ESBD_387113_1734708314933_Combined Specs.pdf

PDF 3 MB Posted

Attached to
HVAC System Efficiency Upgrades – 12 Building at Stiles Unit
Solicitation number
696-FD-24-P037
Issued by
Tom Green County, Beaumont City, Texas

About this file

This is a set of technical specifications from Stanley Consultants, Inc. for a Texas Department of Criminal Justice (TDCJ) HVAC system efficiency upgrade project at the Mark W. Stiles Unit. The project involves replacing six existing gas-fired, chilled water-cooled indoor air handling units, chilled water piping, and gas piping serving Building 12, which comprises six pods (A-F). The work includes connecting new air handlers to existing supply air, return air, outside air duct systems and HVAC controls. Construction must be sequenced so only one mechanical room is under construction at a time, with temporary air conditioning required for affected pods. The specifications include detailed requirements for contractor quality control, temporary facilities and controls, storm water pollution control, and execution requirements.

The specifications outline requirements for submittals, product data, shop drawings, samples, and mock-ups. Key operational requirements include maintaining TDCJ occupancy during construction, minimizing interruptions to operations, and providing temporary services for planned outages exceeding 4 hours. The contractor must provide temporary sanitation facilities for projects over 30 days and a field office for projects over 120 days. The specifications do not include specific pricing terms, set-asides, or funding information, but do detail requirements for quality control staffing, testing, documentation and reporting throughout construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Texas Department of Criminal Justice

Stiles Unit

MWR #04922011

HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing

Issued for Bid Stanley Consultants, Inc

February 22, 2024 6836 Austin Center Blvd, Ste 350

Austin, Texas 78731

Texas Firm Registration: F-174

Seals Page Page 1 of 1

SEALS PAGE

Mechanical Engineer

Gayle Davis, P.E.

Texas Registration No. 114135

Stanley Consultants, Inc.

Texas Firm Registration No. F-174 6836 Austin Center Blvd, Suite 350

512-427-3600

Electrical Engineer

Tarek Tousson, P.E.

Texas Registration No. 99474

Stanley Consultants, Inc.

Texas Firm Registration No. F-174 6836 Austin Center Blvd, Suite 350

512-427-3600

2/22/2024

02/22/2024

Table of Contents Page 1 of 2

Texas Department of Criminal Justice

Stiles Unit HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing

MWR #04922011

This document is released for Bid.

TABLE OF CONTENTS

DIVISION 01

01 00 00 Scope of Work v.20230221 01 10 00 Summary v.20230214 01 25 00 Substitution Procedures v.20160201 01 33 00 Submittals v.20230328 01 42 00 References v.20230221 01 45 16.13 Contractor Quality Control v.20230221

01 45 23 Not Used 01 50 00 Temporary Facilities and Controls v.20190701 01 57 23 Temporary Storm Water Pollution Control v.20200301 01 64 00 Not Used 01 70 00 Execution Requirements v.20230224 01 73 29 Cutting and Patching v.20180201 01 73 30 Paving Repair and Resurfacing v.20200701 01 77 00 Closeout Procedures v.20200301 01 78 23 Operation and Maintenance Data v.20230328 01 78 36 Warranties v.20180301 01 78 39 Project Record Documents v.20210113 01 90 00 Facility Demolition v.20220105

DIVISION 23

23 05 01 Common Work Results for Mechanical v.20200301 23 05 01.10 Basic Mechanical Requirements (For Roofing) v.20190801 23 05 13 Common Motor Requirements for HVAC Equipment v.20190601 23 05 19 Thermometers and Gauges for HVAC Piping v.20190601 23 05 23 General-Duty Valves for HVAC Systems v.20200701 23 05 29 Hangers and Supports for HVAC Piping Systems v.20211122 23 05 48 Mechanical Sound and Vibration Control v.20190601 23 05 53 Identification for HVAC Piping and Equipment v.20200601 23 05 93 Testing, Adjusting, and Balancing for HVAC v.20190601 23 07 13 HVAC Duct Insulation v.20190301 23 07 19 HVAC Piping Insulation v.20200301 23 09 13 Instrumentation and Control Devices v.20211203 23 09 25 Building Automation and DDC Control System v.20190401 23 11 23 Facility Natural-Gas Piping v.20190601 23 21 13 HVAC Piping v.20200301 23 31 13 Metal Ducts v.20211118 23 33 00 Duct Accessories v.20210201

Table of Contents Page 2 of 2

23 73 23 Custom Central Station Air Handling Unit v.20190801

DIVISION 26

26 00 00 Basic Electrical Methods v.20220107 26 05 19 Low Voltage Electrical Conductors and Cables v.20210727 26 05 26 Grounding and Bonding for Electrical Systems v.20210602 26 05 29 Hangers and Supports for Electrical Systems v.20170601 26 05 33 Raceways and Boxes for Electrical Systems v.20230207 26 05 53 Identification for Electrical Systems v.20210602 26 08 13 Electrical Acceptance Testing v.20210201 26 18 23 Low Voltage Surge Arresters v.20170601 26 22 00 Low-Voltage Transformers v.20170601 26 24 16 Panelboards v.20210602 26 27 26 Wiring Devices v.20200301

DIVISION 28

28 00 00 Basic Methods Electronic Systems v.20210210 28 31 10 Fire Alarm Systems v.20190701

Stanley Consultants, Inc Scope of Work v.20230221 Stiles Unit Section 01 00 00 - Page 1 of 2 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

SECTION 01 00 00 – SCOPE OF WORK v.20230221 [Standard TDCJ Specification]

