This document is an addendum to Invitation for Bid (IFB) No. 304T-24-500A1 issued by the Statewide Procurement Division (SPD), a division of the Comptroller of Public Accounts for the State of Texas. The IFB is for the procurement of Laundry Equipment, with the Texas Department of Criminal Justice (TDCJ) as a major customer. The addendum provides answers to questions received regarding the IFB requirements. Key details include that the customer (TDCJ) will disconnect and remove existing equipment anchors, while the contractor is responsible for anchoring and grouting the new machine, as well as making final connections to utility lines within 15 feet. Manuals are required to be provided in hard copy format. The IFB allows for consideration of equivalent brands to the referenced specifications.
The IFB specifies the scope of work for the installation of the washers or dryers, including the customer's responsibility for removing existing equipment and providing utility connections within 3 feet, while the vendor is responsible for making final connections, leveling and anchoring the new equipment, providing startup, and training personnel. Pricing terms, set-asides, incumbents, funding sources, and other salient information were not provided in this addendum document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statewide Procurement Division
IFB NO. 304T-24-500A1 ADDENDUM NO. #2
CONTRACT SPECIALIST: Noah Holdren, CTCD, CTCM
The purpose of this addendum is to provide answers to questions.
QUESTIONS AND ANSWERS: Reference Page 2 of this Addendum
THIS ADDENDUM SHALL BE ATTACHED TO AND FORM A PART OF THE REFERENCED IFB AND
THE CONTRACT.
RESPONDENT MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM, BY SIGNING AND
RETURNING WITH RESPONSE. FAILURE TO SUBMIT THE SIGNED ADDENDUM MAY DISQUALIFY
THE RESPONSE.
RESPONDENT COMPANY NAME AUTHORIZED REPRESENTATIVE SIGNATURE
AUTHORIZED REPRESENTATIVE PRINTED NAME
Questions and Answers IFB No. 304T-24-500A1 Title:
Question No. Question Answer
1 2.(b) Customer is to disconnect and remove anchors so the contractor may remove machine? Yes, the Customer will disconnect and remove the anchors.
2 3.(b) Customer is to anchor and grout machine since contractor is to set in place? No, the Contractor must anchor and grout new machine.
4.(d) Is this 15 feet of utility connection? If the customer put their connection within 15 feet as the crow flies, then the contractor may have more footage if it has to pipe around obstacles.
Yes, machinery is within 15 feet of utility connections.
4 7.(b) Do you want it in DVD or hard copy? Manuals are required to be hard copies.
5 Will foreign manufactures like China be accepted if they meet specs? Reference Part A Section A.7.1 Referenced Brand Example.
Responses on brands of like nature and quality will be considered.
6 The 400 – 410 gas dryer. Does it have a Burner Blower as in 14.? Yes, Line 4, the Dryer, Tumbler, Laundry, 400 - 410 Pound Capacity does have a required burner blower.
7 Ga Braun is a TSL and Brim is an open pocket. Is either acceptable? Yes, for Line 8, either a top loading washer or side loading washer are acceptable.
Attachment F - Requirements and Specifications - Contractor Requirements - Item 4.b & 4.d (Page 3) Bid Document Statement:
b. Furnish all necessary labor and tools needed complete installation
d. Make final connections.
Request for Information
1. Please provide a detailed scope of work that is to be priced for installation of the washers or dryers. This scope of work will ensure consistent pricing from all contractors in the Bid responses.
Installation of Washers or Dryers:
The Texas Department of Criminal Justice (TDCJ) will be responsible for removing existing equipment and providing all electric, water and gas line connections within 3’ of point of connection. The Vendor is responsible for connecting all electrical connections to existing disconnect box and connecting gas lines to existing gas valves. The vendor is also responsible for connecting water lines to existing water cutoff valves and connecting exhaust ductwork from equipment to the point of building penetration not to exceed 15’. All utility connections will be of new material in accordance with local and state building codes. The Vendor is responsible for leveling of equipment and anchoring in accordance with manufacturer specifications. The Vendor is to provide start-up, ensuring that all equipment is operating to manufacturer specifications and training a predetermined number of personnel.
Laundry Equipment
Addendum No. 2
| 9_Addendum #2 304T-24-500A1.pdf |
| Addendum #2 Questions and Answers 500A1.pdf |
File details come from the government source that posted it. Updated .