ESBD_489524_1771953638149_Addendum 1 LSB 95915.pdf
PDF 1 MB Posted
- Attached to
- Life Science Building - Civil Repairs
- Solicitation number
- 753-26-95915
- Issued by
- Van Zandt County, Texas
About this file
This is Addendum No. 1 to a Request for Proposals (RFP) issued by Sam Houston State University in Huntsville, Texas for a General Contractor to perform Life Science Building Civil Repairs. The RFP was originally posted on February 12, 2026, with RFP No. 753-26-95915. The addendum, issued February 24, 2026, provides revised sections for respondent pricing and delivery proposals, includes a mandatory pre-submittal conference sign-in sheet from February 19, 2026, technical specifications, and alternate drawing specifications. The project involves selective demolition, miscellaneous cast-in-place concrete work, site clearing, earth moving, and concrete paving. Key milestone dates include execution of the General Contractor Agreement by April 3, 2026, notice to proceed with material procurement by April 10, 2026, onsite construction start by May 18, 2026, substantial completion by August 7, 2026, and final completion by September 7, 2026. The point of contact for the solicitation changed to Ely Gonzalez, Project Controls Specialist, at ely.gonzalez@shsu.edu or 936-294-3152. Respondents must submit both a base proposal cost and an alternate cost for potential removal and replacement of approximately 115 linear feet of existing 12-inch storm line with new 12-inch HDPE piping if the existing line cannot be successfully cleaned and cleared.
The specifications detail comprehensive requirements for site work including site clearing with topsoil stripping and stockpiling, grubbing, and removal of vegetation; earth moving with excavation, backfill, and compaction requirements at varying percentages based on application; utility trench backfill using bank run sand and cement-stabilized sand with specific embedment standards; and concrete paving with 4000 psi compressive strength at 28 days and air content of 4.5 percent plus or minus 1.5 percent. Materials specifications mandate compliance with ASTM standards for reinforcement, aggregates, admixtures, and curing compounds, with particular attention to water-soluble chloride content limits and geotextile requirements for subsurface drainage. The contractor is responsible for coordinating with utility locator services, establishing temporary erosion and sedimentation controls, protecting existing vegetation and structures, and conducting field quality control testing with documented results. All demolition waste becomes the contractor's property unless otherwise indicated, and historic items or relics uncovered during demolition remain the property of the owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(i) (ii)
REQUEST FOR PROPOSALS
FOR
GENERAL CONTRACTOR
FOR
SAM HOUSTON STATE UNIVERSITY
HUNTSVILLE, TEXAS
Life Science Building – Civil Repairs RFP No.:
753-26-95915
Notice To All Respondents:
The following is Addendum No. 1 to the Request for Proposals (RFP)
ESBD Posting No. 753-26-95915 which was posted on February 12, 2026
Prepared By:
Chuck Jones
Director, Facilities Planning and Construction Sam Houston State University
2424 S. Sam Houston Ave.
Addendum No. 1 Issued February 24, 2026
I. Attachments:
a. Mandatory Pre-Submittal Conference “Sign in Sheet” held on 2/19/26
b. Replacement of 6.2 Respondent’s Pricing and Delivery Proposal: The attached document replaces Sections 6.2 through 6.2.4, Respondent’s Pricing and Delivery Proposal, in their entirety. Respondents shall use the attached revised sections when preparing and submitting their proposal.
c. Technical Specifications
d. Alternate 1 Drawings and Specifications
II. Revised Point of Contact:
a. This Addendum is issued to notify that the Point of Contact for this solicitation has changed. All other requirements of the RFP remain unchanged. All other terms and conditions of the solicitation remain unchanged.
Point of Contact for this solicitation has changed to:
Name: Ely Gonzalez Title: Project Controls Specialist Email: ely.gonzalez@shsu.edu Phone: 936-294-3152
-END OF ADDENDUM NO. 2 -
mailto:ely.gonzalez@shsu.edu
6.2 RESPONDENT’S PRICING AND DELIVERY PROPOSAL
RFP No.: 753-26-95915
Project Name: RFP for Competitive Sealed Proposals for Life Science Building - Civil Repairs – 95915 at Sam Houston State University
From:
Respondent’s Name:
Mailing Address:
City,State,ZipCode:
Phone-Number:
To: Chuck Jones, Director, Facilities Planning & Construction Sam Houston State University 2424 Sam Houston Ave.
