This is a Schedule of Pay Item Prices document for the Texas Commission on Environmental Quality's (TCEQ) Dry Cleaner Remediation Program Site Activities (Solicitation 582-26-00001). The document outlines an extensive list of fixed price and reimbursable pay items across 28 major categories including drilling and boring, well installation, sample collection, laboratory analyses, field measurements, surveys, reports, labor, equipment, and various support services. The schedule covers comprehensive environmental remediation activities including soil sampling, groundwater monitoring, waste disposal, and site assessment work.

The pricing structure is divided between fixed price items (paid per unit such as per foot, per sample, per hour) and reimbursable items marked as TBD (to be determined). Major service categories include professional labor rates for roles like Program Manager, Project Manager, and Professional Geoscientist; equipment rates for various drilling methods and machinery; laboratory testing for soil, water, and vapor analyses; and field services such as well installation, sampling, and site surveys. The document does not specify total contract value, term length, or funding sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF PAY ITEM PRICES

Dry Cleaner Remediation Program Site Activities

SCHEDULE OF PAY ITEM PRICES

<Insert Your Company Name Here>

PAY ITEM #PAY ITEM DESCRIPTIONUNITPAY ITEM PRICETYPE
1.DRILLING AND BORING
1-1.Hand Auger BoringPER FOOTFIXED PRICE
1-2.HSA Boring for 2 inch Well Installation; 0 to 50 feet total depthPER FOOTFIXED PRICE
1-3.HSA Boring for 2 inch Well Installation; 0 to greater than 50 feet total depthPER FOOTFIXED PRICE
1-4.HSA Boring for 4 inch Well Installation; 0 to 50 feet total depthPER FOOTFIXED PRICE
1-5.HSA Boring for 4 inch Well Installation; 0 to greater than 50 feet total depthPER FOOTFIXED PRICE
1-6.HSA Boring for 6 inch Well Installation; 0 to 50 feet total depthPER FOOTFIXED PRICE
1-7.HSA Boring for 6 inch Well Installation; 0 to greater than 50 feet total depthPER FOOTFIXED PRICE
1-8.MUD Boring for 2 inch Well Installation; 0 to 50 feet total depthPER FOOTFIXED PRICE
1-9.MUD Boring for 2 inch Well Installation; 0 to greater than 50 feet total depthPER FOOTFIXED PRICE
1-10.MUD Boring for 4 inch Well Installation; 0 to 50 feet total depthPER FOOTFIXED PRICE
1-11.MUD Boring for 4 inch Well Installation; 0 to greater than 50 feet total depthPER FOOTFIXED PRICE
1-12.MUD Boring for 6 inch Well Installation; 0 to 50 feet total depthPER FOOTFIXED PRICE
1-13.MUD Boring for 6 inch Well Installation; 0 to greater than 50 feet total depthPER FOOTFIXED PRICE
1-14.AIR Boring for 2 inch Well Installation; 0 to 100 feet total depthPER FOOTFIXED PRICE
1-15.AIR Boring for 2 inch Well Installation; 0 to greater than 100 feet total depthPER FOOTFIXED PRICE
1-16.AIR Boring for 4 inch Well Installation; 0 to 100 feet total depthPER FOOTFIXED PRICE
1-17.AIR Boring for 4 inch Well Installation; 0 to greater than 100 feet total depthPER FOOTFIXED PRICE
1-18.AIR Boring for 6 inch Well Installation; 0 to 100 feet total depthPER FOOTFIXED PRICE
1-19.AIR Boring for 6 inch Well Installation; 0 to greater than 100 feet total depthPER FOOTFIXED PRICE
1-20.Boring for 8 inch Well Installation/Surface CasingPER FOOTFIXED PRICE
1-21.Boring for 10 inch Well Installation/Surface CasingPER FOOTFIXED PRICE
1-22.Direct Push BoringPER FOOTFIXED PRICE
1-23.Direct Push Boring with Cone Penetrometer Test (CPT) ProbePER FOOTFIXED PRICE
1-24.Private Utility LocateREIMBURSABLETBD
1-25.Drilling and Boring Method Not Otherwise SpecifiedREIMBURSABLETBD
2.WELL INSTALLATION
2-1.Well Installation - 2 inch diameterPER FOOTFIXED PRICE
2-2.Well Installation - 4 inch diameterPER FOOTFIXED PRICE
2-3.Surface Casing - 8 inch diameterPER FOOTFIXED PRICE
2-4.Surface Casing - 10 inch diameterPER FOOTFIXED PRICE
2-5.Adder - Well screen greater than 20 feetPER FOOTFIXED PRICE
2-6.Above-Grade Well CompletionPER WELLFIXED PRICE
2-7.Install Well VaultPER VAULTFIXED PRICE
2-8.Well Pad RepairREIMBURSABLETBD
2-9.Well Installation by Method Not SpecifiedREIMBURSABLETBD
3.RE-DEVELOP EXISTING WELL
3-1.Re-Develop Existing Well - Up to 25 feet total depthPER WELLFIXED PRICE
3-2.Adder - Re-Develop Existing Well - Each additional 25 feetPER EACH ADDITIONAL 25 FEETFIXED PRICE
4.PLUGGING AND ABANDONMENT
4-1.Plug and Abandon 2 inch or less WellPER FOOTFIXED PRICE
4-2.Plug and Abandon greater than 2 inch to 6 inch WellPER FOOTFIXED PRICE
4-3.Plug and Abandon greater than 6 inch WellPER FOOTFIXED PRICE
4-4.Remove Well VaultPER VAULTFIXED PRICE
4-5.Remove BollardPER BOLLARDFIXED PRICE
5.WELL GAUGING
5-1.Well GaugingPER WELLFIXED PRICE
6.SAMPLE COLLECTION
6-1.Soil/Sediment Sample CollectionPER SAMPLEFIXED PRICE
6-2.Low Flow Sample Collection from Monitoring Well - Up to 100 feet total depthPER WELLFIXED PRICE
6-3.Low Flow Sample Collection from Monitoring Well - Greater than 100 to 400 feet total depthPER WELLFIXED PRICE
6-4.Purge and Sample Collection from Monitoring Well - Up to 100 feet total depthPER WELLFIXED PRICE
6-5.Purge and Sample Collection from Monitoring Well - Greater than 100 to 400 feet total depthPER WELLFIXED PRICE
6-6.Domestic Water Well Sample CollectionPER WELLFIXED PRICE
6-7.Other Water Sample CollectionPER SAMPLEFIXED PRICE
6-8.Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)PER SAMPLEFIXED PRICE
6-9.Vapor/Ambient Air Sample Collection - SUMMATM Canister (or Equivalent)PER SAMPLEFIXED PRICE
6-10.Vapor/Ambient Air Sample Collection - Bottle-VacTM Sampler (or Equivalent)PER SAMPLEFIXED PRICE
