ESBD_450952_1756912486104_RFQ - Final - CMAR for Terminal A B Reconfiguration and Rehabilitation.pdf

PDF 388 KB Posted

Attached to
Construction Manager at Risk - Request for Qualifications – Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport
Solicitation number
2025-055
Issued by
Bexar County, Texas

About this file

The City of San Antonio has issued a Request for Qualifications (RFQ) for a Construction Manager at Risk (CMAR) for the Terminal A/B Reconfiguration and Rehabilitation project at San Antonio International Airport. The solicitation (RFQ: 2025-055) seeks a qualified construction management firm to provide preconstruction and construction services for upgrading and modernizing Terminals A and B. The project aims to enhance passenger experience, improve operational efficiency, and create architectural continuity with the airport's Terminal Development Program. Proposals are due on November 3, 2025, at 10:00 AM Central Time, with a non-mandatory pre-submittal conference scheduled for September 9, 2025, and a site visit on the same day. The City anticipates City Council consideration in April/May 2026, with a total contract not to exceed $260,000,000 over the life of the agreement.

The RFQ includes a Disadvantaged Business Enterprise (DBE) program with an 11.22% contract-specific goal for preconstruction phase costs. The project will involve comprehensive terminal upgrades, including baggage handling system reconfiguration, hold room expansions, security checkpoint improvements, facade enhancements, and systems upgrades for both terminals. The CMAR will be responsible for managing complex, multi-phased construction activities while maintaining airport operations. Respondents will be evaluated on experience (35 points), key personnel qualifications (35 points), and proposed work plan/approach (30 points). The selection process will involve an initial qualification review, followed by a shortlist of up to five firms who will participate in a second evaluation stage with additional criteria.

View the file

Other files

File Type Posted
ESBD_450952_1756912453924_Solicitation Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF SAN ANTONIO

REQUEST FOR QUALIFICATIONS (RFQ)

CONSTRUCTION MANAGER AT RISK FOR THE TERMINAL A/B

RECONFIGURATION AND REHABILITATION AT SAN ANTONIO

INTERNATIONAL AIRPORT

RFQ: 2025-055 | WBS: 33-03351

Release Date: September 3, 2025

Proposals Due: November 3, 2025, at 10:00 AM Central Time (CT)

This solicitation has been identified as High-Profile.

PROHIBITED CAMPAIGN CONTRIBUTIONS

Prohibition against Campaign or Officeholder Contributions for Individuals and Entities Seeking High- Profile Contracts. Under Section 2-309 of the Municipal Campaign Finance Code, the following are prohibited from making a campaign or officeholder contribution to any member of City Council, candidate for City Council or political action committee that contributes to City Council elections beginning on the *10th business day after a contract solicitation has been released through the 30th calendar day following the approval by City Council (“blackout” period):

1. Any individual seeking a high-profile contract;

2. Any owner, officer, officer of board, executive committee member, and general board member of an entity seeking a high-profile contract;

3. The legal signatory of the high-profile contract;

4. Any attorney, lobbyist or consultant hired or retained to assist the individual or entity in seeking a high-profile contract;

5. Subcontractors hired or retained to provide services under the high-profile contract;

6. Any first-degree member of the household of any person listed in (1), (2), (3) or (5) of this subsection;

and

7. Any corporate political action committee (PAC) established or formed by the entity seeking a high-profile contract.

A high-profile contract cannot be awarded to the individual or entity if a prohibited contribution was made by any of these individuals during the “blackout” period.

*For this solicitation, the first day contributions are prohibited is September 17, 2025.

The first day contributions may be made is the 31st day after the contract is approved at a City Council “A” Session.

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 2

RESTRICTIONS ON COMMUNICATIONS

In accordance with and as authorized by Section 2-61 of the City Code, the following Restrictions on Communications apply to this solicitation: Respondents are prohibited from contacting 1) City officials, as defined by §2-62 of the City Code of the City of San Antonio, regarding the RFQ or proposal from the time the RFQ has been released until the contract is posted for consideration as an agenda item during a meeting designated as an “A” session; and 2) City employees from the time the RFQ has been released until the contract is approved at a City Council “A” session.

Restrictions extend to “thank you” letters, phone calls, emails and any contact that results in the direct or indirect discussion of the RFQ and/or proposal submitted by Respondent.

Violation of this provision by Respondent and/or its agent may lead to disqualification of Respondent’s proposal from consideration.

For additional information, see the section of this RFQ entitled “Restrictions on Communications”.

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 3

TABLE OF CONTENTS

Section Section Name Page

Number I. Background 4

II. Scope of Work and General Requirements 5

III. Schedule of Events 8

IV. Pre-Submittal Conference 8

V. Submittal Document Requirements and Evaluation Criteria 9

VI. Submission Instructions 16

VII. RFP Evaluation Criteria for Shortlisted Firms 17

VIII. Amendments to RFQ 18

IX. Restrictions on Communications 18

X. Award of Contract and Reservation of Rights 19

Exhibit # RFQ Exhibits

Exhibit A Project Overview -

Exhibit B Construction Manager at Risk Contract Template and General

Conditions

Exhibit C Procedures for Obtaining Airport Personnel Identification

Badge and Airfield Driver’s License

Exhibit D Standard Surety and Insurance Requirements -

Exhibit E Required Federal Contract Provision for Solicitations -

Exhibit F Aviation San Antonio Airport System Sustainable Airport

Manual (SAASSAM) Vol. 1

Exhibit G Aviation SAASSAM Checklist -

Exhibit H Terminal A/B Reconfiguration and Rehabilitation Pre-Submittal

Parking

Form # Required Forms

Respondent’s RFQ Submittal must contain the following documents.

