About this file
This is Addendum 1 issued by the City of San Antonio Public Works Department for the Lee's Creek Park project (ID No. 23-03976). The addendum extends the bid opening date from December 20, 2024 to January 7, 2025 at 2:00 PM CT. Key changes include revisions to Sheet L0.03 removing references to alternate and bamboo clearing, requirements for construction site display signs, and updates to include COSA General Notes and EPIC sheet. The project requires contractors to submit prior approvals by December 18, 2024 at 12:00 PM to Michelle.Birch@sanantonio.gov. Technical specifications detail requirements for decomposed granite repairs including removal/replacement of steel edging, herbicide treatment, tilling of existing material, and installation of Stalok concentrated binder. Geotextile fabric must be commercial grade, woven polyester, moisture-permeable (Warren's Terra Bond or equivalent).
The project has an estimated construction budget of $498,300 and must be substantially completed within 210 calendar days. Bidding is conducted through CivCast (www.civcastusa.com/bids) with requirements for Small Business Economic Development Advocacy (SBEDA) Program participation. The contract is structured as a unit price agreement where established prices remain valid throughout the contract duration. Quantities shown are estimates for budgetary purposes, and the City may order all, some, or none of the work shown. All bids must include pricing for all units/line items including alternates, with $0.00 entries indicating no-cost items and blank entries resulting in bid disqualification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Finance Department, Procurement Division
PO Box 839966 - San Antonio, TX 78283-3966 - Tel: 210-207-5734
Page 1 | 2
ADDENDUM 1
PROJECT NAME: Lee’s Creek Park
DATE: December 13, 2024
PROJECT NO: 23-03976
This addendum is separated into sections for convenience; however, all respondents, bidders, contractors, subcontractors, material men, and other parties must be responsible for reading the entire addendum. The failure to list an item or items in all affected sections of this addendum does not relieve any party affected from performing as per instructions, providing that the information is set forth one time any place in this addendum. These documents will be attached to and will become part of the Contract Documents for this project. The respondent/bidder is required to acknowledge the receipt of this addendum.
GENERAL:
1. The following changes and/or additions to the Contract Documents, via this addendum, must apply to proposals made for and to the execution of the various parts of the work affected thereby.
2. Careful note of the Addendum must be taken by all interested parties and all trades affected must be fully advised in their performance of the work involved.
3. This Addendum is hereby made part of the project requirements and contract documents for the above reference project. Ensure to acknowledge this Addendum in CivCast when downloading this Addendum. Acknowledgement of this Addendum is a requirement in order to submit bid in CivCast.
This addendum consists of the items and their associated attachments as listed below:
A. ADMINISTRATIVE CHANGES TO BID DOCUMENTS:
1. THE BID OPENING HAS BEEN EXTENDED
a. FROM: FRIDAY, DECEMBER 20, 2024
b. TO: TUESDAY, JANUARY 7, 2025
B. CHANGES TO PLANS / SPECIFICATIONS:
1. REVISED SHEET L0.03, REMOVED THE REFERENCE TO ALTERNATE AND GRAPHIC
REFERENCE TO BAMBOO CLEARING
2. REFERENCE ATTACHED CONSTRUCTION SITE DISPLAY SIGNS. CONTRACTOR TO
PROVIDE SIGNS ON SITE WITH THE FOLLOWING INFORMATION:
A. LEE’S CREEK PARK IMPROVEMENTS
(CONTRACTOR NAME)
DUNAWAY
Finance Department, Procurement Division
PO Box 839966 - San Antonio, TX 78283-3966 - Tel: 210-207-5734
Page 2 | 2
B. NOTE: FINAL PROJECT TEXT AND QR CODE WILL BE PROVIDED BY COSA.
C. CONTRACTOR SHALL PROVIDE PROOF OF SIGNS PRIOR TO APPROVAL BY
LANDSCAPE ARCHITECT AND CITY OF SAN ANTONIO REPRESENTATIVE PRIOR
TO FINAL FABRICATION
3. UPDATED COVER SHEET TO INCLUDE COSA GENERAL NOTES AND EPIC SHEET
C. QUESTIONS & RESPONSES:
1. WHEN DO PRIOR APPROVALS NEED TO BE SENT IN?
A. PLEASE SEND ANY PRIOR APPROVALS BY WEDENSDAY, DECEMBER 18, 2024,
AT 12:00 P.M., TO THE SOLICITATION’S POINT OF CONTACT,
MICHELLE.BIRCH@SANANTONIO.GOV.
