ESBD_462961_1763054324064_Addendum 1 - District 4 Parks.pdf
PDF 7 MB Posted
- Attached to
- District 4 Parks (2022 Bond)
- Solicitation number
- 152-10-2025-17
- Issued by
- Bexar County, Texas
About this file
This is Addendum 1 to the Invitation for Bids issued by the City of San Antonio's Finance Department, Procurement Division for the District 4 Parks project (ID No. 23-03974), involving improvements across four parks within the city's jurisdiction. The addendum extends the bid opening date from November 18, 2025, to November 21, 2025, and modifies the pricing form by adding two shade structures as line items 23 while removing two grass-related items (items 26 and 27 from the original bid). The project encompasses construction and improvements at Gateway Terrace Park, Medina Base Park, Spicewood Park, and one additional location, with work including demolition, grading, concrete installation, electrical service for shade structures, plexipave court surfacing, landscaping with bermudagrass sod, bench installation, and coordination of shade structure delivery and installation. A pre-bid meeting was conducted on October 29, 2025, at which clarifications were provided regarding shade structure heights (16 feet entry height), contractor responsibilities (two shade structures fall under contractor scope while four are city-provided), and acceptable substitute manufacturers (Tenesco and PlayWell Group approved with conditions). The project requires a 180-calendar-day substantial completion timeline with mandatory acknowledgment of the addendum receipt through the CivCast e-procurement system.
The contract is structured as a unit price bid with a base bid and additive alternates, with all respondents required to submit pricing for every unit and line item to the hundredths place. The estimated construction budget is $700,000, with prevailing wage rate requirements applicable to all bidders. Seven plan sheets have been revised and reissued as part of this addendum, including layout plans, skate park enlargement details, demolition and erosion control specifications, tree preservation requirements, and planting plans. Contractor responsibilities include Stormwater Pollution Prevention Plan (SWPPP) compliance, utility location verification, tree protection and relocation coordination, erosion control maintenance, security during demolition, and temporary irrigation for landscape establishment. The Small Business Economic Development Advocacy (SBEDA) Program, Local Preference Program, and Veteran-Owned Small Business Preference Program apply to this procurement. Bidders must submit a Subcontractor/Supplier Utilization Plan, Local Preference Program Identification Form, and Heat Illness Prevention Acknowledgment Form as mandatory documentation. No specific incumbent vendors are identified, and the project encourages participation from local San Antonio businesses meeting applicable preference criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_462961_1760730290554_010 IFB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Finance Department, Procurement Division P.O. Box 839966 | San Antonio, Texas 78283-3966 | 210.207.5734
ADDENDUM I
SUBJECT: District 4 Parks, (ID No.: 23-03974), Date of Issue: October 17, 2025;
Scheduled to Close: November 18, 2025
FROM: Jaime E. Contreras, Procurement Manager
DATE: November 13, 2025
THIS NOTICE SHALL SERVE AS ADDENDUM NO. 1 –
TO THE ABOVE REFERENCED INVITATION FOR BIDS
This addendum is separated into sections for convenience; however, all Respondents, and other parties shall be responsible for reading the entire addendum. The failure to list an item or items in all affected sections of this addendum does not relieve any party affected from performing as per instructions, providing that the information is set forth one time any place in this addendum. These documents shall be attached to and become part of the Contract Documents for this project. The Respondent shall be required to acknowledge the receipt of this addendum.
1. The following revisions and/or additions to the Contract Documents, as outlined in this Addendum, shall apply to all submittals and the execution of the applicable portions of the work.
2. All interested parties and affected trades are required to thoroughly review this Addendum and incorporate its contents into their respective scopes of work.
3. This Addendum is hereby incorporated into the project requirements and Contract Documents for the referenced project. Bidders must acknowledge receipt of this Addendum in CivCast when downloading. Acknowledgment is a mandatory requirement for bid submission in CivCast.
4. This Addendum includes the following items and any associated attachments as listed below.
THE ABOVE-MENTIONED INVITATION FOR BIDS IS HEREBY AMENDED AS FOLLOWS:
ADMINISTRATIVE CHANGES TO BID DOCUMENTS:
1. The bid opening date has been extended:
a. From: Tuesday, November 18, 2025
b. To: Friday, November 21, 2025
2. 024 Pricing Form has been updated.
a. Added item No. 23 - shade structures (2)
b. Removed item No. 26 – Grass, Solid Sod (Buffalo Grass, Min. 1’ Along Edges)
c. Removed item No. 27 -Grass, Hydroseed (Native Grass Mix)
QUESTIONS SUBMITTED IN ACCORDANCE WITH THE
040 STANDARD INSTRUCTIONS TO BIDDER/RESPONDENT PRE-BID MEETING:
On Wednesday, October 29, 2025, the City of San Antonio hosted a Pre-Bid Meeting to provide information and clarification for the above referenced project. Below is a list of questions that were asked at the pre-bid meeting. The City’s official response to questions asked is as follows:
Question 1: What is the height of the shade structure at basketball court and the playground?
Response: 16’ entry height.
Question 2: Are the four-basketball shade structures the general contractor’s responsibility?
Response: The four Basketball shade structures are under the scope of City. Only two shade structures in Spicewood Park playground & Medina Base Park (Dog park) is under the scope of the contractor.
General contractor responsible for coordinating the installation of the shade structures.
Question 3: Can I submit a possible substitute?
Response: Yes, substitute request was submitted by Tensoshade and Playwell Group. The substitution request was reviewed and approved with conditions by the City of San Antonio’s consultant team. Please see the Revisions Submitted to Specifications Section below for more details.
