Text version
DATE: December 12, 2016 GSA Public Building Services R2, Border Station Office Project Manager: Karen M. Wilson Champlain, NY 518-298-3264 x108 or 315-529-5530 (cell)
STATEMENT OF WORK
NORTHBOUND GATES – CHATEAUGAY LPOE
LOCATION: Site, Chateaugay LPOE (NY0586CI), Chateaugay, New York 12920
OBJECTIVE: Install lift arm gate in the northbound lane at the Port to prevent vehicles from using the lane when travelling southbound. Gate to be normally closed. When a vehicle approaches from the south, the gate shall open upon signal from a ground loop. The gate closure shall be controlled by a safety loop detector to the north side of the gate. The gate will also able to be operated by wired remote control from the Inspection Booth.
PROJECT TIME: Work shall be completed within 90 calendar days (60 calendar days for installation plus 30 calendar days for digital message sign) of the Notice to Proceed (NTP). Due to the outside nature of the work, upon request, the NTP may be delayed until spring.
PROJECT SCOPE: Contractor shall provide all parts, equipment, materials, and labor to complete the following work:
Contractor is responsible for securing a highway work permit from the Franklin County Highway Dept.
1. Install one high performance commercial DC-powered barrier (lift) gate operator. Include heater for tower and built-in battery back-up. Reference Specification Section 111200.
2. Install one 12 foot long LED lighted aluminum lift arm. Gate arm shall have a reflective face.
3. Provide submittal information on operator tower and gate arm for approval before ordering.
4. The operator tower shall be mounted on a concrete pad. Pad to have an underground depth of 36 inches and extend a minimum of 4 inches above grade. Reference Specification Section 680.
5. Install four (4) 42 inches high, 6 inch round, painted steel, concrete filled bollards at the corners of the gate operator pad.
6. Provide traffic management during installation so that the travelling public can continue to safely travel northbound with minimal disruption. Provide traffic management plan for review prior to starting work.
7. Pull power wiring and control cables from LPOE Inspection Building through existing spare conduit feeding the rpms. Add underground conduit from the rpms to the gate operator. Trench pavement in the center of the road and then across the road and in the shoulder at the minimum width necessary to install the conduit and backfill properly per NYSDOT standards. Backfill and patch trenches in the road and shoulder to match existing. Reference Specification Section 680.
8. The lift gate shall be controlled by a 6 ft x 6 ft ground loop detector (free exit) located on the south side of the gate. Reference Specification Section 680. Gate closure shall be controlled by a safety loop detector. Provide remote manual override for gate operation to be controlled from booth. Use existing conduit for control wiring to booth and install a labelled box and switch or button.
9. Install a stop sign for attachment to the gate arm.
10. Provide a 36” x 36” W3-1 traffic warning sign, with a stop sign symbol warning of a stop ahead.
Sign will be installed by others.
KarenMWilson Typewritten Text page 14 of 38 in SOW_-_Northbound_Gates_-_Group_1_package_1-25-17