This file contains daily and weekly environmental cleanup reports from EnviroServe documenting response activities at Lake Storey in Galesburg, Knox County, Illinois from February 14 through April 19, 2024. The cleanup operation addressed a diesel fuel contamination incident affecting three coves of Lake Storey and a generator location site. The response activities included installing containment booms, removing contaminated vegetation, skimming contaminated water, washing bank lines, monitoring contamination levels, and managing waste disposal. Major equipment deployed included over 120 petroleum absorbing soft booms, 800 feet of river level hard boom, 100 feet of creek level hard boom, and multiple frac tanks for contaminated water storage.

By the end of the reporting period, EnviroServe had disposed of 182 tons of solid waste and 144,000 gallons of liquid waste. The cleanup progressed through several phases, including initial containment, active remediation of three affected coves, removal of contaminated soil and concrete at the generator site, and final environmental sampling. PID readings for benzene levels were monitored throughout the excavation process, with readings ranging from 17-148 ppm. The final phase included collecting grid pattern samples submitted to Pace Laboratories, with results expected by April 25, 2024.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1100 SW Monarch Street

Peoria, IL 61602

2 4 - H O U R EM ER G EN C Y R ESP O N SE:

800-488-0910

W ASTE SO L U TIO N S:

800-642-1311 www. enviroserve.com

State of IL

Knox County, (Galesburg) IL

Incident# H20240120, H20240116

EnviroServe # 11517

12/14/2024

• Team explored lake on watercraft. -

▪ Discovered the extent of contamination appears to be contained to the 3 coves and bank-lines of those three coves.

• Activity of Cove 1-

▪ Pom installed to assist in collection. Saturated boom is beginning to be removed as needed. Moving forward, Hard boom will remain installed, soft boom will be removed as needed. Oil snaring will also be conducted. Continued efforts of skimming with the vacuum truck. Vegetation removal has and will continue.

• Activity of Cove 2-

▪ Cove 2 is still contained utilizing soft boom, with anticipation of installing hard, river level boom by EOD 2/15/2024

• Activity of Cove 3-

▪ 32 soft booms have been installed, as well as 1- hard river level boom was installed. Efforts to begin removal of contaminates are anticipated to begin later this week.

• Activity on Main Body of Lake

▪ 1- creek level hard boom placed at East end of lake flowing into Lincoln Park.

• Activity on Main Site (Generator Location) -

▪ The generator has been removed and placed into a containment on site. Efforts to remove the concrete have begun, exploration of the substrate below has shown significant diesel contamination. EnviroServe will continue to remove concrete as needed and as discussed. A cone of depression has been created in efforts to pull contamination out of the substrate to be collected.

To date, EnviroServe has deployed the following resources:

• 101- petroleum absorbing Soft Boom

• 2- River level hard boom

• 1- Creek level hard boom

• 150 ft.- of sheen absorbing Pom

• 3- 55 gal Poly drums

To date, EnviroServe has removed the following Contaminants:

• 21k Frac tank(533G) ON SITE – 18,500 gal (approx.)

• 1 - 20yd Rolloff box (ROB415) ON SITE (Full with Vegetation Removal)

• 1 – Soft boom (Cove-1)

To date, EnviroServe has disposed of the following waste:

• 0 pounds of total waste disposed.

• 0 gallons of total waste disposed.

Should you have any questions, additional input, or need any other information, please feel free to contact the undersigned at 309-303-7776.

Respectfully, EnviroServe- Peoria

Zach Minton

Operations Coordinator

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

www.enviroserve.com

2/15/2024

• Team explored lake on watercraft. - Team explored lake, no new contamination discovered Team began washing banks of cove 1

All removed vegetation condensed with wood chipper into Roll off Box #2 ROB415 Empty and ready for loading

Actively skimming the lake.

Boom installed to block any contamination migration into overflow wetlands Hard Boom to be installed first thing 2/16/2024

Cove remains contained Boom will be inspected daily

No further contamination has been discovered.