Question 4: Is there a substitution in the structure, would the pier depth change?
Response: Pier depth will be determined by the manufacturer.
QUESTIONS SUBMITTED IN ACCORDANCE WITH THE
040 STANDARD INSTRUCTIONS TO BIDDER/RESPONDENT:
QUESTIONS SUBMITTED ON CIVCAST
Question 1: Unit Pricing Form items 20 21 are the same as items 26 27. Please clarify what is to be included for each of these items.
Response: It is the same. Ignore the Item 26-27 as it is the same as 20-21 (includes all four parks).
Mobilization, Insurance & bonds added to base bid unit price form.
Question 2: What is included in Unit Price Form item 6 Demolition?
Response: This GT L1.0, MED L1.0 (demo of Skate Park is alternate-1), PA L1.0 , SW L1.0 are the ones that need to be included.
Question 3: Reference note 4 on plan sheet GT-L3.0 estimates quantity at 1,500 sf. My takeoff is half that quantity. Please confirm engineer’s estimate.
Response: Quantity corrected. See revised plan GT-L3.0.
Question 4: The hardscape schedule code numbers on plan sheet MED-L3.2 do not coincide with what the item is on drawing. Please clarify.
Response: Codes adjusted. See revised plans.
Question 5: Please confirm that ALL shade structures will be direct purchase through the city and not included in the scope, only the coordination with Capiral Shade for installation.
Response: Not all Shade structures are direst purchase by City. There are 2 shade structures that are under the scope of the contractor - Spicewood Park playground & Medina Base Park (Dog park)
REVISIONS TO CONSULTANT’S DOCUMENTS (SPECIFICATIONS, PLANS, ETC.)
Consultant’s revisions listed below will be issued as an attachment to this addendum.
REVISIONS SUBMITTED TO PLANS
1. Revise Plan Sheet GT-L3.0
2. Revise Plan Sheet MED-L3.2
3. Revise Plan Sheet SW-L1.0
4. Revise Plan Sheet SW-L2.0
5. Revise Plan Sheet SW-L3.0
6. Revise Plan Sheet SW-L3.3
7. Revise Plan Sheet SW-L4.0
REVISIONS SUBMITTED TO SPECIFICATIONS
1. Substitution request: Tenesco Shade Structure is approved with conditions. The structural steel, powder costing, etc. shall meet or exceed specification 13 31 23.
2. Substitution request: PlayWell Group Shade Structure is approved.
3. Reminder: Contractor is required to obtain a Stormwater Pollution Prevention Plan (SWPPP) for this project.
SIGNED AND SEALED BY CONSULTANT (Engineer/Architect of Record). By signing and sealing this addendum, the Engineer/Architect of Record acknowledges that the sign/seal is only for changes/clarifications to the items associated with the Engineer’s/Architect’s work referenced in this addendum.
11-06-2025
Jaime E. Contreras Procurement Manager Procurement Division, Finance Department
END OF ADDENDUM 1
'-0
90'-0"
'-0
EQ.
EQ.
145'-0"
CODE DESCRIPTION QTY DETAIL
10' DEEP CONCRETE FOOTER;
MANUFACTURER: CAPITAL SHADE; PURCHASE
AND INSTALLATION BY OWNER - CONTRACTOR
TO COORDINATE INSTALLATION.
13' DEEP CONCRETE FOOTER;
MANUFACTURER: CAPITAL SHADE; PURCHASE
AND INSTALLATION BY OWNER - CONTRACTOR
TO COORDINATE INSTALLATION.
SHADE CANOPY; MANUFACTURER: CAPITAL
SHADE; PURCHASE AND INSTALLATION BY
OWNER - CONTRACTOR TO COORDINATE
DELIVERY, STORAGE, AND INSTALLATION.
ADD ALT. 1: 5' CONCRETE PATH;
COLOR: STANDARD GRAY;
FINISH: MEDIUM BROOM.
727 SF 2/GT-L3.1
REFERENCE NOTES SCHEDULE
1/GT-L3.1
1/GT-L3.1
1 BY OWNER
1. WRITTEN DIMENSIONS SHALL GOVERN OVER SCALED DIMENSIONS.
2. ALL IMPROVEMENTS SHALL BE STAKED IN THE FIELD BY THE CONTRACTOR AND
APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION OR
INSTALLATION. NOTIFICATION SHALL BE PROVIDED TO THE LANDSCAPE ARCHITECT ONE
WEEK PRIOR TO REVIEW.
3. CONTRACTOR SHALL VERIFY ALL UTILITIES SHOWN ON THE PLANS AS WELL HAVE THE
SITE UTILITIES LOCATED ON THE GROUND PRIOR TO THE START OF CONSTRUCTION
ACTIVITIES. IN THE EVENT THAT THE CONTRACTOR DISCOVERS AN UNDERGROUND
UTILITY THAT IS NOT REPRESENTED WITHIN THE CONSTRUCTION DOCUMENTS OR AS
MARKED ON THE SITE, HE SHALL IMMEDIATELY CONTACT THE OWNERS REPRESENTATIVE
TO DETERMINE NEXT STEPS PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN THE AREA
OF THE NEWLY DISCOVERED UNDERGROUND UTILITY.
4. THE CONTRACTOR SHALL EXAMINE THE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS AND DETAILS.
5. ALL DIMENSIONS ARE TO BACK OF CURB AND FACE OF BUILDING UNLESS OTHERWISE
NOTED.
6. HANDICAP RAMPS TO BE LOCATED AND INSTALLED AS SHOWN IN DRAWINGS.
CONTRACTOR SHALL ENSURE THAT ALL TAS/ADA GUIDELINES ARE FOLLOWED.
7. REINFORCEMENT SHALL BE PROVIDED IN THE CONCRETE IMPROVEMENTS AS SHOWN
WITHIN THE CONSTRUCTION DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED
CONTINUOUS THROUGH CONTROL JOINTS, AND PER DETAIL DRAWINGS FOR THE
EXPANSION JOINTS.
8. EXPANSION JOINT AND CONTROL JOINT SPACING SHALL BE LOCATED AS SHOWN ON
PLANS AND DETAILS.
9. CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT WHERE PROPOSED CONCRETE
MEETS EXISTING WALKS OR CURBS.
10. GRADING IMPROVEMENTS HAVE BEEN DESIGNED WITH THE INTENT OF THE FOLLOWING
GUIDELINES:
· ALL WALKS SHALL HAVE A MAXIMUM CROSS SLOPE OF 2% IN THE DIRECTION OF
THE DOWNHILL SIDE.
· THE RUNNING SLOPE OF THE WALKS SHALL BE NO GREATER THAN 5%.
· ALL GRADES SHALL BE FINISHED TO A SMOOTH, FLOWING CONTOUR, MAINTAINING
FLOW PATTERNS THAT ALLOW THE WATER TO FLOW FROM PLANTED AREAS,
ACROSS PAVED AREAS TO DRAINAGE COLLECTION POINTS AS DEPICTED IN THE
CONSTRUCTION DOCUMENTS.
11. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE THROUGHOUT CONSTRUCTION
ACTIVITIES FOR THE PROJECT. ACCUMULATION OF STANDING WATER WILL NOT BE
PERMITTED.
12. THE CONTRACTOR IS TO LOCATE, DOCUMENT, AND PROTECT ALL CONTROL BENCH
MARKS THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES.
13. ALL QUANTITIES PROVIDED ARE TO BE VERIFIED AND ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
14. IF DISCREPANCIES WITH PLAN AND MATERIAL/FURNISHING SCHEDULE SHOULD OCCUR,
THE CONTRACTOR IS RESPONSIBLE TO VERIFY WITH LANDSCAPE ARCHITECT, PRIOR TO
START OF CONSTRUCTION.
LAYOUT & DIMENSION GENERAL NOTES
POINT DESCRIPTION NORTHING EASTING
1 SIDEWALK N 13681284.9217 E 2093582.3672
2 SIDEWALK N 13681273.9102 E 2093656.3059
3 SIDEWALK N 13681263.0392 E 2093729.3013
4 SHADE
STRUCTURE POLE
N 13681060.4679 E 2093787.1941
5 SHADE
STRUCTURE POLE
N 13681101.3980 E 2093831.0658
6 SHADE
STRUCTURE POLE
N 13681035.5904 E 2093892.4609
7 SHADE
STRUCTURE POLE
N 13680994.6603 E 2093848.5892
8 SIDEWALK N 13681201.7525 E 2094087.7793
9 SIDEWALK N 13681191.0890 E 2094159.4927
10 SIDEWALK N 13681180.4254 E 2094231.2062
NORTHING/EASTING POINT SCHEDULE
GT-L3.0
1 LAYOUT PLAN
1" = 30'-0"
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
G A
T E
W A
Y T
E R
R A
C E
P A
R K
LA
YO
U T
PL
A
N
PRO
PERTY LIN
E
PROPERTY LINE
PRO
PERTY LIN
E
M
ER
RY
O
AK
S D
R.
G
RE
EN
C
AS
TL
E
D R.
LIM
IT OF W
ORK
LIM
IT
OF W
ORK
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
EXISTING
BASKETBALL
COURT
NOTE: PLACE EDGE OF
SIDEWALK TO
ADJACENT GATE POST
EXISTING OVERHEAD UTILITIES
EX
IS
TI
N G
O V
ER
H
EA
D U
TI
LI
TI
ES
EX
IS
TI
N G
O V
ER
H
EA
D U
TI
LI
TI
ES
EXISTING OVERHEAD UTILITIES
REF. SHEET GT-U1.0 FOR
ELECTRICAL CONNECTION.
/0
/2
A D
D
EN
D U M
H R M
MED-L3.5
MED-L3.5
MED-L3.5
MED-L3.5
MED-L3.5
MED-L3.5
MED-L3.5
MED-L3.5
MED-L3
.5
MED-L3.5
MED-L3.5
2MED-L3
.5
CODE DESCRIPTION DETAIL
10" RAISED CONCRETE SLAB, ADD ALT. 1 1/MED-L3.5
STEEL LEDGE, ADD ALT. 1 2/MED-L3.5
CONCRETE STEPS, ADD ALT. 1 3/MED-L3.5
CONCRETE RAMP, ADD ALT. 1 4/MED-L3.5
A FRAME CONCRETE TRIANGLE, ADD ALT. 1 6/MED-L3.5
LUEDER LIMESTONE BLOCK BENCH, ADD ALT. 1 7/MED-L3.5
RAISED RAIL FEATURE, ADD ALT.1
HARDSCAPE SCHEDULE - SKATE PARK
QUANTITY
1 PER MANUF.
POINT DESCRIPTION NORTHING EASTING
14 RAISED CONC.
SLAB
N 13681929.1577 E 2086172.1143
15 GRIND RAIL N 13681934.8897 E 2086166.1861
16 GRIND RAIL N 13681941.8179 E 2086170.1861
17 LIMESTONE BENCH N 13681959.0541 E 2086205.2694
18 LIMESTONE BENCH N 13681956.4642 E 2086216.4433
19 NORTH SKATE
FEATURE
N 13681950.1235 E 2086224.6846
20 NORTH SKATE
FEATURE
N 13681939.4559 E 2086221.0584
21 CENTRAL SKATE
FEATURE
N 13681919.7372 E 2086186.9045
22 A FRAME SKATE
FEATURE
N 13681902.3186 E 2086202.7346
23 SOUTH WEST
SKATE FEATURE
N 13681914.1644 E 2086162.1933
24 SOUTH EAST
SKATE FEATURE
N 13681891.2871 E 2086203.3301
25 LIMESTONE BENCH N 13681870.6135 E 2086195.6291
26 LIMESTONE BENCH N 13681897.6391 E 2086242.4871
NORTHING/EASTING POINT SCHEDULE
MED-L3.2
1 SKATE PARK ENLARGEMENT (ADD ALT. NO.1)
1" = 10'-0"
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
M E
D
IN
A B
A S
E P
A R
K
SK
A
TE
P
A R
K E
N
LA
R G
EM
EN
T (A
D D
A
LT
. N O
.1
LIM
IT O
F W O
RK
HP
HP HP
HP
= HIGH POINT OF DESIGN (18")
0°
TY
P.
105°TYP.
'-6
'-0
22'-6"
9'-6"
6'-0"
TYP
29'-7"
6'-7"
TYP
6' -0
" T
YP
3' -0
8'-0" TY
P.
4'-0"
TYP
. 8'-0" TY
P.
8'-6"
7'-0"
1'-2"
17'-0"
9'-7"TYP.
14'-8"
3' -0
6'
-0
TY
P.
5'-9"
'-6
TY
P.
20'-0"
20'-0"
TYP.
6'-0"
6'-0" TY
P.
3'-0"
TYP.
8' -5
" T
YP
8' -0
4'-0" TYP.
STEEL
COPING
TYP.
4'-0" TYP.
1' -6
TY
P.
4'-0" TYP.
90°
120°
TYP.
4'-0"
TYP.
'-6
TY
P.
4' -0
" T
YP
1'-6"TYP.
90°
TYP.
75°
TYP.
90°
90°TYP.
90°TYP.
90°TYP.
3'-0"
8'-0"
TYP
6'-0"
TYP.
TY
P.
90°
TY
P.
4'-8"
1'-6"
90°
90°
9'-3"
TYP.
TY
P.
10'-10"
TYP.
8'-0"TYP.
C L
45°
TYP.
90°TYP.
6'- 3"
TY
P.
6'-0"
TYP
5'-0"
/0
/2
A D
D
EN
D U M
H R
30153
UELBX
E
STRUCTURE POLE
1. CONTRACTOR IS TO REVIEW ALL GENERAL NOTES PRIOR TO BEGINNING WORK
2. CONTRACTOR RESPONSIBLE FOR ANY DAMAGE TO TREES THAT ARE TO BE RELOCATED.
CONTRACTOR TO INSTALL NEW TREE OF EQUIVALENT SIZE IF DAMAGED DURING RELOCATION.
3. CONTRACTOR RESPONSIBLE FOR COORDINATING CONSTRUCTION DELIVERY & SERVICE
ACCESS. CONTRACTOR RESPONSIBLE FOR ANY DAMAGE INCURRED TO FACILITIES & RETURN
TO PRE-CONSTRUCTION CONDITIONS.
4. SAWCUT AND REMOVE ALL EXISTING SIDEWALKS AND PAVEMENT AS SHOWN ON THE PLANS.
COORDINATE TEMPORARY UTILITY SHUT DOWN IN ADVANCEMENT OWNER'S REPRESENTATIVE.
5. CONSULT THE DIMENSIONAL CONTROL PLAN. VERIFY THE PORTION OF EXISTING CONCRETE
CURBS AND PAVEMENT WHICH ARE TO REMAIN.
6. COORDINATE WITH LOCAL POWER, TELEPHONE, CABLE, AND GAS COMPANIES PRIOR TO THE
REMOVAL AND/OR RELOCATION OF EXISTING UTILITIES.
7. ALL UTILITIES SHOULD BE CUT AND PLUGGED IN ACCORDANCE WITH THEIR RESPECTIVE
UTILITY COMPANY REQUIREMENTS PRIOR TO DEMOLITION.
8. CONTRACTOR TO PLUG ALL EXISTING EXPOSED ENDS OF ABANDONED UTILITIES, IF ANY.
9. CONTRACTOR TO DETERMINE SOURCE OF ALL EXPOSED UTILITIES AND, IF REQUIRED,
RECONNECT TO PROPOSED UTILITIES.
10. CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND LEGAL DISPOSAL OF ALL THE
UNSUITABLE MATERIALS FROM THE PROJECT SITE. CONTRACTOR SHALL CONTACT ALL LOCAL
AUTHORITIES TO DETERMINE DISPOSAL REQUIREMENTS.
11. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING AND MAINTAINING EROSION CONTROL
MEASURES ON THE SITE IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS
UNTIL THE SITE HAS BEEN STABILIZED.
12. CONTRACTOR IS RESPONSIBLE FOR GRADING ALL DISTURBED AREAS TO ALLOW FOR
POSITIVE DRAINAGE. GRADING SLOPES ARE NOT TO EXCEED 3:1.
13. AREAS EXCAVATED FOR FOUNDATION OR UNDERGROUND STRUCTURE REMOVAL SHALL BE
BACK-FILLED AND COMPACTED TO A MINIMUM OF 95% STANDARD PROCTOR DENSITY.
14. CONTRACTOR IS RESPONSIBLE FOR SECURITY OF THE SITE DURING DEMOLITION ACTIVITIES
AND UNTIL SUBSTANTIAL COMPLETION.
