ESBD_472152_1763765404816_Attachment F - Standard Owner Requirements - All Facilities Projects 2023.pdf
PDF 152 KB Posted
- Attached to
- Capitol Bois D’Arc Wood Handrail Refinishing
- Solicitation number
- 809-26-0004
- Issued by
- Texas
About this file
This document is a standard owner requirements guide issued by the State Preservation Board (SPB) for all facilities projects, establishing mandatory operational procedures and compliance standards for contractors working on state property. The requirements apply to general contractors, subcontractors, contractor employees, and temporary workers engaged in projects at Capitol Complex facilities. Contractors must obtain SPB approval of a detailed schedule and work plan prior to commencing work, demonstrate compliance with OSHA and all federal, state, and local safety regulations, and submit to full background checks and security assessments. The SPB retains the right to temporarily stop work at any time, modify project requirements based on scope changes, and approve all contractor personnel and any mid-project contractor substitutions. Specific provisions address signage requirements, parking arrangements, smoking prohibitions throughout state buildings and within 15 feet of entrances, personal conduct standards prohibiting headphones and profanity, and equipment specifications requiring soft or inflatable rubber wheels on all wheeled equipment.
For exterior projects, additional requirements mandate complete work area enclosure with temporary fencing, clearly designated alternate pedestrian and vehicular routes, and comprehensive protection of all landscape elements, building finishes, and underground utilities. Contractors must notify SPB at least 24 hours in advance for excavation exceeding 12 inches in depth and arrange SPB employee observation; they are financially responsible for any damage to utilities, surfaces, or equipment caused by their operations. Special provisions address tree protection with specific crown protection zones and root buffers, hot work permits required 24 hours in advance for any work involving open flames or heat-producing activities, and sound limitations restricting heavy equipment operation to before 7:00 a.m. or after 6:00 p.m. on weekdays. Contractors must provide all necessary signage, maintain daily cleanup using covered carts, remove all construction debris and hazardous materials off-site, and secure work areas at the end of each workday. Water sources may be available through SPB coordination at no cost where accessible; electrical service is typically unavailable and contractors must provide portable generators. All modifications to these standard requirements require SPB review and approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Standard Owner Requirements For State Preservation Board Facilities Projects
February 2016
Please note: The term "Contractor" in this document refers to all general and sub-contractors, contractor employees and all temporary employees of SPB.
The following applies to ALL State Preservation Board Facilities Projects:
• Schedule and Work Plan: Prior to commencing work, Contractor must obtain approval from SPB of a schedule and work plan which demonstrates how the work will be accomplished in the allotted time and meet all requirements of the SPB.
• Modifications to this document: Changes to the requirements of this document may be approved by SPB after review and discussion of the Schedule and Work Plan, depending on the hardships in accomplishing the work presented by the Contractor.
SPB may make additional expectations of the Contractor in response to changes in the scope of work occurring after the execution of this document.
• Forced Delays: SPB may stop the work temporarily at any time for any reason.
Forced delays occur rarely when the Contractor's work is impacting government operations in a negative way (i.e. disrupting a meeting in a nearby building.)
• Safety: At all times while working on state property, Contractors must satisfy all safety requirements of OSHA and all other federal, state and local safety regulations.
Contractors must provide a safe working environment within the designated work area.
Contractors must utilize signage and caution tape to inhibit visitors and unauthorized personnel from entering the work area or crossing the pathway of vehicles entering or exiting the work area. Contractor must secure the work area to the extent possible at the end of each workday to prevent unauthorized access. Contractor must provide SPB 24-hour access to the site, including a key or combination to the lock on the work area gate. Contractors are advised that visitors are often present during the work and must be aware of visitors during any work performance.
• Contractor Approval: All Contractors must be approved by SPB to work on state property. In the event that a change in contractors is required during a project, new contractors must be approved by SPB.
• Security Assessments: All Contractors and employees who plan to work on state property are subject to full background checks and approval. The level of scrutiny will vary depending on the nature of the project and the specific location of the work.
Contractors should be prepared to provide SPB with a list of all employees who they propose to work on the project. There is no implied guarantee that work access will be granted.
Vehicular access to the Capitol Drive is controlled by DPS and only accessible with proper credentials. Contractors must request vehicular access in writing to SPB at least 24 hours in advance of the requested access time. There is no implied guarantee that drive access will be granted.
• Signage: Contractor must provide all signs needed and maintain them throughout the project. Typically, signs must address the following issues:
-Define the boundaries of the Construction Area.
-Define required safety measures within Construction Area (i.e. hardhats, etc.)
