This is a Statement of Work (SOW) issued by the Texas Animal Health Commission for IFB 554-25-004 for Fence Construction Services at El Sauz Ranch, posted February 11, 2025. The project involves constructing seven fence sections totaling approximately 10,570 feet to support the HP El Sauz CFTEP Herd Plan, including the Mogotes Trap Wing (2,240 ft), Venado Pasture Wing (2,640 ft), Emily's Pasture Fence (2,530 ft), South Monterrey Fence (200 ft), Beto's Tank North Alley Fence (1,000 ft), Beto's Tank South Alley Fence (1,000 ft), and South Monterrey CRP Trap (960 ft).
The SOW specifies detailed requirements for fence construction materials and installation, including H-braces, posts, and fencing materials. The fencing requires pressure-treated wooden posts of various sizes (vertical posts 10 ft x 8 inches, horizontal posts 10 ft x 4 inches, line posts 8 ft x 5 inches), galvanized steel T-posts (6.5 ft), and StaTite 50 949-6-330' Fixed Knot Fence with an additional strand of 12.5-gauge barbed wire. The document includes specific post spacing requirements, installation depths, and detailed maps showing the layout of each fence section. The contractor must ensure all materials meet or exceed specifications and complete work with minimal environmental disruption.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Animal Health Commission IFB 554-25-004 for Fence Construction Services Posted February 11, 2025
Edited 2/4/2025
Attachment C: Statement of Work (SOW) for Construction of Fencing at El Sauz Ranch
Project Title:
HP El Sauz CFTEP Herd Plan Support Fencing
Project Overview:
This project involves the construction of several fence sections to support the HP El Sauz CFTEP Herd Plan, including various fence types and configurations across designated areas. The scope includes installation of wooden vertical and horizontal posts, T-posts, bracing, and wire fencing, following the provided specifications and design maps.
Scope of Work:
The contractor is responsible for creating fencing with the below listed specifications:
Fence Sections Needed:
1. Mogotes Trap Wing (~2,240 ft)
2. Venado Pasture Wing (~2,640 ft)
3. Emily’s Pasture Fence (~2,530 ft)
4. South Monterrey Fence (~200 ft)
5. Beto’s Tank North Alley Fence (~1,000 ft)
6. Beto’s Tank South Alley Fence (~1,000 ft)
7. South Monterrey CRP Trap (~960 ft) ** Please note that this fence has requirements that differ slightly from the other fences**
FENCING SPECIFICATIONS
1. H Braces:
• Standard Bracing:
o Install a single “H” brace at the beginning, middle (if applicable), and end of each fence section.
o For fence sections longer than 2,640 ft (half a mile), a second “H” brace should be installed approximately every 1,320 ft.
o The middle “H” brace is not required for the South Monterrey 200 ft section.
• For both Beto’s Tank Fences:
o Double “H” braces are required where the fence changes direction. Please refer to the attached map for locations.
2. Posts:
Posted February 11, 2025
Vertical Posts:
• Material: Pressure-treated wood, 10 ft in length, 8 inches in diameter.
• Installation: Posts to be buried 5 ft deep and backfilled with soil (no concrete or caliche).
• Post Treatment:
o Excess length of vertical posts should be cut to align with the T-posts.
o Vertical posts must be notched to support horizontal posts.
Horizontal Posts:
• Material: Pressure-treated wood, 10 ft in length, 4 inches in diameter.
Line Posts:
• Material: Pressure-treated wood, 8 ft long, 5 inches in diameter.
• Installation: Posts to be buried 3 ft deep and backfilled with soil (no concrete or caliche).
Excess top portion of line posts to be cut to match T-post height.
T-Posts:
• Material: Galvanized steel, 6.5 ft long.
• Installation: T-posts to be buried 2 ft deep.
Spacing:
• First 100 ft of fence and throughout the entire section:
o H Brace → 20 ft → T-post → 20 ft → T-post → 20 ft → T-post → 20 ft → T-post → 20 ft → Line Post
• H Brace to H Brace Line Post Spacing (1320 ft sections):
o H” Brace----100ft----Line Post----100ft----Line Post----100ft----Line Post---- 100ft----Line Post----100ft----Line Post----100ft----Line Post----100ft----Line Post----100ft----Line Post----100ft----Line Post----100ft----Line Post----100ft--- -Line Post----100ft----Line Post---120ft-----“H Brace”
Posted February 11, 2025
3. Fencing Materials:
Fixed Knot Fence:
• StaTite 50 949-6-330’ Fixed Knot Fence (or equivalent).
• Install one strand of 12.5-gauge Premium 4-Point Class 1 Barbed Wire approximately 2 inches above the fixed knot fence.
Posted February 11, 2025
4. For the South Monterrey CRP Trap (240 ft x 240 ft) – 960 ft:
H Braces:
• Double “H” Braces to be installed at every corner of the trap.
• Single “H” Brace to be placed at one corner to start the fence after the gate is hung.
• No middle “H” braces required.
Post Specifications:
• Vertical Posts: Same as described for other sections.
• Horizontal Posts: Same as described for other sections.
Post Spacing:
• First 120 ft:
o H” Brace→ 10ft→ T Post→ 10ft→ T Post→ 10ft→ T Post→ 10ft→ T Post→ 10ft→
T Post→ 10ft→ T Post→ 10ft→ T Post→ 10ft→ T Post→ 10ft→ T Post→ 10ft→ T Post→ 10ft→ T Post→ Line Post → (continue this spacing for the entirety of the fence).
• H Brace to H Brace Line Post Spacing:
o H Brace → 120 ft → Line Post → 120 ft → H Brace
Fencing:
• Same as described for other sections.
5. Maps
• Mogotes Trap Wing
Posted February 11, 2025
• Venado Pasture Wing
• Emily’s Pasture Fence
Posted February 11, 2025
• South Monterrey Fence
• Beto’s Tank North & South Alley
Posted February 11, 2025
• South Monterrey CRP Trap
• Big Picture Map
Posted February 11, 2025
General Requirements:
• All posts, braces, and fencing materials must meet or exceed the specifications for the materials listed in the IFB.
• The contractor must ensure that all work is performed according to the provided maps and fence designs.
• All construction activities should be completed with minimal environmental disruption, and the work site should be left clean upon project completion.
| Fence Sections Needed: |
| FENCING SPECIFICATIONS |
| 1. H Braces: |
| 2. Posts: |
| Vertical Posts: |
| Horizontal Posts: |
| Line Posts: |
| T-Posts: |
| Spacing: |
| 3. Fencing Materials: |
| Fixed Knot Fence: |
| 4. For the South Monterrey CRP Trap (240 ft x 240 ft) – 960 ft: |
| H Braces: |
| Post Specifications: |
| Post Spacing: |
| 5. Maps |
General Requirements: