Enterprise File Storage Draft Requirements Document.pdf
PDF 476 KB Posted
- Attached to
- Enterprise File Storage (EFS) Program Expansion
- Solicitation number
- 26-02-TS
About this file
Performance Work Statement Summary: Enterprise File Storage Program Expansion
This is a Performance Work Statement (PWS) for the Internal Revenue Service (IRS) Enterprise File Storage (EFS) Program Expansion, effective June 2026. The contract supports the IRS's modernization efforts by enabling the completion of 18 workflow requests on the EFS backlog list over a base year plus two 12-month optional periods. The contractor will deliver 6 new workflows annually (3 low complexity, 2 medium complexity, and 1 high complexity) while maintaining existing EFS workflows including Centralized Authentication File (CAF), U.S. Certification of Residency, Employer Identification Numbers (EIN), Income Verification Transcripts (IVES), USDA forms, and Return Integrity Verification Operations (RIVO) workflows. The contract encompasses development, testing, maintenance, and enhancement of the Pega platform-based digitization system to enable paperless processing of over 60 million pages of taxpayer documents annually.
The contractor must provide comprehensive program support across six firm-fixed-price (FFP) tasks: orientation briefing (within 2 weeks of award), contract management with monthly status reporting, knowledge transfer/transition-in activities (with Microsoft Project schedules and transition checklists), Pega configuration and development using Agile and SAFe methodologies, comprehensive testing support (integration, system, performance, 508 compliance, regression, automated, and manual testing), and transition support with documentation transfer and knowledge handoff. The estimated level of effort is 21,776 labor hours annually across 10 labor categories including Program Manager, Senior Application Analyst, Senior Software Developer, Test Analyst, Quality Assurance Analyst, 508 Tester, Technical Writer/User Researcher, Senior Systems Architect, Lead System Architect, and IT Administrative Specialist. Key personnel must maintain a 12-month minimum assignment, possess Pega certifications (PCLSA, PCSSA, PCLBA), hold moderate-level or above IRS security clearances, and demonstrate expertise in Pega Cloud for Government (PCFG), enterprise platforms, database integration, cloud infrastructure, cybersecurity frameworks, and IRS-specific systems. All deliverables must conform to Section 508 accessibility standards, IRS CMMI standards, and undergo surveillance through a Quality Assurance Surveillance Plan (QASP) with defined performance metrics across five rating levels. Performance will be conducted on-site at IRS New Carrollton Federal Building, Lanham, Maryland during standard workdays (7:00 a.m. to 5:00 p.m. EST, Monday-Friday), with no travel reimbursement, and the government will furnish identification badges, building access cards, laptop computers with common operating environment, office space, and standard software.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Information - EFS Program Expansion.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enterprise File Storage (EFS) Program Expansion Performance Work Statement (PWS)
Date: June 2026
C.1 BACKGROUND
The purpose of this acquisition is to award a contract for program support services related to the ongoing development, testing, maintenance, and enhancement of the Enterprise File Storage (EFS) Digitization/Pega Platform.
Every year, the Internal Revenue Service (IRS) receives millions of pages of forms and correspondence via mail and fax. The mailed in forms are logically received as paper and need to be digitized. For the forms received via fax, the IRS prints these documents and then manually processes them up through and including archiving. This legacy methodology is cumbersome, limits employee ability for flexible work, and stunts IRS progress towards modernized automation tools to reduce human workloads.
This contract shall support key IRS modernization efforts with the expansion of IRS’s EFS program by enabling the completion of the 18 workflow requests that are currently listed on the EFS backlog list. The contractor will complete 6 new workflows each year while ensuring the newly completed workflows and the following existing EFS workflows are supported and enhanced:
Enterprise File Storage Existing Workflows
• Centralized Authentication File (CAF): digitalization of Form 2848, Form 8821, and Form 706
• U.S. Certification of Residency: digitalization of Form 8802
• Employer Identification Numbers (EIN): digitalization of Form SS-4 and Bank list
EINs
• Income verification transcripts (IVES): Form 4506C
• USDA: Form CCC-941
• Return Integrity Verification Operations (RIVO):
o Automated Questionable Credits (AQC): LTR 4800C, LTR 3219C, LTR
105C, LTR 106C, LTR 131C
o Taxpayer Protection Program (TPP): LTR 135C, LTR 18C, LTR 418C, LTR 4883C, LTR 5071C, LTR 5447C, LTR 5747C, LTR 6167C, LTR
6330C, LTR 6331C
o Withholding Only Work (WOW): LTR 916C, Notice CP 05A
The new workflows will consist of three low complexity workflows, two medium complexity workflows, and one high complexity workflow in the base period and each option period. A low complexity workflow is a straightforward workflow with minimal branching and few dependencies. A medium complexity workflow is a workflow with multiple paths, business rules, approvals, and some integrations. A high complexity workflow is a workflow involving extensive business logic, multiple integrations, dynamic routing, and complex exception handling.
The Contractor shall provide services to expand EFS digital capabilities, leverage AI and automation for case analysis and resolution, and modernize core case management systems to enable scalable, enterprise-wide solutions. Specialized contractor expertise is required to maintain existing projects, deliver on new projects and perform system integrations that involve software development of IRS’ specific systems. IT requires qualified contracting support that has significant experience with IRS’ IT mission, evolving initiatives, Pegasystems Cloud for Government (PCFG), EFS programs and the IRS processes and tools required for development and support.