All associated rainwater lines have been washed utilizing a sewer jetter.

Contaminated wash water has been collected and placed into on site frac.

Boot installed connecting storm drain to outfall to allow continuous flow without any further contamination.

• 101- petroleum absorbing Soft Boom

• 2- River level hard boom

• 1- Creek level hard boom

• 150 ft.- of sheen absorbing Pom

• 21k Frac tank(533G) ON SITE – 18,500 gal (approx.) – FULL

• 21k Frac tank (532G) ON SITE – 6,000 gal (approx.)

• 1 - 20yd Roll off box (ROB415) ON SITE

• 1 – 20yd Roll off box (Roll off #2) ON SITE (1/8 full of chipped vegitation)

• 1 – Soft boom (Cove-1)

• 4 – Soft boom (Main site creek)

• 100 ft Pom (Main site creek)

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/16/2024

▪ Saturated boom has been removed and replaced.

▪ Continued to remove impacted vegetation.

▪ 2/17-18/2024 – Plans to continue impacted area removal

▪ All saturated boom has been removed

▪ Deployed 400 ft of river level hard boom

▪ Hard boom installed between cove 2 and wetland inlet.

▪ Continued to skim surface water.

▪ 2/17-18/2024 – Plans to continue washing banks

▪ Begin sweeping the area with hard boom to shrink the area of contamination.

▪ Cove is contained

▪ 2/17-18/2024 – Plans to begin sweeping with hard boom to shrink area of contamination and begin skimming.

▪ No new contamination discovered.

▪ 2/17-18/2024 – Plans to continue investigations to ensure no contamination is discovered

▪ Removed more soil around catch basin #1

▪ Continued skimming and cleaning creek.

▪ 2/17-18/2024 – Plans to continue monitoring and collecting contamination from

Catch Basin #1

• 122- petroleum absorbing Soft Boom

• 800 ft- River level hard boom

• 50 ft- Creek level hard boom

• 200 ft.- of sheen absorbing Pom

• 21k Frac tank (532G) ON SITE – 14,000 gal (approx.)

• 1 - 20yd Roll off box (ROB415) ON SITE

• 1 – 20yd Roll off box (ROB345) ON SITE (1/8 full of chipped vegetation)

• 1 - 20yd Roll off box (ROB343) ON SITE

• 19 – Soft boom (Cove-1)

• 37 – Soft boom (Cove- 2)

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/18/2024

▪ 2/19/2024 – Plans to continue impacted area removal.

▪ Inspected boom, removed sticks and debris caught in the boom.

▪ 2/19/2024 – Plans to continue washing banks

▪ Inspected boom, removed debris caught in the boom

▪ 2/19/2024 – Plans to begin sweeping with hard boom to shrink area of

▪ No new contamination discovered

▪ 2/19/2024 – Plans to continue investigations to ensure no contamination is

▪ Agitated creek bank

▪ Collected water skimmings

▪ 2/19/2024 – Plans to continue monitoring and collecting contamination from

▪ Plan to remove concrete from generator room floor Pending equipment arrival

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 19,000 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 3,000 gal (approx.)

• 1 - 20yd Roll off box (ROB415) ON SITE

• 1 – 20yd Roll off box (ROB345) ON SITE (1/8 of chipped vegetation)

• 1 - 20yd Roll off box (ROB343) ON SITE (3/4 of rubble and contaminated soil)

• 19 – Soft boom (Cove-1)

• 50 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 4– Soft boom (Main site creek)

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/17/2024

▪ 2/18/2024 – Plans to continue impacted area removal.

▪ Water ops postponed due to cold weather

▪ 2/18/2024 – Plans to continue washing banks

▪ Cove is contained

▪ 2/18/2024 – Plans to begin sweeping with hard boom to shrink area of

▪ Boat ops postponed due to cold weather

▪ 2/18/2024 – Plans to continue investigations to ensure no contamination is

▪ Prepped creek area for excavation

▪ Continued skimming and cleaning creek.