2. FOR THE DECOMPOSED GRANITE REPAIR ARE WE TO REMOVE THE EDGING AND
INSTALL NEW EDGING AND REMOVE EXISTING DECOMPOSED GRANITE AND
REINSTALL WITH STALOK CONCENTRATED BINDER?
A. REFERENCE DETAIL H/L3.01 FOR DECOMPOSED GRANITE REPAIR NOTES.
REMOVE AND REPLACE EXISTING STEEL EDGING, HERBICIDE TREATMENT AND
TILL TOP 2" OF EXISTING DECOMPOSED GRANITE PATH AND REPLACE WITH
STALOK CONCRENTRATE BINDER FOR ALL DECOMPOED GRANITE PAVING ON
SITE. REFERENCE DETAIL I/L3.01 FOR ALL NEW DECOMPOSED GRANITE.
3. WHAT TYPE OF GEO-TEXTILE FABRIC IS TO BE USED UNDER DECOMPOSED GRANITE?
A. THE GEO-TEXTILE FABRIC TO BE COMMERICAL GRADE, WOVEN POYESTER,
MOISTURE-PERMEABLE FABRIC. WARREN'S TERRA BOND POLYESTER
GEOTEXTILE FABIRC, TAN IN COLOR OR APPROVED EQUIVALENT.
4. IS THERE A GEO-TECH REPORT FOR THE PARK. NEED TO KNOW IF WE WILL
ENCOUNTER ROCK.
A. NO GEOTECH REPORT IS AVAILABLE AT THIS TIME.
SIGNED AND SEALED BY CONSULTANT (Engineer/Architect of Record)
By signing and sealing this addendum, the Engineer/Architect of Record acknowledges that the sign/seal is only for changes/clarifications to the items associated with the Engineer’s/Architect’s work referenced in this addendum.
David Rios Procurement Manager Finance Department - Procurement Division
END OF ADDENDUM NO. 1
12/12/2024
CITY OF SAN ANTONIO
Issued By: Public Works Department Date Issued: December 13, 2024
ID NO.: 23-03976
(010) LOW QUALIFIED FORMAL INVITATION FOR BIDS (IFB) to CONTRACT Lee’s Creek Park
Form 010 Invitation for Bids (IFB) Revised 10/2023
Online bidding is utilized via CivCast at https://www.civcastusa.com/bids. Online bid services will open for bidding on Friday, November 15, 2024, and close on Tuesday, January 7, 2025, at 2:00 P.M. CT. Follow submittal instructions on https://www.civcastusa.com/. Hard Copies will not be accepted for this solicitation. Bids will be opened and the Bid Results will be posted on CivCast on the day of the bid deadline. Bid Results will be read aloud utilizing WebEx. Access WebEx by phone at 1-415-655-0001 and/or https://www.webex.com/ with Access Code: 1770 23 1452, Password: 3HrMPWvWr58
A Non-Mandatory Pre-bid meeting will be held through WebEx on Tuesday, November 26, 2024, at 10:00 A.M. CT. Access the WebEx by phone at 1-415-655-0001 and/or https://www.webex.com/ with Access Code: 2634 289 4478, Password: RehTxcDk595. The Deadline for questions is scheduled for December 6, 2024, at 4:00PM (CT).
The estimated construction budget for this contract is $498,300.00.
