This is a Cost Proposal Form (Attachment C) for RFP 809-26-0004 issued by the State of Texas for the Capitol Bois D'Arc Wood Handrail Refinishing project. The scope of work involves refinishing Bois D'Arc wood handrails mounted atop cast iron balustrades at the Texas Capitol building, with work to be performed in place while preserving the architectural integrity and finish of the existing handrails. Respondents must submit firm-fixed price, lump sum bids that remain valid for 120 days from the proposal opening date. The cost proposal must include all materials, labor, equipment, and services necessary for turn-key completion of the work, along with general conditions such as required insurance.
Bids must be submitted in both written and figure form, with the written amount governing in case of discrepancy. Respondents are required to specify their proposed total cost in dollars and indicate the base time for completion in calendar days following issuance of a Notice to Proceed. All costs must be comprehensive and include profit, overhead, and any other expenses required for full project completion. The form requires signature and authorization from the bidder's representative, confirming that the respondent has examined all RFP documents, solicitation materials, plans, scope of work, imagery, and site conditions before submitting their proposal.
Text of this file
ATTACHMENT C
RESPONDENT’S COST PROPOSAL FORM
RFP 809-26-0004
CAPITOL BOIS D’ARC WOOD HANDRAIL REFINISHING
Respondent (firm name): ________________________________________________________
Proposed amounts must be firm-fixed price, lump sum bid. Bids must be good for 120 days from proposal opening date. Cost proposal should be based on cost, including all pricing for materials and labor plus any profit or general conditions, including insurance, required for turn-key completion of the scope per the terms herein.
Firm Fixed Price, Lump Sum (including all expenses) to refinish the Bois D’Arc wood handrails mounted atop cast iron balustrades at the Texas Capitol, in place, preserving their architectural integrity and finish.
Having carefully examined the RFP, solicitation documents, plans, scope of work and imagery for the referenced project, as well as the premises and conditions affecting the work, we hereby propose to furnish all materials, labor, equipment, services necessary for and incidental to the execution and completion of the work for the following amounts and times.
_______________________________________________DOLLARS
($_________________) *NOTE: Amount shall be shown in both written and figure form. In case of discrepancy between the written amount and the figure, the written amount will govern.
Base Time: The Respondent, by the signature of their authorized representative below, further agrees that, if awarded the contract, the work will be substantially complete in the calendar day time indicated herein following the date of a Notice to Proceed.
Base Time ______________ calendar days.
Authorized Representative
| Authorized Representative: |
| Respondent (Firm) Name: |
| #: |
| Text1: |
| ###: |
| ##: |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .