12_Asbestos_Survey.pdf
PDF 3 MB Posted
- Solicitation number
- EQ10PCP-15-5012
About this file
Asbestos Survey
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_001_2015.07.08.pdf | ||
| 4_The_Agreement_C101-SAT_APR_2015.doc | DOC document | |
| 6_Exhibit_B_Customer_Satisfaction_Survey.docx | DOCX document | |
| 9_GSA_527.pdf | ||
| 8_PBS_3490_1.pdf | ||
| 1_The_Solicitation.docx | DOCX document | |
| 10_SOW.doc | DOC document | |
| 11_WA150036_2015.06.12_WA36.docx | DOCX document | |
| 3_SF_1442.docx | DOCX document | |
| 2_Offeror_Representations_ Certifications.doc | DOC document | |
| 7_Security_Clearance_Desk_Guide-External_Contractor.pdf | ||
| 8_PBS_P_3490.2_(Signed_on_Sept._2__2014).pdf | ||
| 5_Exhibit_A_Project_Experience_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION SURVEY REPORT
GENERAL SERVICES ADMINISTRATION
FEDERAL CENTER SOUTH, BLDG. 1201
BUILDING WA0953KC
SEATTLE, WASHINGTON
April 9, 2007 Prepared for:
Mr. Ron Smith
GSA
400 15th Street SW Auburn, WA 98001
Prepared by:
EHS – International, Inc.
13228 NE 20th Street, Suite 100 Bellevue, WA 98005
(425) 455–2959
Federal Center South, Bldg. 1201, Seattle, WA EHSI Project 9143-10 WA0953KC April 9, 2007
ASBESTOS REINSPECTION
GENERAL SERVICES ADMINISTRATION
FEDERAL CENTER SOUTH, BLDG. 1201 (WA0953KC)
SEATTLE, WASHINGTON
BACKGROUND
EHS International, Inc. (EHSI), a hazardous materials consulting firm, under contract to the General Services Administration (GSA) was tasked by GSA to conduct a hazardous materials reinspection and confirmation sampling in accessible areas at the Federal Center South Building 1201, located at 4735 East Marginal Way, Seattle, WA.
EXECUTIVE SUMMARY OF FINDINGS
The following suspect materials were assumed to be asbestos containing or sampled and identified as either asbestos-containing materials (ACM) or non-ACM in the subject areas of the building:
Asbestos-Containing Materials (ACM) Sampled Non-Asbestos Materials
ACM thermal system insulation (TSI) on piping runs and fittings
Joint Compound (JC)
Vinyl asbestos tile (VAT) and ACM mastic Gypsum wallboard (GWB) Sheet vinyl (SV) with ACM backing and mastic Fiberglass insulation on piping
Cement asbestos board (CAB) window panels Window putty
HVAC vibration cloth Sound board White magnesia joint filler associated with boilers Ductwork insulation
Gray patching material Silver paint Tan trowled-on insulation inside boiler stack 1’x2’ acoustic ceiling tile (ACT)
Brown cove base mastic Red terrazzo White mastic under fiberglass insulation Lath and plaster Black expansion joint caulking between concrete slab flooring
Masonry work (brick, mortar, concrete, etc.) associated with boilers
Red/black roof grout Red brick and gray mortar associated with building structure
Boiler gaskets Black cork pipe insulation Roofing black tar sealant Gray felt pipe insulation
Assumed ACM Gray window sill membrane Fire doors Black terrazzo Welding hood interior insulation 2’x4’ worm and hole pattern suspended acoustic ceiling tile (SACT)
Assumed ACM Sampled Non-Asbestos Materials Gaskets associated with piping Black sealant tape on ductwork Sound board Yellow boiler brick lining Leveling compound Spray applied fireproofing Window caulking Brown carpet mastic 12” ACT with worm and hole pattern and associated mastic 2’x2’ blue rubber floor tile and tan mastic
DAMAGED MATERIAL
Damaged ACM TSI pipe insulation was noted on the first and second floors. Refer to drawings DM-1.0 and DM-2.0 (Appendix H) for approximate locations of the damaged ACM material. Refer to Appendix A, Damaged Materials Sheet, for details.
