ES7034.pdf
PDF 19 KB Posted
- Attached to
- Hard Target Void Sensing Fuze (HTVSF) FMU-167 Federal contract opportunity
- Solicitation number
- FA8213-22-R-3011
About this file
This document contains a government file regarding rework and repair of nonconforming materials for a federal contract opportunity. The government file provides definitions and requirements for rework and repair procedures to be documented and approved by the government. Rework procedures must conform completely to specifications, while repair procedures may still have some nonconformance. Procedures must include the cause and preventative actions for nonconformances, as well as reinspection requirements.
The related federal contract opportunity is a solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center for a Hard Target Void Sensing Fuze (HTVSF) FMU-167. Additional attachments will be provided directly to offerors. No further details are given on products, response dates, or other salient information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821322R3011_______0004.pdf | ||
| FA821322R3011_______0003.pdf | ||
| FA821322R3011_______0002.pdf | ||
| FA821322R3011_______0001.pdf | ||
| GFP.pdf | ||
| ExhibitCCDRLs.pdf | ||
| ES6200ADC.pdf | ||
| FA821322R3011.pdf | ||
| FMU167SPI.pdf | ||
| ExhibitBCDRLs.pdf | ||
| ES7650.pdf | ||
| DD254ContractSecurityClassificationSpecification.pdf | ||
| WARP.pdf | ||
| REPSHIP.pdf | ||
| ES7035.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
June 2020 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Variation, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence. Additionally, the procedures shall list the lot number(s) of the items affected along with the estimated or known quantity of items requiring repair or rework.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.