This is a set of construction plans and specifications for the Entrada Way Culvert Slip-Out Bank Stabilization Project prepared by the County of San Mateo Public Works Department. The project involves comprehensive creek channel realignment, bank stabilization, and roadway improvements along La Honda Creek adjacent to Entrada Way. The scope of work includes clearing and grubbing operations, installation of erosion and sediment control measures (high visibility silt fencing, wildlife exclusion fencing, and stabilized construction entrances), temporary creek diversion systems with fish exclusion netting, excavation and dewatering of isolated work areas, installation of engineered log structures (ELS) with timber pilings, placement of scour protection rock and salvaged boulders, channel realignment with low-flow channel construction, roadway pavement removal and replacement, installation of drainage infrastructure including a 24-inch storm drain pipe, retaining wall construction with soldier piling and ground anchors, and riparian restoration through live stake and container plant installations. Sealed bids are due by 2:00 p.m. on Thursday, July 23, 2026, with public bid opening immediately following. Contractors must register on the OpenGov website to access all bidding documents and are required to submit a Plan Holder's Affidavit if obtaining documents through alternative sources. Questions regarding contract documents must be submitted in writing via email to mclement@smcgov.org and wng@smcgov.org by 5:00 p.m. on July 16, 2026, with responses posted to the County's Public Works website.
The plans indicate this is a complex multi-phase construction project requiring coordination of water management, environmental controls, and in-stream work activities. All temporary water management measures are preliminary schematics subject to contractor modification and engineer approval, with the contractor bearing sole responsibility for managing surface water and groundwater and submitting a Temporary Creek Diversion System Plan prior to commencing in-water work. Construction access is restricted to property 083-051-110 on the left (east) bank with all heavy equipment requiring crane placement into the work area. The project requires coordination with qualified biologists for fish exclusion and wildlife protection measures, and engineer inspections are mandatory at multiple stages including verification of clearing and grubbing limits, root zone protection installation, excavation extents, and key log placement before construction advancement. Tree surveys were completed November 5-6, 2024, and January 8, 2025, with specific tree removal protocols and protection requirements detailed throughout the plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY OF SAN MATEO
CALIFORNIA
PROJECT
LOCATION
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER COVER
G01
PROJECT
LOCATION
OHW
TOP
June 26, 2026
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER CONSTRUCTION BMPS
G02
LA HONDA GUILD
CUESTA
083-370-010
SUBDIVISION NO. 1
CUESTA LA HONDA
(17-RSM-PG056)
Block 3
McEVOY 083-370-010
VOL 10 PG 71
LA HONDA GUILD - CUESTA
083-051-150LA HONDA GUILD
CUESTA
083-051-120
Bruce 083-051-110
SUBDIVISION NO. 1
CUESTA LA HONDA
(17-RSM-PG056)
Block 1
E N T R A D
A W A Y
6 0 ' R O W
PINGER AND FERGUSON
083-012-060
PARCEL I
2007-095388
(VOL 32 PG 87)
BUILDING
BUILDING
BUILDING
BUILDING
26105 26106
26161
26162
26177
2620526206
26208
2622026221
26222
26232
26233
26237
262412624226245 26247
26250
26254
26305
26306
2630726308 26472
2661926621
26622
2662526626 26627
26628
26636
26639
26642
26644
26650 26651
26655
26657
2665826659
26662 26663
26711
26727
26751
26773
26776
26777 26778
26779
26780
2678126783
26784
26786
2678726789
26797
26818
26819 26820
26942
27068
27120
27123 100037
100038
100039 100040 100041
100042
100130
100131 100132
100133 100134
100135100136 100137
100187
100214
100220 100223
100225
100227
100228
WATERS OF THE US
X
26124
26463264642644526446
100209
100210100211
100216
100217
OHW
OHW
OHW
OHW
O H
W
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW
OHW
O H
W
OHW
O
HW
OHW
O H
W
OHW
OHW
TOP
TOP
TOP
TOP
TO
P
TOP
TO
P
TOP
TOP
TO
P
TOP
TOP
TOP
TOP
TO
P
TOP
TOP
TOP
TO
P
TOP
TOP
TO
P
TOP
TO
P
TOP
TOP
TOP
TOP
26444
150000 150001150002
150003150004
150005150006150007150008150009
150010 150011150012
150016
26378
26231
HVSF HVSF HVSF
H
VS
F
HV
SF
HVSF
HVSF
HVSF HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
HVSF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
WEF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
WEF WEF
C02
HIGH VISIBILITY SILT FENCE
(WITH WILDLIFE EXCLUSION)
SITE ACCESS FROM
ENTRADA WAY
PROJECT LIMITS
TYP
C04
TEMPORARY ROOT ZONE
PROTECTION - TYPE A
TYP
26021
26022
26457
26609 26614
26673
26676 26677
26698
26699
27035
100141 100142
100155
100207
100139
100140
27038
100138
100208100150
150017
C02
STABILIZED CONSTRUCTION
ENTRANCE
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XCONNECT HVSF TO
FISH EXCLUSION
NETTING
SEE NOTE 1 (TYP) CONNECT HVSF TO
FISH EXCLUSION
NETTING
C04
TEMPORARY ROOT ZONE
PROTECTION - TYPE B
PROTECT IN PLACE
OVERHEAD POWER
STEEL PLATE
SEE NOTE 3
TYP
C02
WILDLIFE EXCLUSION
FENCE
K-RAIL
LEGEND
PROJECT LIMITS
HIGH VISIBILITY SILT FENCE
(WITH WILDLIFE EXCLUSION)HVSF
STAGING AND
STORAGE
TEMPORARY
CONSTRUCTION ENTRANCE
SITE ACCESS
TEMPORARY ROOT ZONE
PROTECTION -TYPE A
WILDLIFE EXCLUSION
FENCE
WEF
TEMPORARY ROOT ZONE
PROTECTION - TYPE B
STEEL PLATE
REDONDA WAY
LA HONDA GUILD
CUESTA
083-092-190 E N T R A D A W A Y
6 0 ' R O W
BUILDING
TENNIS
COURT
X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
EO
P
HVSF HVSF HVSF HVSF HVSF HVSF
HV
SF
H
VS
F
H
VS
F
W
EF
W
EFWEF
WEF
WEF
WEF
WEF
WEF
WEF
W
EF
W
EF
W
EF
STAGING AND STORAGE PROTECT IN PLACE
OVERHEAD POWER
C02
STABILIZED CONSTRUCTION
ENTRANCE
PROTECT IN PLACE TREE
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER
020 20 40
SCALE IN FEET
C01
NOTES:
1. TERMINAL ENDS OF HIGH VISIBILITY SILT FENCE (WITH WILDLIFE EXCLUSION) SHALL BE INTEGRATED WITH FISH EXCLUSION NETS TO ENSURE A CONTINUOUS WILDLIFE EXCLUSION BARRIER ALONG THE PROJECT
LIMITS.
2. WILDLIFE EXCLUSION FENCE LIMITS SHOWN ARE APPROXIMATE AND SUBJECT TO CHANGE THROUGHOUT THE CONSTRUCTION PERIOD AND PER THE DIRECTION OF THE ENGINEER OR THE QUALIFIED BIOLOGIST.
WILDLIFE EXCLUSION FENCE SHALL CONFORM TO THE BMP BIO-3 REQUIREMENTS OF SAN MATEO
COUNTY'S ROUTINE MAINTENANCE PROGRAM.
3. STEEL PLATE(S) TO BE PLACED OVER EXISTING ROADSIDE DRAINAGE DITCH AS PART OF STABILIZED
CONSTRUCTION ENTRANCE TO PROTECT IN PLACE AND MAINTAIN ITS FUNCTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A TRAFFIC CONTROL PLAN FOR ALL PHASES OF CONSTRUCTION. ORANGE ADVISORY SIGNS SHALL BE ADDED AT EASTERN AND WESTERN EDGES OF THE PROJECT LIMITS ALONG ENTRADA WAY WITH EXACT LOCATIONS DETERMINED WITH THE COUNTY IN THE TRAFFIC CONTROL PLAN. CONTRACTOR SHALL MAINTAIN A MINIMUM 11 FOOT
WIDE TRAVEL LANE OPEN DURING CONSTRUCTION.
5. RIGHT OF ENTRY AREAS EXTEND BEYOND THE CONSTRUCTION ENTRANCE AND SHALL NECESSARILY COVER THE ENTIRE PORTION OF THE PROJECT LIMITS THAT OCCUR OUTSIDE OF COUNTY RIGHT OF WAY.
TESC PLAN
MATCHLINE THIS SHEET
MATCHLINE THIS SHEET
K-RAIL
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER TESC DETAILS
C02
ISOMETRIC
(STEEL POSTS AND TRENCH SHOWN)
SPLICE DETAIL
SEE NOTE 3
SEE NOTE 3
SHEET FLOW
(TYPICAL)
PROTECTED AREA
PROTECTED AREA
6' - 0 " M
AX. SPACING
PROTECTED AREA
GEOTEXTILE FOR HIGH VISIBILITY SILT FENCE
COLOR - ORANGE
(STEEL POSTS SHOWN)
TYPICAL HIGH VISIBILITY SILT FENCE
WITHOUT BACKUP SUPPORT
TYPICAL TRENCH INSTALLATION DETAIL
1. DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND
AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH
SURFACE FOLLOWING EXCAVATION TO AVOID CONCENTRATING
FLOWS. COMPACTION MUST BE ADEQUATE TO PREVENT
UNDERCUTTING FLOWS.
2. POST SHALL ONLY BE STAKED ON THE CONSTRUCTION SIDE
FABRIC
(GEOTEXTILE)
(TYPICAL)
NOTES
1. SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER
TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE
FENCE AT THE OVERLAP. JOINING SECTIONS SHALL NOT BE
PLACED IN LOW SPOTS OR IN SUMP LOCATIONS.
(WOOD POSTS SHOWN)
FASTEN GEOTEXTILE
TO POST EVERY 6" (IN.) O.C.
NOTES
1. HIGH VISIBILITY SILT FENCE (HVSF) SHALL CONFORM TO MEASURES IN
BMP BIO-3 FROM SAN MATEO COUNTY'S ROUTINE MAINTENANCE
PROGRAM.
2. HVSF SHALL MEET ALL REQUIREMENTS FOR HIGH VISIBILITY SILT
FENCE AND WILDLIFE EXCLUSION FENCE.