REINSPECTION
EHSI accomplished an asbestos materials reinspection of the subject building on March 28th, 2007. The intent of the reinspection is to specifically identify, quantify, determine the current condition, assign homogenous sample area numbers (HSA#), and develop an engineer’s cost estimate for removal/disposal of ACM.
EHSI was tasked to use applicable Federal, State, and local guidelines in the accomplishment of its reinspection. EHSI was further tasked to provide a written report for the areas reinspected including identification of all suspect materials and a determination of whether suspect material was ACM.
A spreadsheet listing all of the reinspection data is included in Appendix A.
REINSPECTION FINDINGS
Asbestos-Containing Materials
EHSI reviewed the GSA electronic data files for previous asbestos inspections. A 1994 report by Med-Tox listed pipe TSI on runs and fittings, cove base mastic, VAT and mastic, CAB window panels, HVAC vibration cloths, boiler gaskets, white magnesia joint filler, gray patching material, tan trowled-on insulation in boiler stack interior, white fiberglass mastic, Sheet vinyl, red/black roof grout and black tar sealant as sampled and confirmed asbestos-containing materials. A limited 2005 survey by EHSI listed TSI as a sampled and confirmed asbestos containing material. Additional survey samples taken previously confirmed that the following materials were not ACM: cork insulation on pipes and vessels, gray felt pipe insulation, gray window sill membrane, window putty, spray-on fireproofing, GWB, ductwork insulation, yellow boiler lining brick, red terrazzo, leveling compound, white brick, red brick, silver paint, lathe and plaster, 1’x 2’ ACT, black terrazzo, 2’x4’ SACT, sound board, black sealant tape on ductwork, fiberglass insulation on piping and gaskets associated with piping.
Past renovation activity noted includes:
The second floor has undergone HVAC modifications.
The first floor has undergone renovation including reconfiguration and addition of office spaces.
Thirteen (13) bulk samples of suspect ACM were collected as part of this reinspection.
Summaries of asbestos sampling information including sample number, sample location, material description, and analytical results are included in Table 1 below.
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FEDERAL CENTER SOUTH, BUILDING 1201
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL
DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
9143-10-01 2nd floor, women’s restroom lounge
Window putty and paint
ND N/A
9143-10-02QA
2nd floor, women’s restroom lounge
Layer 1: White foam and paint Layer 2: Tan window caulking and paint
L1: ND
L2: ND
N/A
N/A
9143-10-03 2nd floor, women’s restroom lounge
2’x 4’ white SACT with hole and wedge pattern ND N/A
9143-10-04* 2nd floor, AHU-5 JC 0.1% Chrysotile
9143-10-05 2nd floor, AHU-5 at hallway entrance
Layer 1: Brown carpet mastic Layer 2: White leveling compound
L1: ND
L2: ND
N/A N/A
9143-10-06 Boiler room, vessel #5
Silver paint ND N/A
9143-10-07 Boiler room, platform, E
Layer 1: Red terrazzo Layer 2: Gray cementitous underlayment
L1: ND
L2: ND
N/A N/A
9143-10-08 Boiler room, E Window putty and paint ND N/A 9143-10-09 Boiler room, E Window caulking and paint ND N/A
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
FEDERAL CENTER SOUTH, BUILDING 1201
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL
DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
9143-10-10 Boiler room, welding area, E
Layer 1: Red brick Layer 2: Gray mortar
L1: ND
L2: ND
N/A N/A
9143-10-11 Boiler room, Storage room 12A35
Layer 1: 12” ACT with worm and hole pattern Layer 2: Dark brown mastic
L1: ND
L2: ND
N/A
N/A
9143-10-12 1st floor, E stairwell landing
Layer 1: 2’x 2’ blue rubber tread Layer 2: Brown mastic
L1: ND
L2: ND
N/A
N/A
9143-10-13 Warehouse, just outside AHU 2,3 & 10
Black expansion joint caulking between concrete floor slabs
3% Chrysotile
KEY: ACT = acoustic ceiling tile, JC = joint compound, SACT = suspended acoustical ceiling tile, N/A = not applicable, ND = none detected.