-Prohibit unauthorized personnel inside the Construction Area.
-Delineate alternative accessible routes when existing routes are being blocked.
(SPB will provide directives.)
In some cases, SPB may permit Contractors to also attach to the construction fence up to 2 copies of a Project Sign. Typically, Project Signs include a project title, graphic image of the completed project, name of the general contractor, etc. The design for all signs that include the name of any entity or person must be submitted to SPB for approval prior to fabrication or posting of the sign.
• Parking: The SPB is not responsible for providing Contractor parking. However, a limited amount of parking may be made available for contractor's use; the number and location of parking spaces to be determined based on the requirements of the work.
Contractors may be charged a nominal fee for certain parking privileges. In some cases, SPB may issue a limited number of swipe cards to contractor employees for complimentary parking at the Capitol Visitors Parking Garage, 1201 San Jacinto.
Contractor must pay $5.00 for each swipe card not returned to SPB.
• Smoking: All state office buildings in the Capitol Complex are designated as smoke-free facilities. Smoking is also prohibited in the loading dock, garages, and all areas within 15 feet of any entrance or exit. Smoking is never allowed within the confines of the work area, even when the work area is considered exterior.
• Personal Behavior: The use of headphones, speakers and audio equipment on the job site is prohibited. Contract employees must not use profanity nor wear clothing that contains inappropriate language or images while working on state property.
• Wheeled Equipment: All dollies, job boxes, hand trucks, carts, buggies, pallet jacks and other wheeled equipment must have soft rubber wheels or inflatable rubber wheels.
No steel or other metal wheels are permitted on the premises without prior approval by SPB. Contractors are financially responsible, on a per-occurrence basis, for repair of any damage to surfaces caused by Contractor's vehicles or equipment. SPB will determine if a particular repair may be addressed by the Contractor or if the Contractor must pay SPB to address the repair.
• Lay Down and Storage: Contractors must only use the confines of the limits of construction and designated lay down areas for storage, lay down, staging, supplies, materials, equipment, assemblies, and work. Contractors must provide a plan prior to construction commencement indicating planned areas for materials, vehicles, and tools storage.
• Scaffolding: Custom scaffolding assemblies require submission of engineered drawings prior to installation. No scaffolding assemblies may be anchored to the building with any destructive means. Friction- and pressure-fit systems with padding to protect existing construction may be considered.
• Hot Work Permits: Hot Work Permits issued by the Capitol Fire Marshal are required for all interior work involving open flames or producing heat and/or sparks. Hot Work Permits are required for exterior work involving open flames or producing heat and/or sparks occurring within 50 feet of any structure. Contractors must provide requests for Hot Work Permits a minimum of 24 hours prior to the commencement of the work, and obtain the permit prior to performing the work.
• Sound Limitations: All work involving heavy equipment and/or producing high-volume sounds or vibrations must be scheduled in advance with the SPB and will be limited to the hours before 7:00am and after 6:00pm on weekdays or limited to weekend hours, depending on the Capitol event schedule. This includes, but is not limited to, drilling piers and pouring or demolishing concrete. Contractor's use of certain generators may be limited to off hours.
• Clean-up: All clean-up of tools and equipment, if required, must be done off site and not on the grounds or in the building. Contractors must not dispose of any hazardous chemicals or any type of solids using the state's sanitary or storm sewer system.
Contractors must remove all construction debris and trash from the construction area daily using covered carts, in accordance with state and federal laws.
The following applies to State Preservation Board Facilities Projects that include EXTERIOR work areas:
• Visitor Safety: Contractor must enclose the entire work area with temporary fencing and provide clearly-designated safe alternate pedestrian and vehicular routes when existing routes are obstructed. To inhibit unauthorized access, Contractors must secure the work area at the end of each workday and whenever Contractor's employees are not present.
• Heavy Equipment: Large trucks and other heavy equipment are not permitted on the
Capitol Grounds without prior approval of SPB. At least 48 hours before the work begins, contractors must provide SPB information on how they intend to protect the grounds from damage by equipment as it moves on and off the work site. Construction mats must be utilized to protect the grounds when heavy equipment is used for excavation, concrete work, stone placement and similar work. Contractors may be required to utilize Tire Socks, Fork Socks, Track Socks and Drip Diapers when working in certain areas. (Also see Sound Limitations and Protection of Exterior Building Finishes and Landscapes.)
Contractors should be aware of local regulations regarding the operation of heavy equipment on City of Austin streets.