PART 1 – GENERAL

1.1 PROJECT DESCRIPTION (SCOPE OF WORK)

A. Project consists of but not limited to replacing the six (6) existing gas-fired, chilled water-cooled indoor air handling units, chilled water piping, and gas piping serving Building 12 within the Mark W. Stiles Unit. Building 12 is comprised of six pods (A-Pod, B-Pod, C-Pod, D-Pod, E-Pod, and F-Pod). Building 12 has three mechanical rooms centrally located between each pair of pods at level 2. Each mechanical room contains two air handling units that serve one pod each. All supply, outdoor air, and return air systems to be tested, adjusted, and balanced. The new air handlers will connect to the existing Building 12 supply air, return air, and outside air duct systems. The new air handlers will connect to the existing Building 12 HVAC control system. Within Building 12, the electrical breakers, conductors, and selected conduits serving the air-handlers will be replaced. New panelboards with surge protective devices at the main panelboard serving the new mini power zone units will be added.

B. Construction to be sequenced so that only one Building 12 mechanical room is under construction at a time. Temporary air-conditioning is required for the pods impacted by the construction work. Provide all temporary construction including but not limited to temporary ductwork, temporary electrical power, etc. required to provide temporary air-conditioning (heating / cooling dependent on the season) to the Building 12 pods impacted by the construction work.

1.2 PROVISIONS FOR PROJECT SUPPORT

A. Provide and install temporary extensions and connections to utilities as required for construction operations. See Section 01 50 00 for requirements and utilities available from Texas Department of Criminal Justice (TDCJ).

1. For a construction duration greater than 30 days, temporary Sanitation Facilities are required to be provided and installed as part of Project Scope of Work. For a construction duration 30 days or less, use of TDCJ’s Sanitation Facilities will be permitted.

a. Provided Sanitation Facilities shall comply with Section 01 50 00.

B. For a construction duration greater than 120 days, a Field Office is required to be provided as part of Project Scope of Work. For a construction duration of 120 days or less, a Field Office is not required to be provided as part of Project Scope of Work, but may be provided for contractor’s convenience.

1. Provided Field Office shall comply with Section 01 50 00.

2. Provide and install temporary extensions and connections to utilities as required for

Field Office, if applicable.

C. Irrespective of the provision of a Field Office:

1. Provide one (1) cell phone with voicemail and “smart phone” service that includes web-based e-mail application OR one (1) cell phone with voicemail and one (1) desktop computer, laptop computer, electronic notebook, electronic tablet or similar

Stanley Consultants, Inc Scope of Work v.20230221 Stiles Unit Section 01 00 00 - Page 2 of 2 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011 device with web-based e-mail application. See Section 01 50 00 for additional requirements.

2. Provide Other Office Equipment as described in Section 01 50 00, 2.2.A.5.

END OF SECTION 01 00 00

Stanley Consultants, Inc Summary v.20230214 Stiles Unit Section 01 10 00 - Page 1 of 3

SECTION 01 10 00 – SUMMARY v.20230214 [Standard TDCJ Specification]

PART 1 – GENERAL

1.1 SECTION INCLUDES

A. Definitions

B. Interrelation of Specifications

C. Work sequence

D. TDCJ occupancy (Texas Department of Criminal Justice occupancy)

1.2 DEFINITIONS

The listed terms may, or may not, appear in this Specification Section or other Specification Sections included in this solicitation. If a term listed below appears in this Specification Section or other Specification Sections included in this solicitation, the term shall be interpreted according to the meaning identified.

A. Architect – shall be interpreted to intend either Architect or Engineer (A/E).

B. Authority Having Jurisdiction (AHJ) – An organization, office, or individual responsible for enforcing the requirements of a code or standard, or for approving equipment, materials, an installation, or a procedure.

C. Certifying Authority – the Design Professional who has, or will, provide professional seal and signature for required plans and/or specifications.

D. Closeout/Close-Out – final activities as may be identified to demonstrate compliance with Construction Documents requirements and/or to transfer of operation, maintenance, and/or control to TDCJ.

E. Construction Documents – shall be interpreted to intend the IFC Drawings and/or Specifications including all Approved alterations.

F. Design Professional (DP) – shall be interpreted to intend A/E or other certifying entity acceptable to applicable AHJ.

G. Engineer – shall be interpreted to intend either Architect or Engineer (A/E).

H. Engineer of Record (EOR) – shall be interpreted to intend Certifying Authority.

I. Exposed – any area less than 16’ above finished floor (A.F.F.), or grade, or less than 10’ from any platform that can be climbed, in any area that can be traversed while standing.

1. Unless otherwise identified in writing, interpret areas such as basements, offices, equipment rooms, pipe chases, and other such areas as ‘Exposed’, to include areas with lay-in type ceilings.

J. IFC – Issued-For-Construction (IFC)

K. Owner’s Representative – see Project Administrator.

Stiles Unit Section 01 10 00 - Page 2 of 3 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

L. Project Administrator (PA) – TDCJ resource responsible for project management activities on behalf of Owner.

1. Where references of ‘Owner’, ‘Owner’s Representative’, ‘TDCJ’, ‘TDCJ’s’ representative’, etc. appear in relation to coordination activities, construction related required submittals, and/or obtaining approvals, these references shall be interpreted to intend the PA.

a. Where instructions identify a submission to the A/E, the submission shall be to the PA who will forward to A/E.

