This is a Statement of Work (SOW) attachment for RFP PR-0002353-A issued by the Texas Facilities Commission (TFC) for HVAC maintenance services in Houston, Waco, and Fort Worth, Texas. The contract requires the contractor to provide preventative maintenance and repair services on HVAC equipment at various TFC-owned or managed buildings in those cities, including quarterly maintenance following OEM standards, system fluid testing, annual boiler maintenance, and air handler system maintenance with 4 inspections per year. The contract term runs through August 31, 2026 with two additional two-year renewal options possible, plus a potential 3-month extension for re-solicitation purposes. The contractor must provide both routine scheduled maintenance as well as emergency response services, with initial response times of 15 minutes for emergencies and one business day for non-emergencies.
The contractor is responsible for all labor, tools, parts and materials needed to complete maintenance tasks. The contractor must maintain a local physical office in the awarded locations and provide 24/7 emergency response capability. Payment bonds are required for projects over $25,000 and performance bonds for projects over $100,000. The contractor must submit detailed invoices within 2 weeks of service completion, with pricing to match the awarded rates in Attachment E. The contract includes provisions for additional services to be quoted and approved via Purchase Order. Travel time is not reimbursable, and freight/shipping charges are not allowable expenses except for approved expedited shipping.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP PR-0002353-A
HVAC Maintenance Services in Houston, Waco, and Ft Worth, Texas
1. ATTACHMENT A - STATEMENT OF WORK.
1.01. SERVICE AND PERFORMANCE REQUIREMENTS.
(a) Contractor shall provide preventative maintenance and repair services on HVAC equipment for TFC at various TFC owned or managed buildings located in Houston, Fort Worth, and Waco Texas. Equipment and systems are listed in Attachment F –Equipment List (hereinafter referred to as Attachment F) Attachment F is attached hereto and incorporated herein for all purposes. The equipment and systems listed in Attachment F are representative of the known equipment or systems and may or may not be all inclusive;
however, Contractor may provide services on any HVAC and related equipment and systems at TFC properties in Houston, Fort Worth, and Waco Texas.
(b) BASE SERVICES.
(i) Perform all quarterly maintenance, following OEM standards, at State Office
Buildings to keep HVAC equipment running optimally and prevent unplanned downtime.
(ii) Contractor assumes all responsibilities for planning, scheduling, and managing routine maintenance on HVAC equipment.
(iii) Test system fluids for contaminants and other physical characteristics and trends.
Conditions indicating sub-optimal HVAC system performance are identified before issues become critical.
(iv) Minimal preventative maintenance requirements for boilers annually. Contractor shall provide all required labor, tools, parts, and materials to complete scheduled maintenance tasks as per manufacturer recommendation which if applicable shall include, but not be limited to:
(A) Check and log boiler operating temperature and pressure.
(B) Open both fireside and waterside of boiler.
(C) Clean fireside of normal soot deposits.
(D) Flush the normal loose scale from the waterside.
(E) Check tube sheets and tubes for evidence of water leakage.
(F) Remove water column heads and inspect water column piping.
(G) Check condition of refractory in doors for leakage and burner throat.
(H) Visibly check both fireside and waterside for cracking, pitting, corrosion, erosion and scale.
(I) Install new gaskets and seal fireside and waterside.
(J) Remove domestic water boiler headers and soft brush tubes.
(K) Remove heating boiler headers and soft brush tubes.
(L) Check pipe unions for leaks and correct if possible.
(M) Inspect pipe insulation.
(N) Check operating gas pressures of all boilers.
(O) Perform combustion analysis on the domestic and hot water heating boilers.
(P) Check temperature rise through each boiler and record.
(Q) Check operating and safety controls of each boiler, and adjust, as necessary.
(R) Check igniters and replace them as required.
(S) Check water flows of hot water pumps to ensure proper operation to each boiler.
(T) Check combustion efficiency on one fuel and adjust air-fuel controls for optimum efficiency.
(U) Check safety relief valves and low water cut-off devices for each boiler.
(V) Check electrical connections on all boilers and tighten as necessary.
(W) Remove, inspect, and clean electronic water level probes where applicable.
(X) Contractor shall record and report abnormal conditions and measurements taken to TFC Contract Administrator immediately.
(Y) The maintenance report shall be given to the TFC Contract Administrator within five (5) business days.
(Z) Contractor shall report completed buildings to the TFC Contract Administrator on a Contractor supplied form approved by the TFC Contract Administrator via e-mail quarterly and when as needed services are completed.
(v) Minimal preventative maintenance requirements for air handler system. Contractor shall provide all required labor, tools, parts, and materials to complete scheduled maintenance tasks as per manufacturer recommendation which if applicable shall include, but not be limited to:
(A) Air Handler System maintenance is inclusive of the following but not limited to:
(1) Provide 4 inspections per year;
(2) Fan belt replacement every 2 years; to prevent belt failure;
(3) Provide, deliver, install air filters 4 times per year and dispose of used ones;
(4) Grease the bearings once a year;
(5) VFD maintenance 4 times per year;
(6) Replacement of compressor oil filters annually.
(7) Recalibrate refrigerant monitor in the compressor room annually if applicable.
(B) Contractor shall record and report abnormal conditions and measurements taken to TFC Contract Administrator immediately.
(C) The maintenance report shall be given to the TFC Contract Administrator within five (5) business days.
