Spec.Division_1_Table_of_Contents.52517.pdf
PDF 174 KB Posted
- Attached to
- Construction Manager as Constructor (CMc) Services for the Dwight D. Eisenhower Memorial Project Federal contract opportunity
- Solicitation number
- EQWPIAA-17-0016
About this file
Spec Document - Table of Contents
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EISENHOWER MEMORIAL SPECIFICATION
TABLE OF CONTENTS
DWIGHT D. EISENHOWER MEMORIAL
100% Construction Documents
March 1, 2017
Division 1 Table of Contents
011000 SUMMARY
011400 WORK RESTRICTIONS
012100 ALLOWANCES
012300 ALTERNATES
012500 SUBSTITUTION PROCEDURES
012520 REQUESTS FOR INFORMATION
012600 OPTIONS
012700 UNIT PRICES
012900 PAYMENT PROCEDURES
013000 ELECTRONIC PROJECT MANAGEMENT
013100 PROJECT MANAGEMENT AND COORDINATION
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013210 NETWORK ANALYSIS SCHEDULES
013220 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
014000 QUALITY CONTROL
014025 QUALITY CONTROL TESTING FOR AIR BARRIERS
014050 CONTRACTOR QUALITY CONTROL
014100 MOCKUPS GP
014200 REFERENCES
014500 STRUCTURAL TESTING INSPECTION AND QUALITY ASSURANCE
015000 TEMPORARY FACILITIES AND CONTROLS
015350 CONTRACTING OFFICER'S REPRESENTATIVE'S OFFICE
015460 SAFETY AND HEALTH
015639 TEMPORARY TREE AND PLANT PROTECTION LAND
015930 SECURITY REGULATIONS
016000 PRODUCT REQUIREMENTS
017000 EXECUTION REQUIREMENTS
017130 CUTTING AND PATCHING GP
017350 FIRE PREVENTION PRECAUTIONS FOR HOT WORK
017410 CONSTRUCTION INDOOR AIR QUALITY
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DOCUMENTATION
017839 PROJECT RECORD DOCUMENTS
017900 DEMONSTRATION AND TRAINING
018111 SUSTAINABLE DESIGN REQUIREMENTS
019113 GENERAL COMMISSIONING REQUIREMENTS
File details come from the government source that posted it. Updated .