About this file
This is a Notice to Contractors issued by the County of San Mateo, California, for the Entrada Way Culvert Slip-Out Bank Stabilization Project, a 600-foot project involving bank stabilization and appurtenant work. Sealed bids must be received by mail or hand delivery to the County Executive's Office at 500 County Center, 5th Floor, Redwood City, California, 94063 by 2:00 p.m. on Thursday, July 23, 2026, where bids will be publicly opened and read aloud. The project encompasses extensive earthwork, landscape, drainage, and structural elements including channel excavation (381 cubic yards), structure excavation (1,404 cubic yards for engineered log structures and 122 cubic yards for soldier pile walls), vegetated soil lifts (480 square yards), planting (0.3 acres), wildlife exclusion fencing (700 linear feet), asphalt concrete surfacing (36 tons), soldier piling work (193 linear feet of steel W12x72 piling and 194 linear feet of drilled holes), engineered log structures (three types), drainage pipe installation (77 linear feet combined), and various support materials and services. Inquiries regarding contract documents must be submitted in writing to the project engineer by 5:00 p.m. on July 16, 2026. Contractors must register on the OpenGov website to access bidding documents or submit a completed Plan Holder's Affidavit to the County no later than three working days prior to the bid opening date. The Plan Holders List will be posted to the County's Public Works website two working days prior to bid opening.
The engineer's estimate for the project is $2,249,400. The project is federally funded under FEMA-4683-DR-CA and is subject to prevailing wage requirements established by the California Department of Industrial Relations, with wage rates available through the Department of Industrial Relations website or by phone at 415-703-4774. All contractors and subcontractors must be registered with the Department of Industrial Relations per Labor Code Section 1725.5. The contractor must possess either a Class A license or a combination of applicable Class C licenses at the time of contract award. Contractors shall pay overtime at not less than 1.5 times the prevailing rate and Sunday/holiday wages at not less than two times the prevailing rate. The County requests preference for hiring from the local labor market within San Mateo County. Bids may not be withdrawn for forty-five days after the bid opening date. The County reserves the right to reject any or all bids and waive any irregularities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NC. E5103
COUNTY OF SAN MATEO
STATE OF CALIFORNIA
NOTICE TO CONTRACTORS
NOTICE IS HEREBY GIVEN, that
Sealed bids will be received either by mail to the office of the County Executive’s
Office, or hand-delivered prior to the bid opening to the County of San Mateo at 500
County Center, 5th Floor, Redwood City, California, 94063 until the hour of
2:00 p.m., Thursday, July 23, 2026 where the bids will be publicly opened and read aloud for the following project in accordance with the specifications therefore and to which special reference is made as follows:
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
TOTAL PROJECT APPROXIMATELY 600 FEET IN LENGTH
WITH APPURTENANT WORK THERETO
IN SAN MATEO COUNTY
COUNTY PROJECT NO. 13311
PROJECT FILE NO. E5103
FEDERAL-AID PROJECT NO. FEMA-4683-DR-CA
CAL OES NO. 081-00000
Bids are required for the entire work described herein.
Bidders are advised of the following:
1. Contractor should be placed on a Plan Holders List for bidding. To be placed on the Plan Holders List, the Contractor shall either:
a. Bidder shall register and create an account on the OpenGov website to download all bidding documents, including forms of proposal and contract, directly from https://procurement.opengov.com/portal/smcgov/projects/267320
Project’s OpenGov Reference:
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
Project ID: E5103 https://procurement.opengov.com/portal/smcgov/projects/267320
b. If bidding documents are obtained through a source other than those outlined in 1a above, complete and sign the following Plan Holder’s Affidavit and return to the County by PDF either via email to mclement@smcgov.org, and wng@smcgov.org or by fax at (650) 361-8220. The Contractor is advised that the table should be received by the County no later than three (3) working days prior to the bid opening date.
Plan Holder’s Affidavit
Project Title
ENTRADA WAY CULVERT SLIP-OUT BANK
STABILIZATION PROJECT
Project No. 13311 Project Engineer: Michael Clement
Project Manager: Wency Ng
Bid Open Date and Time: 2:00 p.m., Thursday, July 23, 2026
Company Name:
Mailing Address:
Phone Number:
Fax Number:
E-mail Address:
(Name and Title of Authorized Representative of Bidder)
(Signature of Authorized Representative of Bidder)
2. The Plan Holders List will be posted to the County of San Mateo’s Public
Works website two (2) working days prior to the bid open date.