* The composite of this GWB and JC sample contains less than 1% asbestos and therefore the layer was found to be non-asbestos. Therefore, based on U.S. Environmental Protection Agency (EPA) guidance, the Puget Sound Clean Air Agency (PSCAA) considers the GWB system including the asbestos-containing joint compound to be a non-asbestos material. Therefore, the material is considered non-ACM.
Demolition of GWB with less than 1% asbestos joint compound is not considered an “asbestos project,” but OSHA does require certain worker training, work practices, notifications, engineering controls, exposure monitoring and supervision.
ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Any survey, regardless of how extensive, can miss concealed materials. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contingency plans should include stopping work on identification of concealed suspect ACM, evacuation of the area, and sampling by a certified AHERA inspector. Concealed suspect material may include, but is not limited to:
non-fiberglass pipe insulation; spray-applied coatings; cementitious board; asphalt or paper vapor barriers; and mastics.
LIMITATIONS
During reinspection, not all rooms or areas were accessible due to tenant restrictions.
This reinspection was limited to the chemicals and materials identified herein. No effort was made to identify hazardous materials in soil, water, or air, other than those listed herein. Limited destructive inspection (e.g., cutting holes in floors, walls, and ceilings) of the building materials to identify, sample, quantify and determine the condition of concealed suspect building materials was not accomplished for this reinspection. Any reinspection, regardless of how extensive, can miss concealed materials. Contractors should be aware of the potential that demolition activities may expose concealed suspect ACM and should have preplanned contingencies for handling these materials when discovered during demolition work. Any concealed, suspect ACM material that was not sampled or that was assumed to be ACM by this reinspection report when encountered must be assumed to be ACM and treated as such until sampled by a certified AHERA Building Inspector and analyzed by a certified laboratory.
STANDARD OF CARE
The recommendations and conclusions contained in this report represent the professional opinions of EHSI. These opinions are derived in accordance with Federal, State and local environmental and health and safety laws and regulations. This reinspection was accomplished in accordance with applicable Federal, State, and local regulations and industry standards in effect at the time. Other than this, no other warranty is implied or intended.
APPENDICES
Appendix A provides the reinspection physical assessment of asbestos containing materials spreadsheet utilized during the reinspection. Appendix B provides the analytical reports and chain-of-custody forms for asbestos samples for the current reinspection. Appendix C contains sampling methodology. Appendix D contains AHERA Building Inspector certificates. Appendix E provides laboratory certification for asbestos analysis. Appendix F includes the sample location drawings. Appendix G includes the homogenous material drawings. Appendix H includes Damaged ACM material drawings.
AHERA CERTIFIED BUILDING INSPECTOR
The AHERA Certified Building Inspectors listed below reinspected the Federal Center South, Building 1201 in Seattle, WA on March 28, 2007 in accordance with Federal, State, and local requirements.
Lisa Kollasch EHS-International, Inc.
15228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9199-02-05 Expiration Date: 01/11/08
Elizabeth Huarte EHS-International, Inc.
15228 NE 20th Street Suite 100 Bellevue, WA 98005 AHERA Building Inspector Certification #: 9199-02-02 Expiration Date: 01/11/08
APPENDIX A
PHYSICAL ASSESSMENT OF ACM SPREADSHEET
Building Name: Richard Hall Buildng Number: 206-764-6778
Address:
Seattle, WA
HOMOGENOUS
MATERIALS
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R E D
Q U A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
R
S P O N S
A C T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
T
O F R E M E D
IA
T
IO
N
Extra Large Bore TSI (14"
OD) pipe runs 386 Yes 1 Boiler room Throughout
Linear
Ft.