6-11.NAPL Sample CollectionPER SAMPLEFIXED PRICE
6-12.Sample Collection Not Otherwise SpecifiedREIMBURSABLETBD
7.LABORATORY ANALYSES
7-1.Soil, Volatile Organics (EPA 8260/5035)PER SAMPLEFIXED PRICE
7-2.Soil, Total Petroleum Hydrocarbons (TCEQ-1005)PER SAMPLEFIXED PRICE
7-3.Soil, Total Metals (8 RCRA Metals) (EPA 6010 or 6020 and 7471)PER SAMPLEFIXED PRICE
7-4.Soil, PCE, TCE, cis-1,2-DCE, trans-1,2-DCE, and VC (EPA 8260/5035)PER SAMPLEFIXED PRICE
7-5.Soil, Total Petroleum Hydrocarbons (TCEQ-1006)PER SAMPLEFIXED PRICE
7-6.Soil Analysis, Not Otherwise SpecifiedREIMBURSABLETBD
7-7.Water, Volatile Organics (EPA 8260)PER SAMPLEFIXED PRICE
7-8.Water, Total Petroleum Hydrocarbons (TPH) (TCEQ-1005)PER SAMPLEFIXED PRICE
7-9.Water, Metals (8 RCRA metals) (EPA 6020 and 7470)PER SAMPLEFIXED PRICE
7-10.Water, TDS (Filterable Residue) (EPA 160.1)PER SAMPLEFIXED PRICE
7-11.Water, PCE, TCE, cis-1,2-DCE, trans-1,2-DCE, and VC (EPA 8260)PER SAMPLEFIXED PRICE
7-12.Water, Methane + Ethane + Ethene (RSK175)PER SAMPLEFIXED PRICE
7-13.Water, Total Organic Carbon (EPA 9060)PER SAMPLEFIXED PRICE
7-14.Water, Total Petroleum Hydrocarbons (TCEQ-1006)PER SAMPLEFIXED PRICE
7-15.Water, 4 Anions—Nitrate, Nitrite, Sulfate and Chloride (EPA 9056A)PER SAMPLEFIXED PRICE
7-16.Water Analysis, Not Otherwise SpecifiedREIMBURSABLETBD
7-17.Vapor/Ambient Air, Volatile Organic Compounds GC/MS (EPA TO-15)PER SAMPLEFIXED PRICE
7-18.Vapor/Ambient Air Analysis, Not Otherwise SpecifiedREIMBURSABLETBD
7-19.Geotechnical Soil, Dry Bulk Density (ASTM D2937)PER SAMPLEFIXED PRICE
7-20.Geotechnical Soil, Total Soil Porosity and Volumetric Water Content (API RP40)PER SAMPLEFIXED PRICE
7-21.Geotechnical Soil, Fraction Organic Carbon (Walkley Black Method)PER SAMPLEFIXED PRICE
7-22.Geotechnical Soil, Unified Soil Classification System (USCS) Determination (ASTM D2487)PER SAMPLEFIXED PRICE
7-23.Geotechnical Soil Analysis, Not Otherwise SpecifiedREIMBURSABLETBD
7-24.TCLP (EPA 1311)PER SAMPLEFIXED PRICE
7-25.Other Laboratory Analysis, Not Otherwise SpecifiedREIMBURSABLETBD
7-26.Additional Laboratory Charge for Seven (7) Day TurnaroundPER ANALYSISFIXED PRICE
7-27.Additional Laboratory Charge for Three (3) Day TurnaroundPER ANALYSISFIXED PRICE
7-28.Additional Laboratory Charge for One (1) Day TurnaroundPER ANALYSISFIXED PRICE
8.FIELD MEASUREMENT
8-1.Field Measurement of Initial Point Within 1,000 Feet and Line of Sight of Common Datum or BenchmarkPER INITIAL POINTFIXED PRICE
8-2.Field Measurement of Each Additional Point Within 1,000 Feet and Line of Sight of Common Datum or BenchmarkPER POINTFIXED PRICE
8-3.Field Measurement of Initial Point Beyond 1,000 Feet and/or Line of Sight of Common Datum or BenchmarkPER INITIAL POINTFIXED PRICE
