Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

A001

a. The purpose of this amendment is to inform potential Offerors that revisions made to the Statement of Work (SOW) are in red text and the Mt Vernon Floor Plan.

b. The required response date/time for submission of proposals remains the same: 29 January 2016 at 4:00 PM PST.

General Services Administration 400 15th St SW Auburn, WA 98001-6599

EQ10PCP-15-5077

EQ10PCP-16-5077

01/12/2016

01/05/2016

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

U.S. General Services Administration 400 15th St SW Auburn, WA 98001 GSA Northwest/Arctic Region

STATEMENT OF WORK

Roosevelt Business Center

Mount Vernon, WA

DESCRIPTION

Veteran’s Administration (VA) Handbook 0730 indicates specific physical security requirements and options for areas which contain information resource management servers and mainframes, telephone equipment rooms, electrical power, and telecommunication data connections. Increased security measures and intrusion notification devices are needed for the Mt. Vernon office. Installed components must be Federal Information Processing Standard Publication (FIPS) 12 and Homeland Security Presidential Directive 12 (HSPD-12) compliant and work with both the current Lenel Physical Access Control System (PACS) and Government issued Personal Identification Verification (PIV II) cards. In addition, the installed components must be integrated to current level of functionality with the Lenel PACS. Installed intrusion system and equipment must be compliant with Department of Homeland Security requirements.

In addition, intrusion system and equipment must pass acceptance testing from Federal Protective Service (FPS) alarm monitoring MegaCenter. MegaCenter Alarm Requirements (MAR) document will need to be completed and submitted by the Contractor prior to scheduling alarm system acceptance testing. Security items must conform to the requirements listed in VA Handbook 0730 which will be provided to GSA and the contractor.

LOCATION

Roosevelt Business Center 1420 Roosevelt St, Unit #1 Mount Vernon, WA 98274

1. SCOPE

VA Handbook 0730 indicates specific physical security requirements and options for areas which contain information resource management servers and mainframes, telephone equipment rooms, electrical power, and telecommunication data connections. Applicable requirements listed in VA Handbook 0730 must be met.

1. Data Closet Requirements:

(a) Install temperature and humidity monitoring system with reporting and notification capabilities in the data closet.

(b) Install mortise lock that is automatically locking and includes a ¾” deadbolt with an inside thumb latch on the data closet door. Mechanical locking systems must allow for single motion egress. Request multiple uniquely keyed interchangeable tumblers with copies of keys.

(c) Install alarm activated strobe outside of the data closet. Install alarm activated 90Db horn inside the data closet.

(d) Install door contacts on the data closet door.

(e) Install motion detector in the data closet.

(f) Install PIV card reader with keypad outside of data closet door.

(g) Install a digitally recordable camera in the data closet, the cameras will be compatible with the Lenel picture archiving system.

(h) Install remote key operated activation/deactivation switch outside the data closet.

(i) Access, temperature, humidity, and alarm activity reports should be captured and accessible by designated Seattle VBA and OIT staff. Provide signage to be placed external to the data closet indicating the room is alarmed. Contractor is to provide programming. Wiring to be concealed at the doorway jamb.

(j) Install Intrusion Detection System (IDS) to include, alarm activated strobe light, 90Db horn, battery backup with AC charger, motion sensors, video cameras (digitally recordable and remotely viewable), door contacts, REX, along with a video door phone/monitoring system with video monitor for office employees to communicate with visitors at main entrance.

(k) IDS must be programmed to notify Federal Protective Service (FPS) upon unauthorized entrance. Alarm system is to be connected to battery backup with AC chargers. Installed components must be Federal Information Processing Standard Publication (FIPS) 12 and Homeland Security Presidential Directive 12 (HSPD-12) compliant and work with both the current Lenel Physical Access Control System (PACS) and Government issued Personal Identification Verification (PIV II) cards.

(l) In addition, the installed components must be integrated to current level of functionality with the Lenel PACS. IDS and equipment must be compliant with Department of Homeland Security requirements. In addition, intrusion system and equipment must pass acceptance testing from Federal Protective Service (FPS) alarm monitoring MegaCenter.

MegaCenter Alarm Requirements (MAR) document will need to be completed and submitted by the vendor prior to scheduling alarm system acceptance testing.

(m) The Contractor is responsible to install electrical circuits as needed to support systems.

Statement of Work – Mt Vernon SSA Project

(n) The Contractor is responsible to provide and install any additional data, communication, equipment, and programming needed to integrate the existing Lenel PACS that is located at 915 2nd Avenue, Suite 1086, Seattle, WA 98174 with the addition of the Mt.Vernon office Lenel operated security items.

(o) Install five duress buttons at marked locations. Must be compatible with existing Lenel system.

(p) Extend existing HVAC to the Data Closet to address the cooling requirements associated with the equipment within. Install required temperature controls to maintain a temperature between 65-75° Fahrenheit.

2. Exterior Door Requirement:

(a) Replace existing exterior door and door hinges to increase security of the main entrance/exit. Door hinges for the exterior door are to be installed inside the office space.

Install peephole in new door. New security lockset to be installed in new exterior door that is automatically locking with inside thumb latch and includes a minimum ¾” deadbolt.

(b) Install HID RPK40 Multi-Class PIV II card reader with keypad on exterior of building.

Install electric door strike on exterior door. Install a digital, fixed color camera to monitor the main entrance and exit. The system should include a digital video recorder (DVR) with remote access capability. It should have sufficient storage to store images recording at a rate of 15 frames per second for a period greater than 30 days. Ensure that all newly installed security components are capable of being monitored by the Federal Protective System. This may require the replacement of the current security system at this location.

Contractors will be escorted by a VA employee at all times while work is being performed in the data closets as this space is a secure area. VA Handbook 0730 will be provided to Contractor.

2. GENERAL

2.1 PARKING AND SECURITY ACCESS:

a) Parking for Contractors and vehicle access to the building will be as directed by the Property

Manager.

b) See attached GSA PBS Policy and Security Guidelines for additional details. The security clearance process may take a minimum of 30 working days. Contractors will not start work until a favorable initial adjudication is determined.

2.2 WORK HOURS and PROCESSES:

Government personnel are scheduled to occupy the building during the hours of Monday through Friday, except for established government Holidays, 6:00 AM to 6:00 PM. Work shall be coordinated with the Program and Property Managers to mitigate impacts on these spaces. The Contractor’s working hours shall be established outside of Government Occupied Hours.

a. All construction work shall be conducted from 6:00 P.M. to 5:30 A.M. Monday through Friday each week.

b. The Contractor’s work shall be neat, clean, and organized. No equipment storage available at the location and Contractor must remove items brought in after each shift.

2.3 SPECIFIC TASKS:

The Contractor shall install the following equipment list as required.

Table 1: DATA CLOSET ITEMS

Number of Items

Description of Equipment

1 Mortise Lock, automatically locking with inside thumb latch and includes a ¾” deadbolt (example provided)

4 Interchangeable keyed core cylinders (Each cylinder keyed differently, with 2 keys per cylinder)

1 Electric Strike 1 Motion Detector 1 Temperature and humidity monitoring device, to include reporting and notification system 1 Remote key operated activation/deactivation switch with 5 key copies 1 Alarm activated strobe light system 1 Alarm activated 90Db horn 1 Battery Backup with AC chargers for alarm/intrusion detection system 1 Door Contacts 1 Camera (digitally recordable and remotely viewable, compatible with existing

Lenel system) 1 1-3/4 inch solid core hardwood or hollow steel construction door with lower vent.

Paint to match existing color.