This will continue to enable paperless workflows for the processing of over 60 million pages of critical taxpayer service inventory and provide the stable and flexible technical foundation for additional printed paper inventories to be added to the expanded platform, such as Document Upload Tool (DUT), Taxpayer Digital Communications (TDC) eGain, Zero Paper Initiative (ZPI) and scanned paper. This functionality will allow for true First In-First Out (FIFO) processing to address longstanding challenges raised by oversight organizations and ensure the IRS follows the Office of Management and Budget (OMB) and National Archive and Records Administration (NARA)’s mandate to eliminate paper archiving.
C.2 OBJECTIVES
The objective of this contract is to provide ongoing development, support, testing, enhancements and upgrades to the EFS program. Section C.3 of this Performance Work Statement (PWS) describes the scope and expectations for the EFS orientation briefing, contract management, knowledge ramp up, Pega configuration, workflow testing, and transition.
The tasks in this PWS are set up in a phased approach with the objective of eventually handing off to Agency operations personnel, while allowing for new development through contractor Subject Matter Experts (SMEs). The IRS requires SMEs with specific skillsets in software development, application integration, and architecture and engineering for the Legacy and future platforms for the EFS programs at the IRS. It allows for use of contractors for specialized efforts with the end goal of handoff to the Agency.
The contractor shall provide ongoing operations, maintenance and support for the EFS program. The contractor shall support new workflow initial Minimum Viable Product (MVP) delivery, stakeholder engagement, iterative enhancements, and a phased knowledge and ownership transfer. The framework must be scalable and can be applied to all EFS workflows, including EFS workflows in production and EFS workflows that will be developed in the future.
C.3 SCOPE OF WORK AND DESCRIPTION OF TASKS
The contractor shall provide development teams to provide support for ongoing EFS program operations, maintenance, and rapid delivery of fully functional, compliant MVPs using the Pega platform. The contractor shall provide SME and technical support to IRS task leaders and project managers. The contractor shall provide a Development Organization chart depicting software development roles such as Scrum Master, Product Owner, Senior/Junior Developer, and Tester (names of individuals are not required). The development team shall report to the contractor’s Program Manager.
The contractor shall deliver the following 18 workflow requests that are currently listed on the EFS backlog list:
Prioritization Name Complexity Level
Description
1-Base Year Unidentified & Misapplied Payments medium
Build and install customized EFS paperless electronic workflow to consolidate, centrally manage, assign, and monitor unidentified payments, including the development of electronically generated reports that can be used to efficiently evaluate case management data.
2-Base Year Form 1310-Decedent Return Refund
High
Build and install an EFS paperless electronic workflow, receiving, routing and processing the Form 1310 to include integration of EEFax and ZPI Inventory. Forms 1310 submitted with returns cause Code and Edit to put Computer Condition Code L or W on the return record, affecting how the refund is treated by IMF when the return posts. The CCC will cause the refund to be issued to the secondary name line and the 1310 stays with the return.
These refunds do not need attention from AM. If the 1310 is sent as a loose document, then it gets routed to AM and is worked as correspondence, usually in response to AM working Transcript 46 cases (refund frozen because the taxpayer is deceased).
3-Base Year RIVO (Group 2) low
Add RICS RIVO FRP, BMF IDT and Entity Fab inventories to RICS RIVO EFS workflow including EEFax, ZPI and DUT integration
4-Base Year TPP - DocAI low
This is the introduction of DocAI for the TPP inventory that would extract the information from the incoming cases and populate them into the RIVO workflow, saving a great deal of effort for the clerks.
5-Base Year ZPI Workflows Low Complexity low
Build and install customized EFS paperless electronic workflow to receive scanned data files from ZPI. Integrate with ZPI/DIM and other backend solutions to send back misrouted files. Customized based on requirements gathering from the customer.
6-Base Year USCerts Database Integration medium
Integration of the US Certs workflow directly with the USCerts Database to reduce manual data entry and enable further automation of cases.
7-First Option Year eClas Integration high eClas integration would be the highest level of integration beyond IAT and enabling a full connection and data exchange between the workflow and backend systems.
8-First Option Year
ZPI Workflows Medium Complexity medium
Build and install customized EFS paperless electronic workflow to receive scanned data files from ZPI. Integrate with ZPI/DIM and other backend solutions to send back misrouted files. Customized based on requirements gathering from the customer.
9-First Option Year
EIN IAT Integration low
This is the next level of integration for EIN and would leverage the data provided by the DocAI for EI and enabling the automation and integration between the workflow and backend systems.
The new workflows and integrations may include but are not limited to EFS integrations and partnerships with the Document Upload Tool (DUT), Taxpayer Digital Communications (TDC) eGain, Zero Paper Initiative (ZPI), scanned paper, AI initiatives, and other initiatives to improve the taxpayer experience. The Program Manager is responsible for the product deliverables for each workflow.
The contractor shall provide personnel who will be able to obtain and retain IRS clearances at the moderate level or above, and well-versed in IRS’ EFS solutions as well as the Agency architecture to allow for collaboration between solutions.
The contractor shall assist the EFS program manager and IT program teams with development of customized presentations and reporting for program stakeholders and management as well as preparation of white papers, documentation, and budgeting that addresses business and IT sponsored modernization solutions. The contractor shall
10-First Option Year
SP ERS Clerical Correspondence low
Build and install EFS paperless electronic workflow for ERS Clerical Correspondence inventory including EEFax, secure messaging and ZPI integration.
