12_Asbestos_Survey.pdf

PDF 3 MB Posted

Attached to
Federal Center South, Parapet Wall Repair, Seattle WA
Solicitation number
EQ10PCP-15-5012
Issued by

About this file

Asbestos Survey

View the file

Other files

File Type Posted
Amendment_001_2015.07.08.pdf PDF
4_The_Agreement_C101-SAT_APR_2015.doc DOC document
6_Exhibit_B_Customer_Satisfaction_Survey.docx DOCX document
9_GSA_527.pdf PDF
8_PBS_3490_1.pdf PDF
1_The_Solicitation.docx DOCX document
10_SOW.doc DOC document
11_WA150036_2015.06.12_WA36.docx DOCX document
3_SF_1442.docx DOCX document
2_Offeror_Representations_ Certifications.doc DOC document
7_Security_Clearance_Desk_Guide-External_Contractor.pdf PDF
8_PBS_P_3490.2_(Signed_on_Sept._2__2014).pdf PDF
5_Exhibit_A_Project_Experience_Form.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS REINSPECTION SURVEY REPORT

GENERAL SERVICES ADMINISTRATION

FEDERAL CENTER SOUTH, BLDG. 1201

BUILDING WA0953KC

SEATTLE, WASHINGTON

April 9, 2007 Prepared for:

Mr. Ron Smith

GSA

400 15th Street SW Auburn, WA 98001

Prepared by:

EHS – International, Inc.

13228 NE 20th Street, Suite 100 Bellevue, WA 98005

(425) 455–2959

Federal Center South, Bldg. 1201, Seattle, WA EHSI Project 9143-10 WA0953KC April 9, 2007

ASBESTOS REINSPECTION

GENERAL SERVICES ADMINISTRATION

FEDERAL CENTER SOUTH, BLDG. 1201 (WA0953KC)

SEATTLE, WASHINGTON

BACKGROUND

EHS International, Inc. (EHSI), a hazardous materials consulting firm, under contract to the General Services Administration (GSA) was tasked by GSA to conduct a hazardous materials reinspection and confirmation sampling in accessible areas at the Federal Center South Building 1201, located at 4735 East Marginal Way, Seattle, WA.

EXECUTIVE SUMMARY OF FINDINGS

The following suspect materials were assumed to be asbestos containing or sampled and identified as either asbestos-containing materials (ACM) or non-ACM in the subject areas of the building:

Asbestos-Containing Materials (ACM) Sampled Non-Asbestos Materials

ACM thermal system insulation (TSI) on piping runs and fittings

Joint Compound (JC)

Vinyl asbestos tile (VAT) and ACM mastic Gypsum wallboard (GWB) Sheet vinyl (SV) with ACM backing and mastic Fiberglass insulation on piping

Cement asbestos board (CAB) window panels Window putty

HVAC vibration cloth Sound board White magnesia joint filler associated with boilers Ductwork insulation

Gray patching material Silver paint Tan trowled-on insulation inside boiler stack 1’x2’ acoustic ceiling tile (ACT)

Brown cove base mastic Red terrazzo White mastic under fiberglass insulation Lath and plaster Black expansion joint caulking between concrete slab flooring

Masonry work (brick, mortar, concrete, etc.) associated with boilers

Red/black roof grout Red brick and gray mortar associated with building structure

Boiler gaskets Black cork pipe insulation Roofing black tar sealant Gray felt pipe insulation

Assumed ACM Gray window sill membrane Fire doors Black terrazzo Welding hood interior insulation 2’x4’ worm and hole pattern suspended acoustic ceiling tile (SACT)

Assumed ACM Sampled Non-Asbestos Materials Gaskets associated with piping Black sealant tape on ductwork Sound board Yellow boiler brick lining Leveling compound Spray applied fireproofing Window caulking Brown carpet mastic 12” ACT with worm and hole pattern and associated mastic 2’x2’ blue rubber floor tile and tan mastic

DAMAGED MATERIAL

Damaged ACM TSI pipe insulation was noted on the first and second floors. Refer to drawings DM-1.0 and DM-2.0 (Appendix H) for approximate locations of the damaged ACM material. Refer to Appendix A, Damaged Materials Sheet, for details.

