This is Addendum No. 2 for RFB 2024-084 issued by the City of Waco, Texas Purchasing Services for the Wetlands Pump Station Project. The addendum makes two key changes: 1) increases the bid depth to bearing stratum for the piers (30 inch & 24 inch) from 30 feet to 36 feet as shown in updated sheet S-12, and 2) changes the bid closing/opening date to December 11, 2024, with bids due by 2:00 p.m. CT and bid opening at 2:05 p.m. CT via Zoom video conference. The technical drawings include detailed pier plan notes, pier schedules, and typical concrete plan specifications.
The addendum includes a blank Zoom access instructions form for both pre-bid/proposal and bid/proposal opening sessions, though the specific meeting details are not filled in. The document requires bidders to sign and return the addendum acknowledgment page with their RFB response to confirm receipt and understanding of these changes. No pricing terms, set-asides, funding requirements or other financial details are modified in this addendum.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services Post Office Box 2570
Waco, Texas 76702-2570 Phone: 254-750-8098
Fax: 254-750-8063 melaniew@wacotx.gov
CITY OF WACO www.waco-texas.com
Date: 11/25/2024
RFB No: 2024-084 Commodity: Wetlands Pump Station Project Purchasing Agent: Melanie Wade
Closing Time: 2:00 P.M. CST, Wednesday, December 11, 2024 Opening Time: 2:05 P.M. CST, Wednesday, December 11, 2024
RFB Opening Location: Via Zoom Video and Dial In
Addendum No: 2
1. Updated plan sheet. The bid depth to bearing stratum for the piers (30 inch & 24 inch) was changed from 30 feet to 36 feet. See updated sheet S-12.
2. The closing/opening date has been changed to December 11, 2024. Bids are due by 2:00 p.m. CT and will be opened at 2:05 p.m. CT via zoom. Attached is the updated zoom information sheet.
The above-mentioned RFB has been changed. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.
Firm:____________________________________________________________________________________
Address___________________________________________________________________________________
Signature of Person Authorized to Sign Bid:______________________________________________________________________
Signor's Name and Title (print or type):_____________________________________________________________________________
E-mail Address:____________________________________________________________________________
Date:____________________Telephone:___________________________Fax:_________________________ mailto:melaniew@wacotx.gov file://NETAPP/HOMES/JodyC/0%20Purchasing/Utilities/2014/RFB%202014-012%20Generator%20Rebuild/www.waco-texas.com
TYPICAL PIER DETAIL
SCALE: NOT TO SCALE
X :\C lo ud
-J ob fil es
\2
2-
1_ W et la nd sI rr ig at io nP um pS ta tio n\
_P la ns
_E ng in ee rin g\
D ra w in gs \C on st ru ct io n\
-0
_2 -P la ns
.d w g
BYREVISIONDATENO.
6310 LBJ FREEWAY SUITE 217 DALLAS, TEXAS 75240
CONSULTING ENGINEERS
McCREARY & ASSOCIATES, INC.
214-957- 4041
FIRM No. F-338
CITY OF WACO, TEXAS
WETLANDS PUMP STATIONW
WINTON
E N G I N E E R I N G
“Turning Ideas into Reality” Waco, Texas (254) 776-7024
TBPELS FIRM REGISTRATION #F-0282
PIER PLAN NOTES / PIER DETAIL
S-12 S-32
TYPICAL CONCRETE PLAN NOTES
1. REFER TO SHEETS S-01 - S-10 FOR STRUCTURAL PLAN SPECIFICATIONS.
2. REFER TO SHEET S-13 FOR PIER LAYOUT / FOUNDATION PLAN.
3. DATUM ELEVATION 100.00' = 485.00' (ACTUAL).
4. THESE PLANS ARE INTENDED TO DESCRIBE THE GENERAL REQUIREMENTS FOR THIS PROJECT.
NOT ALL CONDITIONS ARE SPECIFICALLY DETAILED. CONTRACTOR IS RESPONSIBLE TO PROVIDE
ALL ITEMS REQUIRED FOR A COMPLETE AND FINISHED PRODUCT.
5. VERIFY ALL DIMENSIONS, AND EXACT SIZE AND LOCATION OF ALL DOORS, BLOCK-OUTS,
DEPRESSIONS, EMBEDS, ELECTRICAL BOXES, AND SIMILAR ITEMS WITH STRUCTURAL AND MEP
PLANS PRIOR TO DRILLING PIERS OR FORMING CONCRETE. NOTIFY STRUCTURAL ENGINEER OF
DISCREPANCIES.
6. CONTRACTOR SHALL COORDINATE WITH FINAL ELECTRICAL/PLUMBING PLANS, AND WITH
ELECTRICAL AND PLUMBING SUBCONTRACTORS, REGARDING ALL WORK REQUIRED WITHIN
FOUNDATION, INCLUDING AT A MINIMUM, GROUND WIRE CONNECTIONS, RECESSED FLOOR
BOXES, PIPE / CONDUIT PENETRATIONS, PIPE SLEEVES, ETC. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO SCHEDULE AND COORDINATE ALL INSPECTIONS REQUIRED BY THE
SPECIFICATIONS, AND BY AUTHORITIES HAVING JURISDICTION, PRIOR TO PLACING CONCRETE.