1 Door frame – paint to match existing color.

1 HID RPK40 Multi-Class PIV II Card Reader with Keypad

Table 2: GENERAL OFFICE ITEMS & EXTERIOR DOOR

Number of Items

Description of Equipment

1 Metal security exterior door – design and color are to match existing 1 Door frame – paint to match existing color

1 set Security type door hinges 1 Peephole 1 Security lockset, automatically locking with inside thumb latch and includes a minimum ¾” deadbolt 1 HID RPK40 Multi-Class PIV II Card Reader with Keypad 1 Request to exit (REX) 1 Electric door strike 1 Video door phone/monitoring system with video monitor 1 Security system to include (alarm activated strobe light, 90Db horn, battery backup with AC charger, motion sensors, video cameras (digitally recordable and remotely viewable), door contacts.

1 Security & miscellaneous signage

2.4 CONTRACTOR REQUIREMENTS:

Card Readers shall be the HID “Combo” unit that has both a card reader and a built-in keypad.

2.5 TECHNICAL REQUIREMENTS:

a. For doors with mechanical lock systems, ensure the day lock on the main door is automatically locking, with a minimum 19 mm (3/4 in.) dead bolt and inside thumb latch. [VA Handbook 0730]

b. Where mechanical lock systems are used, installed lock sets must allow for single motion egress.

Doors set in steel frames must be fitted with a mortise lock with a deadlock feature. IAW ANSI/BHMA A156.13 American National Standards for Mortise Locks. The installation of high security exit devices meeting NFPA Life Safety Code standards is appropriate. The locking requirements (including access controlled egress doors) outlined in National Fire Protection Association (NFPA) Life Safety Code standard, latest edition, 101-7.2.1.5 and 7.2.1.6 must be followed. Note: Fire code prohibits locks from being locked from the inside that require a key to exit The intent is that there must be two locks, one of which must be key operated. The other lock can be key, combination or electronic. (NFPA 101, 7.2.1.5.2) locks, if provided, shall not require the use of a key, a tool or special knowledge or effort for the operations from the egress side. [VA Handbook 0730]

c. Special Key Control. Room door lock keys and day lock combinations, where applicable, are Special Keys as defined in VA Handbook 0730/2 paragraph 8.d. (10) of the appendix.

Special Key: A key which can only open a lock in a high risk or sensitive area (locally determined), and which cannot be opened by a great grand master, grand master, master or any other individual key. Special keys may also include those that can only open certain doors for cleaning, maintenance, construction, mental health units, etc. [VA Handbook 0730]

d. Ensure the intrusion detection equipment has an automatic reset capability following intrusion detection. [VA Handbook 0730]

e. Configure an intrusion detection alarm system to broadcast a local alarm of sufficient volume to deter an illegal entrant. [VA Handbook 0730]

f. Ensure the intrusion detection equipment has a remote, key operated activation/deactivation switch installed outside the room and adjacent to the room entrance door frame and/or a central alarm ON- OFF control in the security guard office. [VA Handbook 0730]

g. Doors are of 45 mm (1-3/4 in.) solid core hardwood or hollow steel construction. Dutch or half doors are unacceptable. Removable hinge pins on door exteriors must be retained with set pins or spot welded, preventing their removal. This applies only if the hinge pins are on the outside of the doors and door frames. Hinge pins will be on the outside if the door opens outward. [VA

h. Ensure all doors are 45 mm (1-3/4 in.) solid core hardwood or hollow steel construction. [VA

i. Doors set in steel frames must be fitted with a mortise lock with a deadlock feature. IAW ANSI/BHMA A156.13 American National Standards for Mortise Locks. [VA Handbook 0730]

j. Regularly monitor the temperature and humidity of facilities that contain information systems. [VA

k. Other Room Access Means. Interstitial overhead areas which enable entry into a secure room from an unsecured room must be barricaded by the installation of a suitable partition in the interstitial space which prevents "up and over" access. Openings in construction above ceilings or below raised access floors shall be protected as below requirement. [VA Handbook 0730]

l. Other Room Access Means. All vents, ducts, and similar openings in excess of 96 square inches