15. THE HORIZONTAL AND VERTICAL LOCATIONS OF EXISTING SUBSURFACE UTILITIES HAVE BEEN
DETERMINED FROM DATA RECORDED BY OTHERS. IT WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO PROTECT ALL UTILITY MAINS, MANHOLES, CLEANOUTS, VALVE BOXES, AND
FIRE HYDRANTS, ETC. IN THE AREA OF DEMOLITION.
DEMOLITION GENERAL NOTES
SW-L1.0
1 DEMOLITION AND EROSION CONTROL PLAN
1" = 30'-0"
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
S P
IC
E
W O
O D
P A
R K
D
EM
O
LI
TI
O
N A
N D
E R
O
SI
O N
C O
N
TR
O L
PL
A
N
EXISTING
PLAYGROUND
EXISTING
BASKETBALL
COURT
PR
OPE
RT
Y L
INE
PROPERTY LINE
HIGHCREST DR.
LIMIT OF WORK
LI
M
IT
O
F W
O
RK
LIMIT OF WORK
LIM
IT O
F W
ORK
12" EROSION
CONTROL LOGROLL
EXISTING
SIDEWALK
TO BE PROTECTED
EXISTING CONCRETE
TO REMAIN AND BE
PROTECTED
PROPERTY LINE
12" EROSION
CONTROL LOGROLL
SAW CUT AND DISPOSE
OF 16 SF CONCRETE
SIDEWALK; 4' SQ. MIN.
REMOVE AND DISPOSE
OF KILL SWITCH.
PRUNE EXISTING TREE TO
BRANCHES BACK 10' FROM
COURT EDGE. REVIEW WITH CITY
ARBORIST PRIOR TO PRUNING.
REMOVE AND
DISPOSE OF EXISTING
CONCRETE BENCH
EXISTING TRASH
RECEPTACLES TO BE
PROTECTED
DISCONNECT ELECTRICAL AND
REMOVE AND DISPOSE OF LIGHT
POLE FIXTURE AND FOUNDATION;
EXISTING ELECTRICAL TO BE USED
FOR NEW SHELTER LIGHTING. SEE
ELECTRICAL PLANS.
NOTE:
AREA OF SOIL DISTURBANCE: 4,589 SF
CONTRACTOR TO USE EXISTING TRAIL FOR ACCESS
TO SITE. REPAIR DAMAGED CONCRETE ON EXISTING
TRAIL AT END OF PROJECT. AVOID DAMAGE TO
EXISTING TREES AND RESEED DAMAGED TURF AREA.
TRAIL TO REMAIN OPEN TO PUBLIC.
STAGING
AREA
LIMIT OF WORK
LIMIT OF WORK
/0
/2
A D
JU
S
TE
D L
IM
IT
O F
W O
R K
H
TREE PRESERVATION LEGEND
PROTECTED TREE TO REMAIN
TREE TO BE REMOVED
TREE PROTECTION FENCE
SAN ANTONIO MANDATORY
CRITERIA SECTION 35-523
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
TR
EE
P R
ES
ER
VA
TI
O N
P
LA
N
SW-L2.1
1 TREE DATA AND DETAILS
1" = 30'-0"
S P
IC
E
W O
O D
P A
R K
EXISTING
PLAYGROUND
EXISTING
BASKETBALL
COURT
PR
OPE
RT
Y L
INE
PROPERTY LINE
HIGHCREST DR.
LIMIT OF WORK
LI
M
IT
O
F W
O
RK
LIMIT OF WORK
LIM
IT O
F W
ORK
PROPERTY LINE
STAGING
AREA
STAGING
AREA
TREE PROTECTION
FENCING, TYP.
TREE
PROTECTION
FENCING,
TYP.
PRUNE EXISTING TREE TO
BRANCHES BACK 10' FROM
COURT EDGE. REVIEW WITH CITY
ARBORIST PRIOR TO PRUNING.
TREE PROTECTION
FENCING, TYP.
LIMIT OF WORK
LIMIT OF WORK
/0
/2
A D
JU
S
TE
D L
IM
IT
O F
W O
R K, T R
EE
F
EN
C E
A D
D
ED
H R
NORTHING/EASTING POINT SCHEDULE
CODE DESCRIPTION QTY DETAIL
10' DEEP CONCRETE FOOTER;
MANUFACTURER: CAPITAL SHADE; PURCHASE
AND INSTALLATION BY OWNER - CONTRACTOR
TO COORDINATE INSTALLATION
13' DEEP CONCRETE FOOTER;
MANUFACTURER: CAPITAL SHADE; PURCHASE
AND INSTALLATION BY OWNER - CONTRACTOR
TO COORDINATE INSTALLATION.
SHADE CANOPY; MANUFACTURER: CAPITAL
SHADE; PURCHASE AND INSTALLATION BY
OWNER - CONTRACTOR TO COORDINATE
DELIVERY, STORAGE, AND INSTALLATION.
SHADE CANOPY; MANUFACTURER: CAPITAL
SHADE; PURCHASE AND INSTALLATION BY
OWNER - CONTRACTOR TO COORDINATE
DELIVERY, STORAGE, AND INSTALLATION.
6' PARK BENCH;
ZAMARANO OR APPROVED EQUAL.
5" THK. STANDARD PEDESTRIAN CONCRETE;
COLOR: NATURAL GRAY;
FINISH: MEDIUM BROOM.