Required Forms must be uploaded individually in CivCast.

Statement of Qualifications (Criteria A, B, C) -

Form 1 Submittal Checklist and Table of Contents -

Form 2 Submittal Cover/Signature Sheet -

Form 3 Contracts Disclosure Instructions Form -

Form 4 Litigation Disclosure Form -

Form 5 Statement of DBE Responsibility -

Form 6 Veteran-Owned Small Business (VOSB) Tracking Form -

Form 7 Heat Illness Prevention Acknowledgment Form -

Form 8 Key Personnel Commitment Form -

Proof of Insurability (Current Certificate of Insurance) -

Certificate of Interested Parties – TEC Form 1295 -

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 4

CONSTRUCTION MANAGER AT RISK FOR THE TERMINAL A/B

RECONFIGURATION AND REHABILITATION AT SAN ANTONIO

INTERNATIONAL AIRPORT

RFQ: 2025-055 | WBS: 33-03351-01-02

I. BACKGROUND

To effectively support the growth of the San Antonio Metropolitan Area and Airport, the City of San Antonio is undertaking the Terminal A/B Reconfiguration and Rehabilitation (TABRR) project to upgrade existing Terminals A and B. To successfully execute this effort, the City seeks a qualified Construction Manager at Risk (CMAR) firm with demonstrated technical capability and extensive experience in aviation construction to provide preconstruction and construction services for the reconfiguration and rehabilitation of Terminals A and B at San Antonio International Airport (SAT). The TABRR project aligns with the Terminal Development Program (TDP) and published design standards and is intended to enhance the passenger experience, improve operational efficiency, and provide a cohesive and modernized terminal environment. The construction scope will include restroom upgrades, expanded hold room areas, and enhancements to terminal functionality, with the goal of creating continuity with the new terminal development. The scope will also include preconstruction and construction services required to coordinate with other adjacent projects, including those related to passenger airside circulation, and the airside connector between Terminals A and B.

Terminal A, commissioned in 1984, spans 378,524 square feet across three levels: Arrivals, Departures, and Mezzanine. Serving as a vital hub for passenger operations, it features 16 gates that facilitate efficient airline services. The Arrivals Level includes airline support spaces, three baggage claim devices totaling 405 linear feet of claim frontage, and three L3 6600 Explosive Detection System (EDS) units for baggage screening. The Departures Level houses a check-in hall with 55 counter positions, of which 10 are currently vacant, along with 25 kiosks, an eight-lane Security Screening Checkpoint (SSCP) featuring four full-body scanners, hold rooms, concessions, and restrooms. The Mezzanine Level houses administrative offices for the City of San Antonio and additional support spaces like conference rooms and restrooms to ensure smooth airport operations.

Terminal B, constructed in 2010, consists of 231,753 square feet and is three levels: Arrivals, Departures, and Mezzanine. The Arrivals Level includes checked baggage screening with two L3 6600 EDS units interconnected with Terminal A, along with three baggage carousels providing 360 linear feet of claim frontage. This level also accommodates airlines’ baggage services offices and operational spaces. The Departures Level features 25 check-in counter positions, three of which are currently unused, 13 kiosks, a four-lane Transportation Security Administration (TSA) SSCP equipped with two full-body scanners, and designated queuing areas for general passengers, premium travelers, and TSA PreCheck. The Mezzanine Level includes a conference room and mechanical equipment areas that are essential to the terminal’s operations, and it also provides access to the pedestrian bridge connecting to the Rental Car Facilities (RACs) across Terminal Drive.

A comprehensive assessment of Terminals A and B is currently being conducted to evaluate existing conditions and identify necessary improvements. A draft copy of the assessment will be provided to the CMAR for review as soon as it becomes available, fall 2025. The assessment may provide additional context and detail regarding the scope of potential rehabilitation efforts. The selected CMAR will be expected to participate in constructability reviews, value engineering, phasing and logistics planning, and cost estimating during preconstruction. The CMAR will support the City and design team to align the scope with budget and schedule constraints. Ultimately, the CMAR will prepare a Guaranteed Maximum Price (GMP) proposal for the City’s approval based on the completed design documents.

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 5

The CMAR will address the program's diverse scope, scale, and operational complexity. The concurrent construction projects within TABRR demand airport-specific expertise and specialized construction services to ensure success. The CMAR will be responsible for supporting design implementation, managing all construction-related activities, and coordinating the resources to successfully reconfigure and rehabilitate Terminals A and B. Key members of the CMAR’s team will be collocated with the Aviation Department staff. The successful CMAR will be a firm with extensive experience in complex airport terminal construction and renovation, including alternative project delivery methods, and managing multidisciplinary teams across planning, design, and construction.

Personnel provided by the selected CMAR must be able to obtain all required TSA security clearances, including background checks for airfield access. The selected CMAR will be responsible for ensuring that all subcontractors are properly badged or escorted to ensure adequate staffing for each project.