11-First Option Year
BMF Entity Class for Corporations low
Build and install EFS paperless electronic workflow for BMF Entity Class for Corporations inventory to include EEFax, DUT and ZPI integration.
12-First Option Year
SP RAIVS
medium
Build and install EFS workflow for RAIVS programs to include SBA, UN, LEAP, Ten Day and Photocopy inventories, to include EEFax, ZPI and DUT integration.
13-Second Option Year
ZPI Workflows High Complexity high
Build and install customized EFS paperless electronic workflow to receive scanned data files from ZPI. Integrate with ZPI/DIM and other backend solutions to send back misrouted files. Customized based on requirements gathering from the customer with system integration.
14-Second Option Year
AM FIRPTA
low
Build and install EFS paperless electronic workflow for Foreign Investment in Real Proper Tax (FIRPTA) inventory to include EEFax, ZPI and DUT integration.
15-Second Option Year
BMF Entity Programs added to BMF Entity medium
Build and install additional BMF Entity program inventory workflows to the BMF Entity Class for Corporations EFS workflow; Form 8832, BMF Entity Correspondence and IMF Entity Control, BMF Entity Unpostables, to include EEFax, ZPI and DUT integration.
16-Second Option Year
RICS RIVO Gp3 low
Add OARS and Bank Leads to RICS RIVO EFS workflow inventories, including EEFax, ZPI and DUT integration as well as integration within RIVO inventory streams to identify and consolidate in-process cases with OARS inventory.
17-Second Option Year
Form 4442 low
Build and install EFS paperless electronic workflow for Form 4442 Referral process: to include EEFax and all other delivery channels and IAT integration as well as multiple BOD case status capability
18-Second Option Year
ITIN
medium
Design, development, and implementation of a modern, technology-enabled workflow to digitally process the Form W-7, including integration of RTS.
report on project status and risks as required. The contractor shall provide Analysis of Alternatives to modernize legacy systems in addition to Return on Investment (ROI) and cost savings analysis as necessary. The contractor shall work directly with the business and stakeholders around the Agency, leading meetings as required and providing communications of project status as necessary.
The Agency will provide personnel to manage the EFS systems for eventual transition. A transition plan will be developed within 15 days after Agency personnel are provided.
Any software or processes developed must conform to the Section 508 standards.
Firm-Fixed Price (FFP) Tasks:
• Task 1 Orientation Briefing
• Task 2 Contract Management
• Task 3 Ramp-up Knowledge Transfer/Transition in
• Task 4 Pega Configuration
• Task 5 Testing Support
• Task 6 Transition Support
C.3.1 Task 1: Orientation Briefing
Within two weeks of contract award, the Contractor shall conduct an orientation briefing for the Government. The Government does not desire an elaborate orientation briefing, nor does it expect the Contractor to expend significant resources in preparation for this briefing. Rather, the intent of the briefing is to initiate the communication process between the Government and Contractor by introducing key contract participants, explaining their roles, reviewing communication ground rules, and assuring a common understanding of contract requirements and objectives.
The orientation briefing shall be held at the Government's facility, and both parties shall mutually agree upon the date and time.
The completion of this briefing shall result in the following:
a) Initiate communications between the Government and Contractor and assure a common understanding of contract requirements, objectives, and expectations.
Delivery of required Orientation Briefing materials and briefing minutes to the Contracting Officer’s Representative (COR) after the briefing.
b) The Contractor and Government personnel who will perform work under this contract will be introduced.
c) The Government will show the applicable facilities to the Contractor if the Contractor will be performing work on the Government's site.
d) The Government may provide any Government-Furnished Property (GFP) to the Contractor at this time.
e) Any issues concerning the Contractor clearances for Contractor personnel will be discussed.
f) The Contractor shall demonstrate confirmation of their understanding of the work to be accomplished under this contract PWS.
g) The Contractor shall provide the accounting period end dates to be used for the term of this contract.
h) The Contractor shall provide a list of Key Personnel (See C.3.8).
i) The Contractor shall take minutes during the orientation meeting and document the key points of discussion, action items and who will perform them as well as who was in attendance.
DESIRED OUTCOME: Initiate the communication process between the Government and Contractor and assure a common understanding of the contract requirements, objectives, and expectations; delivery of required Orientation Briefing materials and Briefing minutes to the COR after the Briefing.
C.3.2 Task 2: Contract Management
The Contractor shall provide contract management support to ensure uninterrupted performance of the current program portfolio’s solutions/products. The Contractor shall ensure the IRS-identified staff receives the knowledge and skills needed to maintain the portfolio’s solutions/products designed, maintained, tested, and implemented. The Contractor shall ensure all personnel performing any work in this effort maintain a Medium Level Minimum Background Investigation (MBI) clearance
Specifically, the Contractor shall provide the following support services:
C.3.2.1 Subtask 2.1: Task Management Support
a) Provide contract management and oversight.
b) Effectively and efficiently develop, monitor, update, and manage the
Program and Performance objectives and tasks, as it moves toward successfully achieving its goals to enhance accountability, participation, and transparency.
c) Attend and actively participate in stakeholder meetings, as needed, to discuss activities regarding the status of the current Portfolio’s solutions/products.
d) Perform ad-hoc requests including but not limited to contract financial reports, presentations, and other reports in support of the Portfolio’s Solutions/Products at the direction of the COR and / or the technical point of contact.