150 Fair Low Other
See
DM
dwgs
Repair Sampled Minor Yes
$3,750
Small Bore TSI (<6" OD) pipe runs 385 Yes All All Throughout
Linear
Ft.
1,000 Good Low Other
See
DM
dwgs
Repair Sampled Minor Yes
$15,000
Extra Large Bore TSI (14"
OD) pipe fittings 382 Yes 1 Boiler room Throughout Each 30 Good Low Other N/A O&M Sampled None Yes
$900
Small Bore TSI (<6" OD) fittings 383 Yes All All Throughout Each 1,220 Good Low Other
See
DM
dwgs
Repair Sampled Minor Yes
$18,300
VAT and ACM mastic on concrete 327 Yes 1
South warehouse Floor Sq. Ft. 1,380 Good Low Other N/A O&M Sampled None No
$2,500
VAT and ACM mastic under
VAT and ACM mastic, on concrete
314 Yes 1
Warehouse, custodial offices
Floor Sq. Ft. 1,450 Good Low Other N/A O&M Sampled None No
$4,000
Re-Inspection Physical Assessments of Asbestos-Containing Materials
Propty Mngr:
Phone:
Order No:
WA0953KC
4735 East Marginal Way
GSA Federal Center South, Bldg. 1201
March 26, 2007Date:
Northwest/Arctic RegionService Center:
HOMOGENOUS
MATERIALS
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
VAT and ACM mastic under carpet squares, on concrete 314 Yes 1
Throughout E office area Floor Sq. Ft. 1,750 Good Low Other N/A O&M Sampled None No
$3,950
SV with ACM backing and mastic under carpet squares, on concrete
410 Yes 1 1106 Floor Sq. Ft. 75 Good Low Other N/A O&M Sampled None Yes
$500
Cement Asbestos Board in window panels 216 Yes Exterior Exterior North Wall Sq. Ft. 1,781 Good Low Other N/A O&M Assumed None Yes
$6,300
White magnesia joint filler associated with boilers 255 Yes 1 Boiler room Boilers
Linear
Ft.
50 Good Low Other N/A O&M Sampled None Yes
$750
Tan trowled on insulation inside boiler stack 367 Yes All
Boiler room and exterior Boiler stack Sq. Ft. 705 Good Low Other N/A O&M Sampled None No
$10,600
Gray patching material 376 Yes 1 Boiler room Throughout Sq. Ft. 410 Good Low Other N/A O&M Sampled None No
$1,025
Brown cove base mastic 61 Yes All Throughout Walls at floor level Linear
Ft.
5,669 Good Low Other N/A O&M Sampled None No
$7,100
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
White mastic under fiberglass insulation 353 Yes 2 Fan rooms Throughout
Linear
Ft.
300 Good Low Other N/A O&M Sampled None No
$2,250
Black expansion joint caulking between concrete slab flooring
255 Yes 1 Warehouse Floor Linear
Ft.
12,000 Good Low Other N/A O&M Sampled None No
$110,000
Assumed ACM core fire doors 258 Yes All Throughout Doors Each 44 Good Low Other N/A O&M Assumed None No
$3,300
Welding fume hood, interior 367 Yes 1
Welding area
N of boiler room
North Sq. Ft. 100 Good Low Other N/A O&M Assumed None No
$750
HVAC vibration cloth 271 Yes All All HVAC Linear
Ft.
667 Good Low Other N/A O&M Sampled None Yes
$3,700
GWB and JC 339 No All Throughout Walls/Ceilings Sq. Ft. Good Low Other N/A O&M Sampled None No
Masonry work (brick, mortar, concrete, etc.)
associated with boilers
367 No 1 Boiler room Boilers Sq. Ft. Good Low Other N/A Sampled None
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
Red brick and gray mortar associated with building structure
77 No All All Walls Sq. Ft. Good Low Other N/A Sampled None
Welding fume hood, interior 367 Yes 1
Welding area
N of boiler room
North Sq. Ft. 100 Good Low Other N/A O&M Assumed None No
$750
Fiberglass insulation on piping 345 No All Throughout Piping
Linear
Ft.