Driving within the secured areas of the airfield will be required and will necessitate an airfield driver’s license. For more details, refer to the Request for Qualifications (RFQ) Exhibit C - Procedures for Obtaining Airport Personnel Identification Badge and Airfield Driver’s License.

The selected CMAR shall adhere to all terms and conditions outlined in the contract documents, as well as Federal Contract Provisions (Exhibit E). The selected CMAR must comply with the applicable provisions of the Federal Aviation Administration (FAA) Advisory Circular (AC) #150/5100-14E, “Architectural, Engineering, and Planning Consultant Services”, AC 150/5370-10G - Standards for Specifying Construction of Airports &/or their most current versions for Airport Grants Projects. These circulars provide guidance on selecting contractors and consultants and apply to the procurement of services like the CMAR. This AC can be accessed online at http://www.faa.gov.

PURPOSE AND INTENT

The CMAR will provide management and construction oversight of the TABRR program throughout its duration beginning in the design phase and continuing through construction. The CMAR will provide program-level leadership to ensure the overall success of the TABRR, as well as project-level coordination, scheduling, cost estimating, constructability reviews, and construction management. The CMAR’s early involvement during design is essential to support scope alignment, schedule development, phasing, and budgeting efforts.

The CMAR should have significant experience in leading and managing similar terminal reconfiguration & rehabilitation projects. This expertise must include the ability to provide effective construction oversight, advise the City and Airport’s executive teams, in discussing the program at outreach events within the community. The CMAR shall ensure that project scopes, schedules, and budgets are met through collaboration with the City.

The City will award one Construction-Manager-At-Risk (CMAR) as a result of the solicitation for a total contract not to exceed amount of $260,000,000 over the life of the agreement. Contract award and amendment funding will be based on phasing of projects, requirements to maintain FAA grant eligibility, and availability of funds.

II. SCOPE OF WORK AND GENERAL REQUIREMENTS

Following the facility assessment conducted by Garver LLC, Terminal A will undergo a strategic reconfiguration & rehabilitation to upgrade aging infrastructure and modernize spaces to meet current airport standards. This includes improvements to hold rooms, restrooms, terminal finishes, and other key areas as well as a new passenger airside circulation corridor to connect Terminals A and B.

http://www.faa.gov/

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 6

Terminal B will receive targeted upgrades focused on Furniture, Fixtures, and Equipment (FF&E), terminal finishes, curtain wall repairs, and Americans with Disabilities (ADA) upgrades. The designs will align with the aesthetic and functional characteristics of SAT’s TDP and SAT’s published design standards and will enhance the passenger experience, improve connectivity between terminals, and maximize passenger circulation, and improve operational efficiency.

The CMAR’s scope of services shall include, but is not limited to, the following tasks for both Terminal A and Terminal B:

1. Project Initiation and Programming

1. Review Assessment, Architectural, and Engineering Deliverables

Analyze the Terminal A and Terminal B Reconfiguration & Rehabilitation Assessment, including summaries of prior studies and new assessments for Terminal A, along with all architectural and engineering deliverables. A draft copy of the assessment may be provided to the CMAR for review as soon as it becomes available, fall 2025.

2. Stakeholder Coordination: Collaborate with SAT staff, airlines, and other stakeholders to refine programmatic requirements, considering the extensive strategic renovation of Terminal A, limited scope for Terminal B, and the ability to enhance passenger connectivity.

3. Design Standards Integration: Incorporate SAT’s published design standards and ensure that construction quality is in alignment with the new Terminal C.

4. Provide Program Progress Monitoring, Tracking, and Reporting: Track program preconstruction and construction milestones and provide regular progress updates to SAT stakeholders, including schedule, cost, and scope alignment.

5. Collaborate with the TDP to reconfigure shared landside and airside components at Terminals A and B, including, but not limited to screening checkpoints, ticketing areas, the closure of the easternmost curbside door in TA departure and arrival levels, as well as potential façade enhancements. This includes technical coordination with the TDP to support the relocation of Federal Inspection Services (FIS) to the new terminal, ensuring functional and aesthetic integration across all terminal development initiatives.

2. Pre-Construction Services

1. Design Review: Provide constructability and phasing input on Terminal A’s strategic renovation, Terminal B’s FF&E and window curtainwall sealant improvements, and the new passenger airside circulation corridor to connect Terminal A and Terminal B.

2. Cost Estimation: Develop progressive cost estimates and a GMP based on design documents, addressing the varying scope across both terminals and connectivity elements.

3. Scheduling: Create and maintain a master schedule, including detailed phasing plans to ensure minimal uninterrupted airport operations during construction.

4. Subcontractor Procurement: Solicit and recommend subcontractors for Terminal A (Rehabilitation and Reconfiguration), Terminal B (FF&E, sealant, glazing), and Terminal A/B Connector (structural, architectural, mechanical, electrical, and plumbing [MEP], roofing).

5. Permitting Coordination: Secure permits (as applicable) with the design team and SAT.

6. Provide Program Progress Monitoring, Tracking, and Reporting: Monitor and report on the program’s progress to SAT stakeholders.

3. Construction Management – Terminal A (Targeted Reconfiguration & Rehabilitation)

Reconfiguration:

1. Manage the demolition and rebuild of baggage handling system (405 LF).

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 7

2. Manage the complete overhaul (Arrivals, Departures, Mezzanine), including new baggage claim infrastructure (previously 3 devices, 405 LF), check-in hall (55 counters, 10 vacant), and an eight-lane Security Screening Checkpoint (SSCP) (8 lanes, 4 scanners) to support 8-12 gates.