8-4.Field Measurement of Each Additional Point beyond 1,000 Feet and/or Line of Sight of Common Datum or BenchmarkPER POINTFIXED PRICE
9.GLOBAL POSITIONING SYSTEM (GPS) DATA COLLECTION
9-1.GPS Measurement of Initial PointPER INITIAL POINTFIXED PRICE
9-2.GPS Measurement of Each Additional PointPER POINTFIXED PRICE
10.PROFESSIONAL SURVEY
10-1.Professional Survey by Registered Land SurveyorREIMBURSABLETBD
11.RECEPTOR SURVEY AND EXPOSURE PATHYWAY IDENTIFICATION
11-1.Receptor Survey and Exposure Pathway IdentificationPER SURVEYFIXED PRICE
11-2.Adder - Drinking Water SurveyPER SURVEYFIXED PRICE
12.DRINKING WATER SURVEY
12-1.Drinking Water SurveyPER SURVEYFIXED PRICE
13.WATER WELL RECORDS INVENTORY
13-1Water Well Records InventoryPER REPORTFIXED PRICE
14.WELL YIELD DETERMINATION (GROUNDWATER CLASSIFICATION)
14-1.Well Yield Determination (TRRP-8 Method 2a)PER TEST PER WELLFIXED PRICE
14-2.Well Yield Determination (TRRP-8 Method 2b)PER TEST PER WELLFIXED PRICE
14-3.Well Yield Determination (TRRP-8 Method 2c)PER TEST PER WELLFIXED PRICE
14-4.Well Yield Determination (TRRP-8 Method 1)PER SITEFIXED PRICE
15.IN-SITU INJECTION
15-1.Direct Push Boring with In-Situ InjectionPER FOOTFIXED PRICE
15-2.In-Situ Injection Into Permanent WellPER WELLFIXED PRICE
16.EXCAVATIONS AND/OR REMOVALS
16-1.Excavate and/or Remove Soil/Material/Debris, Backfill and Compact Excavation, and/or Till/Incorporate/Mix Soil/MaterialREIMBURSABLETBD
17.CONCRETE AND ASPHALT WORK
17-1Concrete Coring for Hand Auger and Direct Push BoringPER PENETRATIONFIXED PRICE
17-2Remove Concrete SlabPER SQUARE FOOTFIXED PRICE
17-3Construct Concrete SlabPER SQUARE FOOTFIXED PRICE
17-4Adder – 1 inch of Concrete ThicknessPER SQUARE FOOTFIXED PRICE
17-5Remove Asphalt SlabPER SQUARE FOOTFIXED PRICE
17-6Construct Asphalt SlabPER SQUARE FOOTFIXED PRICE
17-7Adder – 1 inch of Asphalt ThicknessPER SQUARE FOOTFIXED PRICE
17-8Remove Surface Cover greater than 200 square feetREIMBURSABLETBD
17-9Construct Surface Cover greater than 200 square feetREIMBURSABLETBD
18.WASTE DISPOSAL AND PRODUCT HANDLING
18-1.Disposal of Clean Drill Cuttings Onsite (Soil)PER DRUMFIXED PRICE
18-2.Disposal of Class 1 WastePER CUBIC YARDFIXED PRICE
18-3.Disposal of Class 1 WastePER DRUMFIXED PRICE
18-4.Disposal of Class 2 WastePER CUBIC YARDFIXED PRICE
18-5.Disposal of Class 2 WastePER DRUMFIXED PRICE
18-6.Disposal of Class 3 WastePER CUBIC YARDFIXED PRICE
18-7.Disposal of Class 3 WastePER DRUMFIXED PRICE
18-8.Disposal of Hazardous WasteREIMBURSABLETBD
18-9.Additional Charge for Expedited Waste RemovalPER DRUMFIXED PRICE
19.REPORTS
19-1.Field Activity Report (FAR)PER REPORTFIXED PRICE
19-2.Affected Property Assessment Report (APAR)PER REPORTFIXED PRICE
19-3.Monitoring Event Summary and Status Report (MESSR)PER REPORTFIXED PRICE
19-4.Response Action Plan (RAP) Report for Non-Engineered Response ActionPER REPORTFIXED PRICE