3. ANGLE TERMINAL END UPHILL 24" (IN) TO 48" (IN) TO PREVENT FLOW
AROUND FENCE (TYPICAL).
4. PERFORM MAINTENANCE AS NEEDED
5. SPLICES SHALL NEVER BE PLACED IN LOW SPOTS OR SUMP
LOCATIONS. IF SPLICES ARE LOCATED IN LOW OR SUMP AREAS, THE
FENCE MAY NEED TO BE REINSTALLED UNLESS THE ENGINEER
APPROVES THE INSTALLATION.
6. INSTALL SILT FENCING PARALLEL TO MAPPED CONTOUR LINES WITH
THE SUPPORTING POST ON THE PROJECT SIDE.
7. CLIMBER BARRIER FABRIC SHALL BE FOLDED AWAY FROM THE
CONSTRUCTION SIDE AND TOWARDS THE PROTECTED AREA AT AN
ANGLE REQUIRED BY QUALIFIED BIOLOGIST.
8. ESCAPE TUNNELS SHALL BE INSERTED INTO THE FENCING AT 150' OC
OR PER THE DIRECTION OF THE QUALIFIED BIOLOGIST.
9. HVSF SHALL OVERLAP FISH EXCLUSION NETTING PER SPLICE DETAIL
SHOWN WITH AN OVERLAP OF A MINIMUM OF 12 INCHES. HVSF SHALL
NOT EXTEND BELOW THE OHWM.
SCALE:
DETAIL - HIGH VISIBILITY SILT FENCE (WITH WILDLIFE EXCLUSION) 1
C01NTS
CONSTRUCTION
SIDE
FOLD AND SECURE TOP
OF GEOTEXTILE FOR
CLIMBER BARRIER
POST ~
WOOD OR STEEL
(TYPICAL)
NOTE
PROTECTED
SIDE
BACKFILL TRENCH
WITH NATIVE SOIL
6" MIN
TRENCH
DEPTH
2'
SELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE),
120# MIN. TENSILE STRENGTH, UV STABILIZED
6" ON CENTER, TYPADJUST ANGLE
AS REQUIRED
FOLD AND SECURE TOP OF
GEOTEXTILE FOR CLIMBER BARRIER
42" MIN
GEOTEXTILE
12"
TYPICAL NO TRENCH INSTALLATION DETAIL
1. GEOTEXTILE SHALL BE FOLDED THEN SEALED TO THE GROUND
TO PREVENT WILDLIFE FROM ENTERING THE SITE.
2. POST SHALL ONLY BE STAKED ON THE CONSTRUCTION SIDE
CONSTRUCTION
SIDE
NOTE
PROTECTED
SIDE
SELF-LOCKING TIE~NYLON 6/6 (MIN. GRADE),
120# MIN. TENSILE STRENGTH, UV STABILIZED
6" ON CENTER, TYP
FOLD AND SECURE TOP OF
GEOTEXTILE FOR CLIMBER BARRIER
42" MIN HIGH VISIBILITY
GEOTEXTILE
COLOR - ORANGE
ADJUST ANGLE
AS REQUIRED
TEMPORARY
CONSTRUCTION
FENCE POST
TEMPORARY CONSTRUCTION FENCE SUPPORT FOR PAVEMENT
AREA. SEE TRENCH INSTALLATION FOR NON-PAVEMENT AREA.GROUND SEAL
SCALE:
DETAIL - WILDLIFE EXCLUSION FENCE 2
C01NTS
NOTES
1. FENCE SHALL CONFORM TO MEASURES IN BMP BIO-3 FROM SAN
MATEO COUNTY'S ROUTINE MAINTENANCE PROGRAM.
2. FENCE SHALL MEET ALL REQUIREMENTS FOR WILDLIFE EXCLUSION
BARRIER.
3. PERFORM MAINTENANCE AS NEEDED
4. CLIMBER BARRIER FABRIC SHALL BE FOLDED AWAY FROM THE
CONSTRUCTION SIDE AND TOWARDS THE PROTECTED AREA AT AN
ANGLE REQUIRED BY QUALIFIED BIOLOGIST.
5. ESCAPE TUNNELS SHALL BE INSERTED INTO THE FENCING AT 150' OC
OR PER THE DIRECTION OF THE QUALIFIED BIOLOGIST.
1 FT MIN
SCALE:
DETAIL - STABILIZED CONSTRUCTION ENTRANCE 3
C01NTS
50 FT MIN, TYP
EXISTING ROAD
20 FT RADIUS MIN, TYP
TYPE A ROCK
PROVIDE FULL WIDTH
OF INGRESS/EGRESS
AREA, 16 FT MINSTABILIZED CONSTRUCTION ENTRANCE NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WATER POLLUTION CONTROL AND DUST CONTROL MEASURES.
STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AS A TYPE 1 TEMPORARY CONSTRUCTION
ENTRANCE PER STANDARD SPECIFICATIONS OR AS APPROVED BY THE ENGINEER.
INSTALL STEEL PLATE OVER EXISTING
CONCRETE DITCH TO PROTECT IN PLACE
EXCAVATE TO MATCH
ELEVATION OF TOP OF
EXISTING PAVEMENT
TAPER ALL EDGES AT
A 1:1 SLOPE
BERM 8" HEIGHT BY 3'-0" WIDTH
LEGEND
REMOVE TREE -
TYPE A
TEMPORARY ROOT ZONE
PROTECTION - TYPE A
SITE ACCESS
CLEAR AND GRUB
CL
TEMPORARY ROOT ZONE
PROTECTION - TYPE B
REMOVE TREE -
TYPE B
CLEARING
CG
EXISTING BOULDERS
PAVEMENT REMOVAL
SITE ACCESS
K-RAIL
LA H
O
N D
A G U
ILD
C
U
ESTA
083-370-010
LA HONDA GUILD - CUESTA
083-051-150LA HONDA GUILD
CUESTA
083-051-120
Bruce 083-051-110
SUBDIVISION NO. 1
CUESTA LA HONDA
(17-RSM-PG056)
Block 1
PINGER AND FERGUSON
083-012-060
PARCEL I
2007-095388
(VOL 32 PG 87)
26105 26106
26177
2620526206
26208
2622026221
26222
26232
26233
26237
26472
26657
26658 26659
26662 26663
26711
26773
26776
26777
26778
26779
26780
26781
26818
26819 26820
100130 100133 100134
100135 100136
100137
100187
100214
100220 100223
100225
100227
100228
WATERS OF THE US
26124
26463 26464 26445 26446
100209
100210100211
100216
100217
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
OHW OHW
O H
W
O
HW
O H
W
OHW
OHW
O H
W
OHW
OHW
OHW OHW
OHW
TOPTOP
TOP
TOP
TOPTOP
TOP
TOP
TOP
TO
P
TOP
TO
P
TO
P
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP TOP TOP
TOP
TOP
TOP
TOP
26444
150000
150001150002
150003 150004
150005150006 150007
150008 150009
150010
150011 150012
150016
26378
26231
C G
C G
CG
C G
C G
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
C G
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG CG CG CG CL CL CL
C L
C L
CL
CG
CG
CG CG CG
C G
C G
CG
CGCGCGCGCGCG
CG
CG
CG
CG
CG
CG
CG
CG
CG
C G
C G
C G
C G
C G
C G
C G
C G
CG
CGCG
CG
CG
CG
CG
C G
C G
C G
CL
CL
CL
C L
CLCLCLCLCL
C L
C L
C
L CL
CL
CL
CL
CL
CL CL
CL
CL
CL
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
WEF
W
EF
W
EF
W
EF
WEFWEF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
W
EF
WEF WEF
W
EF
CLEARING AND GRUBBING
BOULDER REMOVAL
AND SALVAGE
SEE NOTE 6
BEGIN GUARDRAIL
REMOVAL
END GUARDRAIL REMOVAL
REMOVE 24" HDPE AND
SAND BAG BERMS
PROTECT IN PLACE
OVERHEAD POWER
SITE ACCESS FROM ENTRADA WAY
SEE NOTE 8
PAVEMENT REMOVAL
CONCRETE DITCH REMOVAL
CONCRETE DITCH REMOVAL
REMOVE CONCRETE
DEBRIS
CLEAR
CLEAR
26021
26022
26457
26609
26614
26673
26676
26677 26698
26699
27035
100141
100142
100155
100207
100139
100140
27038
100138
100208100150
150017
150013 150014
150015
TEMPORARY
EXCAVATION
LIMITS
SEE NOTE 10
K-RAIL
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER
010 10 20
SCALE IN FEET
SITE ACCESS AND PREP
C03
NOTES:
1. TREE SURVEY PERFORMED ON NOVEMBER 5TH-6TH 2024 AND
JANUARY 8 2025. SEE TREE LISTS, SHEETS G03-G10. TREE
DIAMETER SHOWN IN INCHES MEASURED AT DIAMETER AT
BREAST HEIGHT (DBH). DRIP LINE (DRIP) DIAMETER SHOWN IN
FEET.
2. CONTRACTOR TO COORDINATE WITH THE ENGINEER A
MINIMUM OF FIVE DAYS PRIOR TO ANY GROUND DISTURBING
ACTIVITY TO ALLOW THE ENGINEER TO VERIFY AND STAKE
CLEARING AND GRUBBING, AND CLEARING LIMITS.
3. CONTRACTOR SHALL ONLY CLEAR AND MOW WITHIN STAGING
AND STORAGE AREA. NO GRUBBING SHALL BE ALLOWED
WITHIN STAGING AND STORAGE AREA.
4. EVALUATE TREE PROTECTION OPPORTUNITIES FOR TREES
ADJACENT TO CLEARING AND GRUBBING, AND CLEARING
LIMITS WITH THE LICENSED ARBORIST AND ENGINEER PRIOR
TO TREE REMOVAL ACTIVITIES. TREES NOT IDENTIFIED FOR
REMOVAL SHALL BE PROTECTED UNLESS OTHERWISE NOTED
BY THE ENGINEER.
5. REMOVED TREES SHALL BE SALVAGED FOR REUSE AS
RACKING LOGS AND SLASH MATERIAL AND AS WOOD MULCH
PER THE SPECIAL PROVISIONS. ALL SURPLUS WOOD, WOOD
MULCH OR DEBRIS SHALL BE HAULED OFFSITE BY THE
CONTRACTOR.