(D) Contractor shall report completed buildings to the TFC Contract Administrator on a Contractor supplied form approved by the TFC Contract Administrator via e-mail quarterly and when as needed services are completed.
(c) AS NEEDED SERVICES.
(i) TFC may, from time to time, request Contractor to complete HVAC Services including Cooling Towers and Chillers on an as needed basis. Upon request by TFC for services, Contractor shall prepare and submit to TFC a quote for such services requested formatted to match pricing as awarded and identified on Attachment E – Compensation and Fees (hereinafter referred to as Attachment E). Attachment E is attached hereto and incorporated herein for all purposes. Contractor shall proceed with the work only after the quote is approved by TFC through the issuance of a “Purchase Order.” (hereinafter referred to as a “Purchase Order”). Each Purchase Order shall be subject to the terms and conditions set forth in this Contract, and shall include a schedule and term, and compensation which shall be negotiated prior to issuance of such Purchase Order. A Purchase Order may include more than one job/project. TFC will not pay Contractor for any work completed by Contractor without an approved Purchase Order provided, however, that in the event of an emergency, Contractor may begin service upon a verbal direction from the TFC Contract Administrator, as per Section 1.01. (b)(ii)(C).
(ii) Contractor shall record and report abnormal conditions and measurements taken to TFC Contract Administrator immediately.
(iii) A completed maintenance report shall be given to the TFC Contract Administrator within five (5) business days.
(iv) The following shall be included on submitted quote:
(A) a breakdown of material and labor (flat fees are not acceptable);
(B) the hourly rate with an estimated number of hours;
(C) a statement as to whether the work to be performed will be scheduled for regular or overtime hours or a combination of both;
(D) any markups over cost; and
(E) labor type/description.
(v) Quotes shall not include taxes. TFC is tax-exempt. Quotes shall be formatted to match pricing as awarded and identified on Attachment E. The TFC Contract Administrator purchasing products and services under this Contract may negotiate more advantageous pricing or participate in special promotional offers. In such event, a copy of such offerings shall be documented on project quotes.
(vi) Contractor shall match service ticket with approved Purchase Orders.
(vii) Contractor understands and agrees that no guaranteed minimum number of
Purchase Orders or amount of work will arise from this Contract.
(d) RESPONSE TIME
Contractor’s response to an initial request shall include the following types:
(i) Non-emergency.
(A) Contractor’s initial response shall be within one (1) business day, unless otherwise agreed to by the TFC Contract Administrator. Contractor shall have a technician on site in the time frame agreed to by the TFC Contract Administrator at the time of the Contractor’s initial response.
(B) Contractor, runs diagnostics and/or troubleshoots equipment, will provide TFC Contact Administrator with a quote for services as per Attachment E.
(C) Upon acceptance of quote, a Purchase Order will be issued, and Contractor shall perform services as per the Contract.
(ii) Emergency.
(A) Contractor’s initial response shall be within fifteen (15) minutes, unless otherwise agreed to by the TFC Contract Administrator. Contractor shall have a technician on site within two (2) hours, unless otherwise agreed to by the TFC Contract Administrator at the time of the Contractor’s initial response.
(B) Contractor, runs diagnostics and/or troubleshoots equipment, will provide TFC Contact Administrator with a quote for services as per Attachment E.
(C) In the event of an emergency, Contractor may begin service upon verbal direction from the TFC Contract Administrator. Written confirmation in the form of an e-mail with a Purchase Order Number will be sent within one (1) business day of the initial call followed by a fully approved Purchase Order.
(e) WORKING HOURS.
Contractor shall be available to provide service between the hours of 7:00 a.m. and 6:00 p.m., Monday through Friday, excluding national holidays (hereafter referred to as “Business Hours”). It is understood by TFC and Contractor that there may be instances in which work must be completed outside of Business Hours. Such work shall be pre-authorized by TFC.
(f) MATERIALS, PROGRAMMING, AND SOFTWARE
(i) Contractor must make all repairs and supply all parts as set forth in Attachment E, including wiring or cabling. All parts used in repairs must be new or if refurbished, shall be listed as such on quotes. If refurbished, parts must carry the same warranty as new parts. All parts must be equal to or exceed existing parts. Refurbished equipment and components will be accepted by TFC on a case-by-case basis.
(ii) Contractor shall cover programming and configuration of the system including any networking. Contractor shall cover annual software or firmware upgrades, as needed, based on system changes.
(g) REQUIRED PERSONNEL.
Supervisor oversight and coordination will be required during projects that require sub-contracting or multiple trades until repair is complete. Reference Articles 4 and 7 for additional personnel requirements.
(h) TRAVEL TIME AND SERVICE TICKET.
Travel time to and from a job site, including work covered under warranty, is not reimbursable under this Contract. Contractors shall check in and out with the TFC point of contact listed on the issued Purchase Order for each service or project to provide commencement and completion times for the “Service Ticket”, or summary list, for the services performed under the Purchase Order. Contractors shall provide the following information on the Service Ticket:
(i) building name;
(ii) date and time of the request for services;
(iii) date and time of the technician’s arrival on site;
(iv) description of the malfunction;
(v) description of the corrective action taken, including itemized labor hours and parts;
(vi) date and time of completion of the repair; and,
(vii) the signature of the TFC and Contractor representatives
(i) FREIGHT AND SHIPPING CHARGES Freight and shipping charges are not an allowable expense under this contract. Expedited shipping charges, with prior approval from the TFC Contract Administrator, may be allowed.