19-5.Final Site Closure Report (FSC)PER REPORTFIXED PRICE
19-6.Class V Injection Well Inventory/AuthorizationPER REPORTFIXED PRICE
19-7.Class V Injection Well Status ReportPER REPORTFIXED PRICE
19-8.Field Activity Excavation ReportPER REPORTFIXED PRICE
19-9.DUS Report for One (1) to Five (5) BatchesPER REPORTFIXED PRICE
19-10.DUS Report for Six (6) to Ten (10) BatchesPER REPORTFIXED PRICE
20.LABOR
20-1.Program ManagerPER HOURFIXED PRICE
20-2.Project ManagerPER HOURFIXED PRICE
20-3.Professional Geoscientist (PG)PER HOURFIXED PRICE
20-4.Geoscientist (GIT or PG)PER HOURFIXED PRICE
20-5.Hydrogeologist/ModelerPER HOURFIXED PRICE
20-6.Field TechnicianPER HOURFIXED PRICE
20-7.Scientist/Technical SpecialistPER HOURFIXED PRICE
20-8.Translator/InterpreterPER HOURFIXED PRICE
20-9.DraftspersonPER HOURFIXED PRICE
20-10.Laborer or Security GuardPER HOURFIXED PRICE
20-11.AdministrativePER HOURFIXED PRICE
21.HEAVY EQUIPMENT
21-1.BobcatPER HOURFIXED PRICE
21-2.BackhoePER HOURFIXED PRICE
21-3.Front‑End LoaderPER HOURFIXED PRICE
21-4.TrackhoePER HOURFIXED PRICE
21-5.Heavy Equipment Not Otherwise SpecifiedREIMBURSABLETBD
22.LIGHT EQUIPMENT
22-1.Traffic Barricade, Type I, minimum 2 feetPER DAYFIXED PRICE
22-2.Traffic Barricade, A-Frame, minimum 6 feetPER DAYFIXED PRICE
22-3.Light Equipment Not Otherwise SpecifiedREIMBURSABLETBD
23.EXPENDABLE MATERIALS
23-1.Polyethylene SheetingPER ROLLFIXED PRICE
23-2.Sorbent Sock, 2 inch diameter wellEACHFIXED PRICE
23-3.Sorbent Sock, 4 inch diameter wellEACHFIXED PRICE
23-4.Expendable Materials Not Otherwise SpecifiedREIMBURSABLETBD
24.MILEAGE
24-1.Light Vehicle MileagePER MILEFIXED PRICE
24-2.Medium Duty TruckPER MILEFIXED PRICE
24-3.Drill Rig/Direct Push RigPER MILEFIXED PRICE
24-4.Heavy Vehicle Not Otherwise SpecifiedPER MILEFIXED PRICE
24-5.Single-Axle Trailer MileagePER MILEFIXED PRICE
24-6.Double-Axle Trailer MileagePER MILEFIXED PRICE
25.MEALS AND LODGING
25-1.Meals and Lodging Western Region (Per Diem)PER NIGHTFIXED PRICE
25-2.Meals and Lodging Eastern Region (Per Diem)PER NIGHTFIXED PRICE
26.ADDITIONAL REIMBURSABLES
26-1.AirfareREIMBURSABLETBD
26-2.Car RentalREIMBURSABLETBD
26-3.Sample Shipping CostREIMBURSABLETBD
26-4.Other Shipping CostREIMBURSABLETBD
26-5.Copy FilesREIMBURSABLETBD
26-6.Permit FeesREIMBURSABLETBD
26-7.ChemicalsREIMBURSABLETBD
26-8.Miscellaneous ReimbursableREIMBURSABLETBD
27.PROCURING EQUIPMENT OR SERVICES
27-1.Procurement Fee for Amounts Greater than $10,000 in ValuePER PROCUREMENTFIXED PRICE
28.RESERVED
28-1.RESERVEDTBDTBD
28-2.RESERVEDTBDTBD
28-3.RESERVEDTBDTBD
28-4.RESERVEDTBDTBD
28-5.RESERVEDTBDTBD

&"Arial,Regular"&9TCEQ Solicitation: 582-26-00001 &"Arial,Regular"&9DRY CLEANER REMEDIATION PROGRAM SITE ACTIVITIES

File details come from the government source that posted it. Updated .