6. PORTIONS OF THE BOULDERS PLACED IN THE EMBANKMENT
HAVE FAILED AND FALLEN INTO THE STREAM CHANNEL.
SALVAGE AND STOCKPILE ALL BOULDERS ONSITE FOR REUSE
AT THE DIRECTION OF THE ENGINEER, AS SHOWN ON SHEET
C07, AND PER THE SPECIAL PROVISIONS.
7. WATER MANAGEMENT FEATURES, PER APPROVAL IN THE
CONTRACTOR PRODUCED TEMPORARY CREEK DIVERSION
SYSTEM PLAN, SHALL BE INSTALLED BEFORE ANY EQUIPMENT
IS PLACED IN THE LA HONDA CREEK WORK AREA.
8. CONTRACTOR SHALL ACCESS LA HONDA CREEK AND
ADJACENT PROJECT AREA FROM PROPERTY 083-051-110 ON
THE LEFT (EAST) BANK OF THE CREEK. ALL HEAVY EQUIPMENT
SHALL BE LIFTED WITH A CRANE INTO THE LA HONDA CREEK
WORK AREA. EQUIPMENT SHALL BE STORED ABOVE OHW
OVERNIGHT IN ACCORDANCE WITH PERMITS AND
SPECIFICATIONS.
9. TREES IDENTIFIED ON THE PLANS FOR TYPE B REMOVAL
SHALL BE CUT FLUSH WITH EXISTING GROUND SURFACE,
WITH STUMP AND ROOT MASS LEFT IN PLACE. ALL OTHER
TREES DESIGNATED FOR REMOVAL SHALL BE TYPE A
REMOVAL AND SHALL BE FULLY GRUBBED, INCLUDING STUMP
AND ROOT MASS.
10. TEMPORARY EXCAVATION LIMITS FOR STRUCTURE
EXCAVATION (ELS) SHALL NOT BE EXCEEDED.
/ / / / / / / / / / / / / / / / / REMOVE ITEM
C04
TEMPORARY ROOT
ZONE PROTECTION - TYPE A
TYP
REMOVE TREE
SEE NOTE 5
TYP
C04
TEMPORARY ROOT
ZONE PROTECTION - TYPE B
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER SITE ACCESS AND PREP DETAILS
C04
HIGH VISIBILITY FENCE AS SHOWN ON PLANS.
PLACE WOOD MULCH OVER THE ROOTS OF EXISTING TREES TO
BE PRESERVED TO THE MAXIMUM EXTENT FEASIBLE, PER
ENGINEER GUIDANCE, PRIOR TO MOBILIZING LARGE
EQUIPMENT TO PROTECT ROOTS AND SUPPORT LONG-TERM
TREE HEALTH.
CRITICAL ROOTZONE
SCALE:
DETAIL - TEMPORARY ROOT ZONE PROTECTION - TYPE A 1
VARNTS
NOTES:
1. THE CONTRACTOR SHALL CONTACT THE ENGINEER TO OBSERVE AND DOCUMENT THE ROOT ZONE PROTECTION AND TREE PROTECTION FENCING WHEN THE INSTALLATION IS COMPLETE. THE ENGINEER SHALL BE NOTIFIED AT LEAST 5 WORKING DAYS PRIOR TO THE COMPLETION OF THE INSTALLATION. TEMPORARY ROOT ZONE PROTECTION INSTALLATION IS REQUIRED BEFORE ADJACENT
EARTHWORK ACTIVITIES MAY BEGIN.
2. AT THE COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL DISTRIBUTE THE WOOD MULCH AROUND EXISTING VEGETATION AND
COVER ANY BARE SOIL.
PLACE HIGH VISIBILITY FENCE TO PROTECT THE
ROOTS OF EXISTING TREES TO BE PRESERVED
TO THE MAXIMUM EXTENT FEASIBLE.
CRITICAL ROOTZONE
SCALE:
DETAIL - TEMPORARY ROOT ZONE PROTECTION - TYPE B 2
VARNTS
NOTES:
1. THE CONTRACTOR SHALL CONTACT THE ENGINEER TO OBSERVE AND DOCUMENT THE ROOT ZONE PROTECTION AND TREE PROTECTION FENCING WHEN THE INSTALLATION IS COMPLETE. THE ENGINEER SHALL BE NOTIFIED AT LEAST 5 WORKING DAYS PRIOR TO THE COMPLETION OF THE INSTALLATION. TEMPORARY ROOT ZONE PROTECTION INSTALLATION IS REQUIRED BEFORE ADJACENT EARTHWORK
ACTIVITIES MAY BEGIN.
2. AT THE COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL DISTRIBUTE THE WOOD MULCH AROUND EXISTING VEGETATION AND
COVER ANY BARE SOIL.
SCALE:
DETAIL - HIGH VISIBILITY FENCE 3
-NTS
ENVIRONMENTALLY
SENSITIVE AREA
BOUNDARY
PROTECTED
AREA
WORK
AREA
16 IN (TYP)
16 IN (TYP)
6 FT MAX
1.8 FT
4 FT
1 FT MIN
(DEEPER FOR
UNSTABLE SOIL) ISOMETRIC
SECTION
ELEVATION
ELEVATION
FENCE ON SLOPE
NOTES:
1. POST SHALL HAVE SUFFICIENT
STRENGTH AND DURABILITY TO
SUPPORT THE FENCE THROUGH
THE LIFE OF THE PROJECT.
SELF-LOCKING TIE - NYLON 6/6 (MIN GRADE),
50# MIN TENSILE STRENGTH, UV STABILIZED
STEEL T-BAR POST
FENCING MATERIAL
SELF-LOCKING TIE -
NYLON 6/6 (MIN GRADE),
50# MIN TENSILE
STRENGTH, UV
STABILIZED
STAPLE TOP TIE
2x2 WOOD POST
FENCING MATERIAL
HIGH DENSITY POLYETHYLENE OR
POLYPROPYLENE MESH, AND SHALL
BE UV RESISTANT, ORANGE COLOR
2×2 WOOD OR
STEEL T-BAR POST
VERTICAL POST
LA H
O
N D
A G U
ILD
C
U
ESTA
083-370-010
LA HONDA GUILD - CUESTA
083-051-150LA HONDA GUILD
CUESTA
083-051-120
Bruce 083-051-110
SUBDIVISION NO. 1
CUESTA LA HONDA
(17-RSM-PG056)
Block 1
PINGER AND FERGUSON
083-012-060
PARCEL I
2007-095388
(VOL 32 PG 87)
26105 26106
26162
26177
2620526206
26208
2622026221
26222
26232
26233
26237
2624126242
26305
26306 26472
26622
26625 26626
26627
26628
26644
26650 26651
26655
26657
26658 26659
26662 26663
26711
26727
26751
26773
26776
26777
26778
26779
26780
26781 26783
26784
26786
2678726789
26818
26819 26820
27068
100130 100133 100134
100135 100136
100137
100187
100214
100220 100223
100225
100227
100228
WATERS OF THE US
26124
26463 26464 26445 26446
100209
100210100211
100216
100217
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
OHW OHW
O H
W
O
HW
O H
W
OHW
OHW
O H
W
OHW
OHW
OHW OHW
OHW
TOPTOP
TOP
TOP
TOPTOP
TOP
TOP
TOP
TO
P
TOP
TO
P
TO
P
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP TOP TOP
TOP
TOP
TOP
TOP
26444
150000
150001150002
150003 150004
150005150006 150007
150008 150009
150010
150011 150012
150016
26378
26231
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
P
AC
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER
010 10 20
SCALE IN FEET
FISH EXCLUSION NET
WATER MANAGEMENT PLAN
C05
ISOLATION GRAVITY
BYPASS PIPING
BAKER TANK(S)
(LOCATED ON ROADWAY)
FISH EXCLUSION NET
EXAMPLE DEWATERED
ISOLATION WORK AREA
C06
COFFERDAM,
TYP
PIPING FROM DEWATERED
ISOLATION WORK AREA.
PIPING FROM BAKER TANK(S)
EXAMPLE WORK
AREA SUMP PUMP
ENERGY DISSIPATER
EXISTING GROUND
SAND BAGS FILLED WITH
CLEAN WASHED GRAVEL
GRAVITY BYPASS PIPE
EL
EV
AT
IO
N
IN
F
EE
T
STATION
0+12 0+50
PVC, HDPE, OR OTHER
ENGINEER APPROVED
IMPERMEABLE LINER
SAND BAG FILLED WITH
CLEAN WASHED GRAVEL
COFFERDAM, TYP
WORK AREA
FLOW
TEMPORARY FLOW
BYPASS PIPE
DOWNSTREAM
ENERGY
DISSIPATOR
CHANNEL BOTTOM
1'
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER WATER MANAGEMENT DETAILS
C06
SCALE:
DETAIL - COFFERDAM AND PIPE (EXAMPLE) 1
C05NTS
GENERAL NOTES:
1. WATER MANAGEMENT MEASURES SHOWN ON PLANS ARE A PRELIMINARY SCHEMATIC REPRESENTING ANTICIPATED SITE CONDITIONS.
THE CONTRACTOR SHALL ALTER WATER MANAGEMENT MEASURES AS NEEDED OR AS DIRECTED BY THE ENGINEER. THE
CONTRACTOR IS RESPONSIBLE FOR MEETING ALL PERMIT REQUIREMENTS.
2. BEFORE STARTING ANY WORK ON THE PROJECT, THE CONTRACTOR SHALL SUBMIT, FOR ACCEPTANCE BY THE ENGINEER, A WRITTEN PROGRAM INCLUDING WATER POLLUTION CONTROL PLAN (WPCP) AND APPLICABLE PLAN DRAWINGS AND DETAILS TO CONTROL
WATER POLLUTION EFFECTIVELY DURING CONSTRUCTION OF THE PROJECT.
3. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MANAGE ALL SURFACE WATER AND GROUNDWATER, AND TO BYPASS ALL WATER THROUGH THE WORK AREA TO COMPLETELY ISOLATE THE WORK AREA FROM ACTIVE FLOW IN THE CREEK. THE CONTRACTOR SHALL PREPARE AND SUBMIT A TEMPORARY CREEK DIVERSION SYSTEM PLAN (TCDSP) PRIOR TO ANY IN-WATER WORK.
4. ALL TEMPORARY CREEK DIVERSION SYSTEMS EQUIPMENT SHALL BE LOCATED AND ALIGNED WITHIN THE PROJECT WORK AREA LIMITS.
5. LENGTH AND CONFIGURATION OF WORK AREA ISOLATION MEASURES NEEDED WILL VARY DEPENDING ON THE CONTRACTORS MEANS AND METHODS. CONTRACTOR SHALL DETERMINE THE NECESSARY LENGTHS NEEDED FOR THE WORK AREA AND BE RESPONSIBLE FOR DESIGNING, INSTALLING, OPERATING, MAINTAINING AND REMOVING ALL ISOLATION MEASURES.
6. CONTRACTOR SHALL CONSTRUCT WORK AREA ISOLATION MEASURES STARTING AT THE UPSTREAM END OF THE INTENDED WORK
AREA TO DIRECT WATER AWAY FROM THE WORK AREA.
7. THE ENGINEER SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ANY WATER PUMPING ACTIVITIES.
8. INSTALLATION OF ALL WATER MANAGEMENT MEASURES SHALL NOT CAUSE EXCESSIVE SEDIMENTATION, SILTATION, OR EROSION
UPSTREAM OR DOWNSTREAM OF THE PROJECT.
SCALE:
SECTION - COFFERDAM (EXAMPLE) A
C05NTS
FISH EXCLUSION NOTES:
1. PRIOR TO CONSTRUCTING AND OPERATING ANY WORK AREA ISOLATION MEASURE THE CONTRACTOR SHALL INSTALL FISH EXCLUSION
NETS AS DIRECTED BY A QUALIFIED BIOLOGIST WITHIN THE AREA TO BE ISOLATED. ALL FISH REMOVAL WORK SHALL BE COMPLETED BY A QUALIFIED FISHERIES BIOLOGIST. CONSTRUCTION WITHIN THE ISOLATED WORK AREA MAY NOT COMMENCE UNTIL ALL FISH EXCLUSION ACTIVITIES ARE COMPLETED. ALL TERMINAL ENDS OF FISH EXCLUSION NETS SHALL CONNECT TO THE TERMINAL ENDS OF HIGH VISIBILITY SILT FENCE (WITH WILDLIFE EXCLUSION). ALL TEMPORARY FISH EXCLUSION NETS INSTALLED BY THE CONTRACTOR MUST REMAIN IN PLACE DURING REMOVAL OF ISOLATION MEASURES AND OTHER TESC MEASURES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR REMOVING FISH EXCLUSION NETS.
2. FISH RELOCATION SHALL BE CONDUCTED BY COUNTY QUALIFIED FISHERIES BIOLOGISTS PRIOR TO INSTALLING THE TEMPORARY
CREEK DIVERSION SYSTEMS.
3. FISH EXCLUSION BLOCK NETS SHALL BE PROVIDED BY THE COUNTY AND INSTALLED BY THE CONTRACTOR IN CONSULTATION WITH THE QUALIFIED BIOLOGIST. BLOCK NETS SHALL BE MAINTAINED BY THE CONTRACTOR BOTH UPSTREAM AND DOWNSTREAM OF THE DIVERSION, THROUGHOUT THE PERIOD OF CONSTRUCTION. MAINTENANCE INCLUDES PERIODIC REMOVAL OF ACCUMULATED DEBRIS, AS NECESSARY TO ENSURE FUNCTION. BLOCK NETS SHALL BE REMOVED AFTER THE DIVERSION IS REMOVED AND THE IN CHANNEL
WORK AREA IS RE-WATERED.
DEWATERING NOTES:
1. WATER ENCOUNTERED DURING EXCAVATIONS AND WITHIN THE ISOLATED WORK AREAS MAY BE PUMPED AS NECESSARY TO BAKER
TANK(S), OR SIMILAR, SHOWN ON THE PLANS TO ALLOW FOR THE CONSTRUCTION OF THE ELSs AND PLACEMENT OF SCOUR PROTECTION ROCK, AND TO FACILITATE THE REMOVAL OF SEDIMENT AND TURBIDITY FROM THE WATER PER APPROVAL BY THE ENGINEER. ANY DISCHARGE OF WATER RETURNING FROM THE BAKER TANK(S), OR SIMILAR, BACK INTO LA HONDA CREEK (DUE TO DEWATERING ACTIVITIES) SHALL ADHERE TO THE WATER QUALITY REQUIREMENTS SET FORTH IN THE PROJECT PERMITS.
2. DEWATERING WATER MAY BE PUMPED TO THE BAKER TANK(S), OR SIMILAR, AND DISCHARGED THROUGH AN ENERGY DISSIPATOR, LEVEL SPREADER, FILTER SOCK, SILT BAGS, OR OTHER AS APPROVED BY THE ENGINEER. WATER DISCHARGED OR INFILTRATED
SHALL NOT CAUSE EROSION OR RESULT IN TURBIDITY IMPACTS TO LA HONDA CREEK.
3. DEWATERING WATER MAY NOT BE PUMPED DIRECTLY TO THE CREEK CHANNEL WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. WATER SHALL BE DISCHARGED IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND PERMITS.
4. DEWATERED ISOLATION WORK AREA CONFIGURATION SHOWN IN WATER MANAGEMENT PLANS ARE TYPICAL AND MAY BE SUBJECT TO
CHANGE DEPENDING ON DRAINAGE NEEDS WITHIN THE PROJECT LIMITS.
5. ALL PUMPS USED FOR DEWATERING SHALL BE SCREENED IN ACCORDANCE WITH THE FISH SCREENING CRITERIA .
LA H
N D
A G U
ILD
C
U
ESTA
083-370-010
LA HONDA GUILD - CUESTA
083-051-150LA HONDA GUILD
CUESTA
083-051-120
Bruce 083-051-110
SUBDIVISION NO. 1
CUESTA LA HONDA
(17-RSM-PG056)
Block 1
PINGER AND FERGUSON
083-012-060
PARCEL I
2007-095388
(VOL 32 PG 87)
26105 26106
26177
2620526206
26208
2622026221
26222
26232
26233
26472
26628 26657
26658 26659
26662 26663
26711
26727
26773
26776
26777
26778
26779
26780
26781 26783
26784
26786
2678726789
26818
26819 26820
27068
100130 100133 100134
100135 100136
100137
100187
100214
100220 100223
100225
100227
100228
WATERS OF THE US
26124
26463 26464 26445 26446
100209
100210100211
100216
100217
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHW
O
H W
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
OHW OHW
O H
W
O
HW
O H
W
OHW
OHW
O H
W
OHW
OHW
OHW OHW
OHW
TOPTOP
TOP
TOP
TOPTOP
TOP
TOP
TOP
TO
P
TOP
TO
P
TO
P
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TOP
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP TOP TOP
TOP
TOP
TOP
TOP
26444
150000
150001150002
150003 150004
150005150006 150007
150008 150009
150010
150011 150012
150016
26378
26231
L3
L4
L2 C1
C2
L7
L5
L6
L10
L1
L8
L9
C3
ALIGNMENT DATA - CHANNEL REALIGN
L1
L2
L3
C1
C2
L4
START STA.
0+00.00
1+01.13
1+60.45
1+71.34
2+12.85
3+05.66
START COORDINATES
N: 1,943,397.34 - E: 6,045,991.46
N: 1,943,487.63 - E: 6,045,945.90
N: 1,943,546.71 - E: 6,045,940.50
N: 1,943,557.59 - E: 6,045,940.17
N: 1,943,592.41 - E: 6,045,960.31
N: 1,943,669.27 - E: 6,046,006.31
DELTA (Δ)
49° 36' 38"
52° 41' 06"
RADIUS
47.93'
100.94'
TANGENT
22.15'
49.98'
LENGTH
101.13'
59.32'
10.89'
41.50'
92.81'
45.25'
DIRECTION
N26°46'30"W
N05°13'29"W
N01°44'54"W
N03°11'50"E
ALIGNMENT DATA - NEATLINE
C3
L5
L6
L7
L8
L9
L10
L11
START STA.
0+00.00
0+09.64
0+32.65
0+55.38
0+85.45
0+96.18
1+04.68
1+12.94
START COORDINATES
N: 1,943,547.09 - E: 6,045,964.53
N: 1,943,555.83 - E: 6,045,962.18
N: 1,943,576.28 - E: 6,045,972.74
N: 1,943,593.76 - E: 6,045,987.28
N: 1,943,615.65 - E: 6,046,007.89
N: 1,943,624.93 - E: 6,046,013.27
N: 1,943,631.60 - E: 6,046,018.53
N: 1,943,632.62 - E: 6,046,026.72
DELTA (Δ)
69° 50' 43"
RADIUS
7.91'
TANGENT
5.52'
LENGTH
9.64'
23.01'
22.73'
30.07'
10.73'
8.50'
8.26'
2.85'
DIRECTION
N27°19'49"E
N39°44'13"E
N43°17'02"E
N30°04'06"E
N38°15'08"E
N82°58'00"E
S67°49'33"E
ELS TIMBER PILING TABLE
PILE #
TYPE
P2
P1
P2
P1
P1
P2
P2
P1
NORTHING
1943565.56
1943570.21
1943572.62
1943578.65
1943584.64
1943582.84
1943597.91
1943594.34
EASTING
6045985.61
6045984.12
6045999.24
6045995.57
6045999.47
6046006.29
6046009.18
6046002.53
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER
010 10 20
SCALE IN FEET
A C08
SITE PLAN AND GRADING
C07
C09
CHANNEL REALIGNMENT
SOLDIER PILE WALL
SEE SHEETS S1-S5
ROADWAY IMPROVEMENTS
SEE SHEETS CD01-CD09
B C08
C11
ELS TYPE A
C12
ELS TYPE B
LIMITS OF STRUCTURE EXCAVATION (ELS)
SEE NOTE 1
NOTES:
1. SALVAGED BOULDERS SHALL BE PLACED IN DESIGNATED
LOCATIONS AND WITHIN THE ELSs AT THE DIRECTION OF
THE ENGINEER.
2. CONTRACTOR SHALL CONSTRUCT HAND DUG, LOW FLOW
CHANNEL THROUGHOUT THE LENGTH OF CHANNEL
REALIGNMENT PER THE DIRECTION OF THE ENGINEER.