3. Questions regarding the Contract Documents concerning items such as discrepancies, conflicts, omissions, doubts as to meanings, or regarding scope of bid items shall be referred to the Engineer. Inquiries must be received in writing via email, to mclement@smcgov.org and mailto:rhan@smcgov.org mailto:wng@smcgov.org mailto:alai@smcgov.org wng@smcgov.org, by 5 PM on July 16, 2026. Inquiries will be answered in writing via email response if written clarification is warranted, in the opinion of the Engineer, then inquiries and responses will be posted to the Project’s page on the County of San Mateo’s Public Works website. It will be the Contractor’s sole responsibility to ensure that they receive responses, if any. The County will not be responsible for oral clarifications.
4. It will be the Contractor’s sole responsibility to ensure that they have received addendums, if any, which will be posted to the County of San Mateo’s Public Works website on the same day issued. Said addendums will also be sent to all current plan holders and made available during purchase of Plans and Specifications.
5. Proposals in which the prices obviously are unbalanced may be rejected.
6. The Contractor’s attention is directed to the importance of complying with the provisions of Section 7-0.10, “Federal Forms, Posters and Data Required of Contractor During Construction,” and Appendix G, “Pre- Construction Handout Packet for Federal-Aid Contracts,” of these Special Provisions.
7. Bids which are not received in a sealed envelope by bid opening will be rejected. This includes all envelopes which are secured by metal clasp, twist tie, string or those which do not otherwise preclude unauthorized access. Bidders who deliver their bids in an envelope which is not sealed may be allowed to correct this deficiency provided they do so before time/date specified for opening of bids.
The Department of Public Works website will be updated as needed and can be accessed under the Department’s tab found on the County of San Mateo website (http://publicworks.smcgov.org/publicworks).
mailto:wng@smcgov.org http://www.co.sanmateo.ca.us/
ENGINEER’S ESTIMATE
TOTAL PROJECT APPROXIMATELY 600 FEET IN LENGTH
WITH APPURTENANT WORK THERETO
IN SAN MATEO COUNTY
COUNTY PROJECT NO. 13311
PROJECT FILE NO. E5103
FEDERAL-AID PROJECT NO. FEMA-4683-DR-CA
CAL OES NO. 081-00000
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
GENERAL CONSTRUCTION
1 10 1 LS Develop and Apply Water
2 11 1 LS Mobilization
3 12 1 LS Maintaining Traffic
4 13 1 LS Water Pollution Control Plan
5 13 1 LS Water Pollution Control
6 13-12 1 LS Temporary Creek Diversion Systems
7 14 1 LS Construction Waste Management
8 14-11 1 LS Treated Wood Waste
9 15-1 1 LS Remove Drainage Facilities
10 15-2 2 EA Adjust Water Valve Box to Grade
11 15-3 5 EA Pothole and Protect Existing Utilities
Engineer’s Estimate – Continued from Previous Page
Item No.
Section No.
Estimated Quantity
Unit of Measure
Item Description
EARTHWORK AND LANDSCAPE
12 17-1 1 LS Clearing and Grubbing
13 17-1 1 LS Tree Removal
14 17-1 10 EA Additional Tree Removal
15 19-1.01 81 CY Roadway Excavation
16 19-1.02 2.3 CY Roadway Backfill
17 19-2 1 LS Pipe Outfall Construction
18 19-2 381 CY Channel Excavation
19 19-2 183 TON Streambed Sediment
20 19-3 40 CY Imported Topsoil
21 19-3 1,404 CY Structure Excavation (ELS)
22 19-3 122 CY Structure Excavation (Soldier Pile Wall)
23 19-3 102 CY Structure Backfill (Soldier Pile Wall)
24 19-3 15 CY Concrete Backfill (Soldier Pile)
25 19-3 9 CY Lean Concrete Backfill (Soldier Pile)
26 19-3 100 TON Import Structure Backfill (ELS)
27 19-11 480 SQ.YD. Vegetated Soil Lifts
28 20-3 0.3 AC Planting
29 20-4 1 LS Weed and Pest Control
Item
No.