2. If requirements indicate that an approval, etc. is to be obtained, or provided, by the

PA, it shall be interpreted to intend the PA will obtain and/or provide subject approval, etc. from the appropriate entity, which may or may not be the PA.

M. Tamper-resistant – elements resistant to loosening and/or disconnection with common tools. E.g. torx head screws.

N. Quality Assurance Inspector (QA) – TDCJ resource responsible for quality assurance activities such as inspections, etc. as may be required by Construction Documents or otherwise determined by Owner.

1.3 INTERRELATION OF SPECIFICATIONS

A. This specification document is comprised of standard TDCJ specifications applicable to the subject project. Appearance of an item or an element in these specifications shall not be interpreted to indicate that item or element is specifically required for the subject project. If an item or element is specifically identified as required or required in order to provide the proper execution and completion for the subject project, these specifications are required to be met.

1.4 WORK SEQUENCE

A. Construct Work in stages or phases with each to be substantially complete before beginning next to accommodate TDCJ occupancy requirements during the construction.

1. For interior work, to the extent possible, all work including demolition, installation, repair, restoration, functional testing, etc. shall be completed in one area before beginning work in another area.

2. At no time will construction and/or installation personnel be permitted to work in areas where direct contact with offenders is possible, such as through a window opening.

1.5 TDCJ OCCUPANCY

A. TDCJ will occupy the site and premises during entire period of construction for the conduct of normal operations.

1. TDCJ will occupy site and/or existing building(s) during entire construction period.

a. Day-to-day operations will continue during the construction period.

2. Coordinate offender relocation and schedule shut-downs of equipment and utilities, as needed/applicable, for construction progress.

a. All interruptions to TDCJ operations shall be minimized to the fullest extent possible.

1) All services shall remain operational at all times in areas outside the work area.

Stiles Unit Section 01 10 00 - Page 3 of 3 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

2) Provide temporary services for planned outages of permanent services in work areas for periods in excess of 4 hours (consecutive or cumulative) in any 24 hour period unless otherwise approved in writing.

3) Correct inadvertent interruption of TDCJ operations due to construction activities immediately.

PART 2 – PRODUCTS

2.1 GENERAL

A. Brand or manufacturer’s references are descriptive only, and indicate type and quality to be provided. All references to brand or manufacturer names shall be interpreted to include the language “or A/E approved equal”. Any brand or manufacturer meeting specifications will be considered, irrespective of the language “or A/E approved equal” appearing in conjunction with the brand or manufacturer name.

B. All provided products shall be free of Lead Based Paint and Asbestos Containing Material.

PART 3 – EXECUTION

3.1 GENERAL

A. The intent of Construction Documents is to require all items necessary for the proper execution and completion of the work. The Construction Documents by their intent are a complete and usable work product expected to be provided. To meet this requirement, provide construction in place to include that which is indicated in the Construction Documents and that which may be reasonably expected to be required to make the work complete in all respects and consistent with established and accepted construction practices.

1. Compliance with requirements of these Construction Documents includes all tools, connections, applications, inspections by AHJ, consumable products, meters, gages, dispensing means and mechanisms, and miscellaneous items required for storage, installation, operation, maintenance, and/or removal for all temporary and/or permanent elements and services provided until such is removed or accepted by TDCJ at Beneficial Occupancy as required by project objectives.

a. Compliance includes provision in a manner and condition acceptable to

TDCJ.

2. A complete set of Construction Documents shall be provided. Perform complete scope of work regardless of where in the Construction Documents a requirement, or related requirement, appears.

END OF SECTION

Stanley Consultants, Inc Substitution Procedures v.20160201 Stiles Unit Section 01 25 00 - Page 1 of 2 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

SECTION 01 25 00 – SUBSTITUTION PROCEDURES v.20160201 [Standard TDCJ Specification]

PART 1 - GENERAL

1.1 SUMMARY

A. Requirements for Substitution Requests.

PART 2 - PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Unless a Substitution has been approved and published in a written Addendum, the material, product, equipment, or service to be used and/or provided are those specified.

However, during the course of work, a Substitution may be approved if a specified or previously approved material, equipment, product and/or service is determined to be unavailable due to strikes, lockouts, bankruptcy, discontinuance of production, documented shortages or similar occurrences.

2.2 PRODUCT REQUIREMENTS

A. All Substitution requests under this Section require prior approval by TDCJ.

B. All Substitution requests under this Section require review and approval by A/E.

2.3 THRU 2.5

A. Not applicable.

PART 3 - PRODUCTS

3.1 PERFORMANCE QUALIFICATIONS

A. Not applicable.

3.2 PREPARATION

A. Review and coordinate all aspects of each item for conformance in all respects with specifications and requirements.

B. Prepare documentation that the requested substitution is equal or superior to the specified material, product, or equipment and shall consist of applicable information which would aid the A/E in making an informed decision. Include side by side product comparisons, technical data, laboratory test results, product drawings, etc.

1. If use of the proposed material, product, or equipment would result in changes to the design of other elements, the Substitution Request shall describe fully the changes required to the drawings or specifications.

3.3 EXECUTION REQUIREMENTS

A. Do not substitute material, product, equipment or service unless Substitution has been specifically approved in writing.

Stanley Consultants, Inc Substitution Procedures v.20160201 Stiles Unit Section 01 25 00 - Page 2 of 2 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

B. No material, equipment, product or service is “equal” to such specified until a Substitution Request has been approved.

C. Any cost differences resulting from modifications to the drawings and/or specifications and the cost of making the changes, including charges for required design time by A/E, is the responsibility of Contractor/Vendor.