Good Low Other N/A Sampled None
Ductwork insulation 245 No All Throughout HVAC Sq. Ft. Good Low Other N/A Sampled None
Sound board 367 No All
Warehouse, GPO Print
Shop
Walls Sq. Ft. Good Low Other N/A Sampled None
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
Silver paint 370 No All Throughout
Piping, vessels and sheet metal walls in fan rooms
Sq. Ft. Good Low Other N/A Sampled None
1'x 2' ACT 117 No All 2122 Ceiling Sq. Ft. Good Low Other N/A Sampled None
Red terazzo and cementitous underlayment platforms
367 No 1 Boiler room Floor Sq. Ft. Poor Low Other N/A Sampled None
Lath and plaster 392 No All Throughout Walls/Ceilings Sq. Ft. Good Low Other N/A Sampled None
Sealant tape 367 No All Throughout Piping Linear
Ft.
Good Low Other N/A Sampled None
Black cork pipe insulation 345 No All Throughout Piping Linear
Ft.
Good Low Other N/A Sampled None
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
Gray felt pipe insulation 345 No All Throughout Piping Linear
Ft.
Good Low Other N/A Sampled None
Gray window sill membrane 367 No All Throughout Window Sq. Ft. Good Low Other N/A Sampled None
Black terazzo 367 No 2 2118 Floor Sq. Ft. Good Low Other N/A Sampled None
2'x 4' SACT with worm and hole pattern 169 No All Office area Ceiling Sq. Ft. Good Low Other N/A Sampled None
Gaskets 338 No All Throughout Piping and HVAC Each Good Low Other N/A Sampled None
Black sealant tape on ductwork 249 No All Throughout HVAC
Linear
Ft.
Good Low Other N/A Sampled None
Yellow boiler brick lining 76 No 1 Boiler room Boilers Sq. Ft. Good Low Other N/A Sampled None
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
Leveling compound on concrete 272 No All Throughout Floor Sq. Ft. Good Low Other N/A Sampled None
Window caulking 504 No All All Window Linear
Ft.
Good Low Other N/A Sampled None
2'x 2' blue rubber floor tread tiles with tan mastic on concrete
332 No All E stairwell Floor Sq. Ft. Good Low Other N/A Sampled None
12" ACT with worm and hole pattern and associated mastic
194 No 1 Boiler room, space #12A35 Ceiling Sq. Ft. Good Low Other N/A Sampled None
Brown carpet mastic 83 No All Throughout Floor Sq. Ft. Good Low Other N/A Sampled None
Spray applied fireproofing 260 No 1 1310 Ceiling Sq. Ft. Good Low Other N/A Sampled None
Red/black roof grout 367 Yes Roof Roof Roof Linear
Ft.
184,160 Good Low Other N/A O&M Sampled None No
$184,000
CraigSThomas Highlight
DESCRIPTION HSA # ACM FLOOR ROOM LOCATION U
N
IT
S
M E A S U E R
A N T
IT
Y
C O N D
IT
IO
N
D A M G E P O T E N T
IA
L
D A M A G E T Y P E
O T H E R D A M A G E
R E C O M M E N D
S P O N
T
IO
N
S A M P L E D
A S S U M E D
D A M A G E
F R
IA
B
IL
IT
Y
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
Large Bore TSI (>6" OD) pipe fittings 379 Yes All Warehouse Piping Each 25 Good Low Other N/A O&M Assumed None Yes
$500
3/8" gasket material associated with old boilers 338 Yes 1 Boiler room Old boilers
Linear
Ft.
60 Good Low Other N/A O&M Sampled None No
$900
Black tar sealant 405 Yes Roof Roof Roof Linear
Ft.
