*
CS505
RAIN GARDEN
CONC. FOOTING; SEE
STRUCT. DWGS.
NOTES:
1. SEE PLANS FOR WALL DIMENSIONS.
2. SEE CIVIL DRAWINGS FOR FULL
GRADING PLANS.
3. FIELD VERIFY ALL SPOT AND TOP OF
FOOTING ELEVATIONS. MAINTAIN 2'-6"
COVER AT TOP OF FOOTING PER
STRUCTURAL DETAILS.
4. ALL EXPOSED SURFACES SHALL HAVE
A 'SMOOTH RUBBED FINISH' PER
SPEC SECTION 03 30 00.
$1 Sam Houston State University
BP 2 (Civil / Structl / Elevators) For Review BP 2 (Civil / Structl / Elevators) For Bidding BP 3 (ENVELOPE/FINISH/MEP) 90% CDs - FOR
REVIEW
BP 3100% CDs - FOR CONSTRUCTION
ASI #005
ASI #15
ASI #15.1
n A WALL SECTION A' - A” SOUTH EAST RETAINING WALL
D I SCALE: 1" = 4' A B5 WALL SECTION AT SCULPTURE PEDESTAL
SCALE: NTS
cy..
vCi • <<
<3V
Oa: h
+ r.
O*.. 5466
£>£ OF
RFI 0003
Dimensions Elevations & TOW
A5
A3
A3 A3
A3
A5 A5
A3
A3
A3
A5
A5
A5
LS523
SITE SECTIONS
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
2016-03-25
Original Issue
Sheet Number
Sheet Name
Project Status
DD Review1
SAM HOUSTON
STATE UNIVERSITY
SHSU BIOLOGY LAB
CONSTRUCTION DOCUMENTS
2000 Avenue I, Huntsville, TX 77340
HDR. Architecture, Inc.
264175
10/20/15 -
1801 Main Street | Suite 1000 Houston, Texas 77002-8102 713.335.1900
MARK DATE DESCRIPTION
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
WALTER P. MOORE
SHAH SMITH & ASSOCIATES, INC.
2016-05-202
2016-06-023
2016-07-014
2016-07-155
C O
N T
'D
S E
E D
E T
A
IL
C /L
S
C O
N T
'D
S E
E D
E T
A
IL
A /L
S
C O
N T
'D
S E
E D
E T
A
IL
A /L
S
C O
N T
'D
S E
E D
E T
A
IL
B /L
S
RFI 0003
Dimensions Elevations & TOW
PROP. BUILDING
F.F.E. 442.00
GREENHOUSE
TRANSF
ORMER
SWITCH
GENERATOR
S-311
S-311
S-311
S-311
S-201
S-201
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
S-311
SEE 23/S-303FOR STAIRS
SEE 21/S-303 FOR RAMP
S-311
S-311
S-311
S-311
S-311
SEE 20/S-301 FOR LIGHT-POLE
S-311
PLAN
NORTH
KEY PLAN
0 8'-0" 16'-0" 32'-0"
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
Project Number
Original Issue
Sheet Number
Sheet Name
Project Status
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
TEXAS FIRM REGISTRAGTION NO. F-12745
4800 SUGAR GROVE, SUITE 315
STAFFORD. TEXAS 77477 T 713.621.0725
F 713.458.7758 www.ensighthayneswhaley.com
EHW-15-503
HDR Architecture, Inc.
1801 Main Street | Suite 1000 Houston, TX 77002-8102 713.335.1900
264175
SHAH SMITH & ASSOCIATES, INC.
WALTER P. MOORE
BASEMENT WALLS,
FOUNDATION AND SITE
STRUCTURE
X:\Projects\2015\S15026 SHSU Biology Lab Bldg\Revit\S15026 - SHSU Biology Lab Bldg.rvt
/4
/2
:0 :3
A
M
S-100
SITE PLAN
SAM HOUSTON
STATE UNIVERSITY
BIIOLOGY
LABORATORY
BUILDING
CONSTRUCTION DOCUMENTS
2000 AVENUE I,
HUNTSVILLE, TX
77340
06-02-2016 -
SCALE: 1/16" = 1'-0"
1 SITE PLAN
MARK DATE DESCRIPTION
1 6-2-2016 BP 2 (Civil / Structl / Elevators) For Bidding
2 7-15-2016 BP-3 100% CDs - FOR
CONSTRUCTION
3 8-4-2016 BP-3 - ADDENDUM 02
08/04/2016
Revision History
RFI 0309
W Sect of Rain Garden Wall & Footing Clars
RFI 0308
RFI 278 Rain Garden HDPE Piping Slope Clars
#8 @ 4" O.C. (VERT)
#5 @ 18" O.C. (HORIZ)
EACH FACE, TYPICAL
(6) #5 CONTINOUS (LONGITUDINAL)
#5 @ 12" O.C. (TRANSVERSE)
TOP AND BOTTOM
T .O
F
T G
E L
#5 CONTINUOUS
2'-6"
#6 @ 32" O.C.