▪ 2/18/2024 – Plans to continue monitoring and collecting contamination from

▪ Plan to remove concrete from generator room floor Pending equipment arrival

• 800 ft- River level hard boom

• 50 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 14,000 gal (approx.)

• 1 - 20yd Roll off box (ROB415) ON SITE

• 1 – 20yd Roll off box (ROB345) ON SITE (1/8 full of chipped vegetation)

• 1 - 20yd Roll off box (ROB343) ON SITE

• 19 – Soft boom (Cove-1)

• 37 – Soft boom (Cove- 2)

24-HOUR EMER GENCY RESPONSE:

800-488-0910

WAST E SO LUTIONS:

2/19/2024

▪ 2/20/2024 – Plans to continue washing banks

▪ Continue to wash bank.

▪ 2/21/2024 – Plans to begin sweeping with hard boom to shrink area of

▪ 2/20/2024 – Plans to continue investigations to ensure no contamination is

▪ Collected water skimmings

▪ Dropped the depth of the catch basin in preparation for the concrete pour.

▪ Cleaned interior of building to begin core drilling for substrate contamination investigating.

▪ Drilled sample cores and found diesel under building

▪ 2/20/2024 – Plans to continue monitoring and collecting contamination from

▪ Pour new catch basin

▪ Blind out fire suppression system in preparation of demo.

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 19,000 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 3,000 gal (approx.)

• 1 - 20yd Roll off box (ROB415) ON SITE

• 1 – 20yd Roll off box (ROB345) ON SITE (1/4 of chipped vegetation)

• 1 -20yd Roll off box (ROB343) ON SITE(FULL of rubble and contaminated soil)

• 19 – Soft boom (Cove-1)

• 50 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 5000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/20/2024

▪ Washed the banks of Cove 2 with great results

▪ Continued skimming and collecting water

▪ 2/21/2024 – Plans

▪ Continue to collect skimmings

▪ 2/21/2024 – Plans to continue investigations to ensure no contamination is

▪ Collected water skimmings from open excavation

▪ Began concrete work

▪ Removed contaminated soil from the creek at the storm water inlet.

▪ Continued skimming to collect impacted water

▪ 2/21/2024 – Plans to continue monitoring and collecting contamination from

▪ Pour concrete

▪ Asbestos assessment of building

▪ Begin Hauling 20 yd boxes off site for disposal.

▪ Continue running loads of water off site.

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank(533G) ON SITE – 19,500 gal (approx.) – FULL

• 21k Frac tank (532G) ON SITE – 19,500 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 7,800 gal (approx.) - FULL

• 1 – 20yd box (ROB415) ON SITE (1/2 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (1/4 of chipped vegetation)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) ON SITE (1/2 of contaminated soil from creek)

• 1 – 20yd box (SB2690) ON SITE - EMPTY

• 19 – Soft boom (Cove-1)

• 50 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 10,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/21/2024

▪ Activity of Cove 1-

▪ Washed Banks in Cove 1

▪ Activity of Cove 2-

▪ 2/22/2024 – Plans

▪ Activity of Cove 3-

▪ Activity on Main Body of Lake

▪ 2/22/2024 – Plans to continue investigations to ensure no contamination is

▪ Activity on Main Site (Generator Location) -

▪ Completed concrete work

▪ Continued skimming to collect impacted water

▪ Began Hauling 20 yd boxes off site for disposal.