3. Improve the efficiency of baggage handling system (BHS) screening machines at Terminal A induction points to optimize baggage handling operations.

4. Add queue belts to the alarm line to alleviate congestion and streamline baggage screening.

5. Optimize manual encode induction and exit lanes to improve baggage processing efficiency.

6. Reduce the number of gates to accommodate 3,000 SF hold room expansions, to improve passenger seating and circulation.

7. Manage the procurement and installation of Passenger Boarding Bridges as required for replacement, refurbishment, and/or relocation to accommodate a wider range of aircraft and provide greater flexibility in airport operations.

8. Reconfigure the entry vestibules and improve the terminal façade to align more closely with the architectural identity of the new Terminal C. Work could include removal and redesign of existing vestibules, installation of larger bi-parting entry doors, and construction of new vestibule canopies that borrow materials, proportions, and detailing from the TDP design vocabulary. Selective expansion of glazing areas along the façade will be evaluated and implemented to introduce more natural light and visual continuity with Terminal C enhancing the passenger experience and creating a cohesive airport identity.

Rehabilitation (Manage construction of the following):

1. The full architectural rebuild of the terminal based on the Garver, LLC assessment and working collaboratively with the Architect addressing outdated systems.

2. The barrel roof rehabilitation.

3. Installation of new curtain wall systems to comply with energy codes.

4. Update elevators and escalators to code compliance and include energy efficiency upgrades for all levels.

5. Upgrade Building Systems (mechanical, electrical, plumbing, fire suppression, AV, IT, Security)

6. Renovate the bag drop area on the secure side to enhance passenger flow and processing efficiency.

7. Installation of Furniture, Fixtures, and Equipment (FF&E) replacement to align with TDP standards, leaving structural systems intact.

8. Expansion of restrooms to meet modern accessibility standards, improve passenger comfort, and accommodate increased capacity demands.

9. Reconfigure and enlarge hold rooms to enhance seating availability, improve passenger flow, integrate charging stations, and provide a more comfortable waiting experience.

10. Reduce Landside and expand Airside concession areas to increase retail and dining options, improve revenue potential, and enhance the passenger experience while maintaining efficient circulation (2,100 SF Airside reduction and 3,000 SF Airside expansion).

11. Improve overall passenger circulation by optimizing wayfinding, improve corridors, addressing pinch points, and enhance connectivity between key terminal areas.

12. Redevelopment of the Existing FIS Area. Following the relocation of FIS to the new terminal under the TDP, the design team will support SAT in repurposing the vacated space within Terminal A. Potential uses may include Aviation staff offices, expanded

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 8 concessions, expanded baggage claim, or a combination of these functions. The architect will help develop the program create a design to maximize spatial efficiency, maintain operational flexibility, and ensure cohesive integration with the broader terminal improvements.

13. A new boiler system within Terminal A to replace the existing unit currently located in Terminal B. The design team shall identify an appropriate location in Terminal A and develop design documents and specifications for a new system that meets required capacity demands. Coordination with Airport Facilities and the TDP is required to support the decommissioning of the existing system while ensuring continuity of operations and minimizing disruptions to both Terminal B and the TDP.

14. Execute façade improvements to unify design across terminals. This includes surface treatments, replacement of outdated exterior materials, strategic addition of glazing, and color/material alignment with the TDP and airport design standards. Also included is the cleaning, repair, and replacement of curbside pavement as needed to present a more polished, durable public frontage. Upgraded illuminated wayfinding signage will be installed to support improved passenger orientation and visual consistency with the new terminal development.

Systems Integration:

1. Manage full installation of building systems for nearly full replacement of HVAC ductwork, roof units, air handlers, electrical distribution, lighting, fire suppression, IT systems, audio/video, security, and Public Address Voice Evacuation (PAVE).

2. Optimize the existing BHS serving Terminal A, Terminal B, and Terminal C to improve operational efficiency and adapt to reconfigured terminal layouts. The scope includes enabling efficient use of all screening machines by Terminal A ticket counter induction points; ensuring delivery capability to all Terminal A baggage make-up devices; incorporating queue belts along alarm lines to alleviate post-screening congestion; and optimizing manual encode induction and exit lanes.

3. Construction Management - Terminal B (FF&E, ADA Upgrades, and Window Resealing)

Reconfiguration:

1. Manage construction to improve accessibility in accordance with the Americans with

Disabilities Act, Texas Accessibility Standards (TAS), and local government requirements.

2. Manage the construction for the redesign of the check-in counter and queue area to enhance operational efficiency and passenger flow.

3. Manage the construction for the redesign operational spaces to optimize functionality and support airline operations more effectively.

4. Manage the construction for the redesign the baggage claim area to improve accessibility and efficiency for Terminal B airlines.

Rehabilitation:

1. Manage installation of FF&E replacement to align with TDP standards, leaving architectural, structural, MEP, and other systems intact.

2. Manage the upgrades to elevators and escalators for code compliance and include energy efficiency upgrades for all levels.

3. Modernize and expand restrooms to meet current accessibility standards, improve passenger comfort, and accommodate increased capacity demands.

4. Repair and restore the existing curtain walls in accordance with the assessment recommendations, addressing window moisture remediation and resealing upgrades, as

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 9 well as any structural or thermal deficiencies to enhance energy efficiency, weather resistance, and overall durability.