e) Provide a monthly summary of work performed, including a list of deliveries submitted to the government. This report shall be submitted along with the monthly invoice to the government
f) Identify and report all risks and issues encountered, escalate as appropriate.
g) The contractor shall provide an annual Period of Performance summary of work performed, including a list of deliverables, at the end of each Base and Optional Period of Performance. The Government also reserves the right to request this report at any point during the performance of the order at the discretion of the Contracting Officer. This ad hoc report, if desired, will only be requested once during the life of the contract and is in addition to the regularly scheduled Period of Performance Summary report.
h) Electronic copies of monthly submitted invoices along with an up-to-date FFP payment schedule.
i) Account for their personnel (i.e. personal or sick leave) to ensure staffing cover. The contractor shall provide the government with 30 days’ notice of all employees with scheduled leave greater than 5 business days. The COR and technical point of contact shall be informed of all leave, planned or emergency, as soon as possible and the contractor’s work coverage plan to ensure contract performance and timely deliverables.
j) Provide a Staffing Plan and Roster, ten (10) days after contract award and monthly, listing all individuals (including subcontractor staff) by name, labor category, clearance status, team role(s), and aligned PWS tasks for all staff working on this effort including positions onboarding, or transitioning off the contract.
k) Provide the IRS information as it pertains to resources planned, used, and available for current workload activities and to forecast shifts in resources based on IRS priorities. Create a resource tool to be maintained once approved by the government. Any changes to the resource plan shall be approved by IRS. Maintain and use the resource management tool in regular planning meetings to -inform joint decision-making with the IRS related to Contract Contractor staffing and workload planning processes.
The tool shall include existing resources and forecasted resources that may be placed in planning packages that may be performed during the contract Period of Performance.
C.3.2.2 Subtask 2.2: Earned Value Management (EVM)
a) Provide Earned Value Management (EVM) data under this contract on Development, Modernization or Enhanced (DME) work on a monthly basis.
b) Provide data collection and reporting about project performance, schedule and cost, as well as activity progress, EVM measures and key metrics on a monthly basis for project control.
c) Provide corrective action reporting, if needed.
d) Compliance with FAR 52.234-4 Earned Value Management System
(EVMS) and Treasury policy ANSI/EIA STD – 748A.
e) Provide monthly contractor burn rate status, included in the Monthly
Summary Report and the contract status report, complete with contractor burn rate information, organized by task and sub-task, as required seven working days prior to associated invoice submission.
C.3.2.3 Subtask 2.3: Executive Meetings and Reporting
For the purposes of this PWS, executive meetings are where decision-making and policy making occur. Program/operation meetings are where processes and procedures occur, mainly during the normal course of business.
Specifically, the Contractor shall provide the following support services:
a) Assist in the preparation and facilitation of meetings, as needed, with both internal and external stakeholders, including developing meeting and presentation materials, agendas, presentation content, meeting minutes/summaries, notes and action items.
b) Provide monthly and/or weekly status reports, complete with Contractor burn rate information as required seven working days prior to associated invoice submission.
c) Provide a Monthly Status Report (MSR), a monthly Contractor Quality Assessment Report (Attachment 1), and an annual Period of Performance Summary Report for the contract. The Contractor shall work with the COR to determine the needs of such reports and provide reports in accordance with templates provided by IRS.
d) The Contractor shall provide a Monthly Status Report that gives a status update of all work, organized by task and sub task, taking place on this effort. The monthly report should also include Earned Value Management, schedule, staffing levels, and deliverable status as well as an up-to-date accounting of all employee Government Furnished Equipment (GFE), Government Furnished Information (GFI), work locations, and contact information. The MSR shall use metrics to describe the state of the PWS services, organized by task and sub-task, on a monthly basis and will include the financial update with the burn rate by task and sub task, narrative summary of achievements, risks, issues, updated program information, monthly metrics summary, and deliverables for the current monthly period. Any updates to existing deliverables shall be noted in the MSR. The Contractor will conduct/participate in a monthly progress meeting to present the MSR to the Government.
e) Monthly contract status report showing Labor Hour Task titles, CLINs, funding levels, MODs, and estimated and actual burn rates of funding by each Development Value Streams (DVS)’s solutions/products to be included in the MSR.
DESIRED OUTCOME: Contract management support activities are effective and completed on schedule and in accordance with the Business and IT requirements.
Consistent reporting, methods and documentation that provides a logical view.
C.3.3 Task 3: Ramp-up Knowledge Transfer/Transition In
Ramp-Up Knowledge Transfer is defined as the Contractor acquiring and understanding the necessary documentation, information, and processes related to any work in progress.
Transition-In shall be worked concurrently with Ramp-Up Knowledge Transfer.
Successful transition can be defined by its capacity to maintain full continuity of operations, high productivity, and exemplary service quality.
The Contractor shall appoint a knowledge transfer manager to oversee the transfer of knowledge and ensure all areas are accounted for. If desired, this can be the Project Manager or Project Scheduler. Prior to the transfer of knowledge, the Contractor shall develop a draft Knowledge Transfer Plan (KTP) and present it to the Government within the first 10 business days after award. The KTP shall identify the Contractor resources and roles involved in the transfer process, provide a list of risks and mitigation strategies for the transfer, and contain a detailed resource balanced project schedule developed with Microsoft Project. The project schedule shall identify tasks, dependencies, deliverables, and milestones. The project schedule shall be at a sufficient level of detail to track progress on a bi-weekly basis (i.e., all tasks will be detailed to a level such that no task has duration of more than ten workdays). The Government shall have five business days to review the draft KTP and provide comments to the Contractor.
