Bid_Speadsheet.Alternate_A.Rev_Amendment_06.6617.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Construction Manager as Constructor (CMc) Services for the Dwight D. Eisenhower Memorial Project Federal contract opportunity
- Solicitation number
- EQWPIAA-17-0016
About this file
Revised Bid Spreadsheet - Alternate A Delete the SF 1442 and Bid Spreadsheet, as issued previously, and insert the attached revised SF 1442 and Bid Spreadsheet in lieu thereof. These forms are to be used for proposal submission.
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Bid spreadsheet for CMc for Eisenhower Memorial |
| (Revised 6/6/2017) |
| CLIN | ITEM | PRICE | ||
| 1 | Design Phase Services | |||
| 2 | Option 1 - Base Construction Contract | |||
| 2a | Target Estimated Cost of Work (ECW) | |||
| 2b | CMc Contingency Allowance (2a X 3%) | $ - 0 | ||
| 2c | Fee | |||
| 2d | Option #1 Guaranteed Maximum Price ( 2a+2b+2c) | $ - 0 | ||
| 3 | Option 2 | |||
| 3a | Target Estimated Cost of Work (ECW) | |||
| 3b | CMc Contingency Allowance (3a X 3%) | $ - 0 | ||
| 3c | Fee | |||
| 3d | Option #2 Guaranteed Maximum Price | $ - 0 | ||
| 4 | Option 3 | |||
| 4a | Target Estimated Cost of Work (ECW) | |||
| 4b | CMc Contingency Allowance (4a X 3%) | $ - 0 | ||
| 4c | Fee | |||
| 4d | Option #3 Guaranteed Maximum Price | $ - 0 | ||
| 5 | Option #4 (Firm Fixed Price) | |||
| 6 | Option #5 (Firm Fixed Price) |
Total Contract Value $ - 0
| Item # | Unit Pricing |
| 1 | Unit Price No. 1: Contaminated Soil Removal and Disposal (Section 31200) |
| 2 | Unit Price No. 2: Auger Cast-In-Place (ACIP) Piles (Section 316316) |
| The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM 552.243-71) | |||
| Item # | Overhead Pricing | ||
| 1 | Overhead (Home Office)% | Percent (%) | |
| 2 | Extended Overhead (Field Office) | Per Calendar Day. |
Alternate A - Excluding Tapestry Allowance No. 1-A & 1-B
| CLIN | ITEM | PRICE | ||
| 1 | Design Phase Services | |||
| 2 | Option 1 - Base Construction Contract | |||
| 2a | Target Estimated Cost of Work (ECW) | |||
| 2b | CMc Contingency Allowance (2a X 3%) | $ - 0 | ||
| 2c | Fee | |||
| 2d | Option #1 Guaranteed Maximum Price ( 2a+2b+2c) | $ - 0 | ||
| 3 | Option 2 | |||
| 3a | Target Estimated Cost of Work (ECW) | |||
| 3b | CMc Contingency Allowance (3a X 3%) | $ - 0 | ||
| 3c | Fee | |||
| 3d | Option #2 Guaranteed Maximum Price | $ - 0 | ||
| 4 | Option 3 | |||
| 4a | Target Estimated Cost of Work (ECW) | |||
| 4b | CMc Contingency Allowance (4a X 3%) | $ - 0 | ||
| 4c | Fee | |||
| 4d | Option #3 Guaranteed Maximum Price | $ - 0 | ||
| 5 | Option #4 (Firm Fixed Price) | |||
| 6 | Option #5 (Firm Fixed Price) |
Total Contract Value $ - 0
Attachment to SF 1442: This sheet must be completed and submitted with the SF 1442 to be considered.
SUBMIT A SIGNED AND DATED PDF OF THIS DOCUMENT WITH YOUR PROPOSAL SUBMISSION.
image1.emf
File details come from the government source that posted it. Updated .