Section
No.
Estimated
Quantity
Unit of
Measure
Item
Description
EARTHWORK AND LANDSCAPE
30 20-5 100 CY Wood Mulch
31 21 700 LF Wildlife Exclusion Fence
32 21 800 LF
High Visibility Silt Fence (with Wildlife
Exclusion)
33 21 1 LS Hydroseed
SUBBASES AND BASES
34 26 59 TON Aggregate Base (Class 2)
SURFACINGS AND PAVEMENTS
35 39-1 36 TON Asphalt Concrete (Type A HMA)
36 39-5 30 LF Place Asphalt Concrete Dike
STRUCTURES
37 46 4 EA Ground Anchor (Subhorizontal)
38 49-4 193 LF Steel Soldier Piling (W12x72)
39 49-4 194 LF 24" Drilled Hole
40 49-7 48 LF Drilled Hole and Drive Timber Pile (ELS)
41 49-7 16 LF Additional Drilling and Driving Timber Pile
(ELS)
42 51-1 1 EA Type GO Inlet
43 51-1 1 EA 3’x2’ Drop Inlet
Item
No.
Section
No.
Estimated
Quantity
Unit of
Measure
Item
Description
44 51-1 1 EA 3’x4’ Drain Inlet
45 51-2 2.0 CY Class 3 Concrete
46 53 (F) 19 CY
Structural Shotcrete (Retaining Wall-
Shotcrete Facing)
47 57 (F) 2 MFBM Timber Lagging
48 57 1 EA Engineered Log Structure (ELS) - Type A
49 57 1 EA Engineered Log Structure (ELS) - Type B
50 57 1 EA Engineered Log Structure (ELS) - Type C
Drainage Facilities
51 64 17 LF
12" SDR 17 HDPE Storm Drain Pipe
(within roadway)
52 64 38 LF
24" SDR 9 HPDE Storm Drain Pipe (within roadway)
53 64 22 LF
24" SDR 9 HPDE Storm Drain Pipe
(outside roadway)
Miscellaneous Construction
54 72 6 CY Road Embankment RSP
55 72-2 255 TON Scour Protection Rock
Traffic Control Devices
56 83 122 LF Metal Beam Guard Railing
57 83-2 (F) 80 LF Cable Railing
Item
No.
Section
No.
Estimated
Quantity
Unit of
Measure
Item
Description
Materials
58 86 1.5 CY Road Embankment Gravel Filter Aggregate
59 98 8 EA Timber Piling
60 98 16 EA Type R Key Logs
61 98 17 EA Type L Key Logs
62 98 36 EA Racking Logs
63 98 1 LS Slash Material
County Miscellaneous
64 100 1 LS Construction Staking and Survey
65 110 1 EA Connector Pipe Screen
Engineer's Estimate of Costs: $ 2,249,400
(F) Final Pay Quantities - See Section 9-1.02C, “Final Pay Item Quantities,” of the
Standard Specifications.
(Note: Gaps in section numbering, above, indicate the Section is blank or does not apply.)
The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the County of San Mateo does not, expressly or by implication, agree that the actual amount of work will correspond herewith, but reserves the right to increase or decrease the amount of any class or portion of the work, or to omit any portion of the work, as may be deemed necessary or expedient by the Engineer.
Payment to the Contractor for materials furnished and work completed shall be made by the County in accordance with Section 9 of the "Special Provisions" portion of these Contract Documents. Pursuant to Section 22300 of the Public Contract Code, Contractor may, upon his request and at Contractor's expense, substitute equivalent securities for any moneys retained from such payment for the fulfillment of the Contract.
Pursuant to Section 1773 of the California Labor Code, prevailing wage rates in the County have been established by the California Department of
Industrial Relations, and copies are available in the office of the Director of Public
Works. Said prevailing wage rates shall be made available to any interested party on request, and the successful Bidder shall post a copy of the wage rates at the job site. The Contractor’s attention is directed to Section 7-1.02K(2), “Wages,” of the Standard Specifications and the Federal Requirements section of these
Special Provisions. More specifically, reference is made to section FR-2, “Federal
Wage Rates (North County)”.
