006_-_Pricing_Document_-_UPDATED_11.05.2018.pdf
PDF 110 KB Posted
- Solicitation number
- EQWPC-18-0010
About this file
Pricing Document
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN ITEM PRICE
00 Contact Requirements, General and Supplementary Conditions, Permits, Certifications, Bonds, etc.
01 DIVISION- 1 GENERAL REQUIRMENTS $
02 DIVISION- 2 EXISTING CONDITIONS $
03 DIVISION- 3 CONCRETE $
04 DIVISION- 4 MASONRY (NOT USED) $
05 DIVISION- 5 MISC. METALS $
06 DIVISION- 6 WOODS, PLASTICS & COMPONENTS $
07 DIVISION- 7 THERMAL & MOISTURE PROTECTION $
08 DIVISION- 8 OPENINGS $
09 DIVISION- 9 FINISHES $
10 DIVISION- 10 SPECIALITIES $
11 DIVISION- 11 EQUIPMENT (Appliances) $
12 DIVISION- 12 FURNISHINGS $
13 DIVISION- 13 SPECIAL CONSTRUCTION (NOT USED) $
14 DIVISION- 14 CONVEYING SYSTEMS (NOT USED) $
15 DIVISION- 21 FIRE SUPPRESSION $
16 DIVISION- 22 PLUMBING $
17 DIVISION- 23 HVAC SYSTEMS $
18 DIVISION- 26 ELECTRICAL $
19 DIVISION- 27 COMMUNICATIONS $
20 DIVISION- 274116-AUDIO-VIDEO SYSTEMS & EUIPMENT $
21 DIVISION- 28 ELECTRONIC SAFETY & SECURITY $
22 DIVISION- 283111 ADDRESSABLE FIRE ALARM SYSTEMS $
1 Part 1 SUM OF DIVISIONS 00-22 Base Contract $
2 Unit Price 1 $
3 Estimated Quantity, Unit Price 1 $
Solicitation # EQWPD-18-0027-AM0002 - Design Build Contract for Ronald Reagan Building Phase 3 and 4 of the United States Agency for International Development (USAID)
PRICING DOCUMENT
CLIN ITEM PRICE
4 Allowance, Unit Price 1 $
5 Total Contract Price (1+4+5) $
OPTIONAL BID RATES
6 Contractor’s Overhead Rate for Adjustments % 10
7 Contractor’s Profit Rate for Adjustments % 5
8 Contractor’s Bond Rate % 1
9 Contractor’s Daily Rate for Compensable Project Delay (Work Day) $ TBD
File details come from the government source that posted it.