A001_TUS_Pretrial_and_Probation_Painting.pdf

PDF 161 KB Posted

Attached to
TUS Pretrial & Probation Painting
Solicitation number
EQ10PCP-18-0029
Issued by

About this file

A001 - Responses to Questions

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

2. AMENDMENT/MODIFICATION NO.

A001

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide Questions and Answers received through July 31, 2018. See Amendment 001, SF 30 Continuation Page, dated July 31, 2018 for details.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

General Services Administration Construction Acquisitions Branch 400 15th Street SW Auburn, WA 98001-6599 Matthew Chaison, 253-249-6127, matt.chaison@gsa.gov

9A. AMENDMENT OF SOLICITATION NO.

EQ10PCP-18-0029 A001

3. EFFECTIVE DATE

07/31/2018

9B. DATED (SEE ITEM 11)

07/13/2018

X

SCHEDULE

Item No. Supplies/Services Quantity Unit Unit Price Amount

RFQ: TUS Pre-Trial & Probation Painting

AMENDMENT 001, SF 30 Continuation Page, July 31, 2018

Solicitation Number: EQ10PCP-18-0029

The purpose of this Amendment (A001) is to:

PROVIDE: Questions and Answers received from vendors through July 31, 2018.

Please acknowledge receipt of this Amendment A001 in writing when submitting your quote. Quote deadline remains August 8, 2018 at 3:00 PM local time.

Solicitation: EQ10PCP-18-0029 TUS Pre-Trial & Probation Painting

Item Date Submitted Vendor Question

Response Date Government Response

#1 7/27/2018 How many phases do you anticipate? 7/30/2018 4-5 phases however schedule is up to the contractor

#2 7/27/2018 Day time work, 7 – 5? Can we work off hours to minimize the disruption? 7/30/2018

Yes - 7-5 however if contractor would like to perform work after normal hours contractor will need to obtain HSPD-12 credential to escort/supervise up to 5 workers.

#3 7/27/2018 Is there a reflective ceiling plan available or a list of rooms that have ceilings that paint? 7/30/2018

No - current plans to not reflect existing conditions.

#4 7/27/2018 Do we remove shelving in Storage Rooms? 7/30/2018 No - leave shelving in place and paint around.

#5 7/27/2018 Do all painted door Jams, relights and painted doors get repainted? 7/30/2018 Yes - all metal doors and frames

#6 7/27/2018 Do we move all the cubical and paint behind corner to corner? 7/30/2018 Yes

#7 7/27/2018 Are we replacing the corner guards, if so what type and is there a count? 7/30/2018 Yes - match existing. There are (8).

#8 7/27/2018 Is there no cost parking available on site? 7/30/2018 No, contractor will need to pay for parking.

#9 7/27/2018 Is there a lay down area inside we can leave equipment each evening? 7/30/2018 Yes

SF 30
A001 - Wording
Vendor Questions
Sheet1