5. Manage the enhancements to the curbside check-in and ticket lobby to better serve Terminal B airlines.

6. Rehabilitate the Terminal B façade to create architectural continuity with Terminal A and the new Terminal C. Work includes repairs, surface treatments, and the use of complementary materials and finishes from the TDP palette to modernize the exterior and visually tie the terminal into the broader campus design. The scope includes, aesthetic improvements, curbside pavement repair and cleaning, and the installation of upgraded illuminated wayfinding signage for a more consistent passenger experience and improved circulation clarity.

III. SCHEDULE OF EVENTS

The following tentative schedule has been prepared for this project:

IV. PRE-SUBMITTAL CONFERENCE

A non-mandatory Pre-Submittal Conference is scheduled, for September 9, 2025, at 10:00 a.m. CT.

The Pre-Submittal Conference will be held via WebEx meeting. Prospective Respondents may join the WebEx using the following instructions:

Join by phone: 1-415-655-0001 Meeting number (access code): 2331 882 3316 Meeting password: COSA2025 Join meeting:

https://sanantonio.webex.com/sanantonio/j.php?MTID=m3ea8c44b662c6b83ca03a836b0cea6d1

Attendance at the Pre-Submittal Conference is optional, but highly encouraged. Respondents who join the WebEx Pre-Submittal Conference are required to sign into the meeting using a QR code provided only during the meeting. This will confirm Respondent’s attendance and participation for the Pre- Submittal meeting through WebEx.

The Pre-Submittal Conference will be held at the City of San Antonio Airport Center, 10100 Reunion Place, Boeing Conference Room 3rd Floor, San Antonio, Texas 78216. The event is not in the Airport Terminals. The meeting is located adjacent to the San Antonio Airport in the Airport Center office building. City of San Antonio Airport Center guest access and security procedures are provided hereto as Exhibit H - Terminal A/B Reconfiguration and Rehabilitation Pre-Submittal Parking.

Respondent is encouraged to submit written questions concerning this RFQ through the CivCast website at least five (5) calendar days in advance of the Pre-Submittal Conference, in order to expedite the proceedings. City’s responses to questions received by this due date may be distributed at the Pre- Submittal Conference, as well as being posted on the CivCast website at https://www.CivCastusa.com/bids.

Pre-Submittal Conference: September 9, 2025, 10:00 am, CT

Deadline for Submission of Written Questions: September 24, 2025, 4:00 pm, CT

Responses Due: November 3, 2025, 10:00 am, CT

Evaluation of Submittals: December 2025

Interviews: Week of February 9, 2026

Anticipated City Council Consideration: April/May 2026 https://sanantonio.webex.com/sanantonio/j.php?MTID=m3ea8c44b662c6b83ca03a836b0cea6d1 https://www.civcastusa.com/bids

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 10

City’s responses to questions received by this due date may be discussed at the Pre-Submittal Conference, as well as being posted on the CivCast website at https://www.CivCastusa.com/bids.

Any oral responses provided by City staff at the Pre-Submittal Conference shall be preliminary. A written summary of the Pre-Submittal Conference shall contain City’s official responses to issues raised during the Pre-Submittal Conference and posted on the CivCast website at https://www.CivCastusa.com/bids. Any oral response given at the Pre-Submittal Conference that is not confirmed in the posted written summary from the Pre-Submittal Conference or in a subsequent addendum shall not be official or binding on City. Only written responses shall be official. All other forms of communication with any officer, employee or agent of City shall not be binding on City.

Site Visit

A non-mandatory site visit is scheduled on September 9, 2025, at 2:00 p.m. CT., following the non-mandatory Pre-Submittal Conference. Shuttle transportation will be provided from the Pre-Submittal lobby to the site visit location.

Parking Instructions:

The parking garage guard will direct you to park on the top floor of the parking garage (3rd floor). Take the garage elevator to 2nd floor (P2 level) and walk through the sliding door. Take the building elevator to the 3rd floor. The pre-Submittal will be on the third floor – you will see the meeting room as soon as you step off the elevator. Signage will be provided to direct you to the meeting room.

Kindly do not park in the visitor spaces out front of the building; use the parking garage instead.

V. SUBMITTAL DOCUMENT REQUIREMENTS AND EVALUATION CRITERIA

City will conduct a comprehensive, fair and impartial evaluation of all proposals received in response to this RFQ. City will appoint a selection committee to perform the evaluation of the received Statement of Qualifications (SOQ). Each SOQ received by City shall be analyzed to determine overall responsiveness and qualifications to the RFQ. The selection committee may select Respondents who are judged to be reasonably qualified for interviews, depending on whether further information is needed. Interviews are not an opportunity to change a submission. If the City elects to conduct interviews, Respondents may be interviewed and re-scored based upon the same criteria. City may also request information from Respondents at any time prior to final approval of a selected Respondent or seek best and final qualifications from Respondents deemed reasonably qualified for award. Final approval of a selected Respondent is subject to the action of the San Antonio City Council.

Respondent’s SOQ shall include the following items included in the Submittal Checklist & Table of Contents (Form 1) in the following sequence combined in PDF format:

1. SUBMITTAL CHECKLIST AND TABLE OF CONTENTS (Form #1) (Indexed and labeled as “Tab 1”) – Respondent and respondents team members shall complete this form, which shall be used as the Table of Contents and as a checklist for Respondent’s submittal.