(j) LICENSING AND CODES.
(i) Contractor shall ensure service and maintenance technicians are properly trained, certified and licensed, as applicable to the systems listed on Attachment F, to perform the assigned work. TFC reserves the right to verify that the certification or license is current for the individual working on each piece of equipment or system under the Contract. Contractor is responsible for providing training, certification, or license renewals for their employees.
(ii) Contractor shall be responsible for code compliance assessment and for ensuring that all services performed under this Contract will be accomplished in accordance with the most current Boiler Safety Law, Texas Health and Safety Code, Chapter 755, TDLR Enabling Law, Texas Occupations Code, Chapter 51, Boiler Safety Admin Rule, Texas Administrative Code, Chapter 55, Boiler Safety Admin Rules, Texas Admin Code, Chapter 65, TDLR Procedural Rules, Texas Admin Code, Chapter 60, TDLR Admin Rules, Texas Admin Code, Chapter 55, the current edition of the National Board Inspection Code (and addenda) and maintain an R Stamp Certificate of Authorization and all applicable federal, state, and local code requirements. Prior to commencement of work, the Contractor shall secure all required permits, licenses, or other required requisites as determined by federal, state, or local regulations, code, laws, or ordinances.
(k) Service Completion Time.
Contractor must perform work within timeframe agreed upon by Contractor and TFC prior to beginning work. If Contractor cannot perform work within timeframe stated, Contractor may be subject to liquidated damages.
(l) DRAWINGS.
If required and as applicable, as-built drawings shall be furnished to the TFC Contract Administrator within five (5) business days of completion of each project. On a lengthy project as-built drawings will be furnished at logical intervals as the project progresses.
AutoCAD DWG format is preferred, but hand-drawn red-line is the minimum standard for drawings; provided however, that standards may be required to meet those set forth in TFC’s Architectural/Engineering Guidelines, located on the TFC website at:
https://www.tfc.texas.gov/divisions/facilities/prog/construct/formsindex/01%20- %202018%20A-E%20GUIDELINES.pdf. Final payment will be withheld pending delivery of complete and accurate as-built drawings.
(m) MODIFICATIONS TO SPECIFICATIONS OR DRAWINGS.
Modifications to specifications or drawings must receive written approval from the TFC Contract Administrator prior to performance of services. Contractor must notify the TFC Contract Administrator of any discrepancies in the drawings. Contractor shall provide a https://www.tfc.texas.gov/divisions/facilities/prog/construct/formsindex/01%20-%202018%20A-E%20GUIDELINES.pdf https://www.tfc.texas.gov/divisions/facilities/prog/construct/formsindex/01%20-%202018%20A-E%20GUIDELINES.pdf marked-up set of specifications and drawings, marked in red, with any in-place installations differing from those originally shown. Any material or installation method proposed by Contractor not included in these specifications shall be specified in the proposal, including manufacturer’s product data.
(n) BUSINESS OFFICE.
Contractor shall have a local physical office for awarded locations. Contractor shall advise TFC of all current phone numbers. The use of a recording or answering device, or an answering service, is not acceptable except for after regular business hours as set out in Section 1.1.(e) Contractor shall provide the TFC Contract Administrator an emergency twenty-four (24) hour response number to allow immediate contact of the authorized Job Manager. TFC may provide office and storage space, at no expense to Contractor, subject to availability and as reasonably necessary, for the performance of Contractor’s duties under this Contract. If Contractor is provided office space in a state-owned facility, it may only be accessed by Contractor personnel that have been screened and provided a badge by TFC.
1.02. TFC CONTRACT ADMINISTRATOR.
(a) TFC shall designate a TFC Contract Administrator for this Contract who will serve as the point of contact between TFC and Contractor. For all purposes, the TFC Contract Administrator includes the TFC Contract Administrator’s designated representative (hereinafter collectively referred to as “TFC Contract Administrator”). The instructions of the TFC Contract Administrator are to be strictly and promptly followed by Contractor at all times. The TFC Contract Administrator is to have free access to Contractor’s supplies, equipment, and work product at all times for inspection and audit. Contractor is to afford the TFC Contract Administrator all necessary assistance during those inspections and/or audits. The TFC Contract Administrator will decide any and all questions that may arise as to the quality and acceptability of work performed, and as to the manner of performance and rate of progress of the work. The TFC Contract Administrator will determine the amount of work performed and materials furnished which are to be paid under this Contract. Failure of the TFC Contract Administrator during the progress of the Contract to:
(i) discover or reject unacceptable work;
(ii) discover work not in accordance with the Contract; or
(iii) fail to exercise any remedies in connection therewith, shall not be deemed an acceptance thereof or a waiver of TFC’s right to full performance of the Contract.
(b) Contractor agrees to conduct all of its services under this Contract by and through appropriate communications with the TFC Contract Administrator. No work, installation or other services shall be undertaken by Contractor except with the prior written direction of the TFC Contract Administrator. Contractor understands and agrees that work, installation, or any other service performed without the prior written direction of TFC Contract Administrator is work outside the scope of this Contract and shall be performed exclusively at Contractor’s risk and own expense.
1.03. EXAMINATION OF PREMISES.
Contractor shall be held to have examined all properties at which the work will take place and to be familiar with the conditions under which the work will be accomplished. Contractor shall inspect existing conditions prior to commencing work, including elements subject to damage or movement during the performance of services under this Contract.