7. ALL PIPING AND CONDUIT SHALL BE UNDER FULL DEPTH OF SLAB AND SHALL NOT BE LAID ON
TOP OF SUBGRADE OR POLY, OR RUN LATERALLY WITHIN BEAMS. REFER TO NOTE BELOW FOR
PIPE PENETRATIONS.
8. NOTIFY STRUCTURAL ENGINEER AND CONSTRUCTION MATERIALS TESTING COMPANY A
MINIMUM OF (2) BUSINESS DAYS PRIOR TO DRILLING PIERS OR PLACING CONCRETE. INDICATE
APPROXIMATE TIME OF POUR, AS WELL AS WHEN STEEL REINFORCING WILL BE COMPLETED
FOR OBSERVATION.
9. PLACE ALL REINFORCING STEEL WITH PROPER CLEARANCES, LAPS, AND TIE/STIRRUP SPACINGS.
REFER TO DETAILS.
10. PROVIDE BAR CHAIRS, SUPPORTS, STANDEES AND SPACERS AT 4'-0” ON CENTER MAXIMUM FOR ALL LAYERS OF STEEL IN SLABS AND FOOTINGS, AND AS REQUIRED TO MAINTAIN CLEARANCES
AT BEAMS/WALLS.
11. FAILURE TO COMPLY WITH THESE NOTES, THE PLANS, AND SPECIFICATIONS MAY RESULT IN THE
REMOVAL AND REPLACEMENT OF WORK AT CONTRACTOR'S EXPENSE.
TYPICAL CONCRETE PLAN LEGEND
SECTION MARK
SHEET NUMBER
DETAIL NUMBER
PX
DRILLED PIER
PIER MARKXX.XX
TOP OF PIER
IDENTIFICATION NUMBER
PIER SCHEDULE
SHAFT DIA.
(INCHES) VERTICAL
REINFORCING
TIES
REMARKS
P1 30 (10) #8
MK
#3 AT 16" O.C.
REQ'D.
PENETRATION
3'-0" MIN.
BID DEPTH TO
BEARING STRATUM
36'-0"
NOTES:
1. RE: 1/S-12 FOR TYPICAL PIER DETAILS.
2. PROVIDE PIER BOLSTERS AND SLEDS - RE: SPECS.
3. ALL PIERS MUST TERMINATE ON A HARD LAYER.
4. NOTE THAT BID DEPTH TO BEARING STRATUM SHOWN ABOVE IS ESTIMATED BASED ON THE SOIL BORINGS IN THE GEOTECHNICAL REPORT AND
MAY VARY. ACTUAL PIER DEPTH IS DEPTH TO BEARING STRATUM AS DETERMINED IN THE FIELD BY THE GEOTECHNICAL LAB REPRESENTATIVE, PLUS THE REQUIRED PENETRATION SHOWN. ACTUAL DEPTHS OF PIERS MAY BE MORE OR LESS THAN AS INDICATED IN THE PIER SCHEDULE.
5. ALL PIER STEEL SHALL BE SHIPPED IN STOCK LENGTHS AND FIELD CUT BASED ON ACTUAL PIER DEPTHS.
U.N.O. = UNLESS NOTED OTHERWISE
CJ = CONTROL / CONSTRUCTION JOINT
T.O.C. = TOP OF CONCRETE
O.C. = ON CENTER
O.C.E.W. = ON CENTER EACH WAY
THICKENED EDGE.
RE: SECTION
P2 24 (6) #8 #3 AT 16" O.C. 3'-0" MIN. 36'-0"
1 11/22/24 REVISED PIER DEPTH JPK
BID NUMBER:
DATE:
TIME: CENTRAL
QUICK LINK:
MEETING ID:
DIAL IN NUMBER:
PASS CODE:
ADDITONAL
INFORMATION:
BID NUMBER:
DATE:
TIME: CENTRAL
QUICK LINK:
MEETING ID:
DIAL IN NUMBER:
PASS CODE:
ADDITONAL
INFORMATION:
PRE BID/ PROPOSAL
BID/ PROPOSAL OPENING
ZOOM ACCESS INSTRUCTIONS & ADDITIONAL INFORMATION
Rev. 1
RFB 2024-084 Page 3 https://wacotx.zoomgov.com/j/1600980097?
| Closing Time: 2:00 P.M. CST, Wednesday, December 11, 2024 |
| ______________________________________________________ |
| Addendum No: 2 |
| BID NUMBER: RFB 2024-084 |
| MM/DD/YY: 11/20/2024 |
| TIME CENTRAL: 10:00 A.M. (CT) |
| QUICK LINK: |
| MEETING ID: |
| DIAL IN NUMBER: |
| PASS CODE: |
| FREE COMMENT TEXT: MANDATORY on site - Waco Wetlands, 1752 Eichelberger Crossing, Waco, TX 76707 |
| BID NUMBER_2: RFB 2024-084 |
| MM/DD/YY2: 12/11/24 |
| TIME CENTRAL: 2:00 P.M. (CT) |
| QUICK LINK_2: https://wacotx.zoomgov.com/j/1600980097? |
| MEETING ID_2: 160 098 0097 |
| DIAL IN NUMBER_2: 1 551 285 1373 |
| PASS CODE_2: 391862 |
| FREE COMMENT TEXT_2: Via Zoom and Dial In |
File details come from the government source that posted it. Updated .