Spec_012300._ALTERNATES.r2017.52517.pdf

PDF 10 KB Posted

Attached to
Construction Manager as Constructor (CMc) Services for the Dwight D. Eisenhower Memorial Project Federal contract opportunity
Solicitation number
EQWPIAA-17-0016
Issued by
General Services Administration Public Buildings Service National Capital Region

About this file

Spec Document - Alternates

View the file

Other files for this federal contract opportunity

Other files attached to Construction Manager as Constructor (CMc) Services for the Dwight D. Eisenhower Memorial Project, newest first.
File Type Posted
Amendment_06.GS11P17MKC0016.060617.pdf PDF
Revised_SF1442.GS11P17MKC0016.Amendment_06.06062017.pdf PDF
Q&A.Part_3.Amendment_06.60617.pdf PDF
Bid_Speadsheet.Alternate_A.Rev_Amendment_06.6617.xlsx XLSX spreadsheet
Amendment_05.GS11P17MKC0016052617.pdf PDF
Q_and_A.Part_2.GS11P17MKC0016.5252017.pdf PDF
Spec_017700_CLOSEOUT_PROCEDURES.r2017.52517.pdf PDF
Bid_Speadsheet.Alternate_A.revised.52517.xlsx XLSX spreadsheet
Spec.Division_1_Table_of_Contents.52517.pdf PDF
Spec_012100._ALLOWANCES.r2017.52517.pdf PDF
Amendment_04.GS11P17MKC0016.52517.pdf PDF
LBJ_visit_attendees_list_5.17.17.pdf PDF
Amendment_03.GS11P17MKC0016.051917.pdf PDF
Q_and_A.Solicitation_GS11P17MKC0016.5.16.17.pdf PDF
Specification_072726_fluid_app_memb_air_barriers.51617.pdf PDF
Bid_speadsheet.GS11P17MKC0016.5.16.17.xlsx XLSX spreadsheet
Amendment_02.GS11P17MKC0016.051617.pdf PDF
Solicitation_GS11P17MKC0016.Eisenhower_V2_2017.5.16.pdf PDF
DOL_Wage_Rates.DC170002.Solicitation_GS11P17MKC0016.050517.pdf PDF
Agreement_GS11P17MKC0016.v2.051617.pdf PDF
Bid_speadsheet_for_CMc_for_Eisenhower_-_5-2-17.xlsx XLSX spreadsheet
Amendment_01.GS-11-P-17-MK-C-0016.050217.pdf PDF
pre-proposal_attendee_list_4.25.17.pdf PDF
Division_01_Eisenhower_Memorial.r.04172017.pdf PDF
Eisenhower_Memorial_project_Pre-Proposal_Conference_Instructions.pdf PDF
Contract_Pricing_Form.GS11P17MKC0016.CMc_Project.March_22_2017.xlsx XLSX spreadsheet
Past_Performance_Questionnaire.docx DOCX document
Eisenhower_Memorial_Division_01.041017.pdf PDF
GSA527-15b.pdf PDF
Solicitation_GS11P17MKC0016..41017.pdf PDF
Tapestry_Development_Summary_Report.4.5.17.pdf PDF
2017-02-08_01_Eisenhower_Memorial_Spec_Vol1_Div02-22.pdf PDF
Drawings.2016.02-08.100CD_V1.pdf PDF
CMc.Agreement_GS11P17MKC0016.041017.pdf PDF
Reps_and_Certs.CMc.GS11P17MKC0016.Eisenhower.pdf PDF
Drawings.2016.02-08.100CD_V2.pdf PDF
GS_Form_1442.GS11P17MKC0016.Eisenhower.pdf PDF
CMc_SOW.March_22_2017.pdf PDF
2017-02-08_02_Eisenhower_Memorial_Spec_Vo2_Div23-34_&_Appendix.pdf PDF
DOL_Wage_Rates.041017.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALTERNATES 012300 - 1

DWIGHT D. EISENHOWER MEMORIAL

100% Construction Documents March 1, 2017

SECTION 012300 - ALTERNATES

PART 1 - GENERAL

1.1 SUMMARY

A. An alternate provides an amount proposed by the Contractor and stated on the Bid Form for certain work that will adjust the contract amount if the Government decides to accept the corresponding change in the products, materials, equipment, systems or installation methods described in the Contract Documents.

B. The amount for an alternate is the total net adjustment from the contract to incorporate or deduct the alternate work into the project Work.

C. Alternate work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the alternate description.

D. Related Sections:

1. Section 012100 – Allowances.

1.2 PROCEDURES

A. Selection: Acceptance or rejection of each alternate will be made by the Government prior to award of the Contract, and the contract amount will be adjusted accordingly for accepted alternates to establish the contract price.

B. Notification: Immediately following award of the Contract, the Contractor shall notify each party involved, in writing, whether each alternate has been accepted or rejected.

C. Coordination: The Contractor shall modify or adjust affected adjacent work as necessary to completely and fully integrate the accepted alternate work into the project Work.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES

Alternate A: Removal of Allowances No. 1-A and No. 1-B from the scope of the contract.

Allowances No. 1-A and 1-B will be procured and furnished by the Government. With the removal of the Allowances 1-A and 1-B, the Contractor’s project schedule shall include all activities required to install the tapestries within the Option No. 3 duration. The Contractor’s project schedule shall include all activities required to fabricate and furnish the tapestries starting in the Base construction contract period, complete and ready for installation no later than during the Option 3 period, such that all tapestry fabrication and installation shall be completed within the overall project duration. With the removal of Allowances 1-A and 1-B, the Contractor is still responsible for the transportation, storage and installation of the tapestry panels, and the coordination of the cable assembly vendor’s work with the Government’s tapestry artist

END OF SECTION 012300

ALTERNATES 012300 - 2

DWIGHT D. EISENHOWER MEMORIAL

100% Construction Documents March 1, 2017

THIS PAGE LEFT BLANK INTENTIONALLY

File details come from the government source that posted it. Updated .