LOW FLOW CHANNEL SHALL BE 6 INCHES IN DEPTH AND
2 FEET IN WIDTH.
3. NEATLINE SHOWN DELINEATES PAYMENT ITEM LIMIT
BETWEEN CHANNEL EXCAVATION AND STRUCTURE
EXCAVATION (ELS)
4. LIMITS OF TEMPORARY EXCAVATION ARE APPROXIMATE
AND BASED ON ASSUMED BEDROCK ELEVATION AND
1H:1V SLOPE FOR APPROXIMATE QUANTITY ESTIMATION.
ACTUAL SLOPES WILL VARY BASED ON CONTRACTOR
MEANS AND METHODS, AND CONSTRUCTION
SEQUENCING.
LEGEND
SALVAGED BOULDERS
C C
C13
ELS TYPE C
NEATLINE
NEATLINE
LIMITS OF CHANNEL EXCAVATION
TYPE L KEY LOGS
TYPE R KEY LOGS
TIMBER PILING
EL
EV
AT
IO
N
IN
F
EE
T
0+00 0+50 1+00 1+25
OHW OHW OHW OHW
EL
EV
AT
IO
N
IN
F
EE
T
0+00 0+50 1+00 1+25
OHW OHW OHW OHW
LEGEND
STRUCTURE BACKFILL (ELS)
SCOUR PROTECTION ROCK
STREAMBED SEDIMENT
VEGETATED SOIL LIFTS
RACKING LOGS AND
SLASH MATERIAL
WOOD MATERIAL AND
STRUCTURAL BACKFILL (ELS)
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER
05 5 10
SCALE IN FEET
HORIZ. SCALE:
VERT. SCALE:
SECTION - ENGINEERED LOG STRUCTURE (ELS) - TYPE A A
C071"=5'
1"=5'
PROPOSED LA HONDA CREEK
CHANNEL ALIGNMENT
FOR PROFILE SEE 1/C09
APPROXIMATE
BEDROCK ELEVATION
TYP, SEE NOTE 2
SCOUR PROTECTION ROCK
PLACED FROM BEDROCK
SEE NOTE 1
STRUCTURE BACKFILL (ELS)
VEGETATED SOIL LIFTS
ELS TYPE A
EXISTING LA HONDA CREEK CHANNEL ALIGNMENT
PROPOSED GRADE
TYP
EXISTING GROUND
TYP
1EXTENT OF STRUCTURE
EXCAVATION (ELS)
ELS SECTIONS
C08
13'
DEPTH
VARIES
NOTES:
1. SCOUR PROTECTION ROCK SHALL BE PLACED FROM VARIABLE
BEDROCK DEPTH IN 12 TO15 INCH LIFTS. FOR EACH LIFT, THE
CONTRACTOR SHALL FILL VOIDS WITHIN THE SCOUR PROTECTION
ROCK BY PLACING STRUCTURE BACKFILL (ELS) MATERIAL AS DIRECTED
BY THE ENGINEER. EACH LIFT SHALL BE BUCKET COMPACTED.
CONTRACTOR SHOULD EXPECT PLACEMENT OF SCOUR PROTECTION
MIXTURE IN THE PRESENCE OF GROUNDWATER.
2. BEDROCK ELEVATIONS ARE BASED UPON PRELIMINARY GEOTECHNICAL
BORINGS IN THE ENTRADA WAY ROADWAY PRISM AND ARE
APPROXIMATE. PRIOR TO DRILLING EACH TIMBER PILE HOLE, THE
ENGINEER MUST CONFIRM THE BEDROCK ELEVATION.
3. TIMBER PILINGS FOR ELSS SHALL BE INSTALLED IN DRILLED SHAFTS A
MINIMUM OF 6 FEET DEEP INTO BEDROCK. PILES SHALL NOT BE
INSTALLED UNTIL APPROVAL OF THE ENGINEER.
4. STREAMBED SEDIMENT SHALL BE PLACED TO A DEPTH OF 2 FEET
BELOW FINISHED GRADE IN AREAS STREAMWARD OF ELSS AS SHOWN
ON PLANS.
1.5
HORIZ. SCALE:
VERT. SCALE:
SECTION - ELS TYPE B B
C071"=5'
1"=5'
PROPOSED LA HONDA CREEK
CHANNEL ALIGNMENT
FOR PROFILE SEE 1/C09
13'
SCOUR PROTECTION ROCK
PLACED FROM BEDROCK
SEE NOTE 1
STRUCTURE BACKFILL (ELS)
EXTENT OF STRUCTURE
EXCAVATION (ELS)
VEGETATED SOIL LIFTS
ELS TYPE B
RACKING LOGS AND SLASH
MATERIAL PLACEMENT ZONE
STREAMBED SEDIMENT,
SEE NOTE 4.
STREAMBED SEDIMENT,
SEE NOTE 4.
C10
C10
C09
BASE OF TIMBER PILING INSTALLED
INTO BEDROCK (TYP), SEE NOTE 3
NEATLINE
CHANNEL
EXCAVATION
PAY ITEM
LIMIT
STRUCTURE
EXCAVATION
(ELS)
PAY ITEM
LIMIT
NEATLINE
CHANNEL
EXCAVATION
PAY ITEM
LIMIT
STRUCTURE
EXCAVATION
(ELS)
PAY ITEM
LIMIT
SEE SHEET C11 FOR LOG
LAYERING PLAN
SEE SHEET C12 FOR LOG
LAYERING PLAN
WOOD MATERIAL AND STRUCTURAL
BACKFILL (ELS) ZONE
RACKING LOGS AND SLASH
MATERIAL PLACEMENT ZONE
WOOD MATERIAL AND STRUCTURAL
BACKFILL (ELS) ZONE
BASE OF TIMBER PILING INSTALLED
INTO BEDROCK (TYP), SEE NOTE 3
APPROXIMATE
BEDROCK ELEVATION
TYP, SEE NOTE 2
EL
EV
AT
IO
N
IN
F
EE
T
STATION
1+50 2+00 2+50 3+00 3+503+51
ST
A:
+6
1.
EL
: 3
.8
ST
A:
+1
8.
EL
: 3
.1
1.48%
EL
EV
AT
IO
N
IN
F
EE
T
STATION
0+00 0+50 0+95
LEGEND
STRUCTURE BACKFILL (ELS)
SCOUR PROTECTION ROCK
STREAMBED SEDIMENT
VEGETATED SOIL LIFTS
RACKING LOGS AND
SLASH MATERIAL
WOOD MATERIAL AND
STRUCTURAL BACKFILL (ELS)
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER
05 5 10
SCALE IN FEET
HORIZ. SCALE:
VERT. SCALE:
PROFILE - CHANNEL REALIGNMENT 1
C071"=10'
1"=5'
ELS AND CHANNEL REALIGNMENT SECTIONS AND PROFILE
C09
PROPOSED GRADE
EXISTING GROUND
HORIZ. SCALE:
VERT. SCALE:
SECTION - ENGINEERED LOG STRUCTURE (ELS) - TYPE C C
C071"=5'
1"=5'
STRUCTURE BACKFILL (ELS)
AND SALVAGED BOULDERS ,
SEE NOTE 1
STRUCTURE BACKFILL (ELS)
1EXTENT OF STRUCTURE
EXCAVATION (ELS)
SEE ROADWAY PLANS FOR
PROPOSED GRADING
13'
1'
VARIES
NOTES:
1. LOW FLOW CHANNEL SHALL BE HAND DUG THROUGHOUT THE ENTIRE LENGTH OF
CHANNEL REALIGNMENT 6 INCHES DEEP.
NOTES:
1. BACKFILL WITH STRUCTURE BACKFILL (ELS) MATERIAL, AS DEFINED IN THE
SPECIAL PROVISIONS, AND SALVAGED BOULDERS PER THE DIRECTION OF THE
ENGINEER TO CONSTRUCT DESIGN BANK GRADES AS SHOWN.
2. STREAMBED SEDIMENT SHALL BE PLACED TO A DEPTH OF 2 FEET BELOW FINISHED
GRADE IN AREAS STREAMWARD OF ELS AS SHOWN ON PLANS.
3. EXTEND SLASH AND RACKING APPROXIMATELY 2 FEET INTO STRUCTURE BACKFILL
(ELS) AND SALVAGED BOULDERS
SCALE:
DETAIL - CHANNEL TYPICAL SECTION (LOOKING DOWNSTREAM) 3
C08NTS
PROPOSED LA HONDA CREEK
CHANNEL ALIGNMENT
FOR PROFILE SEE B/C08
VEGETATED SOIL LIFTS
EXISTING LA HONDA CREEK
CHANNEL ALIGNMENT
PROPOSED GRADE
TYP
EXISTING GROUND
TYP
STREAMBED SEDIMENT,
SEE NOTE 2.
C10
NEATLINE
CHANNEL
EXCAVATION
PAY ITEM
LIMIT
STRUCTURE
EXCAVATION
(ELS)
PAY ITEM
LIMIT
SEE SHEET C13 FOR LOG
LAYERING PLAN
STRUCTURE BACKFILL (ELS) AND
SALVAGED BOULDERS
RACKING LOGS AND SLASH
MATERIAL PLACEMENT ZONE
WOOD MATERIAL AND STRUCTURAL
BACKFILL (ELS) ZONE
2'
12" SOIL LIFT
8' MIN
VEGETATED SOIL LIFT PREPARATION
(SEE SPECIAL PROVISIONS)
STEP 1
· OVEREXCAVATE TO PLACE COIR MATERIAL FOR VEGETATED SOIL LIFTS
· PROTECT SUBGRADE FROM FOOT TRAFFIC AND CONSTRUCTION ACTIVITIES THAT COULD CAUSE SOIL DISTURBANCE OR BANK
SETTLEMENT PRIOR TO COIR PLACEMENT
STEP 2
· PLACE OUTER WOVEN COIR FOR THE BOTTOM OF THE LIFT
· PLACE NON-WOVEN INNER COIR BLANKET
· STAKE COIR FABRIC TO NATIVE SOIL BELOW LIFT
STEP 3
· INSTALL FORM AND COIR D BLOCK TO HOLD COIR WRAP AND SOIL TO DESIGN DIMENSIONS
· PLACE 12" HIGH LAYER OF NATIVE SOIL BACKFILL MATERIAL AND COMPACT PER SPECIAL PROVISIONS WITHIN THE VEGETATED SOIL LIFTS.
· PLACE 2' IMPORTED TOPSOIL BACKFILL WITHIN THE VEGETATED SOIL LIFT AND COMPACT PER SPECIFICATIONS TO FACILITATE PLANT
INSTALLATION AND GROWTH.