2. EXECUTIVE SUMMARY (Indexed and labeled as “Tab 2”) – Respondent shall include a one

(1) page Executive Summary at the beginning of the Statement of Qualifications. Respondent’s Executive Summary shall state the number of years Respondent’s team has been in business, Respondent’s number of years in business in its local office, Respondent’s local office address

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 11 and the number of employees employed in Respondent’s local office.

3. CONTRACT TEMPLATE AND GENERAL CONDITIONS REVIEW (Indexed and labeled as

“Tab 3”) – Respondent shall review the Contract Template and General Conditions, provided hereto and made a part hereof and labeled as Exhibit B and provide written acknowledgment that Respondent accepts the terms, conditions and requirements of the City’s Contract Template and General Conditions, in Respondent’s submitted proposal under “Tab 3”.

4. LETTERS OF REFERENCE (required) (Indexed and labeled as “Tab 4”) –

Respondent and Co-Respondents must provide a maximum of five (5) letters of reference including contact information for projects completed within 5 years.

5. STATEMENT OF QUALIFICATIONS – Respondent shall provide a narrative document, as outlined in the Statement of Qualifications below, addressing all evaluation criteria in Section V of this RFQ considering the project defined in this solicitation. Sufficient information regarding Respondent’s past projects and key personnel’s experience shall be provided in Respondent’s proposal. to indicate its team has met or exceeded the minimum qualifications provided in Section V of this RFQ in proposal.

The following Evaluation Criteria shall be used, in recommending the award of this Contract:

A. Experience, Background, and Qualifications of CMAR including Key

Subcontractors (35 Points)

Respondent shall respond to the following items, as related to the scope of work outlined in this RFQ:

1. Experience Narrative (Indexed and Labeled as “Tab 5”): Provide a narrative in a maximum of five (5) pages that describes the Respondent’s successful experience constructing facilities similar to this Project at airports through construction manager at risk or another collaborative delivery method. As part of this narrative, describe Respondent’s experience providing:

a) Successful preconstruction services in partnership with airport teams.

b) Construction phase experience delivering airport terminal development programs on schedule, on budget, and with excellent quality and safety performance for projects with $500M or more in construction cost.

c) Include a discussion of the experience of the team members working together on other comparable projects and the results of that experience, including the number of years working together.

In addition, Respondent’s narrative must:

a) Demonstrate a minimum of ten (10) years’ experience in building airport terminal and concourse programs of similar size, complexity and type. Provide date(s) services were provided. If Respondent is proposing a joint venture for this Project, a minimum of ten (10) years’ experience is required of each joint venture member.

b) Demonstrate team’s expertise, understanding and experience in working in landside and airside operational environments at airports.

c) Demonstrate experience with multi-phased projects, and programs with

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 12 multiple project components comprising the program.

d) Include experience that demonstrates the Respondent’s likelihood of success in packaging work to maximize the City’s ability to obtain grant funding to support the program.

e) Demonstrate success in utilizing comparable preconstruction phase services to establish a plan for execution that provides an executable program on schedule and on budget.

f) Demonstrate success using BIM 360, Primavera P6 and other project management software tools.

g) Demonstrate experience and success of key subcontractors on the team.

2. Project Sheets: (Indexed and Labeled as “Tab 6”) – Include the following in support of the above:

Provide 2-page project sheets for three (3) successfully completed projects of similar size, scope and complexity utilizing the construction manager at risk delivery method or another collaborative delivery method. One of these projects must be at least $500M in construction value. For each highlighted project, the project sheet shall include the following:

a) Description of the project and scope of work, including level of LEED certification obtained, if any;

b) Photograph of the project;

c) Project’s proposed substantial completion date and actual substantial completion date (explain inconsistencies);

d) Project’s original construction contract amount and final construction contract amount (explain inconsistencies);

e) Name of design firm;

f) Project Manager and note whether this person will work on the Project and his/her role planned for the Project;

g) Project Superintendent and note whether this person will work on the Project and his/her role planned for the Project;

h) Project Estimator and firm for which they were employed and note whether this person will work on the Project;

i) The owner’s name and the name of the representative who served as the day-to-day liaison for the construction phase of the project in the following format:

o Name of Owner:____________________ o Name and title of Owner’s representative:_________________ o Owner representative’s Phone Number:____________ o Owner representative’s E-mail:___________________

B. Qualifications of Key Personnel (35 Points)

Respondent shall respond to the following items, as related to the scope of work described in the RFQ:

1. Organizational Chart (Indexed and Labeled as “Tab 7”) – Provide a one (1) page organizational chart that identifies Respondent’s proposed team organization. Key personnel should be clearly identified. Team roles should be clearly identified. Only include personnel who would perform work under the CMAR Contract. The organizational chart can be formatted on an 11” x 17” page, if needed.