3.4 QUALITY CONTROL

A. Maintain copies of Approved Substitution Request(s) as Record Submittals.

3.5 COMMISSIONING

A. Not applicable.

3.6 EXECUTION SUBMITTALS

A. Substitution Request with attached required documentation.

3.7 Thru 3.8:

A. No additional requirements.

Stanley Consultants, Inc Submittals v.20230328 Stiles Unit Section 01 33 00 - Page 1 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

SECTION 01 33 00 – SUBMITTALS v.20230328

[Standard TDCJ Specification]

PART 1 - GENERAL

1.1 SUMMARY

A. Requirements for Submittal of Product Data, Shop Drawings, Samples, Mock-Ups, Requests for Information and other work-related submittals, other than Substitution Requests.

B. Definitions:

1. Action Submittals – written and graphic information and physical samples that require responsive action.

2. Closeout Submittals – project completion related information that may or may not require review and approval.

3. Informational Submittals – written and graphic information and physical samples that may or may not require responsive action.

4. Product Data – illustrations, standard schedules, performance charts, instructions, manufacturer’s certificates, brochures, diagrams, test data and other information furnished to illustrate material, product, equipment or system for some portion of the Work.

5. Shop Drawings – drawings, diagrams, schedules and other data specially prepared for the Work to illustrate some portion of the Work.

6. Samples – physical examples which illustrate materials, equipment or workmanship to establish standards for the Work and/or to demonstrate compliance with the established standard of the Work.

7. Quality Control submittals – information and/or items required to demonstrate conformance with standards or other requirements of the Construction Documents which may or may not require review and approval.

8. Request For Information (RFI) – requests for additional information, interpretation, clarification of, or to identify conflicts with, the Construction Documents.

PART 2 - PRODUCTS, EQUIPMENT, MATERIALS AND/OR REQUIRED FIELD SERVICES

2.1 GENERAL REQUIREMENTS:

A. Submittal Schedule:

1. Required information in tabular format. Required information includes:

a. Specification number and title.

b. Submittal category (action or informational).

c. Name of supplier.

d. Description of the Work covered.

2. Demonstrate number of days for review and processing of Submittals and Resubmittals, and in such sequence and duration as to cause no delay in the Work.

a. Additional time for coordination with subsequent Submittals/ Resubmittals as required.

b. Product Data before or concurrent with Samples/Mock-Ups and/or Shop

Drawings.

c. Single submittal for each element of construction and type of product or equipment with all required information.

Stiles Unit Section 01 33 00 - Page 2 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

3. Coordination:

a. Fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

b. Different types of submittals for related parts of the Work when processing will not be delayed because of need to review submittals concurrently for coordination.

c. Logical groupings to facilitate interrelation of Products and Systems:

1) Simultaneous submittal of associated items of operating systems which require correlation for efficient function and installation.

2) Coordinated with other related submittals.

3) Samples/Mock-Ups that contain multiple, related components such as accessories together as one submittal package.

B. Contractor’s Approval Stamp: A uniform stamp with a statement certifying that submittal has been reviewed, checked and approved for compliance with the Construction Documents and provide a place for Contractor’s signature.

C. Transmittal Form: Contractor’s letterhead and title block on a pre-printed form or a permanently affixed label with applicable letterhead.

1. Label or title block:

a. Project name

b. Date

c. Submittal number with applicable resubmittal/revision identifier.

d. Name and address of A/E (Texas Department of Criminal Justice, for

Construction Documents prepared by TDCJ personnel)

e. Name and address of Contractor if information is not contained in pre-printed letterhead, title block or label.

f. Name and address of Sub-contractor, if applicable.

g. Name and address of supplier, if applicable.

h. Name of manufacturer, if applicable.

i. Name of preparer of Submittal.

j. A 6” x 8” space for Contractor’s review and approval markings and action taken by A/E.

D. Prepared written statement:

1. Number and title of applicable Specification Section.

2. Drawing number and detail references, as applicable.

3. Type of element.

4. Locations(s) where product is to be installed, as applicable.

a. Reference sheet number, detail, and/or specification number.

b. Number and name of room or space.

c. Location within room or space.

5. Other necessary identification:

a. Clear indication of specific part number, etc. where product specification sheets contain multiple part numbers.

b. Applicable available options clearly marked.

c. Complete with respect to quantities, dimensions, specific performance, materials, and similar data.

6. All information relating to means and methods of construction, fabrication, assembly, installation, or erection redacted or otherwise deleted unless such is specifically identified in applicable Specification Section as required.

Stiles Unit Section 01 33 00 - Page 3 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

E. Binders: Where individual Specification Sections require submittals in a Binder:

1. Commercial quality, sized for 8-1/2 in. x 11 in. documents, with cleanable covers equipped with clear view covers for insertion of a custom printed Cover Sheet and Spine insert.

2. Unless other is approved in writing, separate binders for each identified category.

3. Appropriately deep for amount of documents, not to exceed 3”.

a. Additional binders as required for documents not accommodated by 3” binder(s).

1) Labeling on coversheet shall include identification of “No. 1 of x”, etc., where x is the total number of binders for that category.

4. Cover Sheet elements:

a. Project Name.

b. Date.

c. Name and location of project.

d. Name of A/E firm (Texas Department of Criminal Justice if design was not provided by a separately engaged A/E firm).

e. Submittal label as identified in specification.

f. Where dividers are specified: Tabbed fly-leaf with typed labels.

5. Spine insert elements:

a. Submittal label as identified in specification.

b. Project Name.