• Protection of Exterior Building Finishes and Landscapes: During the entire construction period, while moving supplies, equipment, materials, tools, debris, and personnel in and out of the Capitol Grounds, it is the contractor's responsibility to protect all exterior building finishes and landscape elements along the delivery and removal route being used. Protections may include heavy-duty construction mats, plywood sheets or other methods approved by SPB. Landscape elements include, but are not limited to: streets, sidewalks, fencing, gates, monuments, statuary, drinking fountains, trash cans, benches, concrete surfaces, turf, planting beds, trees, and underground utilities (manholes, vaults, irrigation systems, electrical systems, water supply, and storm and sanitary sewers.) Contractors must also protect all surfaces and drive lanes from oil, gasoline, or any other petroleum products, chemicals, or construction debris.
Contractors must provide special protection to the limestone curbing of the Capitol Drive by utilizing plywood ramps or other methods approved by SPB. Contractors must ensure that all vehicles and equipment are moved over the protective mats and ramps.
Contractors are responsible for any damage to, or destruction of, any landscape, hardscape, or utilities caused by the actions or inactions of the Contractor's employees.
SPB will determine if a particular repair may be addressed by the Contractor or if the Contractor must compensate SPB to address the repair.
• Excavation Observation: For any excavation expected to be 12" or deeper, Contractor must notify SPB at least 24 hours in advance and arrange for an SPB employee to observe the work. If any potentially historical artifacts are uncovered, the work may be stopped until a full evaluation can be conducted.
• Underground Utilities (State of Texas): Contractors are financially responsible for any damage done to underground utilities by their workforce. Temporary fencing and other accessories must be supported and anchored without the use of stakes or other sub-grade apparatuses whenever possible. Sand bags and water barrels are acceptable anchors.
• Underground Utilities (City of Austin): Contractors disturbing soil more than 16" deep in areas where city utilities may be present must coordinate with the City of Austin.
State law requires contractors to call, no later than 2 business days before excavating, the Texas Excavation Safety System (also known as One Call) at 8-1-1. For city water emergencies, call (512) 972-1000 for 24-hours service.
• Tree Protection: The ability of the SPB to cure construction injuries on trees is very limited, so the Contractor's focus must be on the prevention of damage. Contractor must take all necessary precautions to protect trees and their roots from damage. To the extent possible, root zones must be kept free of equipment and materials. Any necessary trimming must be performed only with prior approval from SPB.
Contractor must employ the following additional protective measures for certain trees to be designated by SPB which are located within or near the work area:
Crown Protection Zones: T-post and orange fence must be set at a minimum of 10 feet from the surface of the trunk, or along the tree's drip line, whichever provides a greater distance from the trunk. No encroachment within 10 feet of a trunk will be permitted without the specific approval of SPB.
Root Buffer: For areas under tree canopies that are inside the construction fence AND will be accessed by any heavy equipment & load (total weight over 5,000 lbs.,) a temporary buffer is required and must cover the root zone and remain in place at the specified thickness until the final grading stage. The protective buffer must consist of shredded wood chips spread over the roots at a minimum of 6 inches in depth, plus a 3/4-inch thick layer of quarry gravel and topped by 3/4-inch thick plywood sheets. Steel plates can be used in lieu of plywood.
Mulch Ring: After final grading of the site, provide mulch (Texas Native Mulch -color Black, or approved equal) to a depth of 4 inches, in a circle around the base of the trees. Diameter of mulch ring to be specified by SPB based on tree size.
• Water: Through coordination with SPB, a non-potable water source may be made available to contractors at no cost, depending on work locations and hose-bib availability. A quick-connect hose fitting is required for water access and may be loaned to contractors by SPB. Contractors must provide hoses as required and return hose fittings to SPB when no longer needed. If hoses cross existing pedestrian routes, Contractor may be required to provide temporary ramps or other protections to avoid a tripping hazard. Contractors are responsible for providing water as needed when no existing nearby source is identified. SPB is not responsible for providing potable (drinking) water to Contractors.
• Accessible Routes: Contractors must maintain the public use of existing accessible routes whenever possible. When Contractors must compromise an accessible route, they must also provide alternative accommodations whenever possible.
• Electrical Power: Electrical service is typically not available to Contractors on the Capitol Grounds. Contractors must provide portable generators as required. (Also see Sound Limitations and Protection of Exterior Building Finishes and Landscapes.)
• Plants & Irrigation: Contractors must not perform any plant-related work without approval of the SPB. In most cases, contractors will be responsible for maintaining turf and other plants within the work area for the duration of the project. Contractors must make every effort to protect existing turf, plants and irrigation systems, and are financially responsible for any damage.