ES7034.pdf

PDF 84 KB Posted

Attached to
F-15 Remanufacture Federal contract opportunity
Solicitation number
FA821324R3032
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is an attachment titled "REWORK AND REPAIR OF NONCONFORMING MATERIAL" that outlines the requirements for rework and repair procedures for nonconforming material under a federal contract.

The key details are:

  • Rework is defined as reprocessing nonconforming material to make it conform completely to drawings, specifications, or contract requirements. Repair is defined as reprocessing nonconforming material to reduce, but not eliminate, the nonconformance to bring it into a usable condition.
  • Rework procedures must be documented by the contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation, and are subject to QAR disapproval.
  • Repair procedures must be documented by the contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
  • Submissions for rework or repair must include a description of the cause and actions taken to prevent recurrence.
  • Rework and repair procedures must include a provision for reinspection that takes precedence over the Technical Data Package requirements.
  • Rework and repair requirements flow down to contractors, suppliers, vendors, and subcontractors.

View the file

Other files for this federal contract opportunity

Other files attached to F-15 Remanufacture, newest first.
File Type Posted
CDRLS.pdf PDF
CADPADItemmarkinginstructions.pdf PDF
SOWAppendixA.pdf PDF
Packaging_SOW.pdf PDF
REPSHIP.docx DOCX document
FA821324R3032.pdf PDF
F011676621.pdf PDF
F001383770.pdf PDF
Item_Descriptions_combined.pdf PDF
CPM_Spreadsheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)

File details come from the government source that posted it. Updated .