REFERENCE NOTES SCHEDULE
4/SW-L3.1
4/SW-L3.1
BY OWNER
BY OWNER
1/SW-L3.1
5/SW-L3.19 SF
1. WRITTEN DIMENSIONS SHALL GOVERN OVER SCALED DIMENSIONS.
2. ALL IMPROVEMENTS SHALL BE STAKED IN THE FIELD BY THE CONTRACTOR AND
APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION OR
INSTALLATION. NOTIFICATION SHALL BE PROVIDED TO THE LANDSCAPE ARCHITECT ONE
WEEK PRIOR TO REVIEW.
3. CONTRACTOR SHALL VERIFY ALL UTILITIES SHOWN ON THE PLANS AS WELL HAVE THE
SITE UTILITIES LOCATED ON THE GROUND PRIOR TO THE START OF CONSTRUCTION
ACTIVITIES. IN THE EVENT THAT THE CONTRACTOR DISCOVERS AN UNDERGROUND
UTILITY THAT IS NOT REPRESENTED WITHIN THE CONSTRUCTION DOCUMENTS OR AS
MARKED ON THE SITE, HE SHALL IMMEDIATELY CONTACT THE OWNERS REPRESENTATIVE
TO DETERMINE NEXT STEPS PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN THE AREA
OF THE NEWLY DISCOVERED UNDERGROUND UTILITY.
4. THE CONTRACTOR SHALL EXAMINE THE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS AND DETAILS.
5. ALL DIMENSIONS ARE TO BACK OF CURB AND FACE OF BUILDING UNLESS OTHERWISE
NOTED.
6. HANDICAP RAMPS TO BE LOCATED AND INSTALLED AS SHOWN IN DRAWINGS.
CONTRACTOR SHALL ENSURE THAT ALL TAS/ADA GUIDELINES ARE FOLLOWED.
7. REINFORCEMENT SHALL BE PROVIDED IN THE CONCRETE IMPROVEMENTS AS SHOWN
WITHIN THE CONSTRUCTION DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED
CONTINUOUS THROUGH CONTROL JOINTS, AND PER DETAIL DRAWINGS FOR THE
EXPANSION JOINTS.
8. EXPANSION JOINT AND CONTROL JOINT SPACING SHALL BE LOCATED AS SHOWN ON
PLANS AND DETAILS.
9. CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT WHERE PROPOSED CONCRETE
MEETS EXISTING WALKS OR CURBS.
10. GRADING IMPROVEMENTS HAVE BEEN DESIGNED WITH THE INTENT OF THE FOLLOWING
GUIDELINES:
· ALL WALKS SHALL HAVE A MAXIMUM CROSS SLOPE OF 2% IN THE DIRECTION OF
THE DOWNHILL SIDE.
· THE RUNNING SLOPE OF THE WALKS SHALL BE NO GREATER THAN 5%.
· ALL GRADES SHALL BE FINISHED TO A SMOOTH, FLOWING CONTOUR, MAINTAINING
FLOW PATTERNS THAT ALLOW THE WATER TO FLOW FROM PLANTED AREAS,
ACROSS PAVED AREAS TO DRAINAGE COLLECTION POINTS AS DEPICTED IN THE
CONSTRUCTION DOCUMENTS.
11. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE THROUGHOUT CONSTRUCTION
ACTIVITIES FOR THE PROJECT. ACCUMULATION OF STANDING WATER WILL NOT BE
PERMITTED.
12. THE CONTRACTOR IS TO LOCATE, DOCUMENT, AND PROTECT ALL CONTROL BENCH
MARKS THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES.
13. ALL QUANTITIES PROVIDED ARE TO BE VERIFIED AND ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
14. IF DISCREPANCIES WITH PLAN AND MATERIAL/FURNISHING SCHEDULE SHOULD OCCUR,
THE CONTRACTOR IS RESPONSIBLE TO VERIFY WITH LANDSCAPE ARCHITECT, PRIOR TO
START OF CONSTRUCTION.
LAYOUT & DIMENSION GENERAL NOTES
POINT DESCRIPTION NORTHING EASTING
1 SHADE
STRUCTURE POLE
N 13659695.9473 E 2108062.9237
2 SHADE
STRUCTURE POLE
N 13659702.1464 E 2108102.4404
3 SHADE
STRUCTURE POLE
N 13659636.6722 E 2108072.2224
4 SHADE
STRUCTURE POLE
N 13659642.8914 E 2108111.7322
5 SHADE
STRUCTURE POLE
N 13659517.2770 E 2108144.0081
6 SHADE
STRUCTURE POLE
N 13659495.5948 E 2108195.6402
7 SHADE
STRUCTURE POLE
N 13659434.2968 E 2108109.1616
8 SHADE
STRUCTURE POLE
N 13659412.6346 E 2108160.8022
NORTHING/EASTING POINT SCHEDULE
X
X
X
X
X
X
HH
FIBER OPTIC
X
X
X
X
X
X
40.00'
.0
56.00'
EQ
EQ
1 2
3 4
.0
SW-L3.0
1 LAYOUT PLAN
1" = 30'-0"
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
S P
IC
E
W O
O D
P A
R K
LA
YO
U T
PL
A
N
PR
OPE
RT
Y L
INE
PROPERTY LINE
LIMIT OF WORK
LI
M
IT
O
F W
O
RK
LIMIT OF WORK
LIM
IT O
F W
ORK
PROPERTY LINE
STAGING
AREA
REF. SHEET SW-U1.0 FOR
ELECTRICAL CONNECTION.