1.04. DAMAGE TO EXISTING STRUCTURES.
(a) Contractor shall be responsible for all damage to existing building or previously completed work resulting from the acts or omissions of its staff or subcontractors. Contractor shall protect the work, adjacent property and the public from damage and debris. It is the intent of this Contract that any item affected by the work shall be restored to a state equal to or better than its original condition.
(b) In the event of damage as a result of Contractor’s or its subcontractor’s operations, Contractor shall notify the TFC Contract Administrator as described below:
(i) if the damage poses a threat to health or safety or if further damage will result if immediate action is not taken, Contractor will report the damage to the TFC Contract Administrator as soon as Contractor is aware of the damage. If the Contractor is not able to reach the TFC Contract Administrator immediately, Contractor may call TFC’s emergency hotline at (512) 463-3600. Contractor shall take any available steps to mitigate further damage.; or
(ii) all other damage must be reported to the TFC Contract Administrator within three
(3) calendar days of Contractor becoming aware of the damage.
(c) Contractor shall repair or restore all damage resulting from the acts or omissions of its staff or subcontractors to the satisfactory approval of the TFC Contract Administrator, such approval not to be unreasonably withheld. Contractor shall present its intended plan of action for the repair or restoration to the TFC Contract Administrator. Contractor shall engage any additional outside services which may be necessary to facilitate repairs until services and facilities are restored. Contractor shall be responsible for all costs to repair and restore disrupted facilities and services, including but not limited to direct and consequential costs resulting from the aforesaid damage. If the TFC Contract Administrator is not satisfied with Contractor’s plan of action, the TFC Contract Administrator may elect to perform such repairs and deduct the cost of such repairs, replacements, and outside services from amounts due to Contractor.
1.05. UTILITIES.
Upon the approval of the TFC Contract Administrator, Contractor shall have the right to utilize air, water, gas, steam, electricity, and similar items of expense from existing outlets at TFC property.
1.06. STORAGE/WASTE REMOVAL.
Contractor will be allowed to temporarily store materials and equipment in performance of this Contract only if space is available in each building. Storage space will be arranged through the TFC Contract Administrator. Contractor shall keep premises clean on a continual basis and no trash or debris will be permitted to accumulate in work areas. Use of a dust barrier may be required and will be communicated to Contractor by the TFC Contract Administrator on a per project basis.
Contractor will remove and dispose of all trash and oil from floors when job is complete for the day. Contractor shall be responsible for removal and disposal of all debris, waste materials, waste packaging material, and excess materials purchased by Contractor associated with this contract which may include, if applicable, the rental of a waste receptacle. If needed, site placement of the waste receptacle shall be approved by the TFC Contract Administrator. TFC is not responsible for the security of stored materials and equipment. TFC encourages the use of gang boxes for tool storage and securing the site when unoccupied by Contractor. Contractor shall maintain at all times clear access to fire lanes and emergency and utility control facilities such as fire hydrants, fire alarm boxes, utility valves, manholes, junction boxes, fire extinguishers, and emergency exits.
1.07. SECURITY AND IDENTIFICATION.
Contractor shall abide by all procedures and rules as conveyed by the TFC Contract Administrator regarding security requirements of the building where work is to be performed. All Contractor’s and subcontractor’s personnel must wear either uniforms or appropriate clothing identifying them as employees of the Contractor or subcontractors at all times when working in TFC facilities.
Contractor personnel must have a TFC supplied identification badge visible at all times when working in TFC facilities.
1.08. CONTRACTOR ACCESS.
Access routes, entrance gates or doors, parking and storage areas, and other necessary Contactor access, along with any imposed time limitations shall be designated by TFC Contract Administrator. Contractor shall conduct operations in strict observation of the access routes and other areas established. Under no circumstances shall any of Contractor’s employee, vehicles, or equipment enter or move upon any area not authorized by TFC Contract Administrator for access by Contractor.
1.09. CONTRACTOR PARKING.
Parking, for Contractor vehicles when performing work, must be coordinated through the TFC Contract Administrator. The TFC Contract Administrator will arrange parking according to parking availability at the job site. Parking in close proximity to the project may not be possible.
Contractors may be required to utilize remote parking and carpooling when space is not available.
TFC will not reimburse Contractor for any cost incurred for parking fees or fines.
1.10. SMOKING.
All facilities where work is to be performed are nonsmoking buildings. Contractor’s employees are prohibited from smoking in all areas except in areas designated for smoking.
1.11. DISPOSAL OF SALVAGEABLE ITEMS.
(a) The TFC Contract Administrator shall mark and/or otherwise inform Contractor of any material that will be salvaged by TFC. Disposal may include depositing in a central location for salvage by TFC or delivery to TFC’s warehouse, located at 6506 Bolm Road, Austin, Texas, or other locations as determined by the TFC Contract Administrator.
(b) TFC may elect to offer any salvageable material to Contractor, as a trade-in on new property of the same general type, in accordance with Texas Government Code Section
2175.903. Contractor is not obligated to accept the salvageable material.
1.12. CHEMICALS.
Contractors and subcontractors shall provide TFC Risk Management and the TFC Contract Administrator a legible Material Safety Data Sheet (hereinafter referred to as “MSDS”) for all chemicals to be used or brought onto TFC controlled property for each project. MSDSs shall be submitted prior to the start of work.