Additionally:
a. When applicable, both Contractor and Subcontractor hereby agree to pay not less than prevailing rates of wages and be responsible for compliance with all the provisions of the California Labor Code, Article 2-
Wages, Chapter 1, Part 7, Division 2, Section 1770 et seq and Section 1810 et seq. A copy of the prevailing wage scale established by the Department of Industrial Relations is on file in the office of the Director of Public Works, and available at www.dir.ca.gov/DLSR or by phone at 415-703-4774.
California Labor Code Section 1776(a) requires each contractor and subcontractor keep accurate payroll records of trades workers on all public works projects and to submit copies of certified payroll records upon request.
b. Pursuant to State Senate Bill SB 854 (Stat. 2014, chapter 28), effective January 1, 2015:
i. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of
Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under
Labor Code section 1771.1(a)].
ii. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the
Department of Industrial Relations pursuant to Labor Code section
1725.5.
iii. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
Attention is directed to the Federal minimum wage rate requirements in the
Contract documents for this Project. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes
"helper" (or other classifications based on hours of experience) or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question.
Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the hotline provided below to report these activities.
Reference is made to Section 2-1.50, Bid Rigging,” of the Standard Specifications, which states: “The U.S. Department of Transportation (DOT) provides a toll-free hotline service to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, or other fraudulent activities. The hotline number is (800)-424-9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT’s effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector
General.”
Wage rates for overtime shall be paid at not less than one and one-half (1-1/2) times the above rates. Wage rates for Sundays and holidays shall be paid at not less than two (2) times the above rates.
The holidays upon which such rates shall be paid shall be all holidays recognized in the collective bargaining agreement applicable to the particular craft, classification, or type of worker employed on the Project.
It is the policy of the County that Contractors on public projects employ their workers and craftsmen from the local labor market whenever possible. "Local Labor
Market" is defined as the labor market within the geographical confines of the County of
San Mateo, State of California. Consistent with this policy, the Contractor is requested to employ craftsmen and other workers from the local labor market whenever possible to do so.
Each bidder shall submit with the bid, Certificates of Compliance and Intent on a form provided in the "Proposal" section of these Contract Documents, a certificate that bidder is in compliance with the provisions of Title VII of the Civil Rights Act of 1964, the
California Fair Employment and Housing Act and any other federal, State and local laws and regulations relating to equal employment opportunity. With the execution of said certificates, bidder also agrees that bidder will maintain or develop and implement, during the course of the work concerned, a program of hiring and employment, conducted without regard to race, religion, color, national origin, ancestry, sexual orientation, or sex of the applicants. With this certification, bidder shall submit any and all information that may be required by the County in connection with the particular project.
Each bidder is hereby notified of Section 9204 and Section 20104 et seq. of the
Public Contract Code as those Sections (attached hereto as Appendix E) relate to resolution of construction claims, and to Section 3186 of the Civil Code, as amended
January 1, 1999 with regard to stop notices and public entity’s rights to retain monies in order to provide for that entity’s reasonable cost of litigation. The bidder is further notified that all provisions of Section 9204 and Section 20104 et seq. of the Public
Contract Code and Section 3186 of the Civil Code, as outlined above shall be considered as incorporated into and become an integral part of these specifications.
Questions relating to equal employment should be directed to the San Mateo
County Department of Public Works, Equal Employment Opportunity Program, 555
County Center, 5th Floor, Redwood City, CA 94063-1665, telephone (650) 363-4100.
Additional technical questions should be directed to the office of the Director of
Public Works, 555 County Center, Redwood City, California, 94063-1665, telephone
(650) 363-4100.
The Contractor shall possess either a Class A License or a combination of Class
C licenses that are applicable for the majority of the work at the time this contract is awarded. No Contract will be awarded to a Bidder who is not licensed as required by laws of the State of California.
The County of San Mateo reserves the right to reject any or all bids and/or waive any informalities or irregularities in any bid received.
Bidders may not withdraw their bid for a period of FORTY-FIVE (45) DAYS after the date set from the opening thereof.
BY ORDER OF THE
BOARD OF SUPERVISORS
COUNTY OF SAN MATEO
DATE: June 26, 2026 Michael Callagy, County Executive Officer/ Clerk of the Board of Supervisors