LIMIT OF WORK
LIMIT OF WORK
/0
/2
A D
JU
S
TE
D L
IM
IT
O F
W O
R K
H R
SW-L3.1
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
S P
IC
E
W O
O D
P A
R K
H A
R D
SC
A
PE
D
ET
A
IL
S
40'X60' SHADE STRUCTURE
NTS
NOTE: DETAIL FOR REFERENCE
ONLY
/0
/2
A D
JU
S
TM
EN
T
O F
D
ET
A
IL
N O
TE
H
SYMBOL CODE BOTANICAL / COMMON NAME CONT QTY
GROUND COVERS
CD
Cynodon dactylon Bermudagrass Sod 9,400 sf
PLANT SCHEDULE
1. ALL PLANTS SHALL BE SET OUT FOR APPROVAL BY THE OWNER'S
REPRESENTATIVE PRIOR TO INSTALLATION.
2. FINE GRADING SHALL BE PERFORMED IN ALL AREAS TO BE LANDSCAPED. FINE
GRADING SHALL INCLUDE THE REMOVAL OF DEBRIS, ROCKS, ETC. FROM THE
SITE AND INSURE POSITIVE DRAINAGE IN ALL AREAS.
3. THE CONTRACTOR SHALL LOCATE ALL UTILITIES AND EASEMENTS IN THE FIELD
PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR IS RESPONSIBLE FOR
ANY DAMAGE TO UTILITIES DURING THE COURSE OF CONSTRUCTION.
4. WRITTEN DIMENSIONS SHALL GOVERN OVER SCALED DIMENSIONS.
5. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS ASSOCIATED WITH THE LANDSCAPE AND
ACCESSORIES.
6. ALL PLANT MATERIALS SHALL MEET ANSI Z60.1 STANDARDS FOR CALIPER,
HEIGHT AND ROOT BALL SIZE. ANY MATERIALS THAT DO NOT MEET OR EXCEED
SUCH STANDARDS SHALL BE REJECTED AND REPLACED AT THE CONTRACTOR'S
EXPENSE.
7. QUANTITIES ARE SHOWN FOR CONVENIENCE ONLY. CONTRACTOR IS
RESPONSIBLE FOR VERIFYING ALL QUANTITIES
PLANTING GENERAL NOTES
1. THE PLANTING PLAN IDENTIFIES AREAS THAT ARE TO RECEIVE VEGETATION
AND TEMPORARY WATERING FOR ESTABLISHMENT.
2. CONTRACTOR MUST MAKE ALL ARRANGEMENTS & PAYMENT FOR
TEMPORARY WATER, MEETING ALL REQUIREMENTS OF LOCAL
JURISDICTION.
3. CONTRACTOR IS RESPONSIBLE FOR METHODS, COST, FREQUENCY,
QUANTITY, AND ALL MAINTENANCE UNTIL LANDSCAPE HAS BEEN
ESTABLISHED & ACCEPTED BY THE OWNER'S REPRESENTATIVE & MEETS THE
REQUIREMENTS OF THE SPECIFICATIONS.
4. THE CONTRACTOR SHALL UTILIZE TEMPORARY IRRIGATION BY ANY METHOD
APPROVED BY THE OWNER'S REPRESENTATIVE ON THE CONDITION THAT
PLANTING ESTABLISHMENT AND ACCEPTANCE IS THE SOLE RESPONSIBILITY
OF THE CONTRACTOR.
5. TEMPORARY IRRIGATION SHALL NOT SPRAY ONTO SIDEWALK IN PUBLIC
ROW.
TEMPORARY IRRIGATION NOTES
40.00'
.0
56.00'
EQ
EQ
1 2
3 4
.0
CD
CD
TYP
TYP
CD
TYP
X
X
X
X
X
X
X
X
X
X
X
X
SW-L4.0
1 PLANTING PLAN
1" = 30'-0"
DESIGN DRAWN DATE
SHEET NO.
S A
N A
N T
O N
IO
, T
E X
A S
D
IS
T R
IC
T
P
A R
K S
S HINOT I
ST
E
C
C
CT
TE
SA
S
ET
S
TA
I
RE
G
OF
3 5
ET
X
N R
LD
RE
CAANDS
T
EP A
P h o n e
� 0 o S
D F
[S
X
LW
e
To ll F re e
X
VW
Ln � T
T B
P E
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . F
-4
T B
P
LS
F
IR
M R
E G
IS
T
R A
T
IO
N N
O . L
S -1
0-w es tw oo dp s.
co m
W es tw oo d P ro fe ss io na l S er vi ce s, I nc
S P
IC
E
W O
O D
P A
R K
PL
A
N
TI
N G
P
LA
N
EXISTING
PLAYGROUND
EXISTING
PLAYGROUND
EXISTING
BASKETBALL
COURT
CONTRACTOR TO SOD TO
LIMIT OF DISTURBANCE,
INSTALL TEMP. IRRIGATION
UNTIL ESTABLISHMENT.
SEE NOTES FOR
ADDITIONAL DETAILS
SOIL PROFILE FOR SOD
1 1/2" = 1'-0"
TURF, REF. PLANTING PLANS
FOR TYPE
EXISTING SOIL TOPSOIL PREP:
1. ADD 1" COMPOST ON THE SURFACE, THEN TILL TO 6" DEPTH
2. INSTALL SOD AS SHOWN, REF. PLANTING PLANS FOR TYPE
CONTRACTOR TO SOD TO
LIMIT OF DISTURBANCE,
INSTALL TEMP. IRRIGATION
UNTIL ESTABLISHMENT.
SEE NOTES FOR
ADDITIONAL DETAILS
PR
OPE
RT
Y L
INE
PROPERTY LINE
LIMIT OF WORK
LI
M
IT
O
F W
O
RK
LIMIT OF WORK
LIM
IT O
F W
ORK
PROPERTY LINE
STAGING
AREA
LIMIT OF WORK
LIMIT OF WORK
/0
/2
A D
JU
S
TE
D L
IM
IT
O F
W O
R K, A D
D
ED
S O
D H R M
PROJECT NAME: District 4 Parks
PROJECT NO.23-03974
CITY OF SAN ANTONIO
024 UNIT PRICING FORM
SECTION ITEM NO. DESC.