Huntsville, TX 77341
Having carefully examined the Uniform General Conditions for Construction Contracts (UGC), the sealed Plans and Specifications and addenda thereto, as prepared by Sam Houston State University, the Project Architect/Engineer on this Project, as well as the premises and all the conditions affecting the work, the undersigned proposes to furnish all labor, materials, and equipment necessary to achieve Substantial Completion of the work in accordance with the Contract Documents for the following sum (Amount shall be shown in both written and figure form. In case of discrepancy between the written amount and the figure, the written amount will govern):
6.2.1 BASE PROPOSAL COST:
DOLLARS
6.2.2 ALTERNATE COST:
In the event the existing 12-inch storm line located within the rain garden cannot be successfully cleaned and cleared, the Contractor shall provide all labor, materials, and equipment necessary to remove and replace approximately 115 linear feet of the existing 12-inch storm line with new 12-inch HDPE piping.
DOLLARS
6.2.3 CONSTRUCTION MILESTONE SCHEDULE: The undersigned agrees, if awarded the contract, to achieve Substantial Completion of the Work as defined in the UGC, the plans and specifications and addenda thereto.
4.2.3.1 Execute General Contractor Agreement ................................................ 04/03/2026
4.2.3.2 Notice to Proceed with procurement of material .................................... 04/10/2026
4.2.3.3 Onsite construction to start .................................................................... 05/18/2026
4.2.3.4 Substantial Completion ......................................................................... 08/07/2026
4.2.3.5 Final Completion ................................................................................... 09/07/2026
The above schedule of events represents a basic timeline for the Project. A final Project timeline will be developed with the Owner at a later time. The Owner can be expected to work with the highest-ranking Respondent to validate and improve on this initial schedule.
6.2.4 RFP ADDENDA: Receipt is hereby acknowledged of the following addenda issued for this RFP
- initial where applicable.
No. 1 No. 2 No. 3 No. 4 No. 5
SAM HOUSTON STATE UNIVERSITY - LIFE SCIENCE DRAINAGE ISSUE FOR CONSTRUCTION
11 NOVEMBER 2025
GESSNER ENGINEERING, LLC 02 41 19 - 1
SELECTIVE DEMOLITION
SECTION 02 41 19 – SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected site elements.
2. Salvage of existing items to be reused or recycled.
B. Related Requirements:
1. Section 31 10 00 "Site Clearing" for site clearing and removal of above- and below-grade improvements not part of selective demolition.
2. Section 33 05 00 “Common Work Results for Utilities” for abandonment of utilities by removal or in place.
1.3 DEFINITIONS
A. Demolish or Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.5 PREINSTALLATION MEETINGS
A. Pre-demolition Conference: Conduct conference at Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
4. Review areas where existing construction is to remain and requires protection.
1.6 INFORMATIONAL SUBMITTALS
A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control.
Indicate proposed locations and construction of barriers.
B. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's and other tenants' on-site operations are uninterrupted.
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
GESSNER ENGINEERING, LLC 02 41 19 - 2
4. Use of site stairs C. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.7 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.8 FIELD CONDITIONS
A. Owner will occupy portions of building or site immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify Architect and Engineer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and
Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
G. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.
1.9 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Materials for utility modification shall meet applicable TCEQ, AWWA, and local AHJ requirements and be suitable for use with utility material.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Survey of Existing Conditions: Record existing conditions by use of measured drawings preconstruction photographs or video, and templates.
1. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems.
1. Arrange to shut off utilities with utility operator.
2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems.
GESSNER ENGINEERING, LLC 02 41 19 - 3
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent property, buildings, and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection.
B. Remove temporary barricades and protections where hazards no longer exist.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically.
2. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
3. Maintain adequate ventilation when using cutting torches.
4. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Work in Historic Areas: Selective demolition may be performed only in areas of Project that are not designated as historic.
D. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
E. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
F. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to full depth at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete.