REINSPECTION

EHSI accomplished an asbestos materials reinspection of the subject building on March 28th, 2007. The intent of the reinspection is to specifically identify, quantify, determine the current condition, assign homogenous sample area numbers (HSA#), and develop an engineer’s cost estimate for removal/disposal of ACM.

EHSI was tasked to use applicable Federal, State, and local guidelines in the accomplishment of its reinspection. EHSI was further tasked to provide a written report for the areas reinspected including identification of all suspect materials and a determination of whether suspect material was ACM.

A spreadsheet listing all of the reinspection data is included in Appendix A.

REINSPECTION FINDINGS

Asbestos-Containing Materials

EHSI reviewed the GSA electronic data files for previous asbestos inspections. A 1994 report by Med-Tox listed pipe TSI on runs and fittings, cove base mastic, VAT and mastic, CAB window panels, HVAC vibration cloths, boiler gaskets, white magnesia joint filler, gray patching material, tan trowled-on insulation in boiler stack interior, white fiberglass mastic, Sheet vinyl, red/black roof grout and black tar sealant as sampled and confirmed asbestos-containing materials. A limited 2005 survey by EHSI listed TSI as a sampled and confirmed asbestos containing material. Additional survey samples taken previously confirmed that the following materials were not ACM: cork insulation on pipes and vessels, gray felt pipe insulation, gray window sill membrane, window putty, spray-on fireproofing, GWB, ductwork insulation, yellow boiler lining brick, red terrazzo, leveling compound, white brick, red brick, silver paint, lathe and plaster, 1’x 2’ ACT, black terrazzo, 2’x4’ SACT, sound board, black sealant tape on ductwork, fiberglass insulation on piping and gaskets associated with piping.

Past renovation activity noted includes:

The second floor has undergone HVAC modifications.

The first floor has undergone renovation including reconfiguration and addition of office spaces.

Thirteen (13) bulk samples of suspect ACM were collected as part of this reinspection.

Summaries of asbestos sampling information including sample number, sample location, material description, and analytical results are included in Table 1 below.

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FEDERAL CENTER SOUTH, BUILDING 1201

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL

DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

9143-10-01 2nd floor, women’s restroom lounge

Window putty and paint

ND N/A

9143-10-02QA

2nd floor, women’s restroom lounge

Layer 1: White foam and paint Layer 2: Tan window caulking and paint

L1: ND

L2: ND

N/A

N/A

9143-10-03 2nd floor, women’s restroom lounge

2’x 4’ white SACT with hole and wedge pattern ND N/A

9143-10-04* 2nd floor, AHU-5 JC 0.1% Chrysotile

9143-10-05 2nd floor, AHU-5 at hallway entrance

Layer 1: Brown carpet mastic Layer 2: White leveling compound

L1: ND

L2: ND

N/A N/A

9143-10-06 Boiler room, vessel #5

Silver paint ND N/A

9143-10-07 Boiler room, platform, E

Layer 1: Red terrazzo Layer 2: Gray cementitous underlayment

L1: ND

L2: ND

N/A N/A

9143-10-08 Boiler room, E Window putty and paint ND N/A 9143-10-09 Boiler room, E Window caulking and paint ND N/A

TABLE 1

SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS

FEDERAL CENTER SOUTH, BUILDING 1201

SAMPLE

NUMBER

SAMPLE

LOCATION

MATERIAL

DESCRIPTION

ASBESTOS

TYPE OF

ASBESTOS

9143-10-10 Boiler room, welding area, E

Layer 1: Red brick Layer 2: Gray mortar

L1: ND

L2: ND

N/A N/A

9143-10-11 Boiler room, Storage room 12A35

Layer 1: 12” ACT with worm and hole pattern Layer 2: Dark brown mastic

L1: ND

L2: ND

N/A

N/A

9143-10-12 1st floor, E stairwell landing

Layer 1: 2’x 2’ blue rubber tread Layer 2: Brown mastic

L1: ND

L2: ND

N/A

N/A

9143-10-13 Warehouse, just outside AHU 2,3 & 10

Black expansion joint caulking between concrete floor slabs

3% Chrysotile

KEY: ACT = acoustic ceiling tile, JC = joint compound, SACT = suspended acoustical ceiling tile, N/A = not applicable, ND = none detected.

* The composite of this GWB and JC sample contains less than 1% asbestos and therefore the layer was found to be non-asbestos. Therefore, based on U.S. Environmental Protection Agency (EPA) guidance, the Puget Sound Clean Air Agency (PSCAA) considers the GWB system including the asbestos-containing joint compound to be a non-asbestos material. Therefore, the material is considered non-ACM.

Demolition of GWB with less than 1% asbestos joint compound is not considered an “asbestos project,” but OSHA does require certain worker training, work practices, notifications, engineering controls, exposure monitoring and supervision.

ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Any survey, regardless of how extensive, can miss concealed materials. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a certified AHERA inspector. Concealed suspect material may include, but is not limited to:

non-fiberglass pipe insulation; spray-applied coatings; cementitious board; asphalt or paper vapor barriers; and mastics.

LIMITATIONS

During reinspection, not all rooms or areas were accessible due to tenant restrictions.

This reinspection was limited to the chemicals and materials identified herein. No effort was made to identify hazardous materials in soil, water, or air, other than those listed herein. Limited destructive inspection (e.g., cutting holes in floors, walls, and ceilings) of the building materials to identify, sample, quantify and determine the condition of concealed suspect building materials was not accomplished for this reinspection. Any reinspection, regardless of how extensive, can miss concealed materials. Contractors should be aware of the potential that demolition activities may expose concealed suspect ACM and should have preplanned contingencies for handling these materials when discovered during demolition work. Any concealed, suspect ACM material that was not sampled or that was assumed to be ACM by this reinspection report when encountered must be assumed to be ACM and treated as such until sampled by a certified AHERA Building Inspector and analyzed by a certified laboratory.

STANDARD OF CARE

The recommendations and conclusions contained in this report represent the professional opinions of EHSI. These opinions are derived in accordance with Federal, State and local environmental and health and safety laws and regulations. This reinspection was accomplished in accordance with applicable Federal, State, and local regulations and industry standards in effect at the time. Other than this, no other warranty is implied or intended.

APPENDICES

Appendix A provides the reinspection physical assessment of asbestos containing materials spreadsheet utilized during the reinspection. Appendix B provides the analytical reports and chain-of-custody forms for asbestos samples for the current reinspection. Appendix C contains sampling methodology. Appendix D contains AHERA Building Inspector certificates. Appendix E provides laboratory certification for asbestos analysis. Appendix F includes the sample location drawings. Appendix G includes the homogenous material drawings. Appendix H includes Damaged ACM material drawings.

AHERA CERTIFIED BUILDING INSPECTOR

The AHERA Certified Building Inspectors listed below reinspected the Federal Center South, Building 1201 in Seattle, WA on March 28, 2007 in accordance with Federal, State, and local requirements.

Lisa Kollasch EHS-International, Inc.

15228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9199-02-05 Expiration Date: 01/11/08

Elizabeth Huarte EHS-International, Inc.

15228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9199-02-02 Expiration Date: 01/11/08

APPENDIX A

PHYSICAL ASSESSMENT OF ACM SPREADSHEET

Building Name: Richard Hall Buildng Number: 206-764-6778

Address:

Seattle, WA

HOMOGENOUS

MATERIALS

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R E D

Q U A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

R

S P O N S

A C T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

T

O F R E M E D

IA

T

IO

N

Extra Large Bore TSI (14"

OD) pipe runs 386 Yes 1 Boiler room Throughout

Linear

Ft.