1.13. CALLBACK.
For the purpose of evaluating performance under this Contract, a “Callback” is defined as a service call that requires Contractor to return to complete or repair a previously performed service due to Contractor’s inability, negligence, or lack of knowledge to perform services. Contractor is to perform Callback Service at no additional cost to TFC, regardless of whether the work is performed during normal working hours or overtime hours. Contractor shall maintain a complete, orderly written report of all Callbacks. These “Callback Reports” shall indicate the time, date, name of personnel, problems reported, and corrective measures taken to complete or repair all problems.
A consolidated Callback Report is to be furnished to TFC as soon as the service is provided.
1.14. CALLBACK RESPONSE.
Failure by Contractor to successfully complete a service will result in a Callback. The TFC Contract Administrator will contact the Contractor and notify them of the Callback. Contractor will respond to the Callback no later than the next business day with a technician possessing the technical expertise, knowledge, and any required material to correct the problem. Contractor shall check in and out with the TFC Contract Administrator to ensure that the TFC Contract Administrator logs the commencement and completion times for the “Callback Service Ticket,” or summary list, for the services performed to correct the problem. Contractor shall provide the following information on the Callback Service Ticket:
(a) building name;
(b) asset name and number;
(c) TFC work order number;
(d) name of Contractor personnel performing the work;
(e) trade category of person performing the work;
(f) number of hours worked;
(g) itemized list of parts/material used/replaced; and
(h) narrative description of what the technician found that was causing the problem and what was done to correct it.
2. TERM AND TERMINATION
2.01. CONTRACT AWARD.
(a) This Contract shall be effective as of last signature below, and shall expire on August 31, 2026, unless extended by the parties by amendment to this Contract or terminated earlier, as provided in Section 2.02. This Contract may be renewed for two (2) additional two (2) year periods. TFC may request an extension not to exceed three (3) months for purposes of re-solicitation. Any extension or renewal of this Contract shall be implemented by an amendment to the Contract signed by both parties and shall be subject to the provisions, terms and conditions of this Contract to include any TFC approved changes.
(b) Notwithstanding the termination or expiration of this Contract, the provisions of this Contract regarding confidentiality, indemnification, transition, records, right to audit and independent audit, property rights, dispute resolution, invoice and fees verification, and default shall survive the termination or expiration dates of this Contract.
2.02. TERMINATION.
(a) Termination with Default. TFC may terminate this Contract immediately for default by providing written notice to Contractor of such termination if the Contractor fails to execute the work properly, performs work in an unsatisfactory manner, or fails to perform any provision of the Contract. In the event of abandonment or default, Contractor will be responsible for paying damages to TFC, including but not limited to, the cost to re-solicit this Contract and any consequential damages to the State of Texas or TFC resulting from Contractor’s non-performance. The defaulting Contractor will not be considered in the re-solicitation and may not be considered in future solicitations for the same type of work, unless the scope of work is significantly changed.
(b) Termination without Default. TFC may, at its sole option and discretion, terminate this Contract at any time, for any reason whatsoever, in whole or in part, by giving written notice (the “Notice of Termination”) to Contractor at least thirty (30) days prior to the effective date of termination or reduction in the scope of work. In the event of termination by TFC under this subsection, Contractor shall be governed by the terms and conditions, and shall perform the acts outlined in the following Section 2.02(c) below.
(c) Implementation of Termination. Contractor shall terminate all work under the Contract to the extent and on the date specified in the Notice of Termination and until such date shall, to the extent stated in the Notice of Termination, do such work as may be necessary and be compensated only for such work as may be necessary as determined by TFC Contract Administrator to preserve the work in progress and to protect materials, properties, and equipment. In the event of termination by TFC, TFC shall pay Contractor for all work satisfactorily performed up to the effective date of termination or reduction in the scope of work in accordance with the prices included in the scope of work.
(d) Termination by Contractor. Contractor may terminate the Contract upon providing sixty
(60) days’ written notice to TFC. In the event of termination by Contractor, Contractor shall be governed by the terms and conditions of this Contract, and shall perform the acts outlined in Section 2.02(c) above. Contractor will be held responsible for additional cost incurred from the termination of this Contract.
2.03. UNSATISFACTORY PERFORMANCE.
In its sole and absolute discretion, TFC may determine that a Contractor's performance is unsatisfactory. An unsatisfactory performance determination may be based upon but is not limited to the following:
(a) more than one (1) Callback per project to correct a problem within thirty (30) calendar days or two (2) Callbacks in a calendar year;
(b) more than one (1) instance within one (1) calendar year of Contractor personnel assigned to a project not having the skill, knowledge, qualifications, and/or license to perform the service;
(c) more than two (2) instances, within one (1) calendar year of exceeding the response time to the Initial Request as defined in Section 1.01(d); more than two (2) instances, within one
(1) calendar year, of not arriving at job site at agreed upon schedule;
(d) failure to provide proper or adequate supervision;
(e) more than one (1) complaint of inappropriate language or behavior within one (1) month;
(f) failure to complete a project within the agreed upon schedule; and/or
(g) more than three (3) instances, within one (1) calendar year of invoices not being submitted accurately within the required time after project completion.
2.04. CORRECTIVE ACTION PLAN.
(a) If TFC identifies one or more instances of Contractor’s unsatisfactory performance based on the actions or inactions set forth in Section 2.03 above or otherwise based on Contractor’s obligations under this Contract, the TFC Contract Administrator may request a corrective action plan (hereinafter referred to as “Corrective Action Plan”) from Contractor by notifying Contractor in writing of the issue(s) which constitute unsatisfactory performance, and direct Contractor to provide a written Corrective Action Plan. Contractor shall deliver a Corrective Action Plan within ten (10) business days of TFC Contract Administrator’s notification, and such plan shall be subject to written approval by the TFC Contract Administrator. The Corrective Action Plan shall address how Contractor will correct the instances of unsatisfactory performance identified by TFC, and provide that Contractor shall, unless otherwise approved in advance by the TFC Contract Administrator, complete all actions set forth in the Corrective Action Plan no later than thirty (30) calendar days following Contractor Administrator’s approval of the Plan. Failure to correct specific instances of unsatisfactory performance included in the notice requesting the Corrective Action Plan, within the time as set forth in this paragraph, shall entitle TFC to avail itself of one or more of the following remedies at TFC’s sole and absolute discretion:
(i) Suspension of contract for a term of three (3) months; or
(ii) TFC’s termination of this Contract.
(b) In addition, if Contractor is required to deliver and perform under more than one (1) Corrective Action Plan within any period of twelve (12) consecutive calendar months during the term of this Contract, and regardless of whether or not Contractor successfully completes such Corrective Action Plans, TFC may consider such conduct to amount to Contractor’s continuing material nonperformance of services under this Contract. In such an event, TFC may invoke one or more of the following remedies at TFC’s sole and absolute discretion:
(i) Suspension of the Contract for a term of six (6) calendar months; and
(ii) TFC’s imposition of liquidated damages on Contractor in an amount equal to ten percent (10%) of the amount of compensation otherwise payable by TFC to Contractor under this Contract for work performed during the three (3) calendar month period preceding the date the most recently submitted Corrective Action Plan was approved by the TFC Contract Administrator; or
(iii) TFC’s termination of this Contract.
2.05. NO LIABILITY UPON TERMINATION.
If this Contract is terminated in accordance with the terms of this Contract or as otherwise provided by law, TFC and the State of Texas shall not be liable to Contractor for any damages, claims, losses, or any other amounts arising from or related to any such termination absent an award of damages pursuant to Texas Government Code, Chapter 2260.
2.06. CHANGE IN FEDERAL OR STATE REQUIREMENTS.
If federal or state laws, rules, regulations or requirements applicable to this Contract are amended, performance under this Contract will be subject to the laws, rules, regulations or requirements applicable at the time of performance under the Contract. If federal or state laws or regulations or other federal or state requirements are amended or judicially interpreted so that either TFC or Contractor cannot reasonably fulfill the Contract and if the parties cannot agree to an amendment that would enable substantial continuation of the contract, the parties shall be discharged from any further obligations under the Contract.
2.07. RIGHTS UPON TERMINATION OR EXPIRATION OF CONTRACT.
In the event that the Contract is terminated for any reason, or upon its expiration, TFC shall retain ownership of all associated work products and documentation obtained from the Contractor under this Contract.
3. CONSIDERATION.
3.01. CONTRACT LIMIT AND FEES AND EXPENSES.
(a) The total amount of this Contract shall not exceed the sum of $XXXX.xx This amount includes the Fiscal Year 2025-26 Base Services fee, as defined in Section 1.01 (b), for $XXXX.xx and $XXXX.xx to cover any As Needed Services, as defined in Section 1.01 (c). Pricing fees shall be invoiced in accordance with Attachment E. Any changes to the not to exceed amount of this Contract or pricing fees set forth in Attachment E shall be submitted to TFC for review and shall be approved by amendment to this Contract.
(b) If, at any time during the term of this Contract, Contractor reduces the comparable price of any article or service covered by the Contract to customers other than TFC, the prices charged to TFC for such articles or services shall also be reduced proportionately. Such reduction shall be effective at the same time and in the same manner as the reduction in price to customers other than TFC. In addition to invoicing at the reduced prices, Contractor shall furnish promptly to TFC complete information regarding the reduction.
3.02. PAYMENTS TO CONTRACTOR.
(a) Payments to Contractor will be made within thirty (30) days from receipt of a correct invoice or billing statement in accordance with the Texas Government Code, Chapter 2251, known as the Texas Prompt Payment Act. An invoice is considered received on the date it is date stamped by TFC Accounts Payable. Contractor will be paid for completion of work accepted and approved by TFC Contract Administrator. For large projects, partial payment may be allowed once per month on completed work with acceptance and approval of the TFC Contract Administrator.
(b) Contractor will be paid for work performed to the end of the preceding month, provided that the work required to be performed under the Contract shall have been fully and satisfactorily completed, accepted, and approved by TFC Contract Administrator.
Inspections shall not be considered to be complete and payable unless the completed, signed inspection form along with copies of service tickets have been submitted to and received by TFC.
(c) Contractor shall invoice TFC for work performed by vendor identification number, building, and purchase order number. Invoices must be submitted in compliance with 34 Texas Administrative Code, Part 1, Section 20.487(a) and must include the purchase order number, the number of employees that worked on the job, the number of hours, and a copy of the project service ticket. Additionally, invoices for any materials purchased for each project must be provided. Address for submission is: Texas Facilities Commission, Accounts Payable, P.O. Box 13047, Austin, Texas 78711-3047 or accountspayable@tfc.texas.gov.
