ES6200ADC.pdf

PDF 309 KB Posted

Attached to
Hard Target Void Sensing Fuze (HTVSF) FMU-167 Federal contract opportunity
Solicitation number
FA8213-22-R-3011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document provides guidance on Ammunition Data Cards (ADCs) for the Hard Target Void Sensing Fuze (HTVSF) FMU-167 solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center. Suppliers must develop and submit ADCs in accordance with MIL-STD-1168 and WARP requirements for each lot produced under the contract, including all assemblies, sub-assemblies, components, explosives, and propellants contained in the end item. A sample ADC must be submitted to WARP 30 days prior to First Article testing or production. Component ADCs and RFV/ECPs must also be included on the deliverable item's ADC when required.

View the file

Other files for this federal contract opportunity

Other files attached to Hard Target Void Sensing Fuze (HTVSF) FMU-167, newest first.
File Type Posted
FA821322R3011_______0004.pdf PDF
FA821322R3011_______0003.pdf PDF
FA821322R3011_______0002.pdf PDF
FA821322R3011_______0001.pdf PDF
WARP.pdf PDF
REPSHIP.pdf PDF
ES7034.pdf PDF
GFP.pdf PDF
ExhibitCCDRLs.pdf PDF
FA821322R3011.pdf PDF
FMU167SPI.pdf PDF
ExhibitBCDRLs.pdf PDF
ES7650.pdf PDF
DD254ContractSecurityClassificationSpecification.pdf PDF
ES7035.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

ES6200

Ammunition Data Cards (End Item Component Listing)

Feb 2020 (revision)

When to Use: When a “Detailed End Item Component Listing” for ADC reporting is specified as a requirement per the Airmunitions Specification.

Text:

Detailed requirements and guidance for the preparation of Ammunition Data

Cards (ADCs) are contained in MIL-STD-1168, DI-MISC-80043 and the Worldwide

Ammunition-data Repository Program (WARP) online user’s manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in

MIL-HDBK-1461.

(a) The supplier shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168, and the user manual located on the

WARP database. The WARP application is accessed through the Munitions

History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(b) The supplier shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.

(c) Unless otherwise authorized by the Procuring Contracting Officer, the supplier shall include, in the components sections on the ADC representing the deliverable item; all assemblies, sub-assemblies, components, explosives, and propellants contained in and used to produce the end item.

(d) When required by the technical data package, all component lot numbers shall be in accordance with MIL-STD-1168 lot number convention. When not required by technical data package, component lot number may be constructed through producer lot number convention.

e. The flow-down of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.

f. All component RFV/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user manual provides information on the level of detail required.

g. A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.

(ES6200)

File details come from the government source that posted it. Updated .