150 Fair Low Other

See

DM

dwgs

Repair Sampled Minor Yes

$3,750

Small Bore TSI (<6" OD) pipe runs 385 Yes All All Throughout

Linear

Ft.

1,000 Good Low Other

See

DM

dwgs

Repair Sampled Minor Yes

$15,000

Extra Large Bore TSI (14"

OD) pipe fittings 382 Yes 1 Boiler room Throughout Each 30 Good Low Other N/A O&M Sampled None Yes

$900

Small Bore TSI (<6" OD) fittings 383 Yes All All Throughout Each 1,220 Good Low Other

See

DM

dwgs

Repair Sampled Minor Yes

$18,300

VAT and ACM mastic on concrete 327 Yes 1

South warehouse Floor Sq. Ft. 1,380 Good Low Other N/A O&M Sampled None No

$2,500

VAT and ACM mastic under

VAT and ACM mastic, on concrete

314 Yes 1

Warehouse, custodial offices

Floor Sq. Ft. 1,450 Good Low Other N/A O&M Sampled None No

$4,000

Re-Inspection Physical Assessments of Asbestos-Containing Materials

Propty Mngr:

Phone:

Order No:

WA0953KC

4735 East Marginal Way

GSA Federal Center South, Bldg. 1201

March 26, 2007Date:

Northwest/Arctic RegionService Center:

HOMOGENOUS

MATERIALS

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

VAT and ACM mastic under carpet squares, on concrete 314 Yes 1

Throughout E office area Floor Sq. Ft. 1,750 Good Low Other N/A O&M Sampled None No

$3,950

SV with ACM backing and mastic under carpet squares, on concrete

410 Yes 1 1106 Floor Sq. Ft. 75 Good Low Other N/A O&M Sampled None Yes

$500

Cement Asbestos Board in window panels 216 Yes Exterior Exterior North Wall Sq. Ft. 1,781 Good Low Other N/A O&M Assumed None Yes

$6,300

White magnesia joint filler associated with boilers 255 Yes 1 Boiler room Boilers

Linear

Ft.

50 Good Low Other N/A O&M Sampled None Yes

$750

Tan trowled on insulation inside boiler stack 367 Yes All

Boiler room and exterior Boiler stack Sq. Ft. 705 Good Low Other N/A O&M Sampled None No

$10,600

Gray patching material 376 Yes 1 Boiler room Throughout Sq. Ft. 410 Good Low Other N/A O&M Sampled None No

$1,025

Brown cove base mastic 61 Yes All Throughout Walls at floor level Linear

Ft.

5,669 Good Low Other N/A O&M Sampled None No

$7,100

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

White mastic under fiberglass insulation 353 Yes 2 Fan rooms Throughout

Linear

Ft.

300 Good Low Other N/A O&M Sampled None No

$2,250

Black expansion joint caulking between concrete slab flooring

255 Yes 1 Warehouse Floor Linear

Ft.

12,000 Good Low Other N/A O&M Sampled None No

$110,000

Assumed ACM core fire doors 258 Yes All Throughout Doors Each 44 Good Low Other N/A O&M Assumed None No

$3,300

Welding fume hood, interior 367 Yes 1

Welding area

N of boiler room

North Sq. Ft. 100 Good Low Other N/A O&M Assumed None No

$750

HVAC vibration cloth 271 Yes All All HVAC Linear

Ft.

667 Good Low Other N/A O&M Sampled None Yes

$3,700

GWB and JC 339 No All Throughout Walls/Ceilings Sq. Ft. Good Low Other N/A O&M Sampled None No

Masonry work (brick, mortar, concrete, etc.)

associated with boilers

367 No 1 Boiler room Boilers Sq. Ft. Good Low Other N/A Sampled None

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

Red brick and gray mortar associated with building structure

77 No All All Walls Sq. Ft. Good Low Other N/A Sampled None

Welding fume hood, interior 367 Yes 1

Welding area

N of boiler room

North Sq. Ft. 100 Good Low Other N/A O&M Assumed None No

$750

Fiberglass insulation on piping 345 No All Throughout Piping

Linear

Ft.