(d) Contractor shall list any costs for required payment or performance bonds as a separate line item on the invoice accompanied by receipt from surety company.
(e) Contractor shall invoice TFC within two (2) weeks of service/project completion for As needed services. Contractor material invoices shall be attached to final invoice.
3.03. ADDITIONAL SERVICES AND ADJUSTMENTS.
(a) Additional Services are those services not included in Article 1 of this Contract which may be requested by TFC at any time for the duration of this Contract. Upon request by TFC for Additional Services, Contractor shall prepare and submit to TFC a quote for such services requested. Additional Services will be charged at the rates set forth in Attachment E.
(b) Additional Services may also include the addition of units and/or facilities for which no unit price was included in Attachment E and may be added to this Contract provided TFC and Contractor agree to a unit price. Prices for any additional units shall be calculated by comparing pricing to similar services included in Attachment E. The addition of units and/or facilities shall be documented by amendment to this Contract.
(c) At any time, TFC may adjust the Contract, in whole or in part, with thirty (30) days’ notice to Contractor. An adjustment will be made when a service is no longer required and shall be documented by amendment to this Contract.
4. CONTRACTOR PERSONNEL.
4.01. REQUIRED QUALIFICATIONS.
mailto:accountspayable@tfc.texas.gov
At all times during the term of the Contract, Contractor shall have available, under direct employment and supervision, the necessary qualified and licensed personnel, organization and facility to properly fulfill all the terms and conditions of this Contract.
4.02. GENERAL AND CRIMINAL BACKGROUND CHECKS.
(a) Contractor represents and warrants that Contractor and Contractor’s employees have not been convicted of a felony criminal offense, or that, if such a conviction has occurred, Contractor has fully advised TFC as to the facts and circumstances surrounding the conviction.
(b) Contractor’s employees and subcontractors that will complete any work on site at a state-owned property may be subject to a criminal background check. Any expense associated with such criminal background check shall be borne by Contractor. If requested by TFC, a complete criminal background check shall be completed before any employee performs services at the site, and may be requested at any time thereafter. Criminal background checks must be accomplished by the Texas Department of Public Safety (“DPS”), which includes fingerprint processing by an independent third-party company selected by DPS.
Upon receipt of the fingerprints of Contractor’s employees and/or subcontractors, DPS or TFC, will adjudicate the results of the criminal background searches in accordance with the criteria set forth in Attachment J, Criminal Background Checks and Application Guidelines, attached hereto and incorporated herein for all purposes.
4.03. REMOVAL OF PERSONNEL.
(a) TFC may request that the Contractor replace unsatisfactory personnel, which request shall not be unreasonably denied.
(b) TFC may request that Contractor remove any employee for cause, including but not limited to, poor or unacceptable performance of work; theft, abusive language or behavior, or improper attire. Repeat occurrences of this type may be cause for termination of the Contract.
4.04. CONTRACTOR SAFETY.
(a) All Contractors and subcontractors conducting work for TFC shall abide by all
Occupational Safety and Health Administration (hereinafter referred to as “OSHA”) rules and regulations provided by the Department of Labor, OSHA, and Code of Federal Regulations, Chapter 29. Employees of Contractor and subcontractors shall be trained in accordance with Chapter 29, Occupational Safety and Health Regulations.
(b) Contractor and subcontractors shall inform the TFC Contract Administrator of their Hazardous Electrical Energy Control, Lockout/Tagout Procedure. Contractor’s procedure must meet or exceed TFC’s procedure as determined by the TFC Contract Administrator.
(c) Work shall not be done on energized electrical circuits, components or equipment. When de-energizing is impractical due to possible harm to personnel, equipment, or facility damage, negative on-site or off-site environmental impact, or business interruption Contractor must follow OSHA requirements as detailed in OSHA Regulations 1910.331 – 1910.399.
4.05. CONTRACTOR COOPERATION.
Contractor agrees to cooperate and coordinate its work with that of other contractors retained by TFC. Upon discovery of an apparent conflict in the sequencing of work with another contractor, Contractor shall report the concern to TFC Contract Administrator who will resolve the conflict.
4.06. E-VERIFY.
(a) By entering into this Contract, Contractor certifies and ensures that it utilizes and will continue to utilize, for the term of this Contract, the U.S. Department of Homeland Security’s E-Verify system, in accordance with the U.S. Department of Homeland Security’s rules, to determine the eligibility of:
(i) all persons employed to perform duties within the State of Texas, during the term of the Contract; and
(ii) all persons (including subcontractors) assigned by the Contractor to perform work pursuant to the Contract, within the United States of America.
(b) Contractor shall provide, upon request of TFC and if available, an electronic or hardcopy screenshot of the confirmation or tentative non-confirmation screen containing the E- Verify case verification number for attachment to the Form I-9 for the three (3) most recent hires that match the criteria above, by the Contractor, and Contractor’s subcontractors, as proof that this provision is being followed. If this certification is falsely made, the Contract may be immediately terminated, at the discretion of TFC, and at no fault to TFC, with no prior notification. Contractor shall also be responsible for the costs of any re-solicitation that TFC must undertake to replace the terminated Contract.
(c) For persons not eligible for E-Verify screening, Contractor (including subcontractors) shall provide, upon request by TFC, another form of documentation of proof of eligibility to work in the United States of America.