Government and Contractor representatives will then meet to discuss the comments after which the Contractor shall incorporate the agreed-upon changes and deliver a final KTP within five working days of the government’s feedback.
The Contractor shall meet with the IRS weekly to discuss the progress of the knowledge transfer. The Contractor shall show an updated MS Project Schedule and discuss any risks or concerns at this time.
The Contractor shall also develop a Transition-In Checklist 10 business days after award to provide a vehicle to verify completion of the necessary transition-in activities. The Transition-In Checklist shall be signed by both, the Contractor, and the COR after completion of the task.
The Contractor shall perform the following activities during the transition-in period:
a) Assign personnel and submit security papers promptly to get background investigations done quickly and gain access to IRS’s network.
b) Request access to tools and documentation.
c) Review and understand all the technical and process documentation.
d) Review and understand the existing data and product security policies in place.
e) Offerors shall provide Ramp-Up Staffing Plan and describe how they will bring resources on board in coordination with the ramp-down efforts of the incumbent.
f) Offerors shall provide Knowledge Transfer Plan/Checklist.
C.3.4 Task 4: Pega Configuration – Development, Maintenance, and Support
Technical services are required to keep agency services running and ensure consistent collaboration support for customers. The contractor shall provide development teams to fulfill the following:
Possess a high level of expertise with the Pega software packages to develop/customize business workflows.
Generate concept of operation for the EFS base system functionality as well as custom workflows based upon business requirements and use-cases including the prioritization of new workflows based upon Business requirements, throughput and retention requirements.
Document EFS Business Requirements through a high level of IRS process understanding and proven business process re-engineering skills to develop workflows for implementation into EFS.
Develop and execute all required test plans and work closely with users for testing.
Use Agile methodologies and SAFe to support iterative development, continuous improvement, and stakeholder collaboration throughout the EFS implementation lifecycle.
Work closely with the ECM team to field and operate the EFS system on the ECM infrastructure.
Work closely with the Pega software packages and vendor support teams to configure and operate EFS workflows.
Develop/maintain FAQs and self-help tools for users on website.
Capture, maintain and track all outstanding issues and action items.
Assist with troubleshooting and resolving outstanding issues.
Develop training and user support guides.
Support the development and implementation of the PMO’s communications plan.
Develop and implement Return on Investment (ROI) calculations to prioritize potential workflows.
Coordinate with business and ITS partners to provision users to system Rapid delivery of a fully functional, compliant MVP using the Pega platform.
Generate concept of operation for the MVP functionality as well as custom workflows based upon business requirements and use-cases including the prioritization of new workflows based upon Business requirements, throughput and retention requirements
Work closely with the Enterprise Pega Platform as a Service (EPPaaS) team to field and operate the EFS system only as it pertains to Pega workflow integration
Support EFS components through a deep understanding of the EFS components and experience with the Engineering Operations (EOps) team and processes
Work closely with the Pega software packages and vendor support teams to configure and operation EFS workflows
Work with the Active Directory team to configure and maintain Single Sign On
Work on the Security Assessment/Authorization (SA&A) testing & review process
Ensure cybersecurity requirements are met for the contract, and any software or processes developed must conform to the Section 508 standards.
Develop and maintain solutions according to no-code/low-code platform layered architecture including support for reusability of platform under Pega Cloud for Government (PCFG)
Provide, maintain, and upgrade software components necessary for delivery of the required capabilities in accordance with all applicable IRS and Federal policies, guidelines, and directives.
Provide Application Architecture guidance and adhere to development standards for no-code/low-code platform.
Provide User Interface/User Experience (UI/UX) templates for the platform/application to ensure consistency with IRS UI/UX standards and template/control reuse.
Design target-state solution with clear separation of system of engagement (Pega) vs. systems of record, aligned to IRS enterprise architecture.
Map legacy data to Pega data model, define data ownership, migration, archival, and decommissioning approach.
Configure secure integrations (uAPI, external/legacy systems), define ICDs, and establish real-time/batch integration patterns.
Translate business capabilities into Pega case types, workflows, roles, and reusable components, including handling current workarounds.
Incorporate Pega AI capabilities, including Document AI for automated case summarization, Knowledge Buddy for real-time employee guidance, and AI-powered chatbots for taxpayer interaction, integrating these features into EFS operations to streamline workflows, enhance decision-making, reduce manual effort, and improve both employee efficiency and taxpayer experience.
Capture and analyze the business, functional and technical requirements.
Create a Feature List consisting of documented User Stories collected during the business process workshops into a project management tool Elicit program requirements and facilitate build-to requirements, document requirements and ensure alignment in appropriate IRS repository.
Identify technical enablers and service/other integrations required by the application in sufficient timeframes so that supporting teams can provide necessary access to or develop the enablers and/or integrations.
Assist in making approved additions/changes to any required artifacts.
Facilitate stakeholder feedback sessions to promote solution/product alignment with stakeholder needs and requirement.
DESIRED OUTCOME – Provide development teams to provide acquisition and engineering support for the development of new workflows, support and enhancement of existing workflows, and day-to-day operations under the guidance of the IRS Program Manager.
C.3.5 Task 5: Testing Support
The IRS requires testing support in various capacities. Test data creation, agile testing and Section 508 compliance testing are critical elements to focus on. These components are key to understanding the importance of this enterprise portfolio, the complexities of processes, and transaction data density involved in this dynamic IRS environment.