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 13

At a minimum, the following key personnel must be clearly labeled on the organizational chart and described in the following section:

a) Senior Project Manager (on-site team leader)

b) Project Manager(s)

c) Pre-Construction Manager

d) Sr. General Superintendent (construction phase onsite lead)

e) General Superintendents (by building system area)

f) Safety Manager

g) Lead Scheduler

h) Lead Estimator

i) Quality Assurance/Quality Control Manager

j) Subcontractor Procurement Coordinator/Diversity Coordinator

2. Organizational Chart Narrative (Indexed and Labeled as “Tab 8”) – Provide a narrative description (up to (2) two pages) of the organization chart describing the proposed assignments, roles and responsibilities, lines of authority, transition of responsibilities from preconstruction to construction phases, and communication for each team member to be directly involved with the Project. The proposed key personnel must have demonstrated experience with relevant airport terminal and concourse programs similar to the scope of the project (preferably over $500M).

3. Resumes (Indexed and Labeled as “Tab 9”) – Not included in the page count for

Section B. – Include the following in support of the above. Respondent shall provide a two (2) pages maximum resume for each of the key personnel listed above.

a) Resumes should link back to project sheets submitted in accordance with

Section 3.A.2 and may reference additional previously completed relevant projects not highlighted in the project sheets, where applicable. If a person did not work on any project included in the project sheets, then the resume should reference projects where the person performed roles similar to the role proposed for this Project.

b) Resumes shall include: 1) license type (if applicable) and number of years licensed; 2) certification or other role specific recognitions, and number of years, including LEED Accreditation, if any; 3) number of years employed with the Respondent or subcontractor; 4) number of years of experience in proposed role identified on the Organizational Chart; 5) number of years of experience working on aviation projects; and 6) experience where applicable with use of BIM technology in delivery of previous construction projects.

C. General Proposed Work Plan/Approach (30 Points) – Submit a description of the Respondent team’s philosophy and proposed approach to the work and availability of labor resources (capacity to perform) in executing the team’s effort. Submit information in a brief narrative plan of up to three (3) pages (exclusive of the plans described below) that clearly and concisely describes the approach to the Project, as well as other information you feel is critical to the success of the Project. In addition, provide information on the items below:

1. Subcontractor Selection Plan/Process (Indexed and Labeled as “Tab 10”) – Provide a maximum three (3) page narrative that describes the selection process you will use to select qualified subcontractors for the Project.

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 14

a) Provide an understanding of how you will determine best value in the subcontractor procurement process, as well as criteria used to evaluate the ability of subcontractors to successfully perform the work.

b) If subcontractors are already identified as a part of Respondent’s team, provide a teaming rationale narrative and proven past experience, if applicable.

2. Pre-Construction Phase Work Plan (Indexed and Labeled as “Tab 11”) – Limit response to the following items to five (5) pages maximum:

a) Describe Respondent’s management approach and how the team organization/approach for the pre-construction scope of work outlined in this RFQ will facilitate an improved construction phase.

b) Describe Respondent’s approach to working with the design team to identify opportunities for cost and schedule assurance in the Project design.

c) Describe Respondent’s approach to providing timely design reviews and input to improve the constructability and biddability of the Project.

3. Construction Phase Work Plan (Indexed and Labeled as “Tab 12”) – Limit response to the following items to five (5) pages maximum:

a) Describe Respondent’s construction management approach and plan for coordination with stakeholders.

b) Describe Respondent’s methodology to plan, oversee, coordinate and manage the implementation of the work, including site management, logistics, and subcontractor management.

c) Describe Respondent’s approach to managing project documentation and communications, such as requests for information, shop drawings, design bulletins/updates, potential changes and other coordination of construction progress meetings with the City, designer(s), and other contractors on site.

6. Disadvantaged Business Enterprise (DBE) Program Requirements (Form #5) (Indexed and Labeled as “Tab 13”) – Respondent shall complete this form.

The City in accordance with Code of Regulations 49, Part 26 (or 49 CFR, Part 26) has established a Disadvantaged Business Enterprise (DBE) Program for Construction Management at Risk (CMAR) contracts. The aim of this program is to promote DBE participation in City procurements, through its prime contract awards and subcontracts, and to afford DBEs an opportunity to compete for City contracts. In particular, this program encourages contractors to provide opportunities to certified DBEs for subcontracts or related contracts.

Notification is hereby given that 11.22% DBE contract specific goal has been established for the preconstruction phase costs.

Additionally, the City has determined that subcontracting opportunities will arise during the construction phase of this Project; however, the specific scopes of work and the magnitude of the scopes of work cannot be determined until the design for the Project has been completed. When the design documents are sufficiently completed, the City will establish appropriate DBE goals, and the Construction Manager at Risk (CMAR) firm shall submit a DBE Compliance Plan meeting the goals or documentation detailing their Good Faith Efforts to meet the established DBE goals.

The selected Respondent will be required to meet the DBE CMAR Program and requirements. A

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 15

DBE Compliance Plan meeting such goals or documentation detailing Good Faith Efforts (GFE) to meet the established DBE goals will be required in the RFP phase. The DBE requirements will be outlined in the RFP. The selection process for the RFP will be based on the information submitted by Respondent as set forth in the Disadvantaged Business Enterprise (DBE) Program Requirements, DBE Construction Manager at Risk Contract Provisions, and DBE Forms.

If these required DBE forms and documentations are not submitted, the proposal submittal will be deemed non-responsive. Respondents are advised to prepare their DBE plan prior to the RFP Phase.

Information on programs such as the City’s Ready to Work Program and the City’s Mentor-Protégé program will be included in the RFP Phase.