6. Table of Contents: Neatly typed, using Table of Contents of Project Manual as format.

7. Fold larger sheets to fit into binders.

2.2 WORK PRODUCT REQUIREMENTS

A. Action Submittals:

1. Product Data:

a. Prepared written statement.

b. Include the following information, as applicable:

1) Manufacturer’s written recommendations.

2) Manufacturer’s product specifications.

3) Manufacturer’s installation instructions.

4) Standard color charts.

5) Manufacturer’s catalog cuts.

6) Wiring diagrams showing factory-installed wiring.

7) Printed performance curves.

8) Operational range diagrams

9) Mill reports

10) Standard product operation and maintenance manuals.

11) Compliance with specified referenced standards.

12) Testing by recognized testing agency.

13) Application of testing agency labels and seals.

14) Notation of coordination requirements.

15) Indication mark on each Submittal showing which products and options are applicable.

2. Shop Drawings:

a. Prepared written statement.

b. Project-specific information, drawn accurately to scale, not based on reproductions of the Construction Documents or standard printed data.

Stiles Unit Section 01 33 00 - Page 4 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

1) Electronic copies of CAD Drawings of the Construction Drawings will not be provided for use in preparing Shop Drawings.

c. Fully illustrated requirements of the Construction Documents. Include the following information, as applicable:

1) Field dimensions.

2) Identification of products.

3) Fabrication and installation drawings.

4) Roughing-in and setting diagrams.

5) Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

6) Shopwork manufacturing instructions.

7) Templates and patterns.

8) Schedules.

9) Design calculations.

10) Compliance with specified standards.

11) Notation of coordination requirements.

12) Notation of dimensions established by field measurement.

13) Relationship to adjoining construction clearly indicated.

14) Seal and signature of professional engineer if specified.

15) Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

d. Sheet Size: Except for templates, patterns, and similar full-size drawings, at least 8-1/2 by 11 inches but no larger than 24 by 36 inches.

3. Samples and Mock-Ups:

a. Prepared written statement.

b. Manufacturer’s charts consisting of units or sections of units showing the full range of colors, textures, patterns, and other similar characteristics available.

c. Complete, full-size Mock-Ups, at Project site, unless other is indicated in applicable Specification Section or approved in writing, prepared from same material to be used for the Work, cured and/or finished in manner specified, and physically identical with material or product proposed for use.

B. Close-out Submittals:

1. Per requirements of individual Specification Sections.

C. Information Submittals:

1. Compatibility Test Report(s): Prepared report(s) written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

2. Coordination Drawing(s): Per requirements in individual Specification Sections. To scale, showing connections, clearances, tolerances, interface requirements, etc.

3. Design Data: Prepared written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include diagrams if applicable. Provide name and version of software, if any, used for calculations.

4. Field Inspection Report(s): Written report(s) required by Construction Documents for recording inspection(s) and/or observation(s). Include the following:

a. Date of Field Inspection.

b. Type and Scope of Inspection.

Stiles Unit Section 01 33 00 - Page 5 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

c. Name of person who performed inspection, qualifications and contact information.

d. Attendees, if applicable.

e. Weather conditions and/or conditions of project area to be inspected.

f. Description of the Work to be inspected.

g. Reference to Specification and/or Drawing where requirement for Inspection is identified.

h. Description of elements found to be in compliance with Construction

Documents.

i. Deficiencies noted to include condition of substrates; unacceptable installation tolerances; and/or any other item(s) that conflicts with requirements of Construction Documents.

j. Identification of specification or other requirement that conflicts with the detrimental condition, unacceptable tolerance(s), etc.

k. Corrective actions taken.

l. Corrective actions recommended.

5. Field Test Report(s): Written report(s) provided by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Construction Documents.

Information included in Field Test Report(s) shall be the same as for Field Inspection Report(s).

6. Installer Certificate(s): Prepared written statement(s) on manufacturer’s letterhead certifying that Installer complies with requirements in the Construction Documents and, where required, is authorized by manufacturer for this specific Project.

7. Material Certificate(s): Prepared report(s) written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting test results of material for compliance with requirements in the Construction Documents.

8. Preconstruction Test Report(s): Prepared report(s) written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Construction Documents.

9. Product Test Report(s): Prepared written report(s) indicating current product produced by manufacturer complies with requirements in the Construction Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

10. Product Certificate(s): Prepared written statement(s) on manufacturer’s letterhead certifying that product complies with requirements in the Construction Documents.

11. Report(s):

a. Cover page with the following information:

1) Project name.

2) Date of report.

3) Type of report.

4) Name, contact information, qualifications of preparer.

5) Specification Section specifying report.

b. Footer includes page numbers.

12. Research/Evaluation Report(s): Prepared written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include:

a. Name of evaluation organization.

b. Date of evaluation.

c. Time period when report is in effect.

d. Product and manufacturers’ names.

Stiles Unit Section 01 33 00 - Page 6 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

e. Description of product.

f. Test procedures and results.

g. Limitations of use.

13. Manufacturer Certificate(s): Prepared written statement(s) on manufacturer’s letterhead certifying that manufacturer meets or exceeds requirements in the Construction Documents. Include evidence of manufacturing experience where required.

14. Manufacturer’s Instruction(s): Prepared written or published information that documents manufacturer’s recommendations, guidelines, and procedures for installing, operating, and maintaining product or equipment.

a. Include the following, as applicable:

1) Name of product.

2) Name, address, and telephone number of manufacturer.

3) Preparation of adjoining elements.

4) Required tolerances.

5) Sequence of installation or erection.