M
IN
M A
X
M A
X
1' - 7"
8"
1' - 8" 3' - 2"
SEE PLAN FOR SLAB,
TYPICAL
#5 @ 12" O.C.
2'-6"
L A
P S
P L
IC
E
C L A
S S
B T
E N
S
IO
N
(2) #5 CONTINUOUS
TYPICAL
R E
A
R C
H 'T
8" CMU WALL
#5 @ 18" O.C.
#4 HAIRPIN @ 12" O.C.
1'-0"
1'-0"
C L R
C L R
2" CLR
L E
V E
L
F
IN
F L R
#6 @ 32" O.C. EMBEDDED 7"
MIN W/ HILTI-RE 500-SD
ADHESIVE
7' - 1"
L A
P S
P L
IC
E
C L A
S S
B T
E N
S
IO
N
(4) #5 CONTINOUS (LONGITUDINAL)
#5 @ 18" O.C. (TRANSVERSE)
TOP AND BOTTOM
T .O
F
T G
E L
RE: CIVIL FOR
SIDEWALK
#8 @ 14" O.C. (VERT)
#5 @ 18" O.C. (HORIZ)
EACH FACE
M
IN
M A
X
1' - 0" 10"
3' - 0"
#4 DOWEL x 2'-0" LONG @ 12" O.C.
EMBEDDED 6" WITH HILTI-HY 200
ADHESIVE OR EQUIVALENT
TYPICAL
4' - 10"
F
IN
F L R
E L
SEE PLAN FOR SLAB, TYPICAL
3/4" JOINT
SLOPE
(2) #5 CONTINUOUS
RE: LANDSCAPE FOR FINISH, TYPICAL
1' - 0"
T .O
S
L A
B E
L
S E
E P
L A
N
RE: CIVIL FOR
PAVING
TYPICAL
1' - 2"
(3) #7 CONTINUOUS
TOP AND BOTTOM
TYPICAL 3
M A
X
(2) #5 CONTINUOUS, TYPICAL
#6 @ 32" O.C.
8" CMU WALL, TYPICAL
BOND BEAM, TYPICAL
T .O
S
L A
B E
L
S E
E P
L A
N
1' - 2"
L A
P S
P L
IC
E
C L A
S S
B T
E N
S
IO
N
(4) #5 CONTINOUS (LONGITUDINAL)
#5 @ 18" O.C. (TRANSVERSE)
TOP AND BOTTOM
T .O
F
T G
E L
RE: CIVIL FOR
SIDEWALK
#8 @ 14" O.C. (VERT)
#5 @ 18" O.C. (HORIZ)
EACH FACE
M
IN
M A
X
1' - 0" 1' - 6" 3' - 0"
5' - 6"
T .O
S
L A
B E
L
S E
E P
L A
N
1' - 2"
M A
X
T .O
F
T G
E L 4
M
IN
M A
X
2' - 3" 1' - 8" 3' - 2"
7' - 1"
T .O
S
L A
B E
L
S E
E P
L A
N
M A
X
8X4 ALUMINUM TUBE AND
CONNECTION NOT BY EHW
L8X4X1/2 x 0'-3" LONG
W/ 2" SLIP CONNECTION
3/4" X 0'-5" LONG KWIK BOLT
1' - 2"
3/16
3 SIDES
L A
P S
P L
IC
E
C L A
S S
B T
E N
S
IO
N
(3) #5 CONTINOUS (LONGITUDINAL)
#5 @ 18" O.C. (TRANSVERSE)
TOP AND BOTTOM
T .O
F
T G
E L
RE: CIVIL FOR
SIDEWALK
#5 @ 14" O.C. (VERT)
#5 @ 14" O.C. (HORIZ)
EACH FACE
M
IN
M A
X
1' - 0"
1' - 0"
1' - 0"
3' - 0"
RE: ARCH FOR FINISH
T .O
S
L A
B E
L
S E
E P
L A
N
MIN
8"
ADDITIONAL #5 CONTINUOUS
#4 HAIRPIN @ 12" O.C.