CODE BID ITEM DESCRIPTION UNIT OF
MEASURE QUANTITY UNIT BID PRICE
The City only will accept bid pricing to the hundredths. Any pricing extended out to three decimal points will be truncated to two decimal points in the City's favor.
Base Bid 1 98814 Erosion Control And SWPPP L.F. 1
Base Bid 2 33013 Tree Protection Fencing L.F. 1
Base Bid 3 33013 Security Fencing L.F. 1
Base Bid 4 33013 Dog Park Fencing & Gate L.F. 1
Base Bid 5 80160 Signs EA. 1
Base Bid 6 91240 Demolition S.Y. 1
Base Bid 7 91223 Excavation, Grading, S.Y. 1
Base Bid 8 96239 Haul Off C.Y. 1
Base Bid 9 98852 Tree pruning & Disposal EA. 1
Base Bid 10 65006 Bench EA. 1
Base Bid 11 65006 Mutt Mitt EA. 1
Base Bid 12 91223 Clean and Level Fill Existing Basketball Court S.F. 1
Base Bid 13 91430 Concrete S.F. 1
Base Bid 14 91438 Electrical Service EA. 1
Base Bid 15 91438 Electrical,Lighting for Shade Structures EA. 1
Base Bid 16 91438 Electrical,Wiring for Shade Structures EA. 1
Base Bid 17 15585 Plexipave Court Surfacing L.F. 1
Base Bid 18 91468 Drinking Fountain EA. 1
Base Bid 19 15585 Basketball Goal EA. 1
Base Bid 20 98852 Grass, Solid Sod (Buffalo Grass, Min. 1' Along Edges) S.Y. 1
Base Bid 21 98852 Grass, Hydroseed (Native Grass Mix) S.F. 1
Base Bid 22 15585 Shade Structures (1) EA. 1
Base Bid 23 15585 Shade Structures (2) EA. 1
Base Bid 24 91468 Plumbing EA. 1
Base Bid 25 91224 Fine Grading L.F. 1
Modification/Altering this Form is Prohibitied
BASE BID UNIT PRICE ITEMS
SECTION NAME
V2024
CITY OF SAN ANTONIO
024 UNIT PRICING FORM
Base Bid 26 98852 Maintenance and Watering of grass until establishment S.F. 1
CITY OF SAN ANTONIO
024 UNIT PRICING FORM
Add Alt. 1 1 91430 Concrete ramps S.F. 1
Add Alt. 1 2 57076 Rebar S.F. 1
Add Alt. 1 3 57068 rails L.F. 1
Add Alt. 1 4 91240 Sawcut and Remove Concrete Slab and Subbase EA. 1
Add Alt. 1 5 65006 Leuder Stone Bench EA. 1
Add Alt. 12 1 33013 Dog Park Fence LF 1
_________________________________________ hereby certifies that the unit prices shown on this form are soley for change order additions/deletions.
These unit prices are 'complete and in place', and include but are not limited to: necessary superintendence, labor, machinery, equipment, tools, materials, mobilization, insurance, overhead and other miscellaneous items and costs.
It is further understood that these unit prices may be used by the City of San Antonio for additions or deletions from the scope with mutual agreement by parties.
Signed: __________________________________________________________________________ Date: ___________________________
Title: __________________________________________________________________________
This Price Schedule may be used for future change orders and is not part of the lump-sum bid.
ADDITIVE ALTERNATES
ADDITIVE ALTERNATES
| Addendum 1 - District 4 Parks |
| FROM: Jaime E. Contreras, Procurement Manager |
| QUESTIONS SUBMITTED IN ACCORDANCE WITH THE |
| 040 STANDARD INSTRUCTIONS TO BIDDER/RESPONDENT PRE-BID MEETING: |
| REVISIONS TO CONSULTANT’S DOCUMENTS (SPECIFICATIONS, PLANS, ETC.) |
| GT-L3.0 - LAYOUT PLAN - ADDENDUM 1 |
| Sheets and Views |
| GT-L3.0 LAYOUT PLAN |
| MED-L3.2 - SKATE PARK ENLARGEMENT (ADD ALT. NO.1) - ADDENDUM 1 |
| Sheets and Views |
| MED-L3.2 SKATE PARK ENLARGEMENT (ADD ALT. NO.1) |
| SW-L1.0 - DEMOLITION AND EROSION CONTROL PLAN - ADDENDUM 1 |
| Sheets and Views |
| SW-L1.0 DEMOLITION AND EROSION CONTROL PLAN |
| SW-L2.0 - TREE PRESERVATION PLAN - ADDENDUM 1 |
| Sheets and Views |
| SW-L2.1 TREE MITIGATION PLAN |
| SW-L3.0 - LAYOUT PLAN - ADDENDUM 1 |
| Sheets and Views |
| SW-L3.0 LAYOUT PLAN |
| SW-L3.3 - HARDSCAPE DETAIL - ADDENDUM 1 |
| Sheets and Views |
| SW-L3.3 HARDSCAPE DETAILS |
| SW-L4.0 - PLANTING PLAN - ADDENDUM 1 |
| Sheets and Views |
| SW-L4.0 PLANTING PLAN |
| Unit Pricing Form for Change Orders_Vertical Projects_D4_revised |
| Sheet1 |
File details come from the government source that posted it. Updated .