(620 cm2) that enter or pass through space shall be protected with either bars or grills. If one dimension of the duct measures less than six inches (150 mm) or duct is less than 96 square inches (620 cm2), bars are not required; however, all ducts must be treated to provide sufficient sound attenuation. If bars are used, they must be 1/2 inch (12.7 mm) diameter steel welded vertically and horizontally six (6) inches (150 mm) on center; if grills are used, they must be of 9-gauge expanded steel. [VA Handbook 0730]

m. Electronic/Magnetic locking systems. Where installed, electronic locking systems will include an automatic “request to exit” sensor and a “push to exit” manual lock release switch. Refer to the NFPA Life Safety Code for details. [VA Handbook 0730]

n. The day lock on the main door must be automatically locking, with a minimum 19 mm (3/4 in.)

dead bolt and inside thumb latch. [VA Handbook 0730]

o. Security items must conform to the requirements listed in VA Handbook 0730

p. VA Handbook 0730 will be provided to contractor

3. SUBMITTALS

3.1 PRODUCT DATA:

Intrusion Detection System data sheet to include all components. Must be compatible with regional Lenel system.

3.2 OPERATIONS AND MAINTAINENCE:

Provide three copies of O&M documentation.

3.3 PROOF OF CONTRACTOR’S LICENSE:

Within 10 calendar days after contract award, the Contractor shall show proof of a valid Washington State Specialty Contractor’s License held by the Contractor and all specialty subcontractor(s) who will perform work during this project (e.g. electrical mechanical subcontractors, etc.) .

3.4 WORK SCHEDULE:

a. Submit a Construction Schedule for the contract period within seven (7) calendar days of contract award. Indicate lead time for materials submittal and delivery.

b. The schedule shall be critical path format either in MS Project, Excel or PDF.

c. The schedule shall provide project start and completion dates that will be used to coordinate the work of all project trades, and shall identify time required prior to construction for ordering/obtaining materials as necessary.

d. Any known deviations or delays shall be pointed out as soon as practical to facilitate coordination with the follow-on activities.

e. Contractor shall provide a revised Project Schedule when schedule changes are deemed as being significant by the GPOC.

3.5 INSPECTIONS:

a. At least two (2) work days prior to completion of construction, the contractor representative shall submit request for a walk through inspection with the GPOC to identify any "punch list" items, items requiring repairs or alterations necessary to meet the quality required under the contract. The on-site contractor representative will inspect quality of work and identify discrepancies prior to requesting an inspection with the GPOC.

b. If any "punch list" items are identified, the contractor shall submit a plan and schedule of corrections to the GPOC.

3.6 WARRANTIES:

The Contractor shall be responsible for installing all material and equipment in accordance with original manufacturer specifications and requirements. All warranty documents shall be provided to the GPOC in duplicates of three.

4. GOVERNMENT FURNISHED PROPERTY

4.1 UTILITY USAGE:

The Contractor may use building utilities subject to the approval of the Property Manager.

4.2 UTILITIES REQUEST:

The Contractor shall arrange area lighting or power for construction activity. Existing utility systems must remain operational throughout construction. Any disruptions in service need to be coordinated in advance of any required outage.

4.3 PROHIBITED USES:

The Contractor shall prohibit his/her employees from entering spaces not pertinent to the work to be performed hereunder, from using telephones (except public pay phones), and from disturbing furniture, papers, etc. belonging to the Tenant or to the US Government.

4.4 EMPLOYEE COMPLIANCE:

The Contractor shall require his/her employees to comply with instructions pertaining to building regulations and conduct issued by duly appointed officials, such as the Property Manager, guards, or inspectors.

5. PERSONNEL SECURITY AND ACCESS

See attached GSA PBS Policy and Security Guidelines for additional details. The security clearance process may take a minimum of 30 working days. Contractors will not start work until a favorable initial adjudication is given.