STEP 4
· WRAP OUTER WOVEN COIR AND NON-WOVEN INNER COIR BLANKET AROUND VEGETATED SOIL LIFT TO ENCASE THE LIFT
STEP 5
· STAKE PER COIR MANUFACTURER'S RECOMMENDATION
BACKFILL TOP LIFT WITH IMPORTED TOPSOIL
BACKFILL FOR PLANTING AREA PREPARATION
WOOD STAKE AND ANCHOR
TRENCH FOR VEGETATED
SOIL LIFT PER
MANUFACTURER'S
RECOMMENDATIONS (TYP)
18" MIN OFFSETSIDE SLOPES,
1.5H:1V MAX
EXISTING GROUND
NON-WOVEN INNER COIR BLANKET
PER SPECIFICATIONS (TYP)
OUTER WOVEN COIR PER
SPECIFICATIONS (TYP)
STAKE VEGETATED SOIL LIFTS TO EACH
OTHER AND TO NATIVE SOILS. SEE
SPECIFICATIONS.
NATIVE SOIL BACKFILL
PROPOSED
GROUND
LIVE STAKE
PLANTING
COIR MATERIAL
ROOTBALL CENTERED ON CROSS CUT
CROSS CUT IN COIR MATERIAL TO
ACCOMMODATE ROOTBALL
COIR MATERIAL
PLANT
INSTALLATION CUT
DETAIL
IMPORTED TOPSOIL
COIR D BLOCK PER SPECIFICATIONS (TYP)
BOTTOM OF VEGETATED SOIL LIFT
RESTING ON LOG IN ELS
STRUCTURE BACKFILL (ELS)
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER ENGINEERED LOG STRUCTURE DETAILS
C10
SCALE:
DETAIL - TYPICAL VEGETATED SOIL LIFTS 1
-NTS
CHAIN, SEE CHAIN LASHING NOTES, 1-6
HORIZONTAL KEY LOG
VERTICAL TIMBER PILING
CHAIN, SEE CHAIN LASHING NOTES
HORIZONTAL KEY LOG
TOP OF VERTICAL TIMBER PILING
CHAIN, SEE CHAIN LASHING NOTES, 1-6
HORIZONTAL KEY LOG
VERTICAL TIMBER PILING
CHAIN, SEE CHAIN LASHING NOTES, 1-6
HORIZONTAL KEY LOG
TOP OF VERTICAL TIMBER PILING
CHAIN LASHING NOTES:
1. LASH HORIZONTAL LOGS TO VERTICAL TIMBER PILINGS WITH CHAIN AS SHOWN ON DETAIL AND LAYERING PLAN OR AS DIRECTED BY ENGINEER. CHAIN LASHING SYSTEM
SHALL BE PUT IN TENSION TO 1/4 OF THE CHAIN WORKING LOAD LIMIT AND BE MAINTAINED DURING CHAIN SHACKLING.
2. CHAIN LENGTH NEEDED PER LASHING WILL VARY BASED ON DIAMETER OF LOGS AT THE ACTUAL LOCATIONS THEY ARE LASHED TOGETHER.
3. CHAIN FOR LASHING SHALL BE 3/8 INCH DIAMETER GRADE 43 HIGH-TEST STAINLESS STEEL CHAIN, WITH A MINIMUM WORKING LOAD LIMIT OF 5400 LBS.
4. ALL HARDWARE USED FOR LASHING SHALL BE STAINLESS STEEL, AND CONNECTIONS SHALL BE OF THE QUANTITY AND TYPE SPECIFIED BY THE MANUFACTURER WITH A
MINIMUM WORKING LOAD LIMIT OF 4000 LBS OR AS APPROVED BY THE ENGINEER.
5. MAR OR ROUND ALL EXPOSED HARDWARE NUTS AND BOLT THREADS AFTER INSTALLATION FOR THEFT PROTECTION. ENGINEER OR OWNER SHALL APPROVE ANY COATING PRIOR TO CONTRACTOR APPLYING IT. SECURE CHAIN TO LOG AND PILING USING 6 INCH LOGGING STAPLE.
6. CONTRACTOR MAY SUBMIT ALTERNATIVE CHAIN CONNECTION SYSTEM FOR APPROVAL.
6" LOGGING STAPLE AT
FIRST CHAIN LINK
IN FULL CONTACT WITH
LOG ON BOTH SIDES
OF SHACKLE
SHACKLE
SCALE:
DETAIL - SIMPLE CHAIN LASHING 2
-NTS
SCALE:
DETAIL - SQUARE CHAIN LASHING 3
-NTS
SCALE:
DETAIL - CHAIN CONNECTION 4
-NTS
A
A
PLAN SECTION
PLAN SECTION
NOTES:
1. MINIMIZE CUTS INTO COIR MATERIAL SO THAT CUTS ARE ONLY AS WIDE AS NEEDED TO
FACILITATE PROPER PLANT INSTALLATION. PROTECT INTEGRITY OF COIR MATERIAL.
2. CUT COIR MATERIAL IN "Y" PATTERN RATHER THAN AN "X" PATTERN TO MINIMIZE
INCISIONS INTO MATERIAL.
3. PEEL BACK COIR MATERIAL TO INSTALL PLANTS.
4. REPLACE COIR MATERIAL FLAPS OVER PLANT ROOTS AND BACKFILL SOILS.
LAYER 3TIMBER PILINGS
LAYER 4
LAYER 1
LAYER 5
LAYER 2
LAYER 6
FLOW
14.5'
15'
6' 7'
RACKING LOGS AND SLASH
MATERIAL PLACEMENT ZONE
SQUARE LASHING (TYP), SEE
DETAILS 3 AND 4 ON SHEET C10
SIMPLE LASHING (TYP), SEE
DETAILS 2 AND 4 ON SHEET C10
STRUCTURE BACKFILL
(ELS) ZONE WOOD MATERIAL AND
STRUCTURAL
BACKFILL (ELS) ZONE
P2
R3 L3L2 L2
R3
L1 R3 L2
L4
L3
R4
R4
R4
L2
L2
P2
P1P1
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER ENGINEERED LOG STRUCTURE DETAILS
C11
GENERAL (TYPES A, B AND C) NOTES:
1. GENERAL STRUCTURE LOCATION AND ORIENTATION SHALL BE STAKED BY THE CONTRACTOR. FINAL STRUCTURE LOCATION
AND ORIENTATION TO BE FIELD VERIFIED BY THE ENGINEER FOLLOWING CONTRACTOR STAKING.
2. ALL TIMBER PILING LOCATIONS SHALL BE STAKED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO TIMBER PILING INSTALLATION. SEE SHEET C07 FOR SPECIFIC TIMBER PILING LOCATION INFORMATION.
3. PRIOR TO PLACING ANY KEY LOGS, THE CONTRACTOR SHALL OBTAIN INSPECTION APPROVAL FROM THE ENGINEER VERIFYING EXTENTS OF THE EXCAVATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER FOR THE EXCAVATION INSPECTION. THE CONTRACTOR SHALL ALLOW 2 WORKING DAYS FOR THE INSPECTION TO TAKE PLACE.
4. KEY LOGS SHALL BE PLACED AT THE LOCATIONS AND ORIENTATIONS SPECIFIED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. TRIM CUT ENDS OF HORIZONTAL KEY LOGS TO FIT AS REQUIRED AT THE DIRECTION OF THE ENGINEER.
5. WOOD MATERIAL CONSISTS OF RACKING LOGS AND SLASH MATERIAL.
6. ALL WOOD MATERIAL DIAMETER SHALL BE MEASURED AT BREAST HEIGHT (DBH) WITH THE EXCEPTION OF "P" PILING LOGS
WHOSE DIAMETER SHALL BE MEASURED AT THE PILE TIP END (SMALLEST DIAMETER).
ELS TYPE A NOTES:
1. CONTROL POINTS FOR ELS PLACEMENTS ARE DEFINED BASED ON TIMBER PILING LOCATION; SEE ELS TIMBER PILING TABLE ON SHEET C07.
2. KEY LOGS SHALL BE PLACED IN DIRECT CONTACT WITH TIMBER PILINGS AND SUBSEQUENT LAYER KEY LOGS;; WITH THE EXCEPTION OF L2 IN LAYER 5 UNLESS DIRECTED OTHERWISE BY THE ENGINEER. LOGS ON THE TOP THREE LAYERS SHALL BE LASHED WITH CHAIN TO EITHER
PILINGS OR KEY LOGS AS INDICATED ON THE PLANS.
3. RACKING LOG AND SLASH PLACEMENT SHALL BE COORDINATED WITH KEY LOG LAYER PLACEMENT TO ENSURE RACKING LOGS AND SLASH EXTEND THROUGH WATERWARD FACE OF STRUCTURE. LAYERS 1 THROUGH 5 SHALL HAVE 3 RACKING LOGS EACH PER LAYER INSTALLED.
SEE LAYERING PLAN AND SPECIAL PROVISIONS.
4. BACKFILL ZONE IS AN APPROXIMATION AND NOT SHOWN TO SCALE; CONTRACTOR TO BACKFILL EACH LAYER PER THE SPECIAL PROVISIONS
AND DIRECTION OF THE ENGINEER.
5. BACKFILL EACH LAYER WITH BACKFILL MATERIAL, AS DEFINED AS STRUCTURE BACKFILL (ELS) PER THE SPECIAL PROVISIONS, FLUSH TO THE TOP OF THE CURRENT LAYER PRIOR TO CONSTRUCTION THE SUBSEQUENT LAYER. COMPACT BACKFILL WITH EXCAVATOR BUCKET IN NO GREATER THAN TWO FOOT LIFTS FIILLING ALL VOIDS. SALVAGED BOULDERS WILL BE PLACED IN LOCATIONS SHOWN ON THE PLANS AND PER THE DIRECTION OF THE ENGINEER. SALVAGED BOULDER PLACEMENT WILL BE PRIORITIZED IN LOCATIONS BETWEEN THE DIFFERENT ELS
TYPES AND BETWEEN THE ELSS AND THE EXISTING GRADE.