▪ Hauling out loads of water (5 Tankers)

▪ Installed sump pump in excavation

▪ 2/22/2024 – Plans to continue monitoring and collecting contamination from

▪ Asbestos assessment of building

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank(533G) ON SITE – 19,500 gal (approx.) – FULL

• 21k Frac tank (532G) ON SITE – 19,500 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 7,800 gal (approx.) - FULL

• 1 – 20yd box (ROB415) ON SITE (1/2 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (1/4 of chipped vegetation)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) ON SITE (1/2 of contaminated soil from creek)

• 1 – 20yd box (SB2690) ON SITE - EMPTY

• 19 – Soft boom (Cove-1)

• 50 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 40,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/22/2024

▪ Continued Washing Banks in Cove 1

▪ 2/23/2024 – Plans

▪ Activity of Cove 3-

▪ 2/23/2024 – Plans to continue investigations to ensure no contamination is

▪ Washed banks in creek

▪ Continued skimming to collect impacted water

▪ Hauling out loads of water (1 Tanker)

▪ 2/23/2024 – Plans to continue monitoring and collecting contamination from

▪ Asbestos assessment of building

▪ Continue running loads of full roll offs off site.

• 123- petroleum absorbing Soft Boom

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank(533G) ON SITE – 6,000 gal (approx.) –

• 21k Frac tank (532G) ON SITE – 16,500 gal (approx.) –

• 8k Frac tank (9190A) ON SITE – 500 gal (approx.) -

• 1 – 20yd box (ROB415) ON SITE (3/4 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (FULL)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) ON SITE EMPTY

• 1 – 20yd box (SB2690) ON SITE - EMPTY

• 20 – Soft boom (Cove-1)

• 50 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 8 Tons of total waste disposed.

• 40,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/23/2024

▪ Swept area with hard boom and reduced the contained area .

▪ 2/24/2024 – Plans

▪ 2/24/2024 – Plans to continue investigations to ensure no contamination is

▪ Collected water skimmings from open excavation.

▪ Washed banks in creek.

▪ Continued skimming to collect impacted water.

▪ Hauling out loads of water (1 Tanker).

▪ Cleaned up all stockpiles of concrete and soil, placed into 20 yard rolloff.

▪ Added large rock to the outfall of the creek where excavation took place.

▪ Installed a collection well in the excavation of CB1 and began adding rock.

▪ Cut concrete in front of building and prepped area to be removed

▪ 2/24/2024 – Plans to continue monitoring and collecting contamination from

Catch Basin #1

▪ Asbestos assessment of building

▪ Continue running loads of water off site.

▪ Begin removing concrete and investigate substrate for contamination

• 123- petroleum absorbing Soft Boom

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 10,500 gal (approx.) –

• 8k Frac tank (9190A) ON SITE – 7800 gal (approx.) – FULL

• 1 – 20yd box (ROB415) ON SITE (3/4 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (FULL)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) (FULL soil and debris from creek)

• 1 – 20yd box (SB2690) ON SITE - EMPTY

• 20 – Soft boom (Cove-1)

• 50 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 45,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/24/2024

▪ Continued to collect skimming from west side of cove

▪ Swept area with hard boom and reduced the contained area .

▪ 2/25/2024 – Plans

▪ Continue to wash bank.

▪ Continue to collect skimmings.

▪ Remove hard boom from cove.

▪ Activity of Cove 3

▪ 2/25/2024 – Plans to skim / wash/ and remove hard boom.

▪ 2/25/2024 – Plans to continue investigations to ensure no contamination is

▪ Washed banks in creek.

▪ Continued skimming to collect impacted water.

▪ Removed section of concrete in front of building

▪ Investigated substrate beneath concrete. PID levels of benzene up to 148 ppm.

▪ Excavated and found pools of red diesel.

▪ 2/25-26/2024 – Plans to continue monitoring and collecting contamination from

Catch Basin #1

▪ Asbestos assessment of building

• 127- petroleum absorbing Soft Boom

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 19,500 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 7800 gal (approx.) – FULL

• 1 – 20yd box (ROB415) ON SITE (3/4 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (FULL)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) (FULL soil and debris from creek)

• 1 – 20yd box (SB2690) ON SITE – (FULL Rubble and soil)

• 26 – Soft boom (Cove-1)

• 100 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 0 – Soft boom ( Cove-3)

• 45,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

2/26/2024

▪ Activity of Cove 2

▪ 2/27/2024 – Plans

▪ Remove soft boom.

