Revised Bid Spreadsheet - Submit along with SF 1442
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Bid spreadsheet for CMc for Eisenhower Memorial |
| (Revised 5/9/2017) |
| CLIN | ITEM | PRICE | ||
| 1 | Design Phase Services | |||
| 2 | Option 1 | |||
| 2a | Target Estimated Cost of Work (ECW) | |||
| 2b | CMc Contingency Allowance (2a X 3%) | $ - 0 | ||
| 2c | Fee | |||
| 2d | Option #1 Guaranteed Maximum Price ( 2a+2b+2c) | $ - 0 | ||
| 3 | Option 2 | |||
| 3a | Target Estimated Cost of Work (ECW) | |||
| 3b | CMc Contingency Allowance (3a X 3%) | $ - 0 | ||
| 3c | Fee | |||
| 3d | Option #2 Guaranteed Maximum Price | $ - 0 | ||
| 4 | Option 3 | |||
| 4a | Target Estimated Cost of Work (ECW) | |||
| 4b | CMc Contingency Allowance (4a X 3%) | $ - 0 | ||
| 4c | Fee | |||
| 4d | Option #3 Guaranteed Maximum Price | $ - 0 | ||
| 5 | Option #4 (Firm Fixed Price) | |||
| 6 | Option #5 (Firm Fixed Price) |
Total Contract Value $ - 0
| Item # | Unit Pricing |
| 1 | Unit Price No. 1: Contaminated Soil Removal and Disposal (Section 31200) |
| 2 | Unit Price No. 2: Auger Cast-In-Place (ACIP) Piles (Section 316316) |
| The following rates and prices will be utilized for changes in accordance with changes clause (FAR 52.243-4) and equitable adjustment clause (GSAM 552.243-71) | |||
| Item # | Overhead Pricing | ||
| 1 | Overhead (Home Office)% | Percent (%) | |
| 2 | Extended Overhead (Field Office) | Per Calendar Day. |
Alternate A - Excluding Tapestry Allowance No. 1-A & 1-B
| CLIN | ITEM | PRICE | ||
| 1 | Design Phase Services | |||
| 2 | Option 1 | |||
| 2a | Target Estimated Cost of Work (ECW) | |||
| 2b | CMc Contingency Allowance (2a X 3%) | $ - 0 | ||
| 2c | Fee | |||
| 2d | Option #1 Guaranteed Maximum Price ( 2a+2b+2c) | $ - 0 | ||
| 3 | Option 2 | |||
| 3a | Target Estimated Cost of Work (ECW) | |||
| 3b | CMc Contingency Allowance (3a X 3%) | $ - 0 | ||
| 3c | Fee | |||
| 3d | Option #2 Guaranteed Maximum Price | $ - 0 | ||
| 4 | Option 3 | |||
| 4a | Target Estimated Cost of Work (ECW) | |||
| 4b | CMc Contingency Allowance (4a X 3%) | $ - 0 | ||
| 4c | Fee | |||
| 4d | Option #3 Guaranteed Maximum Price | $ - 0 | ||
| 5 | Option #4 (Firm Fixed Price) | |||
| 6 | Option #5 (Firm Fixed Price) |
Total Contract Value $ - 0 image1.emf