LOG TYPE DIAMETER (IN) LENGTH (FT) ROOTWAD TOTAL/UNIT
P1 18 (TIP) 30 NO 4
P2 18 (TIP) 35 NO 4
R3 22 20 YES 3
R4 22 15 YES 3
L1 24 20 NO 1
L2 20 20 NO 5
L3 20 25 NO 2
L4 22 30 NO 1
RACKING 8-12 15-25 VARIES 15
SLASH 30 CY
STRUCTURE LOG SCHEDULE:
SCALE:
DETAIL - ELS TYPE A LAYERING PLAN 1
C071" = 10'
TIMBER PILINGS
FLOW
10'
15'
6' 7'
LAYER 3
LAYER 4
LAYER 1
LAYER 5
LAYER 2
LAYER 6
SQUARE LASHING (TYP), SEE
DETAILS 3 AND 4 ON SHEET C10
SIMPLE LASHING (TYP), SEE
DETAILS 2 AND 4 ON SHEET C10
RACKING LOGS AND
SLASH MATERIAL
PLACEMENT ZONE
STRUCTURE BACKFILL
(ELS) ZONE
WOOD MATERIAL AND
STRUCTURAL
BACKFILL (ELS) ZONE
P2
R3 L3
L2 L2
R3
L1R3L2 L3
R4R4
R4
L2
L2
R1
P2
P1
P1
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER ENGINEERED LOG STRUCTURE DETAILS
C12
SCALE:
DETAIL - ELS TYPE B LAYERING PLAN 1
C071" = 10'
LOG TYPE DIAMETER (IN) LENGTH (FT) ROOTWAD TOTAL/UNIT
P1 18 (TIP) 30 NO 4
P2 18 (TIP) 35 NO 4
R1 22 30 YES 1
R3 22 20 YES 3
R4 22 15 YES 3
L1 24 20 NO 1
L2 20 20 NO 5
L3 20 25 NO 2
RACKING 8-12 15-25 VARIES 15
SLASH 30 CY
STRUCTURE LOG SCHEDULE:
ELS TYPE B NOTES:
1. CONTROL POINTS FOR ELS PLACEMENTS ARE DEFINED BASED ON TIMBER PILING LOCATION; SEE ELS TIMBER PILING TABLE ON SHEET C07.
2. KEY LOGS SHALL BE PLACED IN DIRECT CONTACT WITH TIMBER PILINGS AND SUBSEQUENT LAYER KEY LOGS;; WITH THE EXCEPTION OF L2 IN LAYER 5 UNLESS DIRECTED OTHERWISE BY THE ENGINEER. LOGS ON THE TOP THREE LAYERS SHALL BE LASHED WITH CHAIN TO EITHER PILINGS OR KEY LOGS AS INDICATED ON THE
PLANS.
3. RACKING LOG AND SLASH PLACEMENT SHALL BE COORDINATED WITH KEY LOG LAYER PLACEMENT TO ENSURE RACKING LOGS AND SLASH EXTEND THROUGH WATERWARD FACE OF STRUCTURE. LAYERS 1 THROUGH 5 SHALL HAVE 3 RACKING LOGS EACH PER LAYER INSTALLED. SEE LAYERING PLAN AND SPECIAL
PROVISIONS.
4. BACKFILL ZONE IS AN APPROXIMATION AND NOT SHOWN TO SCALE; CONTRACTOR TO BACKFILL EACH LAYER PER THE SPECIAL PROVISIONS AND DIRECTION OF THE
ENGINEER.
5. BACKFILL EACH LAYER WITH BACKFILL MATERIAL, AS DEFINED AS STRUCTURE BACKFILL (ELS) PER THE SPECIAL PROVISIONS, FLUSH TO THE TOP OF THE CURRENT LAYER PRIOR TO CONSTRUCTION THE SUBSEQUENT LAYER. COMPACT BACKFILL WITH EXCAVATOR BUCKET IN NO GREATER THAN TWO FOOT LIFTS FIILLING ALL VOIDS. SALVAGED BOULDERS WILL BE PLACED IN LOCATIONS SHOWN ON THE PLANS AND PER THE DIRECTION OF THE ENGINEER. SALVAGED BOULDER PLACEMENT WILL BE PRIORITIZED IN LOCATIONS BETWEEN THE DIFFERENT ELS TYPES AND BETWEEN THE ELSS AND THE EXISTING GRADE.
LAYER 3LAYER 1 LAYER 2
R3 R3
R4
RACKING LOGS AND
SLASH MATERIAL
PLACEMENT ZONE
BACKFILL ZONE
WOOD MATERIAL AND
BACKFILL ZONE
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103
RE
GIS
TE
RED PROFESSIONAL ENGINEER
STATE OF CALIFORNIAC I V I L
No. 90612
GR
ETC
HEN L. KAYSER ENGINEERED LOG STRUCTURE DETAILS
C13
SCALE:
DETAIL - ELS TYPE C LAYERING PLAN 1
C071" = 10'
LOG TYPE DIAMETER (IN) LENGTH (FT) ROOTWAD TOTAL/UNIT
R3 22 20 YES 2
R4 22 15 YES 1
RACKING 8-12 15-20 VARIES 6
STRUCTURE LOG SCHEDULE:
ELS TYPE C NOTES:
1. KEY LOGS SHALL BE INSTALLED AT THE ANGLE INDICATED IN THE STRUCTURE LOG SCHEDULE AND PER DIRECTION OF
THE ENGINEER WITH THE BUTT END OF THE LOGS (NON-ROOTWAD ENDS) TOUCHING. KEY LOGS SHALL BE PLACED AND BACKFILLED A MINIMUM OF TWO-THIRDS OF THE LOG LENGTH TO A MINIMUM LOG BURIAL DEPTH (AS MEASURED FROM
THE BUTT END OF THE LOG) AS INDICATED IN THE STRUCTURE LOG SCHEDULE.
2. RACKING LOGS AND SLASH MATERIAL NOT SHOWN IN PLAN DETAIL FOR CLARITY. RACKING LOG AND SLASH PLACEMENT SHALL BE COORDINATED WITH KEY LOG LAYER PLACEMENT TO ENSURE RACKING LOGS AND SLASH EXTEND THROUGH
WATERWARD FACE OF STRUCTURE. SEE LAYERING PLAN AND SPECIAL PROVISIONS.
3. BACKFILL ZONE IS AN APPROXIMATION AND NOT SHOWN TO SCALE; CONTRACTOR TO BACKFILL EACH LAYER PER THE
SPECIAL PROVISIONS AND DIRECTION OF THE ENGINEER.
4. BACKFILL EACH LAYER WITH BACKFILL MATERIAL, AS DEFINED AS STRUCTURE BACKFILL (ELS) AND SALVAGED BOULDERS, PER THE SPECIAL PROVISIONS. COMPACT BACKFILL WITH EXCAVATOR BUCKET IN NO GREATER THAN TWO FOOT LIFTS FILLING ALL VOIDS. SALVAGED BOULDERS WILL BE STRATEGICALLY PLACED TO CONSTRUCT DESIGN BANK GRADES AND
MINIMIZE LOCALIZED EROSION PER THE DIRECTION OF THE ENGINEER.
LAYER LOG BURIAL
SLOPE (H:V)
MINIMUM LOG
BURIAL DEPTH (FT)
1 0 9
2 10:1 7 3 6:1 8
H
W
OHW
O H
W
O
HW
OHW
OHW
OHW
O H
W
O H
W
O H
W
O H
W
OHW
O
HW
OHW
O
HW
O
HW
O H
W O
H W
O H
W O
H W
OHW
O H
W
OHW
OHW
OHW
OHW
O
HW
O
HW
OHW
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TO
P
TO
P
TO
P
TO
P TOP
TOP TOP
TO
P
TO
P
TO
P
TOP
TO
P
TO
P
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
ENTRADA WAY
LA HONDA CREEK
(E) BLDG
OHW OHW
TOP TOP
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD01
ROADWAY IMPROVEMENT NOTES ABBREVIATIONS
LEGEND
LIMITS OF PAYMENT KEYNOTES
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
R o ad w ay
I m p ro v em en t
P la n .d w g, ,6
:5 :2
P
M
ROADWAY IMPROVEMENTS
LAYOUT PLAN & NOTES
OHW
OHW
OHW
OHW
O H
W
O H
W
O H
W
O H
W
O H
WO
H
W O
H W
O H
W O
H W
OHW
OHW
O H
W
TOP
TOP
TOP
TOP
TOP
TOPTOP
TOP
TO
P
TO
P
TO
P
TO
P
TO
P
TO
P
TO
P
TOP
TO
P
TOP
TO
P
ENTRADA WAY
1.0%1.6%
(2 .0
1.
8%
4.
0%
2:
1.3%
(2 .0
(2 .4
(CL STA
3+14.71)
(CL STA
2+99.85)
1+55
(E ) 3
.6
2+00
(E ) 3
.4
2+50
(E ) 3
.1
(N
) 3
.5
3+00
(E ) 3
.1
(N
) 3
.3
3+15.04
(E ) 3
.3
OHW OHW
TOP TOP
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD02
PROFILE - EDGE OF PVMT /DIKE FLOWLINE
PLAN - ENTRADA WAY (STA 1+55 TO 3+15)
NOTESLEGEND
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
R o ad w ay
I m p ro v em en t
P la n .d w g, ,6
:5 :2
P
M
ROADWAY IMPROVEMENTS
ENTRADA WAY NORTH EP - PLAN & PROFILE
TOP
7.
0+00
8.
8.
0+50
7.
0+60
OHW OHW
TOP TOP
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD03
NOTESLEGEND
PROFILE - 24-INCH SD PIPE
PLAN - 24-INCH SD PIPE
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
R o ad w ay
I m p ro v em en t
P la n .d w g, ,6
:5 :2
P
M
ROADWAY IMPROVEMENTS
ENTRADA WAY 24 INCH SD PIPE - PLAN & PROFILE
HW
OHW
O
HW
O H
W O
H W
O H
W
O H
W
O H
W O
H W
O H
W O
H W
O H
W O
H W
O H
W TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TO
P
TO
P
TO
P
LA HO
N
DA CREEK
(1.7%)
(2 .0
-2 .5
, T
YP
ENTRADA WAY
2:1 (MAX)
AB
AB
0+00
1.
0+50
7.
0+85
8.
0+00
7.
0+35
0.
0+00
6.
0+35
5.