▪ Activity of Cove 3

▪ Cove Washed, boom has been removed, no further activities for cove 3.

▪ Creek level boom removed from 155 (Lincoln Park)

▪ 2/27/2024 – Plans to continue investigations to ensure no contamination is

▪ Removed stockpiled debris

▪ Removed waste by tanker

▪ Removed solid waste in rolloffs

▪ 2/27/2024 – Plans to continue monitoring and collecting contamination from

Catch Basin #1

▪ Asbestos assessment of building

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 19,500 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 7800 gal (approx.) – FULL

• 1 – 20yd box (ROB415) ON SITE (3/4 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (FULL)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) (FULL soil and debris from creek)

• 1 – 20yd box (SB2690) ON SITE – (FULL Rubble and soil)

• 26 – Soft boom (Cove-1)

• 100 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 18 – Soft boom ( Cove-3)

• 51,000 gallons of total waste disposed.

2 4 - H O U R EM ER G EN C Y R ESP O N SE:

800-488-0910

W ASTE SO L U TIO N S:

2/28/2024

▪ 2/29/2024 – Plans

▪ Remove soft boom.

▪ NO BOAT ACTIVITIES TODAY DUE TO WEATHER

▪ 2/29/2024 – Plans to continue investigations to ensure no contamination is

▪ Removed waste by tanker

▪ 2/29/2024 – Plans to continue monitoring and collecting contamination from

▪ Asbestos assessment of building

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 19,500 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 7800 gal (approx.) – FULL

• 1 – 20yd box (ROB415) ON SITE (3/4 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (FULL)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) (FULL soil and debris from creek)

• 1 – 20yd box (SB2690) ON SITE – (FULL Rubble and soil)

• 26 – Soft boom (Cove-1)

• 100 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 18 – Soft boom ( Cove-3)

• 61,000 gallons of total waste disposed.

2 4 - H O U R EM ER G EN C Y R ESP O N SE:

800-488-0910

W ASTE SO L U TIO N S:

2/29/2024

▪ All banks washed and boom removed. Cove 2 has been completed

▪ 3/1/2024 – Plans to continue investigations to ensure no contamination is

▪ Removed waste by tanker

▪ Received preliminary asbestos report

▪ 3/1/2024 – Plans to continue monitoring and collecting contamination from Catch

Basin #1

▪ Decon and stow hard boom.

▪ Begin preparations for demo

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank (532G) ON SITE – 19,500 gal (approx.) – FULL

• 8k Frac tank (9190A) ON SITE – 7800 gal (approx.) – FULL

• 1 – 20yd box (ROB415) ON SITE (3/4 of Saturated boom, pads, and on site trash)

• 1 – 20yd box (ROB345) ON SITE (FULL)

• 1 – 20yd box (ROB343) ON SITE (FULL of rubble and contaminated soil)

• 1 – 20yd box (SB2949) (FULL soil and debris from creek)

• 1 – 20yd box (SB2690) ON SITE – (FULL Rubble and soil)

• 26 – Soft boom (Cove-1)

• 100 ft Pom (Cove- 1)

• 37 – Soft boom (Cove- 2)

• 18 – Soft boom ( Cove-3)

• 50 Tons of total waste disposed.

• 71,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

3/1/2024

▪ Activity on Lake

▪ Lake activities completed, all deployed materials have been removed from the lake

▪ Removed waste by tanker

▪ Began deconning equipment and stowing.

▪ Began preparation for demo.

▪ 3/4/2024 – Plans to continue monitoring and collecting contamination from Catch

Basin #1

▪ Decon and stow hard boom.

▪ Begin demo of the outbuilding.

▪ Begin cleaning and taking frac tanks off site.