Specifically, the Contractor shall provide Information Technology (IT) Applications Development (AD) the following support services:
a) Testing Management
1. Provide end of PI test, to include test scripts for automated testing, regression, performance, and integration testing completion reports.
2. Provide end-of-iteration test completion reports.
3. Testing – Perform necessary testing processes and test data in support of producing the common services and COTS development platform configuration.
i. Integration testing
ii. System Testing
iii. Performance testing
iv. 508 Testing
v. Regression Testing
vi. Automated Testing
vii. Manual Testing
b) Testing Quality Management
1. Track, monitor, manage, and support coordination and resolution of identified development and production defects, including those that result in Change Requests using approved IRS repository.
c) Section 508 Compliance Management
1. Using IRS standards, ensure that Section 508 of the Rehabilitation Act, amended in 1998, and security requirements are embedded in each work product through testing and validation.
2. Conduct 508 Compliance activities ‐ execute testing methodologies (manual and assistive technology tools) and evaluation of design as it pertains to Section 508 Accessibility and Usability.
3. Create/Alter testing protocols to align with business requirements and Reusable Enterprise Level requirements (RELRS) and business requirements.
4. Incorporate appropriate web content accessibility WCAG 2.0 A and AA level Success Criteria and best practice guidelines in testing protocols.
5. All product testing, including 508 compliance testing and security hardening, is fully completed during each iteration.
DESIRED OUTCOME: The primary goal of measuring the test process for EFS solutions/ products is to help ensure that the solution meets the quality expectations of the IRS. Quality measures will indicate whether the solutions/products are performing to the defined specifications. Provide coordination of and management of all artifacts that detail 508 work activities, test plans/scripts, test result documentation, epics/user stories used to detail 508 work activities. Satisfactory completion of all tasks for the 508 Testing Support through all phases of the Solutions/Products Evaluation, operations and maintenance, Technical Integration, Test and Deployment stages.
C.3.5.1 Integration Testing/Test Data Creation The IRS requires testing support in various capacities. Test data creation, performance testing, agile testing and Section 508 compliance training are critical elements to focus
on. These components are key to understanding the importance of this enterprise portfolio, the complexities of processes, and transaction data density involved in this dynamic IRS environment.
Specifically, the Contractor shall provide the following support services:
a) Integration Testing
1. Develop a comprehensive testing plan that outlines all phases of integration testing, including unit, system, and end to end tests.
2. Configure the testing environment to simulate production conditions accurately, ensuring compatibility with existing systems and software.
3. Execute integration tests cases to verify seamless interaction between modules and other enterprise systems, documenting test results and anomalies.
4. Analyze test outcomes and provide detailed reports, including defect logs, resolution timelines, and impact assessments.
5. Collaborate with stakeholders to validate the system functionality against defined requirements and resolve any integration issues promptly.
6. Integration testing support of applications developed by delivery teams.
7. Manage and coordinate all Integration testing activities on the platforms.
8. Communicate defects and proposed technical workarounds testers may identify.
9. Using IRS standards, ensure that security requirements are reflected in each work product through testing and validation.
10. Create/Alter testing procedures to align with business requirements.
11. Incorporate appropriate Web Content Accessibility Guidelines (WCAG) 2.0 A and AA level Success Criteria and best practice guidelines in testing protocols.
12. All product testing, including Integration testing and security hardening, is fully completed to support each release.
13. Test Plan Document shall contain a detailed description of the testing strategy, objective, scope, timelines, and resources as well as Test Cases and Scripts that include comprehensive list of all test cases and automated scripts, resolution timelines, and statis updates.
14. Data Defect Resolution Reports that logs identified defects, including severity, impact analysis, resolution timelines and status updates.
15. Test Results that detail the testing outcomes, highlighting successful cases, issues resolved, and outstanding defects.
16. Attend program meetings as required
b) Test Data Creation
1. Create test data sets and samples for all projects to support testing efforts.
Test data sets shall replicate the existing data model of the system / applications include, but are not limited to, the legacy systems and mainframe systems as well as other applications as required by the government.
2. Generate mock test data to cover a minimum of 95% of test scenarios
3. Identify the data set required for testing, including sample documents, metadata, and record representative of operation usage.
4. Create, sanitize, and load test data into the system ensuring compliance with data security and confidentiality policies.
5. Execute integration test cases to verify seamless interaction between application modules and other enterprise systems documenting test results and anomalies.
6. Create test data in IRS Legacy applications that the application integrates with for case augmentation or other interfaces so that this data can be used for integration testing. This includes pulling data using legacy data services or other systemic interfaces.
7. Analyze test results and provide detailed reports, including defect log, resolution timelines, and impact assessment.
8. Collaborate with stakeholders to validate the system’s functionality against defined requirements and resolve any integration issues promptly
DESIRED OUTCOME: The primary goal of measuring the test process for EFS solutions/ products is to help ensure that the solution is meeting the quality expectations of the IRS. Quality measures will indicate whether the solutions/products are performing to the defined specifications.
C.3.6 Task 6: Transition Support
The Contractor shall be responsible for the implementation of the transition and application cutover activities. The transition shall cause no disruption in program services or operations. To ensure the necessary continuity of services and to maintain the current level of support, IRS may retain services of the incumbent contractor for some, or all, the transition period, as may be required.