GREENHOUSE STRUCTURE AND
CONNECTION NOT BY EHW
(2) #4 CONTINUOUS
F
IN
IS
H
E D
G R
A D
E E
L
RE: ARCHITECT
FOR FINISH
M A
X
M A
X
#5 @ 12" O.C.
CENTER OF WALL
#4 HAIRPIN @ 12"
O.C. EACH FACE
#5 @ 12" O.C.
EACH FACE
3' - 6"
#5 @ 12" O.C.
TOP AND BOTTOM
1' - 3 1/2"
R E
A
R C
H
IT
E C
T
INFILL AROUND
CONNECTION
4 1/2" 6 1/2" 4 1/2"
(4) #5 TOP AND BOTTOM
T .O
F
T G
E L
1' - 1 1/4" 1' - 1 1/4"
PLAN
NORTH
KEY PLAN
1 2 3 4 5 6
2 3 4 5 61
A
B
C
D
E
A
B
C
D
E
Project Number
Original Issue
Sheet Number
Sheet Name
Project Status
4800 Sugar Grove Blvd, Suite 315 Stafford, Texas 77477 713.621.0725
12600 Northborough Drive, Suite 290 Houston, Texas 77067 832.249.9379
713.805.5096
2800 FM 359
Richmond, Texas 77406 281.497.4171
221 West 6th Street, Suite 800 Austin, Texas 78701 512.330.1297
2825 Wilcrest, Suite 350 Houston, Texas 77042 713.780.7563
ENSIGHT HAYNES WHALEY, LLC
4b TECHNOLOGY GROUP, LLC
PROJECT COST RESOURCES, INC.
TEAM HOKE
TEXAS FIRM REGISTRAGTION NO. F-12745
4800 SUGAR GROVE, SUITE 315
STAFFORD. TEXAS 77477 T 713.621.0725
F 713.458.7758 www.ensighthayneswhaley.com
EHW-15-503
HDR Architecture, Inc.
1801 Main Street | Suite 1000 Houston, TX 77002-8102 713.335.1900
264175
SHAH SMITH & ASSOCIATES, INC.
WALTER P. MOORE
BASEMENT WALLS,
FOUNDATION AND SITE
STRUCTURE
X:\Projects\2015\S15026 SHSU Biology Lab Bldg\Revit\S15026 - SHSU Biology Lab Bldg.rvt
/1
/2
:5 :4
A
M
S-311
FOUNDATION
DETAILS
SAM HOUSTON
STATE UNIVERSITY
BIIOLOGY
LABORATORY
BUILDING
CONSTRUCTION DOCUMENTS
2000 AVENUE I,
HUNTSVILLE, TX
77340
06-02-2016 -
SCALE: 3/4" = 1'-0"
19 SECTION
SCALE: 3/4" = 1'-0"
15 SECTION
SCALE: 3/4" = 1'-0"
1 SECTION
SCALE: 3/4" = 1'-0"
2 SECTION
SCALE: 3/4" = 1'-0"
3 SECTION
SCALE: 3/4" = 1'-0"
16 SECTION
SCALE: 3/4" = 1'-0"
4 SECTION
SCALE: 3/4" = 1'-0"
20 SECTION
SCALE: 3/4" = 1'-0"
5 SECTION
SCALE: 3/4" = 1'-0"
17 SECTION
2 2 2
SCALE: 3/4" = 1'-0"
6 SECTION
2 2
2 2
2 2
SCALE: 3/4" = 1'-0"
18 SECTION
MARK DATE DESCRIPTION
1 6-2-2016 BP 2 (Civil / Structl / Elevators) For Bidding
2 7-15-2016 BP-3 100% CDs - FOR
CONSTRUCTION
3 8-4-2016 BP-3 - ADDENDUM 02
5 10-12-2016 ASI 01
10/12/2016
Revision History
RFI 0012
Service Yard Wall & Footing
| (i) |
| (ii) |
| REQUEST FOR PROPOSALS |
| FOR |
| GENERAL CONTRACTOR |
| FOR |
| SAM HOUSTON STATE UNIVERSITY |
| Life Science Building – Civil Repairs |
| RFP No.: |
| 753-26-95915 |
| Life Science Civil Repair - Owner & GE_Response & As-Builts Drawings (03-02-2026).pdf |
| Life Science Civil Repair - Owner & GE_Response (03-02-2026) |
| As-Builts- Biology Lab Building |
| LS100 Site Hardscape Plan |
| LS520 Site Dtls |
| LS521 Site Dtls |
| LS522 Site Sects |
| LS523 Site Sects |
| 264175C-LS-520_24 |
| LS523 |
| S-100 Site Plan |
| S-311 Foundation Dtls |
File details come from the government source that posted it. Updated .