3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction and recycle or dispose of them.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn demolished materials.
3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 41 19
GESSNER ENGINEERING, LLC 03 30 53 - 1
MISCELLANEOUS CAST-IN-PLACE CONCRETE
SECTION 03 30 53 – MISCELLANEOUS CAST-IN-PLACE CONCRETE
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.
B. Related Requirements:
1. Section 31 20 00 "Earth Moving" for drainage fill under slabs-on-grade.
2. Section 32 13 13 "Concrete Paving" for concrete pavement and walks.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Design Mixtures: For each concrete mixture.
1.4 QUALITY ASSURANCE
A. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.
PART 2 - PRODUCTS
2.1 CONCRETE, GENERAL
A. Comply with the following sections of ACI 301 unless modified by requirements in the Contract Documents:
1. "General Requirements."
2. "Formwork and Formwork Accessories."
3. "Reinforcement and Reinforcement Supports."
4. "Concrete Mixtures."
5. "Handling, Placing, and Constructing."
B. Comply with ACI 117.
2.2 STEEL REINFORCEMENT
A. Reinforcing Bars: ASTM A 615, Grade 60, deformed.
B. Plain-Steel Wire: Not Allowed C. Plain-Steel Welded-Wire Reinforcement: Not Allowed D. Deformed-Steel Welded-Wire Reinforcement: ASTM A 1064/A 1064M, flat sheet.
2.3 CONCRETE MATERIALS
A. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from single source from single manufacturer.
B. Cementitious Materials:
1. Portland Cement: conforming to ASTM C 150, Type I, Type II, or Type III.
2. Fly Ash: ASTM C 618, Class C or F.
C. Normal-Weight Aggregate: ASTM C 33, 1-1/2-inch nominal maximum aggregate size.
D. Air-Entraining Admixture: ASTM C 260.
E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.
GESSNER ENGINEERING, LLC 03 30 53 - 2
1. Water-Reducing Admixture: ASTM C 494, Type A.
2. High-Range, Water-Reducing Admixture: ASTM C 494, Type F.
3. Plasticizing and Retarding Admixture: ASTM C 1017, Type II.
F. Water: ASTM C 94
2.4 RELATED MATERIALS
A. Vapor Retarder: Polyethylene sheet, ASTM D 4397, not less than 10 mils thick; or plastic sheet, ASTM E 1745, Class C.
B. Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber in preformed strips.
2.5 CURING MATERIALS
A. Evaporation Retarder: Waterborne, monomolecular film forming; manufactured for application to fresh concrete.
B. Absorptive Cover: AASHTO M 182, Class 3, burlap cloth.
C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
D. Water: Potable.
E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B.
2.6 CONCRETE MIXTURES
A. Comply with ACI 301.
B. Normal-Weight Concrete:
1. Minimum Compressive Strength: 3000 psi or as indicated at 28 days.
2. Maximum W/C Ratio: 0.45 or as indicated.
3. Slump Limit: 5 inches, plus or minus 1 inch.
4. Air Content: Maintain within range permitted by ACI 301.
2.7 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94 and ASTM C 1116, and furnish batch ticket information.
1. When air temperature is above 75 deg F and below 90 95 deg F, reduce mixing and delivery time to a maximum of 60 minutes
2. When air temperature is above 90 95 deg F, reduce mixing and delivery time to a maximum of 45 minutes.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than
5 minutes after ingredients are in mixer, before any part of batch is released.
2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1
cu. yd.
3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mix type, mix time, quantity, and amount of water added. Record approximate location of final deposit in structure.
PART 3 - EXECUTION
3.1 FORMWORK INSTALLATION
A. Design, construct, erect, brace, and maintain formwork according to ACI 301.
3.2 EMBEDDED ITEM INSTALLATION
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
GESSNER ENGINEERING, LLC 03 30 53 - 3
3.3 VAPOR-RETARDER INSTALLATION
A. Install, protect, and repair vapor retarders according to ASTM E 1643; place sheets in position with longest dimension parallel with direction of pour.
1. Lap joints 6 inches and seal with manufacturer's recommended adhesive or joint tape.
3.4 STEEL REINFORCEMENT INSTALLATION
A. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.
1. Reinforcement shall be accurately positioned and, unless otherwise shown or specified, shall be secured against displacement by using at intersection, annealed iron wire of not less than No. 18 gauge or suitable metal clips. It shall be supported by plastic or metal chairs or spacers.
2. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.
3.5 JOINTS
A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.
B. Construction/Expansion Joints: Install so strength and appearance of concrete are not impaired, at a spacing equal to twenty-four (24) times the thickness of the concrete in inches or at locations indicated or approved by Engineer.
C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness, as follows:
1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint to a radius of 1/8 inch. Repeat grooving of contraction joints after applying surface finishes.
Eliminate groover marks on concrete surfaces.
2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch-wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.
D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.
1. Extend joint-filler strips full width and depth of joint, terminating flush with finished concrete surface unless otherwise indicated.
3.6 CONCRETE PLACEMENT
A. Comply with ACI 301 for placing concrete.
B. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of
ACI 301.
C. Consolidate concrete with mechanical vibrating equipment according to ACI 301.
D. Equipment Bases and Foundations:
1. Coordinate sizes and locations of concrete bases with actual equipment provided.
2. Construct concrete bases 6 inches high unless otherwise indicated; and extend base not less than 6 inches in each direction beyond the maximum dimensions of supported equipment unless otherwise indicated or unless required for seismic anchor support.
3. Minimum Compressive Strength: 3500 psi or as indicated at 28 days.
4. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch centers around the full perimeter of concrete base.
5. For supported equipment, install epoxy-coated anchor bolts that extend through concrete base, and anchor them into structural concrete substrate.
6. Prior to pouring concrete, place and secure anchorage devices. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
7. Cast anchor-bolt insert into bases. Install anchor bolts to elevations required for proper attachment to supported equipment.
3.7 FINISHING FORMED SURFACES
A. Chamfer edges by grinding or dry rubbing.
B. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections exceeding 1/2 inch.
1. Apply to concrete surfaces not exposed to public view.
GESSNER ENGINEERING, LLC 03 30 53 - 4
C. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum number of seams. Repair and patch tie holes and defective areas.
Remove fins and other projections exceeding 1/8 inch.
1. Apply to concrete surfaces exposed to public view, to receive a rubbed finish, or to be covered with a coating or covering material applied directly to concrete.
D. Rubbed Finish: Apply the following rubbed finish, defined in ACI 301, to smooth-formed-finished as-cast concrete where indicated:
1. Smooth-rubbed finish.
2. Grout-cleaned finish.
3. Cork-floated finish.
E. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.8 FINISHING UNFORMED SURFACES
A. General: Comply with ACI 302.1R for screeding, re-straightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.
B. Screed surfaces with a straightedge and strike off. Begin initial floating using bull floats or darbies to form a uniform and open-textured surface plane before excess moisture or bleedwater appears on surface.
1. Do not further disturb surfaces before starting finishing operations.
C. Scratch Finish: Apply scratch finish to surfaces indicated and surfaces to receive concrete floor topping or mortar setting beds for ceramic or quarry tile, portland cement terrazzo, and other bonded cementitious floor finishes unless otherwise indicated.
D. Float Finish: Apply float finish to surfaces indicated, to surfaces to receive trowel finish, and to floor and slab surfaces to be covered with fluid-applied or sheet waterproofing, fluid-applied or direct-to-deck-applied membrane roofing, or sand-bed terrazzo.
E. Trowel Finish: Apply a hard trowel finish to surfaces indicated and to floor and slab surfaces exposed to view or to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage membrane, paint, or another thin film-finish coating system.
F. Trowel and Fine-Broom Finish: Apply a partial trowel finish, stopping after second troweling, to surfaces indicated and to surfaces where ceramic or quarry tile is to be installed by either thickset or thinset methods.
Immediately after second troweling, and when concrete is still plastic, slightly scarify surface with a fine broom.
G. Slip-Resistive Broom Finish: Apply a slip-resistive finish to surfaces indicated and to exterior concrete platforms, steps, and ramps. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route.
3.9 CONCRETE PROTECTING AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
Comply with ACI 306.1 for cold-weather protection and with ACI 301 for hot-weather protection during curing.
B. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
C. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
D. Curing Methods: Cure formed and unformed concrete for at least seven days by one or a combination of the following methods:
1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers.
2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period, using cover material and waterproof tape.
GESSNER ENGINEERING, LLC 03 30 53 - 5
3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.
4. Curing and Sealing Compound: Apply uniformly to floors and slabs indicated in a continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Repeat process 24 hours later and apply a second coat. Maintain continuity of coating and repair damage during curing period.
3.10 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.
B. Tests: Perform according to ACI 301.
1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 1 cu. yd., but less than 25 cu. yd., plus one set for each additional 50 cu. yd. or fraction thereof.
END OF SECTION 03 30 53
GESSNER ENGINEERING, LLC 31 10 00 - 1
SITE CLEARING
SECTION 31 10 00 – SITE CLEARING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Protecting existing vegetation to remain.
2. Removing existing vegetation.
3. Clearing and grubbing.
4. Stripping and stockpiling topsoil.
5. Stripping and stockpiling rock.
6. Removing above- and below-grade site improvements.
7. Disconnecting, capping or sealing, and abandoning site utilities in place.
8. Temporary erosion and sedimentation control. B. Related Requirements:
1.3 DEFINITIONS
A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.
B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.
C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in place surface soil; the zone where plant roots grow.
D. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in place surface soil; the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects larger than 2 inches in diameter; and free of weeds, roots, toxic materials, or other non-soil materials.
E. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings.
F. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction.
G. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.5 MATERIAL OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
1.6 INFORMATIONAL SUBMITTALS
A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.
1. Use sufficiently detailed photographs or video recordings.
GESSNER ENGINEERING, LLC 31 10 00 - 2
2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain. B. Topsoil stripping and stockpiling program.
C. Rock stockpiling program.
D. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.
E. Burning: Documentation of compliance with burning requirements and permitting of authorities having jurisdiction. Identify location(s) and conditions under which burning will be performed.
1.7 QUALITY ASSURANCE
A. Topsoil Stripping and Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work.
Include dimensioned diagrams for placement and protection of stockpiles.
B. Rock Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.
1.8 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
2. Provide alternate routes around closed or obstructed trafficways if required by Owner or authorities having jurisdiction.
B. Improvements on Adjoining Property: Authority for performing site clearing indicated on property adjoining
Owner's property will be obtained by Owner before award of Contract. 1. Do not proceed with work on adjoining property until directed by Architect.
C. Salvageable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated.
D. Utility Locator Service: Notify SHSU and Texas 811 (Did Tess/Call Before You Dig) for area where Project is located before site clearing.
E. Do not commence site clearing operations until temporary erosion- and sedimentation-control measures are in place.
F. Tree- and Plant-Protection Zones: Protect according to requirements in Section 01 50 00 "Temporary
Facilities and Controls"
G. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 31 20 00 "Earth
Moving."
1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.
B. Protect existing site improvements to remain from damage during construction.
1. Restore damaged improvements to their original condition, as acceptable to Owner.
GESSNER ENGINEERING, LLC 31 10 00 - 3
3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.
B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.
C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
D. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal.
3.3 TREE AND PLANT PROTECTION
A. Protect trees and plants remaining on-site.
B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations.
3.4 EXISTING UTILITIES
A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.
1. Arrange with SHSU to shut off indicated utilities.
B. Locate, identify, and disconnect utilities indicated to be abandoned in place.
C. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others, unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Engineer not less than 48 hours in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner’s written permission.
D. Excavate for and remove underground utilities indicated to be removed.
E. Removal of underground utilities is included in earthwork sections; in applicable fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, and utilities sections; and Section 024119
"Selective Demolition."
3.5 CLEARING AND GRUBBING
A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.
1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.
2. Grind down stumps and remove roots larger than 2 inches in diameter, obstructions, and debris to a depth of 18 inches below exposed subgrade.
3. Use only hand methods or air spade for grubbing within protection zones.
4. Chip removed tree branches and dispose of off-site.
B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.
1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches, and compact each layer to a density equal to adjacent original ground.
3.6 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.
B. Strip topsoil to depth of 6 inches in a manner to prevent intermingling with underlying subsoil or other waste materials.
1. Remove subsoil and non-soil materials from topsoil, including clay lumps, gravel, and other objects larger than 2 inches in diameter; trash, debris, weeds, roots, and other waste materials.
C. Stockpile topsoil away from edge of excavations without intermixing with subsoil or other materials. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.
1. Limit height of topsoil stockpiles to 72 inches.
2. Do not stockpile topsoil within protection zones.
3. Dispose of surplus topsoil. Surplus topsoil is that which exceeds quantity indicated to be stockpiled or reused.
GESSNER ENGINEERING, LLC 31 10 00 - 4
4. Stockpile surplus topsoil to allow for respreading deeper topsoil.
3.7 STOCKPILING ROCK
A. Remove from construction area naturally formed rocks that measure more than 1 foot across in least dimension. Do not include excavated or crushed rock.
1. Separate or wash off non-rock materials from rocks, including soil, clay lumps, gravel, and other objects larger than 2 inches in diameter; trash, debris, weeds, roots, and other waste materials.
B. Stockpile rock away from edge of excavations without intermixing with other materials. Cover to prevent windblown debris from accumulating among rocks.
1. Limit height of rock stockpiles to 36 inches.
2. Do not stockpile rock within protection zones.
3. Dispose of surplus rock. Surplus rock is that which exceeds quantity indicated to be stockpiled or reused.
4. Stockpile surplus rock to allow later use by the Owner.
3.8 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.
B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.
1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.
2. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.
3.9 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.
B. Burning tree, shrub, and other vegetation waste is permitted according to burning requirements and permitting of authorities having jurisdiction. Control such burning to produce the least smoke or air pollutants and minimum annoyance to surrounding properties. Burning of other waste and debris is prohibited.
C. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials, and transport them to recycling facilities. Do not interfere with other Project work.
END OF SECTION 31 10 00
GESSNER ENGINEERING, LLC 31 20 00 - 1
EARTH MOVING
SECTION 31 20 00 – EARTH MOVING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Excavating and filling for rough grading the Site.
2. Preparing subgrades for walks, pavements, and turf and grasses.
3. Subbase course for concrete walks and pavements.
4. Subbase course and base course for asphalt and concrete paving.
5. Subsurface drainage backfill for walls and trenches.
6. Excavating and backfilling trenches for utilities and pits for buried utility structures.
B. Related Requirements:
1. Section 03 30 00 "Cast-in-Place Concrete" for granular course if placed over vapor retarder and beneath the slab-on-grade.
2. Section 31 10 00 "Site Clearing" for site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities.
3. Section 31 23 19 "Dewatering" for lowering and disposing of ground water during construction.
4. Section 31 50 00 "Excavation Support and Protection" for shoring, bracing, and sheet piling of excavations.
1.3 DEFINITIONS
A. Backfill: Soil material or Cement Stabilized Sand material used to fill an excavation.
1. Initial Backfill: Backfill placed below, beside, and over pipe in a trench, including haunches to support sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
B. Top Soil: Dark surface soil containing organic matter for growing vegetation C. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
D. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.
E. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.
F. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water.
G. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
H. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Engineer. Authorized additional excavation and replacement material will be paid for according to Contract provisions for unit prices.
I. Bulk Excavation: Excavation more than 10 feet in width and more than 30 feet in length.
J. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Engineer. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.
K. Fill: Soil materials used to raise existing grades.
L. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material 3/4 cu. yd. or more in volume that exceed a standard penetration resistance of 100 blows/2 inches when tested by a geotechnical testing agency, according to ASTM D 1586.
M. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.
N. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.
O. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.
GESSNER ENGINEERING, LLC 31 20 00 - 2
P. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct preexcavation conference at Project site.
B. Review methods and procedures related to earthmoving, including, but not limited to, the following:
1. Personnel and equipment needed to make progress and avoid delays.
2. Coordination of Work with utility locator service.
3. Coordination of Work and equipment movement with the locations of tree- and plant-protection zones.
4. Extent of trenching by hand or with air spade.
5. Field quality control.
1.5 ACTION SUBMITTALS
A. Product Data: Submit manufacturer’s data for each type of product indicating compliance with the specifications regarding dimensions, thickness, weights, and materials. For each type of the following manufactured products required:
1. Cement stabilized sand mix design.
2. Geotextiles.
a. Geotextile: 12 by 12 inches.
3. Warning tapes.
a. Warning Tape: 12 inches long; of each color.
4. Shop Drawings: indicate dimensions, method of field assembly, and components.
5. Submit manufacturer’s “Certificate of Compliance”, stating that the materials furnished comply with this specification.
6. Samples for Verification: For the following products, in sizes indicated below:
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For qualified testing agency.
B. Material Test Reports: For each on-site and borrow soil material proposed for fill and backfill as follows:
C. Classification according to ASTM D 2487.
D. Laboratory compaction curve according to ASTM D 698.
E. Preexcavation Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by earth-moving operations. Submit before earth moving begins.
1.7 QUALITY ASSURANCE
A. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E 329 and ASTM D 3740 for testing indicated.
1.8 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.
B. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
C. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.
D. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.
E. Do not proceed with work on adjoining property until directed by Architect.
F. Utility Locator Service: Notify TAMUSA and Texas 811 (Did Tess/Call Before You Dig) for area where
Project is located before beginning earth-moving operations.
G. Do not commence earth-moving operations until temporary site fencing and erosion- and sedimentation-control measures specified in are in place.
H. Do not commence earth-moving operations until plant-protection measures specified in are in place.
I. The following practices are prohibited within protection zones:
J. Storage of construction materials, debris, or excavated material.
K. Parking vehicles or equipment.
GESSNER ENGINEERING, LLC 31 20 00 - 3
L. Foot traffic.
M. Erection of sheds or structures.
N. Impoundment of water.
O. Excavation or other digging unless otherwise indicated.
P. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.
Q. Do not direct vehicle or equipment exhaust towards protection zones.
R. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.
B. Satisfactory Soils: All fill materials recommended in geotechnical report for each fill type; free of rock or gravel larger than 3 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.
1. Select Fill Plasticity Index: 8 – 20, a max gravel content (percent retained on #4 sieve) of 40 percent, and rocks no larger than 2 inches in their largest dimension.
2. General Fill Plasticity Index: Maximum of 30, and shall be free of debris and organics.
C. Unsatisfactory Soils: Soil Classification Groups GC, ML, OL, CH, MH, OH, and PT according to ASTM D 2487, or a combination of these groups.
1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.
D. Sand: ASTM C 33/C 33M; fine aggregate.
2.2 BANK RUN SAND
A. Materials B. Granular Material free of detrimental quantities of clay, debris, or organic material and which meet the following requirements:
a. Maximum Liquid Limit (LL): 45
b. Maximum Plasticity Index (PI): 15
c. Maximum Percent Passing No. 200 Sieve: 35%
d. Minimum Percent Passing ¾” Sieve: 100%
C. The material shall be free slowing and when wet, shall not adhere to form a ball.
2.3 CEMENT STABILIZED SAND
A. Materials
1. Cement - Type I Portland Cement conforming to ASTM C150.
2. Sand - Clean durable sand meeting grading requirements for fine aggregates of ASTM C33, and the following requirements:
a. Classified as SW, SP, or SM by the United Soil Classification System of ASTM D2487.
b. Deleterious materials:
1) Clay lumps, ASTM C142; less than 0.5 percent.
2) Lightweight pieces, ASTM C123; less than 5.0 percent.
3) Organic impurities, ASTM C40; color no darker than standard color.
4) Plasticity index of 4 or less when tested in accordance with ASTM D4318.
c. Water: Potable water, free of oils, acids, alkalis, organic matter, or other deleterious substances, meeting requirements of ASTM C94.
B. Design sand-cement mixture to produce a minimum unconfined compressive strength of 50 pounds per square inch in 48 hours and 100 pounds per square inch in 7 days when compacted to 95% in accordance to ASTM D558 and when cured in accordance with ASTM D1632, and…