4,500 Good Low Other N/A O&M Sampled None No
$5,200
Window putty 511 No All Throughout Windows Linear
Ft.
Good Low Other N/A Sampled None
$386,025
$115,808
$154,410
$656,243
Abatement Cost Est. Subtotal
Abatement Design Cost
Total Abatement Cost
Abatement Construction Management Costs
Building Name: GSA Federal Center South, Bldg. 1201 Buildng Number:
Address:
Seattle, Washington
HSA # ACM FLOOR ROOM L
O C A T
IO
N
U N
IT
S
A C C E S S
IB
L E
386 Yes 1
AHU-4; AHU-
2,3,10;
Hallway North of Boiler
Room
East wall in
AHU-4; AHU-
2,3,10; Above
SACT in
Hallway
Linear
Ft.
Yes
386 Yes 1 & 2 Boiler Room and AHU-4
Ceiling level above Boiler
#3; East wall in AHU-4
Linear
Ft.
Yes
$124
$93
$527
Yes $150
$310
5 Repair Sampled Medium
*Exclusive of Mobilization Cost.
Date:
Service Center:
Field Office:
Total Abatement Cost
Abatement Construction Management Costs
HOMOGENOUS
MATERIALS DESCRIPTION
Extra Large Bore TSI
(>14"OD) includes aircell and mag runs and fittings.
Small Bore TSI (< 6"OD) includes aircell and mag runs and fittings.
Northwest/Arctic Region
Re-Inspection Physical Assessments of Damaged Materials
Propty Mngr:
Phone:
Order No:
WA0953KC
4735 East Marginal Way
Richard Hall 206-764-6778
March 26, 2007
Abatement Cost Est.
Subtotal
Abatement Design Cost
E S T
IM
A T E D C O
R E M E D
IA
T
IO
N
F R
IA
B
IL
IT
Y
S A M P L E D
A S S U M E D
R E C O M M E N D
S P O N
T
IO
N
E S T
IM
A T
A N T
IT
Y
M A G E D A C M
D
IS
T U R B A N
P
T E N T
IA
L
Yes $1608 Repair Sampled Medium
APPENDIX B
ANALYTICAL REPORTS AND CHAIN OF CUSTODY FORMS FOR
ASBESTOS SAMPLES
APPENDIX C
SAMPLING METHODOLOGY
SAMPLING METHODOLOGY
Asbestos-Containing Materials
The EHSI field inspectors were an asbestos Building Inspector, certified under the requirements of the United States Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA) regulation 40 CFR 763, Subpart E. Sampling was consistent with the requirements of AHERA, as well as meeting the requirements of State and local regulatory agencies. Samples were collected and analytical data obtained for suspect ACM identified in the facility. The number of bulk samples collected and their locations were based on the AHERA regulation and the guidelines provided by the EPA Document 560/5-85-030a, October 1985, Asbestos in Buildings: Simplified Sampling Scheme For Friable Surfacing Materials. Once collected, bulk samples were sealed to eliminate the possibility of contamination. “Chain-of-custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with U.S. EPA Method 600/R-93/116.
Samples were analyzed for asbestos content by NVL Laboratories, Inc. (NVL), Seattle, Washington, a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory. Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on EPA, State, and local regulations.
Samples in the report labeled as #QA are Quality Assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories.
QA samples were submitted to, Northern Laboratory and Consulting Services, Inc.
(NLCS), Burien, Washington, another NVLAP laboratory. Copies of both laboratories’ NVLAP certifications are included in Appendix E.
APPENDIX D
AHERA BUILDING INSPECTOR CERTIFICATES
APPENDIX E
LABORATORY CERTIFICATION FOR ASBESTOS ANALYSIS
APPENDIX F
SAMPLE LOCATION DRAWINGS
APPENDIX G
HOMOGENOUS MATERIAL DRAWINGS
APPENDIX H
DAMAGED ACM MATERIAL DRAWINGS
File details come from the government source that posted it. Updated .