5. STATE FUNDING.
5.01. STATE FUNDING.
(a) This Contract shall not be construed as creating any debt on behalf of the State of Texas and/or TFC in violation of Tex. Const. art. III, § 49. In compliance with Tex. Const. art.
VIII, § 6, it is understood that all obligations of TFC hereunder are subject to the availability of state funds. If such funds are not appropriated or become unavailable, this Contract may be terminated. In that event, the parties shall be discharged from further obligations, subject to the equitable settlement of their respective interests accrued up to the date of termination.
(b) Furthermore, any damages due under this Contract should not exceed the amount of funds appropriated for payment under this Contract, but not yet paid to Contractor, for the fiscal year budget in existence at the time of the breach; provided, however, the foregoing shall not be construed as a waiver of sovereign immunity.
6. RECORDS, AUDIT, PROPRIETARY INFORMATION, AND PUBLIC
DISCLOSURE
6.01. SUPPORTING DOCUMENTS, RETENTION; RIGHTY TO AUDIT; INDEPENDENT AUDITS.
(a) Contractor shall maintain and retain supporting fiscal and any other documents relevant to showing that any payments under this Contract were expended in accordance with the laws and regulations of the State of Texas, including but not limited to, requirements of the Comptroller of the State of Texas and the State Auditor. Contractor shall maintain all such documents and other records relating to this Contract and the State’s property for a period of seven (7) years after the date of submission of the final invoices or until a resolution of all billing questions, whichever is later. Contractor shall make available at reasonable times and upon reasonable notice, and for reasonable periods, all documents and other information related to the Contract. Contractor and any subcontractors shall provide the State Auditor with any information that the State Auditor deems relevant to any investigation or audit. Contractor must retain all work and other supporting documents pertaining to this Contract, for purposes of inspecting, monitoring, auditing, or evaluating by TFC and any authorized agency of the State of Texas, including an investigation or audit by the State Auditor.
(b) Contractor shall cooperate with any authorized agents of the State of Texas and shall provide them with prompt access to all of such State’s work as requested. The acceptance of funds by Contractor or any other entity or person directly under this Contract, or indirectly through a subcontract under this Contract, shall constitute acceptance of the authority of the State Auditor to conduct an audit or investigation in connection with those funds. Contractor acknowledges and understands that the acceptance of funds under this Contract shall constitute consent to an audit by the State Auditor, Comptroller or other agency of the State of Texas. Contractor shall ensure that this paragraph concerning the State’s authority to audit funds received indirectly by subcontractors through Contractor and the requirement to cooperate is included in any subcontract it awards. Furthermore, under the direction of the legislative audit committee, an entity that is the subject of an audit or investigation by the State Auditor must provide the State Auditor with access to any information the State Auditor considers relevant to the investigation or audit.
6.02. PROTECTION OF CONFIDENTIAL INFORMATION.
Contractor hereby acknowledges, understands and agrees:
(a) that in the course of TFC’s performance under the Contract, certain Confidential Information (as defined below) will be disclosed to Contractor; and
(b) that whether developed by TFC or others employed by or associated with TFC, all Confidential Information is, and shall remain, the exclusive and confidential property of TFC, and shall be at all times regarded, treated and protected as such by Contractor in accordance with this Contract. Failure to mark any information “Confidential” shall not affect the confidential nature of such information.
6.03. DEFINITION OF CONFIDENTIAL INFORMATION.
“Confidential Information” shall mean any and all information, whether or not originated by TFC, revealed by or through TFC in connection with the Contract, which the Contractor either knows or reasonably should know to be proprietary, sensitive or confidential in nature, including without limitation:
(a) information either expressly or implicitly identified as originating with or belonging to TFC or marked or disclosed as confidential;
(b) information traditionally recognized as proprietary or as critical infrastructure information of TFC and
(c) information deemed confidential or otherwise protected from disclosure under Texas law.
Such Confidential Information includes, but is not limited to, the following types of information and other information of a similar nature (whether or not reduced to writing or designated as “Confidential”):
(i) Architectural and engineering drawings and specifications in any format including, but not limited to, CAD files, building information management and modeling (BIM) systems and technological system plans (e.g., information technology systems, security systems, fire controls and building automated systems).
(ii) Work product resulting from, or related to, work, projects, or services performed or to be performed by TFC for Contractor that are related to the business and/or operations of TFC, including but not limited to, methods, processes, procedures, analysis, techniques, and audits used in connection therewith.
(iii) Computer software of any type or form in any stage of actual or anticipated research and development, including, but not limited to, programs and program modules, routines and subroutines, processes, algorithms, design concepts, design specifications (design notes, annotations, documentation, flowcharts, coding sheets, and the like), source code, object code and load modules, programming, program patches, and system designs.
(iv) Information relating to TFC’s proprietary rights prior to any public disclosure thereof, including but not limited to, the nature of the proprietary rights, production data, technical and engineering data, test data and test results, the status and details of research and development of products and services, and information regarding acquiring, protecting, enforcing and licensing proprietary rights (including patents, copyrights, and trade secrets).
(v) Internal personnel and financial information, vendor names and other vendor information (including vendor characteristics, services, and agreements), customer lists and contacts, business plan(s), purchasing and internal cost information, internal services and operational manuals, pricing, marketing, and all other manner and methods of conducting TFC’s business.
(vi…
This is the start of the file's text. The full file is on GovTribe.