6. DEBRIS, DEMOLITION, SALVAGE and CLEAN UP

As it accumulates on each shift, the contractor shall replace and dispose of materials, debris, dirt, etc. in accordance with Federal, State, and Local laws. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer and GPOC.

7. MATERIAL AND WORKMANSHIP

7.1 All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

7.2 All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

8. DRAWINGS, SPECIFICATIONS and SITE VISIT

8.1 It is the Contractor’s responsibility to field verify all drawings before laying out the work and shall be responsible for any errors that might have been avoided by complying with this paragraph.

8.2 It is the sole responsibility of the Contractor to visit the site to insure proper information is available for accurate design and repairs and to field verify any dimensions. Any failure of the Contractor to take the actions described in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government.

8.3 Core Drilling into floor cellular metal raceway (Walkerduct): The imbedded portion of the Walkerduct cellular metal raceway system is spaced on five foot centers, beginning at and parallel to the exterior walls of the building. The raceways end at the corner points of the building. The imbedded trenches are fed through main access trenches with removal covers that emanate from two pairs of electrical / telephone closets and extend to the exterior walls crossing the imbedded trenches at 90 degrees. One pair of closets feed the North and West sides of the building while the other pair feeds the South and East sides of the building. Floors 1 thru 5 have round access “potholes”, upper floors also have small “potholes” were obstacles, such as shafts, are skirted. The imbedded ducts are in sets of three, beginning at the exterior wall with the electrical duct, then the data duct, (generally unused due to existing conduit problems), last is the telephone duct. The electrical duct at the exterior wall has been rendered inaccessible by the placement of the perimeter vent and the data duct is used for electrical at these locations. Telephone and data installations are combined in the telephone duct at all locations. To mount a monument, reuse or reopen an existing penetration (check under the carpet tile). For new locations use a 2-1/2 inch diameter core drill to penetrate concrete slab, vacuum excess water during hole sawing process, DO NOT ALLOW WATER TO FLOW FROM WORK AREA. Use 2-1/4 inch diameter hole saw to access cellular metal raceway, remove metal slug and vacuum all debris from trench. DO NOT CORE DRILL ON FLOORS 1 THRU 5, these floors are pre-throated, use the inductive locater to find these locations, they are spaced every 30 inches on center.

Core drilling must be approved by the building manager.

9. DIFFERING SITE CONDITIONS

If the contractor discovers conditions materially differ than the statement of work, the contractor shall cease performance and promptly give written notice to the Contracting Officer and GSA GPOC. The CO or GSA GPOC shall investigate the site to determine if the conditions do, in fact, materially differ and cause an increase or decrease in the Contractor’s cost or time required for performing any part of the work under this contract. Equitable adjustments shall be made by mutual agreement via contract modification. If the site is disturbed prior to the government’s investigation, the Contractor shall bear full responsibility of work and any associated cost.

10. ACCIDENT PREVENTION

10.1 The Contractor shall provide and maintain work environments and procedures which will: Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; Avoid interruptions of Government operations and delays in project completion dates; and Control costs in the performance of this contract.

10.2 For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall use physical means to restrict access or direct flow of pedestrians or vehicles around work areas. Barricades, ropes, signs, lights, etc. are to be used in accordance with accepted safety practices and must be approved by the Property Manager.

10.3 Contractor operations which create unsafe or unhealthy conditions for building occupants or place Government property in jeopardy are prohibited. The contractor shall have a first aid kit available at the work site and assure that at least one person who has received certified training in first aid administration is on site at all times.

11. FIRE HAZARDS

The Contractor shall take every precaution to prevent fires during the performance of this contract. The Contractor shall provide a covered metal receptacle, placed away from combustibles for storage of oily rags, waste, etc. used in the performance of the work. All such receptacles shall be emptied at the end of each shift and properly disposed of outside federal property. Paint product containers are to be kept sealed when not in use. The Contractor shall provide portable fire extinguishers suitable for the potential hazards involved, shall have them available at all times and shall assure that all work personnel are trained in their use.