OHW OHW
TOP TOP
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD04
PROFILE - (E) VALLEY GUTTER FLOW LINE & PIPE OUTFALL SECTION A-A - PIPE OUTFALL SECTION B-B - PIPE OUTFALL
PLAN - 3' X 4' DRAIN INLET AND PIPE OUTFALL
LEGEND NOTES
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
R o ad w ay
I m p ro v em en t
P la n .d w g, ,6
:5 :2
P
M
ROADWAY IMPROVEMENTS
24 INCH SD PIPE OUTFALL - PLAN & PROFILE
H
W O
H W
OHW
O H
W
O
HW
OHW
OHW
OHW
O H
W
O H
W
O H
W
O H
W
OHW
O
HW
O
HW
O
HW
O H
W O
H W
O H
W O
H W
OHW
O H
W
OHW
OHW
OHW
OHW
O
HW
O
HW
OHW
O H
W O
H W
TO
P
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TO
P
TO
P
TO
P
TO
P TOP
TOP TOP
TO
P
TO
P
TO
P
TOP
TO
P
TO
P
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TO
P
TO
P
C
CD
06 D CD
06 E
CD
ENTRADA WAY
LA HONDA CREEK
LA
H
O N
DA
R
O
AD
(E) BLDG
CCD06
DCD06
ECD06
ENTRADA WAY
F
CD
F
CD
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD05
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
R o ad w ay
I m p ro v em en t
P la n .d w g, ,6
:5 :2
P
M
ROADWAY IMPROVEMENTS
ROAD SECTION KEY PLAN
OHW OHW OHW
0+00
8.
0+50
9.
1.
OHW OHW
0+00
8.
0+50
9.
1.
OHW
0+00
8.
0+50
0.
7.
0+00
8.
0+39
8.
7.
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD06
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
R o ad w ay
P ro fi le
S ec ti o n s.
d w g, ,1
:3 :2
P
M
ROADWAY IMPROVEMENTS
ROAD SECTIONS
IC LIV
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD07
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
C D
D
E T
A
IL
S .d w g, ,1
:3 :2
P
M
DETAILS
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD08
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
C D
D
E T
A
IL
S .d w g, ,1
:3 :2
P
C 66905
D N ONSH
A
N
SSEFORPDERETSIGER RE
EN
IG
NE
LANOI
STATE FO
AINROFILAC
D.
U
UA T
CO
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103
CD09
p sm c e n g o n ca ll\ t as k o rd er s\ t o en tr ad a sl ip o u t\ t ec h n ic al c ad d es ig n b id d o cu m en ts s h ee t fi le s\
C D
D
E T
A
IL
S .d w g, ,1
:3 :2
P
UN
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103RETAINING WALL GENERAL PLAN
S1
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103RETAINING WALL GENERAL NOTES
S2
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103RETAINING WALL DETAILS No. 1
S3
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103RETAINING WALL DETAILS No. 2
S4
TY
OF SAN MATEO
P U
B L I C W O R
K S
1/5103RETAINING WALL GROUND ANCHORS
S5
LEGEND
LOWER RIPARIAN
UPPER RIPARIAN
ELS LIVE STAKE PLANTING
NATIVE EROSION CONTROL
SEEDING AREA
LA H
O
N D
A G U
ILD
C
U
ESTA
083-370-010
LA HONDA GUILD - CUESTA
083-051-150LA HONDA GUILD
CUESTA
083-051-120
Bruce 083-051-110
SUBDIVISION NO. 1
CUESTA LA HONDA
(17-RSM-PG056)
Block 1
26105 26106
26177
2620526206
26208
2622026221
26222
26232
26233
26237
26472
26657
26658 26659
26662 26663
26711
26773
26776
26777
26780
100130 100133 100134
100135 100136
100137
100187
100214
100220 100223
100225
100227
100228
WATERS OF THE US
26124
26463 26464 26445 26446
100209
100210100211
100216
100217
OHW
OHWOHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O
HW
O
HW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
OHW OHW
O H
W
O
HW
O H
W
OHW
OHW
O H
W
OHW
OHW
OHW OHW
OHW
TOPTOP
TOP
TOP
TOPTOP
TOP
TOP
TOP
TO
P
TOP
TO
P
TO
P
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TO
P
TOP
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP
TOP
TO
P
TO
P
TOP
TOP TOP TOP
TOP
TOP
TOP
TOP
26444
150000
150001150002
150003 150004
150005150006 150007
150008 150009
150010
150011 150012
150016
26378
26231
REDONDA WAY
LA HONDA GUILD
CUESTA
083-092-190 E N T R A D A W A Y
6 0 ' R O W
BUILDING
TENNIS
COURT
X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
EO
P
CO
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103LIC
EN
SE
D LA
NDSCAPE ARCHITECT
STATE OF CA LIFORNIA
KA
TH
RY
N S
UZANNE FORESTER NO. 7047Signature
Renewal Date
Date
9/30/2026
010 10 20
SCALE IN FEET
PLANTING PLAN
L01
1. ENGINEER SHALL APPROVE GRADING PRIOR TO PLANT INSTALLATION.
2. PLANTING AND SEEDING SHALL OCCUR WITHIN TWO WEEKS AFTER GRADING IS APPROVED.
3. ALL PLANTS SHALL CONFORM TO THE STANDARDS OF THE CURRENT EDITION OF AMERICAN
STANDARD FOR NURSERY STOCK AS APPROVED BY THE AMERICAN STANDARDS INSTITUTE
(z60.01-2014).
4. ALL NURSERY STOCK SHALL BE TESTED AND CERTIFIED FREE OF PHYTOPHTHORA RAMORUM
A MINIMUM OF 30 DAYS PRIOR TO DELIVERY AND INSTALLATION ON SITE.
5. PLANT SUBSTITUTIONS ARE SUBJECT TO APPROVAL BY THE ENGINEER.
6. PLANTS SHALL BE TAGGED OR MARKED FOR IDENTIFICATION UPON DELIVERY.
7. THE ENGINEER SHALL INSPECT ALL PLANT MATERIAL UPON DELIVERY. ALL PLANTS WITH
DAMAGED ROOTS, LEADERS, OR BRANCHES SHALL BE REJECTED. NO ROOT-BOUND
CONTAINER STOCK SHALL BE ACCEPTED.
8. KEEP PLANTS SHADED UNTIL THE TIME OF PLANTING. DO NOT LET THE PLANT MATERIAL SIT
IN THE SUN OR DRY OUT BEFORE PLANTING.
9. THE ENGINEER SHALL APPROVE SAMPLE PLANT LAYOUT PRIOR TO PLANTING.
10. ENGINEER SHALL REVIEW SAMPLE INSTALLATIONS OF EACH PLANT MATERIAL TYPE TO
VERIFY INSTALLATION OCCURS ACCORDING TO PLANS.
11. LOW GROWING SPECIES THAT WILL MAINTAIN A MINIMUM 15-FOOT CLEARANCE SHALL BE
INSTALLED WITHIN 20 HORIZONTAL FEET OF ALL POWER LINES.
12. THOROUGHLY WATER ALL PLANTED AREAS IMMEDIATELY AFTER PLANTING.
13. APPLY 3" OF WOOD MULCH TO ALL PLANTING AREAS ABOVE THE APPROXIMATE 2 YEAR
FLOOD ELEVATION.
14. NATIVE EROSION CONTROL SEEDING AREAS SHALL BE HYDROSEEDED WITH NATIVE EROSION
CONTROL SEED MIX USING A TWO-PASS APPROACH.
15. NATIVE EROSION CONTROL SEEDING AREAS WILL INCLUDE ADDITIONAL NATIVE TREES,
SHRUBS, AND GROUNDCOVER PLANTINGS COORDINATED WITH PROPERTY OWNERS. WILL
OCCUR UNDER A SEPARATE CONTRACT.
GENERAL NOTES
MATCHLINE THIS SHEET
MATCHLINE THIS SHEET
020 20 40
SCALE IN FEET
LOWER RIPARIAN ZONE EXTENDING
TO THE 2-YEAR FLOOD ELEVATION
LOWER RIPARIAN ZONE BEGINS AT THE
APPROXIMATE LOCATION OF THE
ORDINARY HIGH WATER MARK
LOWER RIPARIAN ZONE EXTENDING
TO THE 2-YEAR FLOOD ELEVATION
ELS LIVE STAKE
PLANTING
NATIVE EROSION
CONTROL SEEDING
NATIVE EROSION CONTROL SEEDING
AROUND NEW STONE APRON
SEE NOTE #15
NATIVE EROSION
CONTROL SEEDING AREA
NO VEGETATION INSTALLATION
IS TO OCCUR ON SLOPES
ADJACENT TO THE STREAM
BANK.
SEE NOTE #15
6/22/2026
UN
TY OF SAN MATEO
P U
B L I C W O R
K S
1/5103LIC
EN
SE
D LA
NDSCAPE ARCHITECT
STATE OF CA LIFORNIA
KA
TH
RY
N S
UZANNE FORESTER NO. 7047Signature
Renewal Date
Date
9/30/2026
PLANTING SCHEDULE AND DETAILS
L02
FINISHED GROUND PLANT AT SAME LEVEL AS
GROWN IN CONTAINER
PLANTING HOLE/
EXCAVATION 3X
GREATER THAN
ROOTBALL OR
CONTAINER WIDTH
3" THICK LAYER WOOD MULCH, KEEP
AWAY FROM TRUNK OF PLANT
EXCAVATE SOIL FOR PLANTING TO DIMENSIONS
SHOWN. FIRM SOIL AROUND ROOTBALL AND WATER
TO SETTLE. DO NOT LEAVE AIR POCKETS. DO NOT
DAMAGE ROOTS DURING PLANTING OPERATIONS
REMOVE CONTAINER PRIOR TO PLANTING.
DURING PLANTING OPERATIONS GENTLY LOOSEN
AND SPREAD ROOTS AT BOTTOM OF ROOTBALL
EXISTING GROUND
MAX
LIVE STAKE NOTES:
1. LIVE STAKES SHALL BE HARVESTED WITHIN 50 MILES OF THE PROJECT SITE.
2. ALL LIVE STAKES SHALL BE SINGLE-STEMMED AND STRAIGHT, WITH NO MAJOR CROOKS OR BENDS. PRUNING SHALL ONLY OCCUR AT THE ENDS OF THE
MATERIAL.
3. STAKES SHALL HAVE A BASAL DIAMETER OF 3/4" TO 1 1/2" AND BE AT LEAST 4 FEET IN LENGTH.
4. SOAK THE BASAL END OF ALL WILLOW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .