ESBD_472874_1764961742079_ADDENDUM #2 Emergency Generator Maintenance RFP 26-004 final.pdf

PDF 66 KB Posted

Attached to
Emergency Generator Maintenance Services
Solicitation number
RFP-759-26-004
Issued by
Harris County, Texas

About this file

This is an addendum document related to an Request for Proposal (RFP) 26-004 issued by the University of Houston-Clear Lake (UHCL) for emergency generator maintenance services. The RFP seeks a qualified contractor to provide comprehensive maintenance and service for ten generator systems ranging from 35 to 800 kilowatts, manufactured by Onan, Cummins, Kohler, Katolight, Olympian, and Caterpillar, located at the main Houston campus and Pearland Campus. Required services include quarterly inspections, 100% tune-up parts replacement, cleaning, adjustments, oil and filter changes, lubrication, alarm verification, and annual resistive load bank testing. The deadline for submitting inquiries is December 3, 2025, and proposals must be submitted by December 18, 2025, at 3:00 PM Central Time. The contract term is three years beginning April 1, 2026, with options to renew for two additional one-year terms.

Contractors must demonstrate five years of experience in power production equipment maintenance, provide three customer references, and show evidence of financial stability and personnel qualifications, with evaluation criteria equally weighted at 25 points each for past projects, organizational qualifications, safety plan, and competitive rates. A mandatory Historically Underutilized Business (HUB) Subcontracting Plan is required for proposals exceeding $100,000, with a HUB participation goal of 26 percent, requiring written notification to at least three Texas certified HUBs and two trade organizations at least seven working days before bid submission. Insurance requirements include $1,000,000 Commercial General Liability per occurrence, $2,000,000 aggregate, statutory Workers' Compensation limits, and $1,000,000 Commercial Automobile Liability. The contractor must respond to emergency service calls within 24 hours and maintain an on-site inventory of replacement parts. Payment is invoiced quarterly for one-fourth of the annual contract amount, with payment due within 30 calendar days of invoice receipt, and maintenance labor for parts under $100 is included in the contract price while parts exceeding $100 are billed separately. Successful bidders must submit monthly Progress Assessment Reports documenting compliance and expenditures, with potential enforcement remedies including debarment from state contracting for non-compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 759-26-004 BID NAME: Emergency Generator Maintenance University of Houston-Clear Lake Open Date & Time: December 18, 2025 @ 3:00 PM CT

ADDENDUM No. 1 Date: December 5, 2025

Questions and Answers

Q: Can you provide the list of voltages for the generators listed?

A: We have nine units that are 277/480Volts and one unit 120/208volts this is the unit for Hunter Hall Model No. C550N6.

Q: For the annual Load Bank Testing, how long of a test would you like us to perform?

Our standard is a 2-hour test to NFPA 110 standards.

A: Standard 2-hour Load Bank Testing.

Q: Can Load Bank Testing be performed during normal business hours?

A: Yes, load Bank Testing is done during normal business hours.

Q: Are any of the generators hard to access? For example, on top of a building, in a parking garage, inside an enclosed space?

A: Yes, the units are inside enclosed spaces on the ground, and you can access them.

Q: Do any of the generators have a docking station or quick connect?

A: No

Q: Under the description of the work to be performed - would you like us to change the filters at every quarterly inspection? Typically, we only change filters and fluids one time per year.

A: Once a year or if needed at that time.

Q: Can you clarify bullet point "f." of the Work To Be Performed Section? Does this section mean that if during the quarterly inspection we note a repair is required, that we are not to charge any labor for the repairs that we make?

A: If repairs are needed, that is not part of the inspection. Provide a quote for the work to be done for repairs.

Q: Do you require any inspections of the Automatic Transfer Switches?

A: No

Signature Date

Printed Name:

Company Name:

This Addendum is to be returned with your proposal.

RFP No. 759-26-004 BID NAME: Emergency Generator Maintenance
University of Houston-Clear Lake Open Date & Time: December 18, 2025 @ 3:00 PM CT

File details come from the government source that posted it. Updated .