Good Low Other N/A Sampled None

Ductwork insulation 245 No All Throughout HVAC Sq. Ft. Good Low Other N/A Sampled None

Sound board 367 No All

Warehouse, GPO Print

Shop

Walls Sq. Ft. Good Low Other N/A Sampled None

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

Silver paint 370 No All Throughout

Piping, vessels and sheet metal walls in fan rooms

Sq. Ft. Good Low Other N/A Sampled None

1'x 2' ACT 117 No All 2122 Ceiling Sq. Ft. Good Low Other N/A Sampled None

Red terazzo and cementitous underlayment platforms

367 No 1 Boiler room Floor Sq. Ft. Poor Low Other N/A Sampled None

Lath and plaster 392 No All Throughout Walls/Ceilings Sq. Ft. Good Low Other N/A Sampled None

Sealant tape 367 No All Throughout Piping Linear

Ft.

Good Low Other N/A Sampled None

Black cork pipe insulation 345 No All Throughout Piping Linear

Ft.

Good Low Other N/A Sampled None

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

Gray felt pipe insulation 345 No All Throughout Piping Linear

Ft.

Good Low Other N/A Sampled None

Gray window sill membrane 367 No All Throughout Window Sq. Ft. Good Low Other N/A Sampled None

Black terazzo 367 No 2 2118 Floor Sq. Ft. Good Low Other N/A Sampled None

2'x 4' SACT with worm and hole pattern 169 No All Office area Ceiling Sq. Ft. Good Low Other N/A Sampled None

Gaskets 338 No All Throughout Piping and HVAC Each Good Low Other N/A Sampled None

Black sealant tape on ductwork 249 No All Throughout HVAC

Linear

Ft.

Good Low Other N/A Sampled None

Yellow boiler brick lining 76 No 1 Boiler room Boilers Sq. Ft. Good Low Other N/A Sampled None

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

Leveling compound on concrete 272 No All Throughout Floor Sq. Ft. Good Low Other N/A Sampled None

Window caulking 504 No All All Window Linear

Ft.

Good Low Other N/A Sampled None

2'x 2' blue rubber floor tread tiles with tan mastic on concrete

332 No All E stairwell Floor Sq. Ft. Good Low Other N/A Sampled None

12" ACT with worm and hole pattern and associated mastic

194 No 1 Boiler room, space #12A35 Ceiling Sq. Ft. Good Low Other N/A Sampled None

Brown carpet mastic 83 No All Throughout Floor Sq. Ft. Good Low Other N/A Sampled None

Spray applied fireproofing 260 No 1 1310 Ceiling Sq. Ft. Good Low Other N/A Sampled None

Red/black roof grout 367 Yes Roof Roof Roof Linear

Ft.

184,160 Good Low Other N/A O&M Sampled None No

$184,000

CraigSThomas Highlight

DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U

N

IT

S

M E A S U E R

A N T

IT

Y

C O N D

IT

IO

N

D A M G E P O T E N T

IA

L

D A M A G E T Y P E

O T H E R D A M A G E

R E C O M M E N D

S P O N

T

IO

N

S A M P L E D

A S S U M E D

D A M A G E

F R

IA

B

IL

IT

Y

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

Large Bore TSI (>6" OD) pipe fittings 379 Yes All Warehouse Piping Each 25 Good Low Other N/A O&M Assumed None Yes

$500

3/8" gasket material associated with old boilers 338 Yes 1 Boiler room Old boilers

Linear

Ft.

60 Good Low Other N/A O&M Sampled None No

$900

Black tar sealant 405 Yes Roof Roof Roof Linear

Ft.