12. CODES AND REGULATIONS

12.1 The Contractor shall accomplish all work in accordance with Federal, State, and local regulations and codes.

12.2 The Contractor is responsible for insuring compliance to national, federal, state, and local codes and design standards as referenced in this document.

12.3 The following technical standards and guidelines are incorporated and made a part of this contract:

i. Facility Standards for the Public Buildings Service PBS-P100 2005 (http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=8195&channelPage=%2Fep%2Fc hannel%2FgsaOverview.jsp&channelId=-14201))

ii. PBS CAD Standards, dated March 25, 2004

(http://www.gsa.gov/gsa/cm_attachments/GSA_DOCUMENT/CAD_standards_R2NY1-k_0Z5RDZ-i34K-pR.pdf)

iii. Project Estimating Requirements, PBS P 3440.5

13. NOTICE OF CONFERENCE

The Contractor, or authorized representative, may be required to attend a conference prior to commencement of any work performed under this contract. A representative of the Contracting Office will notify the Contractor after entering into the contract as to the specific time and location of the conference.

Such conferences will normally occur telephonically: however, the Government reserves the right to require the personal presence of the Contractor. (In accordance with FAR 42.5)

13. PROTECTION

The Contractor shall provide adequate protection for all parts of the building, its contents, and occupants wherever work under this contract is performed. Damage caused by the Contractor shall be repaired to the government’s satisfaction at Contractor’s expense.

(End of Statement of Work (SOW)) http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=8195&channelPage=%2Fep%2Fchannel%2FgsaOverview.jsp&channelId=-14201 http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=8195&channelPage=%2Fep%2Fchannel%2FgsaOverview.jsp&channelId=-14201

CraigSThomas Typewritten Text Exterior Door/Frame to be replaced.

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text Data Closet Door/Frame to be replaced

CraigSThomas Typewritten Text

CraigSThomas Line

CraigSThomas Line

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text Video Monitor Location

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Typewritten Text

CraigSThomas Oval

CraigSThomas Oval

VBASEASEWELR

Rectangle

VBASEASEWELR

Rectangle

VBASEASEWELR

Rectangle

VBASEASEWELR

Rectangle

VBASEASEWELR

Rectangle

VBASEASEWELR

Text Box Wireless Duress Buttons (approx locations)

VBASEASEWELR

Rectangle

Mt Vernon SOW.pdf
(a) Install temperature and humidity monitoring system with reporting and notification capabilities in the data closet.
(b) Install mortise lock that is automatically locking and includes a ¾” deadbolt with an inside thumb latch on the data closet door. Mechanical locking systems must allow for single motion egress. Request multiple uniquely keyed interchangeable tumbl...
(c) Install alarm activated strobe outside of the data closet. Install alarm activated 90Db horn inside the data closet.
(d) Install door contacts on the data closet door.
(e) Install motion detector in the data closet.
(f) Install PIV card reader with keypad outside of data closet door.
(g) Install a digitally recordable camera in the data closet, the cameras will be compatible with the Lenel picture archiving system.
(h) Install remote key operated activation/deactivation switch outside the data closet.
(i) Access, temperature, humidity, and alarm activity reports should be captured and accessible by designated Seattle VBA and OIT staff. Provide signage to be placed external to the data closet indicating the room is alarmed. Contractor is to provide ...
Contractors will be escorted by a VA employee at all times while work is being performed in the data closets as this space is a secure area. VA Handbook 0730 will be provided to Contractor.
2. GENERAL
2.3 SPECIFIC TASKS:
The Contractor shall install the following equipment list as required.
i. Facility Standards for the Public Buildings Service PBS-P100 2005 (http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=8195&channelPage=%2Fep%2Fchannel%2FgsaOverview.jsp&channelId=-14201))