• 800 ft- River level hard boom

• 100 ft- Creek level hard boom

• 21k Frac tank(533G) ON SITE – 3,0000 gal (approx.) –

• 21k Frac tank (532G) ON SITE – 0 gal (approx.) –

• 8k Frac tank (9190A) ON SITE – 0 gal (approx.) –

• 1 – 20yd box (ROB415)

• 1 – 20yd box (ROB345)

• 1 – 20yd box (ROB343)

• 1 – 20yd box (SB2949) ON SITE – ¾ full

• 1 – 20yd box (SB2690)

• 38 – Soft boom (Cove-1)

• 49 – Soft boom (Cove- 2)

• 36 – Soft boom ( Cove-3)

• 4– Soft boom (Main site creek)

• 100 ft Pom (Main site creek)

• 100 ft Pom (Cove- 1)

• 800 ft river level boom

• 100 ft creek level boom

• 55 Tons of total waste disposed.

• 75,000 gallons of total waste disposed.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

Week of 3/11/2024

• Monday 3/11/2024-

▪ Removal of concrete and contaminated soil continued

▪ Area open is approximately 10ft x 20ft

▪ PID samples indicated a 50 ppm level of benzene at 1 ft and 17ppm at 3 ft.

• Tuesday 3/12/2024-

▪ Area open is approximately 20ft x 20ft

▪ PID samples indicated a 80 ppm level of benzene

• Wednesday 3/13/2024-

▪ Area open is approximately 20ft x 20ft and a 5ft x10ft

▪ PID samples indicated a 90 ppm level of benzene

• Thursday 3/14/2024-

▪ Large overnight storm, Dewatering, and running loads of waste water

▪ Area open is approximately 20ft x 20ft and a 5ft x10ft

▪ No PID Taken today due to inclement weather

• Friday 3/15/2024-

▪ Area open is approximately 20ft x 20ft and a 15ft x 10ft

▪ PID samples indicated a 20-30 ppm level of benzene

• 182 Tons of total waste disposed.

• 144,000 gallons of total waste disposed.

Should you have any questions, additional input, or need any other information, please feel free to contact the undersigned at 309-303-7776.

24-HOUR EMERGENCY RESPONSE:

800-488-0910

WASTE SOLUTIONS:

Week of 4/15/2024

• Monday 4/15/2024-

▪ Samples were taken in a grid pattern that was discussed with Dan Bowen.

▪ Samples were taken back to the Peoria office to be organized and placed on ice.

• Tuesday 4/16/2024-

▪ Samples were submitted to Pace laboratories in Peoria IL

• Wednesday 4/17/2024-

▪ Crew arrived on site to control water and to assess conditions

• Thursday 4/18/2024-

▪ Crew arrived on site to walk through and remove anything that may be around the site.

▪ Posts were removed in the on site creek

▪ Buckets, boom, and other items were picked up from the site

• Friday 4/19/2024-

▪ No activities were performed on site today

***Tuesday 4/23/2024 – Update received from Pace Laboratories that the results should be finalized and returned to us by Thursday

4/25/2024***

H20240120 - 21424 update Lake Storey - Galesburg IL
H20240120 - 21524 update Lake Storey - Galesburg IL
H20240120 - 21624 update Lake Storey - Galesburg IL
H20240120 - 21724 update Lake Storey - Galesburg IL
H20240120 - 21824 update Lake Storey - Galesburg IL
H20240120 - 21924 update Lake Storey - Galesburg, IL
H20240120 - 22024 update Lake Storey - Galesburg IL
H20240120 - 22124 update Lake Storey-Galesburg IL
H20240120 - 22224 update Lake Storey - Galesburg IL
H20240120 - 22324 update Lake Storey - Galesburg IL
H20240120 - 22424 update Lake Storey - Galesburg IL
H20240120 - 22624 update Lake Storey - Galesburg IL
H20240120 - 22824 update Lake Storey - Galesburg IL
H20240120 - 22924 update Lake Storey - Galesburg IL
H20240120 - 30124 update Lake Storey - Galesburg IL