4,500 Good Low Other N/A O&M Sampled None No

$5,200

Window putty 511 No All Throughout Windows Linear

Ft.

Good Low Other N/A Sampled None

$386,025

$115,808

$154,410

$656,243

Abatement Cost Est. Subtotal

Abatement Design Cost

Total Abatement Cost

Abatement Construction Management Costs

Building Name: GSA Federal Center South, Bldg. 1201 Buildng Number:

Address:

Seattle, Washington

HSA # ACM FLOOR ROOM L

O C A T

IO

N

U N

IT

S

A C C E S S

IB

L E

386 Yes 1

AHU-4; AHU-

2,3,10;

Hallway North of Boiler

Room

East wall in

AHU-4; AHU-

2,3,10; Above

SACT in

Hallway

Linear

Ft.

Yes

386 Yes 1 & 2 Boiler Room and AHU-4

Ceiling level above Boiler

#3; East wall in AHU-4

Linear

Ft.

Yes

$124

$93

$527

Yes $150

$310

5 Repair Sampled Medium

*Exclusive of Mobilization Cost.

Date:

Service Center:

Field Office:

Total Abatement Cost

Abatement Construction Management Costs

HOMOGENOUS

MATERIALS DESCRIPTION

Extra Large Bore TSI

(>14"OD) includes aircell and mag runs and fittings.

Small Bore TSI (< 6"OD) includes aircell and mag runs and fittings.

Northwest/Arctic Region

Re-Inspection Physical Assessments of Damaged Materials

Propty Mngr:

Phone:

Order No:

WA0953KC

4735 East Marginal Way

Richard Hall 206-764-6778

March 26, 2007

Abatement Cost Est.

Subtotal

Abatement Design Cost

E S T

IM

A T E D C O

R E M E D

IA

T

IO

N

F R

IA

B

IL

IT

Y

S A M P L E D

A S S U M E D

R E C O M M E N D

S P O N

T

IO

N

E S T

IM

A T

A N T

IT

Y

M A G E D A C M

D

IS

T U R B A N

P

T E N T

IA

L

Yes $1608 Repair Sampled Medium

APPENDIX B

ANALYTICAL REPORTS AND CHAIN OF CUSTODY FORMS FOR

ASBESTOS SAMPLES

APPENDIX C

SAMPLING METHODOLOGY

SAMPLING METHODOLOGY

Asbestos-Containing Materials

The EHSI field inspectors were an asbestos Building Inspector, certified under the requirements of the United States Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA) regulation 40 CFR 763, Subpart E. Sampling was consistent with the requirements of AHERA, as well as meeting the requirements of State and local regulatory agencies. Samples were collected and analytical data obtained for suspect ACM identified in the facility. The number of bulk samples collected and their locations were based on the AHERA regulation and the guidelines provided by the EPA Document 560/5-85-030a, October 1985, Asbestos in Buildings: Simplified Sampling Scheme For Friable Surfacing Materials. Once collected, bulk samples were sealed to eliminate the possibility of contamination. “Chain-of-custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with U.S. EPA Method 600/R-93/116.

Samples were analyzed for asbestos content by NVL Laboratories, Inc. (NVL), Seattle, Washington, a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory. Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on EPA, State, and local regulations.

Samples in the report labeled as #QA are Quality Assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories.

QA samples were submitted to, Northern Laboratory and Consulting Services, Inc.

(NLCS), Burien, Washington, another NVLAP laboratory. Copies of both laboratories’ NVLAP certifications are included in Appendix E.

APPENDIX D

AHERA BUILDING INSPECTOR CERTIFICATES

APPENDIX E

LABORATORY CERTIFICATION FOR ASBESTOS ANALYSIS

APPENDIX F

SAMPLE LOCATION DRAWINGS

APPENDIX G

HOMOGENOUS MATERIAL DRAWINGS

APPENDIX H

DAMAGED ACM MATERIAL DRAWINGS

File details come from the government source that posted it. Updated .