6) Required adjustments.

7) Recommendations for cleaning and protection.

b. Specifically identify requirements for special post commissioning maintenance activities required to maintain warranties that are outside of typical Periodic Maintenance requirements.

15. Manufacturer’s Field Report(s): Prepared written information documenting factory-authorized (manufacturer) service representative’s tests and inspections. Include the following, as applicable:

a. Name of product.

b. Name, address, and telephone number of factory-authorized service representative making report.

c. Statement of observed field conditions, conditions of surfaces and installation and quality of workmanship.

d. Statement on condition of adjoining elements and acceptability for installation of product.

e. Statement that products at project site comply with manufacturer’s requirements.

f. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

g. Results of operational and other tests and a statement of whether observed performance complies with requirements.

h. Statement whether conditions, products, and installation will affect warranty.

i. Other required items indicated in individual Specification Sections.

16. Material Safety Data Sheet(s) (MSDS): document(s) that contain information on the potential health effects of exposure to chemicals, or other potentially dangerous substances, and on safe working procedures when handling chemical products.

17. Qualification Data: Prepared written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects, engineers and owners, and other information specified.

18. Welding Certificate(s): Prepared written certification dated less than one calendar year previous that welding procedures and personnel comply with requirements in the Construction Documents. Include record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on American Welding Society forms. Include name of firms and personnel certified.

D. Request For Information:

Stiles Unit Section 01 33 00 - Page 7 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

1. Name of project.

2. RFI number.

3. RFI description.

4. Date.

5. Detailed identification and description of problem encountered, information required, item for which interpretation or clarification is required, conflicting requirements, such as Manufacturer’s Instructions conflict with instructions in Construction Documents, etc. Include applicable specification and/or drawing numbers.

6. Recommended resolution to include sizes, ratings, sketches, etc. in compliance with applicable specifications and requirements.

7. Hard-Copy RFIs: Each page of attachments with the RFI number and sequential page number.

8. Software-Generated RFIs: Substantially the same content as Hard-Copy RFIs and Attachments, provided as electronic files in Adobe Acrobat PDF format numbered as for Hard-Copy submission.

9. Supplementary Drawings: Include dimensions, thicknesses, structural grid references, details of affected or adjoining material, assemblies, attachments, products, components, equipment, etc needed to evaluate subject RFI and render an informed response.

2.3 REQUIRED FIELD SERVICES

A. Not applicable.

2.4 PRODUCT, EQUIPMENT, MATERIAL AND/OR FIELD SERVICES WARRANTY

REQUIREMENTS

A. As required per individual Specification Sections.

2.5 PRODUCT, EQUIPMENT, MATERIAL AND/OR FIELD SERVICES SUBMITTALS

A. Elements as required per individual Specification Sections.

PART 3 - EXECUTION

3.1 INSTALLER AND/OR PERFORMANCE QUALIFICATIONS

A. Per requirements of individual Specification Sections.

3.2 PREPARATION

A. All submittals, other than RFIs, attached to a completed Transmittal Form.

B. Information specially prepared for submittal because standard printed data are not suitable for use, prepare as for Shop Drawings.

C. No more than 3 sets of Samples/Mock-Ups shall be required.

D. Partial or incomplete Submittals shall be returned, without review, for resubmission.

E. Prepare and maintain a tabular Log for each type of Submittal(s) (including RFIs) organized by submittal type and submittal number. Include in Log:

1. Project name.

Stiles Unit Section 01 33 00 - Page 8 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

2. Submittal number with applicable resubmittals/revision identifier including submittals that were dropped or otherwise cancelled.

a. Submittal number: Specification Section number followed by decimal point and a sequential number (e.g. 15 08 10.01).

1) Remain consistent throughout submittal type.

b. Resubmittal/revision identifier: Alphabetic suffix after another decimal point added to Submittal number (e.g. 15 08 10.01.A)

3. Description.

4. Date of submittal.

5. Date response was received.

6. Identification of related Minor Change in the Work, Field Order, Proposal Request, etc. as applicable.

F. Immediately upon discovery of the need for information, interpretation, clarification, or direction, submit a Request for Information.

1. Coordinate and submit RFIs in a prompt manner so as to avoid delays in work.

2. Allow 72 hours for response.

3. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for interpretation of A/E’s action on submittals or substitutions.

d. Requests for coordination information already indicated in the Construction

Documents.

e. Incomplete RFIs.

f. RFIs with numerous or significant errors.

3.3 EXECUTION REQUIREMENTS

A. General:

1. Time for review shall commence upon receipt of Submittal.

2. Retain responses for reference for Quality Control and Quality Assurance activities and coordination with other elements.

B. Submittals for Quality Control will be reviewed for compliance with the construction documents only. The review may not constitute a detailed review of adequacy of submitted design calculations. The appropriateness and accuracy of calculations is the responsibility of the Contractor (and Contractor’s professional engineer when such calculations are required to be professionally sealed).

3.4 QUALITY CONTROL

A. As required by individual Specification Sections.

3.5 COMMISSIONING

A. As required by individual Specification Sections.

3.6 EXECUTION SUBMITTALS

A. Every seven (7) calendar days, provide submittal logs.

3.7 INSTALLATION AND/OR WORKMANSHIP WARRANTY REQUIREMENTS

Stiles Unit Section 01 33 00 - Page 9 of 9 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

A. As required by individual Specification Sections.

3.8 CLOSE-OUT

A. As required by individual Specification Sections.

Stanley Consultants, Inc References v.20230221 Stiles Unit Section 01 42 00 - Page 1 of 4 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

SECTION 01 42 00 – REFERENCES V.20230221

1.1 STANDARDS

A. Applicability: For Products specified by reference to an association or trade standard, comply with requirements and recommendations stated in that standard, except when requirements are modified by the Construction Documents, or applicable codes establish stricter standards.