The Contractor shall be responsible for the transition of all technical activities identified in this contract. As part of the transition, the Contractor shall be responsible for:
a) Inventory and orderly transfer of all GFP, to include hardware, software, and licenses; Contractor Acquired Government Property; and GFI.
b) Transfer of documentation is currently in process.
c) Transfer of all software code in process.
d) Certification that all non-public IRS information has been purged from any Contractor-owned system.
e) Participation in knowledge transfer activities in accordance with the transition plan.
f) Providing members to and participate in transition management team.
If the government provides a Transition-Out Plan template, the Contractor shall complete it as assigned; otherwise, the Contractor shall submit a Transition-Out Plan at the direction of the government. The Transition-Out Plan shall:
a) Document the strategic approach.
b) Identify equipment, hardware, software, documents, and other artifacts that are included in the transition.
c) Document milestones and schedules.
d) Document work in progress.
e) Identify transition risks and risk mitigation.
f) Define roles and responsibilities.
g) Define transition approval authorities and lines of communication.
DESIRED OUTCOME: The Contractor provides a Knowledge Transfer Plan that is accepted by the Government and successfully completes knowledge transfer in accordance with the plan. Transition-in Plan/Checklist are accepted and completed as well as the following:
• Successful Ramp-Up Staffing Plan and Knowledge Transfer Plan that is accepted by the Government and successfully completes knowledge transfer in accordance with the plan.
• Transition-In Plan/Checklist is accepted and completed.
• Successful transition of the solution through the lifecycle.
• Ramp-Down Knowledge Transition Plan is accepted, works effectively with the incoming contractor and the Government, and executes the knowledge transfer in accordance with the plan.
• Transition-out Plan/Checklist is accepted and completed.
DESIRED OUTCOME – The contractor shall effectively manage their work and resources to help design, deploy, document, maintain and monitor newly identified technologies and strategies to support IRS initiatives, and regularly report on progress, risks, issues and status.
C.3.7 SKILLS REQUIREMENTS
In addition to meeting the technical requirements set forth in Sections C.1 through C.3.6, the Contractor shall identify the key personnel specified in Section C.3.8. The Contractor and all contractor employees must be tax compliant as of the period of performance start date.
The Contractor shall provide the following certification:
• Program COTS development platform certifications (currently Pega, and any
IRS COTS development platform selected thereafter) o Pega Certified Lead System Architect (PCLSA) o Pega Certified Senior System Architect (PCSSA) o Pega Certified Lead Business Architect (PCLBA)
• The Contractor shall provide expertise on the following system at a minimum, hardware, and software, Java, Pega Infiniti, Pega Collections, Pega Customer Service, Confluence, Jira, Zoom Text (508), JAWS (508), Dragon (508), Ping Federated, Objected Oriented Programming Concepts and Patterns, XML, Docker, Kubernetes, Linux, Insight Manager, S3, PostgreSQL, PCFG, Playwright, Informatica, Pega Diagnostic center (PDC), AWS DMS (Data Migration Service), AWS SCT (Scheme Conversion Tool), AWS CLI (Command Line Interface), Informatica S3 Connector, GitHub, Pega console and other systems if required.
Specialized experience shall also include expertise in these areas: COTS development platform-based Portfolio’s solutions/products orchestrations and choreographies, conduct and prepare effective presentations and briefings for various management levels, technical analysis of Portfolio, Solution, and Product Management processes to enable DVSs. Proven ability to analyze broadly scoped task to synthetize the plausible Portfolio’s solutions/products.
Core Technical Expertise
• Microsoft ecosystem: Office 365, SharePoint (design & management), Teams, Project, Project Server
• Enterprise platforms: Pega Cloud for Government, Biscom, IR Works, One SDLC, AudioCodes, EFS, OpenText Documentum
• Database & integration: SQL, REST API development, EFT (file transfer protocols)
• Cloud & on-prem infrastructure: deployment, interaction, and support
• Network infrastructure: SIP, backbone components, monitoring and management tools
• Cybersecurity & compliance: FISMA (SP 800-53/53A), NIST (SP 800 series, CMMC, FIPS), ITIL, CMMI, PMI, ISO 9000
Program & Project Management
• Program and project leadership aligned with One SDLC and PMBOK standards
• PgMP and PMP-certified management professionals, as identified in
Key Personnel requirements
• Enterprise program management tools and documentation (ProSight, E-300, CPIC, ELC alignment)
• Cost estimating, budgeting, and federal funding cycle experience
• Risk and change management integration
• Performance measurement and operational metrics development
Specialized IRS and Federal Experience
• Deep understanding of IRS programs, initiatives, processes, and enterprise systems (ECM, PCFG, ZPI)
• Experience with IRS common services: Active Directory, Exchange, BEARS, ESM, PSTN, Documentum
• Continuity of operations with current IRS security clearances and access
• Familiarity with E-300 Health Assessments, Summary of Spending
Tables, and program tracking
Additional Technical & Operational Skills
• Workflow and data migration development
• ECM/PMO team and infrastructure management
• Experience supporting OpenText Documentum/xCP and EPPaaS environments
• Enterprise Electronic Fax operations and maintenance
DESIRED OUTCOME –The contractor shall provide personnel with the above qualifications and skills. The contractor shall provide personnel who will be able to obtain and retain IRS clearances at the moderate or above level with access to key EFS environments, to provide immediate support to these ongoing dynamic programs.
C.3.8 Key Personnel/Resources For this contract, key personnel shall be assigned for a minimum period of 12 months, barring circumstances outside the control of the Contractor, e.g., death and disability. All key personnel positions shall be dedicated 100 percent to this contract and be available to begin work immediately on the anticipated contract start date.