Bidder acknowledges that this is a unit price contract; that unit prices established will remain in effect and valid throughout the duration of the contract; the quantities shown are estimated quantities for budgetary purposes only; the award of this contract does not guarantee contractor the entire work shown in this FORMAL INVITATION FOR BID (IFB); the City of San Antonio (City) may order all, some, or none of the work shown in this IFB; and projects will be assigned as they become available. City may elect to award this Project based solely on the base bid, based on a combination of the base bid plus any combination of selected alternates or based on a combination of the base bid plus all alternates that serve the best interest of City. All bids must include a price for all units or line items, including any alternates. Entering a price of “$0.00” shall mean the units or line items will be provided at no cost to City. A unit price left blank shall result in the bid being deemed nonresponsive and disqualified from consideration. City reserves the right to delete line items prior to award.
This invitation includes the following Contract Documents which are required downloads in CivCast:
010 Invitation for Bids 081 General Conditions for Construction Contracts 020 Contract Signature Page ◘ Subcontractor/Supplier Utilization Plan 024 Unit Pricing Form (Lump Sum Bid Only) ◘ Local Preference Program Identification Form 030 Experience & Qualifications Form w/Project Sheets ◘ VOSB Program Tracking Form 040 Standard Instructions to Respondent ◘ Wage Decision 041 Certificate of Interested Parties (TEC Form 1295) ◘ Insurance Requirements
050.01 SBEDA Guidelines ◘ Heat Illness Prevention Acknowledgment Form 060 Supplemental Conditions 075 Performance Bond 076 Payment Bond
The City of San Antonio point of contact for this solicitation is Procurement Specialist II, Michelle Birch, Michelle.Birch@sanantonio.gov. Questions are to be submitted in writing in the Questions and Answers section on CivCast. Bidder understands and agrees to the responsibility for obtaining any and all addenda and adhering to all requirements in addenda. City is not responsible for incorrect information obtained through other sources.
Bid Documents must contain “Legal Name of Company” as listed by the Texas Secretary of State Registry (http://www.sos.state.tx.us/).
The documents required in CivCast (fully completed and with digital signatures) constitute the required information to be submitted as a part of the bid proposal.
The following documents constitute the required information to be submitted as a part of the bid proposal and are required uploads in CivCast:
020 Contract Signature Page ◘ TEC Form 1295 Certification Number & Date 024 Unit Pricing Form (Lump Sum Bid Only) ◘ Local Preference Program Identification Form 030 Experience & Qualifications Form w/Project Sheets ◘ VOSB Program Tracking Form ◘ Bid Bond ◘ Heat Illness Prevention Acknowledgment Form ◘ Subcontractor/Supplier Utilization Plan
It is understood and agreed that the work is to be substantially completed on or before 210 calendar days. This project does not include hazardous environmental work. This project requires 2 project sign(s).
Small Business Economic Development Advocacy (SBEDA) Program – Respondents shall meet the subcontracting requirements as stated on 050.01 Form and on the Subcontractor/Supplier Utilization Plan posted with this solicitation on the City’s website. The Subcontractor/Supplier Utilization Plan will be determined off of the base bid amount.
https://www.civcastusa.com/bids https://www.civcastusa.com/ https://www.webex.com/ https://www.webex.com/ mailto:Michelle.Birch@sanantonio.gov http://www.sos.state.tx.us/ dr08104 Highlight
Form 010 Invitation for Bids (IFB)
Local Preference Program Ordinance – For more detailed information on the Local Preference Program Ordinance, see solicitation document “040 Standard Instructions to Respondent”, section 5.
Veteran-Owned Small Business Preference Program – For more detailed information on the Veteran-Owned Small Business Preference Program, see Ordinance No. 2013-12-05-0864 and solicitation document “040 Standard Instructions to Respondent”, section 6.
Responsible Bidder Ordinance – For more detailed information on the Responsible Bidder Ordinance, see Ordinance No. 2023-01-26- 0041 and solicitation document “040 Standard Instructions to Respondent”, section 7.
Heat Illness Ordinance – For more detailed information on the Heat Illness Ordinance, see Ordinance No. 2023-08-31-0585 and General Conditions for Construction Contract, Article X.1.5 and Art.X.2.3(a).
Bid Protest Procedures – See solicitation document “040 Standard Instructions to Respondent”, section 11.
Wage Decision – Bidder shall meet the prevailing wage rate requirements established for this contract and shall reference the wage decision posted with this solicitation on the City’s website.