B. Publication Dates:

1. Except as otherwise indicated, where compliance with a reference standard is required, comply with standard in effect as of date of issue of Construction Documents, except when a specific date is specified.

2. Copies of Standards: Where copies of standards are needed for proper performance of Work, obtain such copies directly from publication source.

1.2 SCHEDULE OF ABBREVIATIONS

A. Abbreviations and Names: Following is a partial list of Architecture, Engineering, and Construction (AEC) industry standards organizations, codes, publications, practices, procedures, materials, and other accepted practice acronyms. References to these acronyms are listed in applicable specification sections using abbreviations contained below.

AA Aluminum Association AABC Associated Air Balance Council

AAMA American Architectural Manufacturer's Association AASHTO American Association of State Highway and Transportation Officials ABMA American Boilers Manufacturer's Association

ACI American Concrete Institute ACIL American Council of Independent Laboratories

ADC Air Diffusion Council AGA American Gas Association

AHRI Air Conditioning, Heating and Refrigeration Institute AIA American Institute of Architects

AISC American Institute of Steel Construction AISI American Iron and Steel Institute ALSC American Lumber Standards Committee AMI Auburn Manufacturing, Inc.

AMCA Air Movement and Control Association ANSI American National Standards Institute APA American Plywood Association ASCE American Society of Civil Engineers

ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers ASJ All Service Jacket ASME American Society of Mechanical Engineers ASNT American Society of Nondestructive Testing ASPE American Society of Plumbing Engineers ASTM American Society of Testing and Materials

Stiles Unit Section 01 42 00 - Page 2 of 4 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

ASTM-MT ASTM – Mechanical Tubing ATSI Alliance for Telecommunications Industry Solutions

AWI Architectural Woodwork Institute AWPA American Wood-Preservers' Association AWPB American Wood-Preservers Bureau AWWA American Water Works Association AWS American Welding Society BAC Building Automation Control BACnet BAC network

BHMA Builders' Hardware Manufacturers Association BS British Standard cETL ETL (see below) – certified for use in Canada CAD Computer Aided Design CDA Copper Development Association Inc.

CENELEC European Committee for Electrotechnical Standardization CFR Code of Federal Regulations

CISPI Cast Iron Soil Pipe Institute CGA Compressed Gas Association

CPSC Consumer Product Safety Commission CRRC Cool Roof Rating Council CRSI Concrete Reinforcing Steel Institute CS Commercial Standard of NBS (U.S. Dept. of Commerce) DSCC Defense Supply Center Columbus ELL-Jacs Trade Mark of a manufactured elbow cover EMC Electromagnetic Capability

EN A product family standard for industrial, scientific, and medical (ISM) equipment and electro-discharge machining (EDM) and arc welding equipment

ENV Electromagnetic Capability Standard developed by CENELEC EMT Electrical Metallic Tubing (conduit) EPA Environmental Protection Agency EPDM Ethylene Propylene Diene Monomer

ETL Edison Testing Laboratories - certified for use in the U.S.

FACP Fire Alarm Control Panel FCC Federal Communications Commission

FCI Fluid Controls Institute FGMA Flat Glass Marketing Association FM Factory Mutual (Insurance Company Rating) FMG FM Global (Name of Factory Mutual Insurance Company Global) FS Federal Specification (General Services Admin) FSC Forestry Stewardship Council GANA Glass Association of North America

GSM Global System for Mobile (Communications) HI Hydraulic Institute HMAC Hot Mix Asphaltic Concrete

IAPMO International Association of Plumbing and Mechanical Officials IBC International Building Code (International Code Council) IC Integrated Circuit ICBO International Conference of Building Officials

ICC International Code Council ICC-ES ICC-Evaluation Service ICRI International Concrete Repair Institute IEBC International Existing Building Code IEC International Electrotechnical Commission

Stiles Unit Section 01 42 00 - Page 3 of 4 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

IECC International Energy Conservation Code IEEE Institute of Electrical and Electronic Engineers Inc

IDF Intermediate Distribution Frame(s) IP Internet Protocol IP/GSM Internet Protocol / Global System for Mobile (Communications) ISO International Standardization Organization

IT Information Technology LCD Liquid Crystal Display MDP Main Distribution Panel MBMA Metal Building Manufacturers Association MFMA Maple Flooring Manufacturers Association Inc

MIL Military Standardization Documents (U.S. Dept. of Defense) MPI Master Painter’s Institute MSS Manufacturers Standardization Society MSS-SP MSS-Standard Practice NAAMM National Association of Architectural Metal Manufacturers NACE National Association of Corrosion Engineers NCMA National Concrete Masonry Association

NEC National Electrical Code (by NFPA) NECA National Electrical Contractors Association

NEMA National Electrical Manufacturers Association NETA National Electrical Testing Association

NESC National Electrical Safety Code NER National Evaluation Report

NFPA National Fire Protection Association NFRC National Fenestration Rating Council

NICET National Institute for Certification in Engineering Technologies NRCA National Roofing Contractors Association NRTL Nationally Recognized Testing Laboratory NSF National Sanitation Federation PLC Programmable Logic Controller PCI Pre-stressed Concrete Institute

PDI Plumbing and Drainage Institute PVC Polyvinyl chloride PROM Programmable Read Only Memory QPD Qualified Products Database RFCI Resilient Floor Covering Institute RFCI-WP Resilient Floor Covering Institute Work Practice RGS Rigid Galvanized Steel (conduit) RJ Registered Jacks RMS Root Mean Square RPM RPM International – No definition, that’s the name RSA Remote Serial Annunciator RTU Remote Terminal Unit SAE Society of Automotive Engineers SBDS Schottky barrier diodes SBS Styrene-Butadiene-Styrene SDI Steel Deck Institute (in context) SDI Steel Door Institute (in context) SIGMA Sealed Insulating Glass Manufacturers Association

SMACNA Sheet Metal and Air Conditioning Contractors' National Association SNMP Simple Network Management Protocol SPRI Single Ply Roofing Industry SPRI-ES SPRI-Edge System Test

Stiles Unit Section 01 42 00 - Page 4 of 4 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

SSPC Steel Structures Painting Council SSPC-PA SSPC – Performance Application SWIFT Smart Wireless Integrated Fire Technology TABB Testing, Adjusting and Balancing Bureau TAC Texas Administrative Code

TCA Tile Council of America TCP Transmission Control Protocol TCP/IP Transmission Control Protocol/Internet Protocol TCEQ Texas Commission on Environmental Quality TMS The Masonry Society TPDES Texas Pollution Discharge Elimination System TXDOT Texas Department of Transportation UDACT Universal Digital Alarm Communicator Transmitter

UL Underwriters Laboratories VAC Volts Alternating Current VAR(S) Volt Ampere(s) Reactive VOC Volatile Organic Compound WCLIB West Coast Lumber Inspection Bureau (Grading Rules) WFACP Wireless Fire Alarm Control Panel WPSTM Waterford Plant Standard Test Method

WWPA Western Wood Products Association (Grading Rules)

Stanley Consultants, Inc Contractor Quality Control v.20230221 Stiles Unit Section 01 45 16.13 - Page 1 of 10 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

SECTION 01 45 16.13 - CONTRACTOR QUALITY CONTROL v.20230221 [Standard TDCJ Specification]

PART 1 - GENERAL

1.1 SUMMARY

A. Requirements for Contractor Quality Control (QC) System:

1. Plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements.

2. Applicable to all construction operations, both on-site and off-site, and keyed to construction sequence.

B. Definitions:

1. Control Phases: Defined phases utilized to organize QC inspections and other activities for each Definable Unit of Work within the Quality Control Plan:

Preparatory, Initial, Follow-up.

2. Corrective Action(s): Action(s) required to correct completed work identified to be in Non-conformance, to include:

a. Complete removal and replacement of non-conforming Work, or Action(s) required to correct/prevent recurring Deficiencies.

b. Review by A/E to:

1) Determine the cause of Non-Conformance

2) Evaluate for potential of recurrence.

3) Evaluate potential for significant conditions that may be adverse to quality.

4) Identify Follow-up Action(s) and/or Follow-up Inspection(s) required.

3. Contractor’s Daily Quality Control Report: A Field Inspection Report documenting QC activities and status of such each day.

a. Attach Field Test Reports for subject day.

1) Where Field Test Reports are unavailable for subject day due to off-site sample testing, results analysis, etc., note that such test was completed that day on Contractor’s Daily Quality Control Report and include an estimated date for delivery.

4. Deficiency: An element of the Work in-progress where damage, unsatisfactory results and/or other discrepancies can be rectified as the work proceeds.

5. Deficiency Notice: Notification of a Deficiency issued upon identification of workmanship or materials etc. found to be out of compliance with Construction Documents by inspection and/or testing.

6. Definable Unit of Work: a portion of the Work, as may be identified as a Feature, Segment, etc. which is separate and distinct from other portions of the Work and has separate control requirements.

Stiles Unit Section 01 45 16.13 - Page 2 of 10 HVAC System Efficiency Upgrades - 12 Bldg. Inmate Housing - Bid MWR #04922011

a. Each section of the Specifications may generally be considered as a Definable Unit of the Work; however, the organization of the Specifications shall not determine the extent or scope of a Definable Unit of the Work.

7. Follow-up Action(s): Action(s) as determined to be required to confirm satisfactory completion of Corrective Action(s) and/or Remedial Action(s).

8. Follow-up Inspection(s): Beginning of Follow-up [Control] Phase, if required. Final Inspections and other actions conducted to confirm satisfactory completion of Follow-up Action(s) prior to the start of subsequent Definable Unit(s) of Work which may be affected by the identified Deficiencies.

9. Initial Inspection: Beginning of Initial [Control] Phase. Required Inspection conducted upon completion of a representative sample of a given feature of the Work (also identified as a Definable Unit of Work), and prior to the start of a new or changed operation.

10. Non-Conformance: Work identified to be in violation of the terms of the Contract, including, but not limited to:

a. Equipment and/or materials received and/or completed items of the Work found to be in noncompliance with contract requirements.

b. Work or material that cannot be corrected and must be replaced.

c. Work that in order to correct it must have a deviation from Construction Documents approved.

d. Work in which an item must be substituted in lieu of that specified in the Construction Documents

11. Notice of Non-Conformance: Notification of Non-Conformance provided in compliance with Construction Documents.

12. Remedial Action: Action(s) required to correct Deficiencies to either provided, but uninstalled elements or other as yet uncompleted Work.

13. Preparatory Meeting: Beginning of an identified Preparatory [Control] Phase.

a. Identified as…