Below is the Evaluation Criteria Summary:

Evaluation Criteria Summary Maximum Points

A. Experience, Background, & Qualifications of CMAR including Subcontractors

B. Qualifications of Key Personnel 35

C. General Proposed Work Plan/Approach 30

Total Maximum 100 Points

Required Forms (to be uploaded individually in CivCast):

City shall conduct due diligence and analysis of the following required forms:

1. SUBMITTAL COVER/SIGNATURE SHEET (Form #2) – Respondent and Co-Respondents must include the completed Submittal Cover/Signature Sheet with the other required forms. The Submittal Cover/Signature Sheet must be signed by a person (or persons) authorized to bind Respondent and the entity/entities submitting the response. Signature pages signed by a person other than an officer of the company or partner of the firm must be accompanied by evidence of authority. Joint ventures submittals require signatures from all firms participating in the joint venture. Submitting joint ventures are required to provide legal proof of the joint venture, such as a joint venture agreement.

2. CONTRACTS DISCLOSURE FORM (Form #3) – Complete and submit a Contracts Disclosure Form with the proposal. The Contracts Disclosure Form may be downloaded and completed electronically at: https://webapp1.sanantonio.gov/ContractsDisclosure/

Click on the “Print” button at the bottom of the page and place a copy in proposal response as indicated in the Proposal Checklist.

3. LITIGATION DISCLOSURE FORM (Form #4) – Respondent, Co-Respondent and all subcontractors on this project must complete a Litigation Disclosure Form, utilizing additional pages for explanation, if necessary, and submit the completed form. If Respondent is proposing as a team or joint venture, each party to that team or joint venture shall complete and submit a separate Litigation Disclosure Form.

4. STATEMENT OF DBE RESPONSIBLITY FORM (Form #5) – Respondent shall submit the https://webapp1.sanantonio.gov/ContractsDisclosure/

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 16 completed DBE Statement of Responsibly Form with other required forms to confirm Respondent's commitment to comply with DBE program requirements.

5. VETERAN-OWNED SMALL BUSINESS PROGRAM TRACKING FORM (VOSB) (Form #6) – Respondent must submit a completed and signed VOSB Tracking form with this solicitation. This solicitation is not eligible for a preference based on status as a veteran-owned small business (VOSB). Nevertheless, in order to determine whether the program can be expanded at a later date, the City tracks VOSB participation at both prime contract and subcontract levels. San Antonio City Code Chapter 2, Article XI describes the City’s veteran-owned small business preference program.

6. HEAT ILLNESS PREVENTION ACKNOWLEDGMENT FORM (Form #7) – Respondent and

Co-Respondents must include the complete the Heat Illness Prevention Acknowledgment form with this solicitation. Effective August 31, 2023, the Heat Illness Prevention Ordinance implemented requirements to certain City-funded contracts involving activities in outdoor and unconditioned spaces. For more detailed information on the Heat Illness Ordinance, see Ordinance No. 2023-08-31-0585 and General Conditions for Construction Contract, Article X.1.5 and Art.X.2.3(a).

7. KEY PERSONNEL COMMITMENT FORM (Form #8) – Respondent shall include the completed

Key Personnel Commitment Form with the other required forms to confirm Respondent’s commitment to utilize the key personnel it identifies in the RFQ Submittal.

8. LETTER OF INSURABILITY – Submit a letter from insurance provider stating provider’s commitment to insure the Respondent for the types of coverages and at the levels specified in this RFQ if awarded a contract in response to this RFQ. Respondent shall also submit a copy of their current insurance certificate.

9. CERTIFICATE OF INTERESTED PARTIES TEC FORM 1295 – The Texas Government Code

§2252.908, and the rules issued by the Texas Ethics Commission found in Title 1, Chapter 46 of the Texas Administrative Code, require a business entity to submit a completed Form 1295 to the City before the City may enter into a contract with that business entity:

Form 1295 must be completed online. It is available from the Texas Ethics Commission by accessing the following web address:

https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm.

Print your completed Form 1295. Submit your signed Form 1295 with your response to this solicitation. Where requested to provide the name of the public entity with whom you are contracting, insert “City of San Antonio”. Where requested to provide the contract number, provide the solicitation number shown on the cover page of this solicitation (e.g.

IFB 6100001234, RFO 6100001234 or RFQ 6100001234).

The following definitions found in the statute and Texas Ethics Commission rules may be helpful in completing Form 1295.

“Business entity” includes an entity through which business is conducted with a governmental entity or state agency, regardless of whether the entity is a for-profit or nonprofit entity. The term does not include a governmental entity or state agency. (NOTE: The City of San Antonio should never be listed as the “Business entity”.)

https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm

Construction Manager at Risk for the Terminal A/B Reconfiguration and Rehabilitation at San Antonio International Airport RFQ: 2025-055 | WBS: 33-03351 Page 17

“Controlling interest” means: (1) an ownership interest or participating interest in a business entity by virtue of units, percentage, shares, stock, or otherwise that exceeds 10 percent; (2) membership on the board of directors or other governing body of a business entity of which the board or other governing body is composed of not more than 10 members; or (3) service as an officer of a business entity that has four or fewer officers, or service as one of the four officers most highly compensated by a business entity that has more than four officers. Subsection (3) of this section does not apply to an officer of a publicly held business entity or its wholly owned subsidiaries.

“Interested party” means: (1) a person who has a controlling interest in a business entity with whom a…

This is the start of the file's text. The full file is on GovTribe.