Note: If key personnel are not an employee of the vendor, please attach a signed key personnel commitment letter with the proposal and below required certifications. If any key personnel leave the position, the contractor is required to fill the position with an employee who meets the requirements. The resume of the new employee must be provided to the CO and COR for approval to ensure requirements are met.
The following positions are hereby designated as key personnel for this contract:
# Resources Responsibilities Shall have
1 Lead – Software
Architect, Pega Applications:
Serve as an expert consultant to oversee and guide IT strategies, focusing on designing and implementing
• Provide technical leadership as a Pega Lead System Architect (LSA), ensuring seamless integration with existing infrastructure
• Define IT
• 15+ years of experience in IT leadership, architecture, specializing in Pega
• Certified as a Pega Lead System Architect (LSA – both part 1 and architecture, workflows, and enterprise focused solutions, particularly utilizing Lead – Software Architect, Pega Applications is responsible for coordinating the management of all work and shall act as the central point of contact (POC) for this project.
Analyze new and complex project-related problems and create innovative solutions that normally involve the schedule, technology, methodology, tools, solution components, and financial management of the project.
Provide application systems analysis and Transition and Target State plans for application selection, systems development, systems maintenance, and production strategies and manage infrastructure to meet organizational objectives
• Lead teams in system design, deployment, and performance optimization.
• Ensure compliance with regulatory standards and information security protocols
• Provide guidance on best practices, coding standards, and development framework.
• Conduct code reviews and ensure adherence to best practices
• Evaluate emerging technologies for potential integration
• Collaborate with leadership to align IT strategies with business goals.
• Coordinate with Pega vendor with Service Requests and their resolution part 2 certifications) is required.
Attach both certifications
• Strong knowledge of IT systems, networking, and security standards
• Proven experience managing cross-functional teams.
• Strong interpersonal skills to work in dynamic, project-based roles.
• A Bachelor of Science (BS) in computer science (CS) field is required.
activities for necessary support resources.
• Manage Pega platform level 508 defects and their plan for their resolution
• Advocate for reusable design patterns and components that can be leveraged across applications
Key personnel are defined as personnel: (i) identified in the quote as key individual(s) to be assigned for participation in the performance of the contract; (ii) whose resumes were submitted with the quote; or (iii) which are designated as key personnel by agreement of the Government and the Contractor during negotiations.
C.3.9 LABOR HOUR ESTIMATE
The below table is the estimated level of effort anticipated by the Government for a Contractor to complete PWS work as described at Section C.3.
A combination of resources shall be used across each team which will result in some FTE's that are full-time, and others may be ad-hoc or part-time.
Labor Category Position or Role Estimated Total Hours Per Year Program Manager 1440 Senior Application Analyst 6410 Senior Software Developer 960 Test Analyst 960 Quality Assurance Analyst 960 508 Tester 960 Technical Writer/User Researcher/Web Designer /Process Engineer 960
Senior Systems Architect 3800 Lead System Architect 4560 IT Administrative Specialist 766
Total Hours: 21776
C.3.10 PERIOD OF PERFORMANCE
The period of performance (POP) for this contract shall be one (1) year from date of award with two 12-month option periods
C.3.11 PERFORMANCE REQUIREMENTS, STANDARDS AND SURVEILLANCE
The Government believes there is value in incorporating Performance-Based Service Acquisition (PBSA) methodology with an outcomes-based focus for this work. In accomplishing this work, the Contractor shall establish a Quality Assurance Program (QAP) to attain, sustain and advance exceptional delivery of operations and maintenance services. The Contractor’s QAP will include its description of people, tools and processes that it will use to ensure compliance with all contract requirements and its proposed methods for providing continuous improvement in service delivery.
The Contractor’s QAP shall link the Government and Contractor’s quality assurance efforts into an integrated package with shared objectives. Accordingly, the Contractor’s QAP shall demonstrate an in-depth understanding of the IRS’s quality performance requirements, provide a clear statement of how the Contractor’s quality program will advance the IRS toward its objectives (stated in Section C.2), and provide a detailed set of Plans (for example Quality Assurance Surveillance Plan, Configuration Management and Change Control Plan, Asset Management Plan, Risk Management Plan and other plans at the Contractor’s discretion), that the Contractor will use to manage execution of the PWS.
C.4 Section 508 Accessibility Requirements
Section 508 Services
For Development or Customization: All contracts, solicitations, purchase orders, delivery orders and interagency agreements that contain a requirement of services which will result in the delivery of a new or updated information and communication technology (ICT) item/product must conform to the applicable provisions of the appropriate technical standards in 36 CFR, Appendix C to Part 1194, and functional performance criteria in 36 CFR Chapter 3, unless an agency exception to this requirement exists at E202 General Exceptions.
Section 508 Conformance
When Less than Fully Conforming: Each information and communication technology (ICT) product and/or product related service delivered under the terms of this contract, at a minimum, shall conform to the applicable accessibility standards at 36 CFR, Appendix C to Part 1194 at the level of conformance as specified in the Attachment entitled (Please state where attachment may be found and name of attachment for example, Section J., Voluntary Product Accessibility Template (VPAT) or Section J., Evaluation Matrix).
Section 508 Accessibility of Information and Communication Technology (100% Compliance)
When Fully Conforming: Each information and communication technology (ICT) product or service furnished under this contract shall comply with the Information and…