Engineer_Estimate-7-1-2025_(For_review_only).xlsx
XLSX spreadsheet 31 KB Posted
- Solicitation number
- 25-0537-ITB-C
- Issued by
- Pinellas County, Florida
About this file
The document is an Engineer's Estimate for the Federal Open Channel Drainage Repair Work Order Contract - Package 1 (Contract No. 25-0537) for Pinellas County, Florida, scheduled for July 1, 2025. The work order contract is designed to construct open channel repair projects, with each work order serving as a standalone project. The scope includes re-establishing open channel slopes, removing trees and storm-related debris, implementing erosion control, providing fill material, sodding, vegetation trimming, fencing, and associated incidental items. The comprehensive estimate includes detailed line items across multiple categories such as mobilization, traffic control, pipe culvert installation, concrete work, tree removal, and environmental mitigation, with quantities ranging from 5 to 99,000 units for various items.
The total estimated bid amount is $15,466,475.25, broken down into main categories including Open Channel Drainage Repair ($13,509,685.25), Water Main work ($9,085.00), Reclaimed Water work ($6,655.00), Sanitary Sewer adjustments ($6,050.00), and Other Items ($1,935,000.00). The contract includes significant contingency and unspecified work line items, with $1,800,000 allocated for unspecified work and additional allocations for water, reclaimed water, sanitary sewer, and survey work. The pricing structure demonstrates detailed unit pricing for extensive infrastructure repair and maintenance activities, reflecting a comprehensive approach to managing drainage and related infrastructure improvements in Pinellas County.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Federal Open Channel Drainage Repair Work Order Contract - Package 1 Contract No. 25-0537
| BID No. 25-0537 | 7/1/25 | |||||
| Engineer Estimate | ||||||
| Pay Item No. | Description | Quantity | Unit | UnitPrice | Amount | |
| OPEN CHANNEL DRAINAGE REPAIR | ||||||
| 101-0310 | EMERGENCY Mobilization at County's Request | 6.00 | EA | $ 6,600.00 | $ 39,600.00 | |
| 101-0311 | REMOBILIZATION AT COUNTY'S REQUEST | 6.00 | EA | $ 7,700.00 | $ 46,200.00 | |
| 102-1074 | CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE), FDOT 102-600 | 500.00 | LF | $ 2.20 | $ 1,100.00 | |
| 102-1076 | ARROW BOARD/ADVANCED WARNING ARROW PANEL | 550.00 | EA/DAY | $ 38.50 | $ 21,175.00 | |
| 102-1099 | PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) -TEMPORARY | 230.00 | EA/DAY | $ 38.50 | $ 8,855.00 | |
| 102-1100 | OFF DUTY LAW ENFORCEMENT OFFICER | 100.00 | HR | $ 107.80 | $ 10,780.00 | |
| 102-1250 | COMMERCIAL MATERIALS FOR DRIVEWAY MAINTENANCE | 100.00 | CY | $ 110.00 | $ 11,000.00 | |
| 102-1600 | SIGN, WORK ZONE, (Temporary) | 750.00 | EA/DAY | $ 5.50 | $ 4,125.00 | |
| 102-1602 | FLAGGER - MOT per each flagger | 240.00 | HR | $ 55.00 | $ 13,200.00 | |
| 102-1651 | CONES, (Temporary), per FDOT Index No. 102-600 | 2,500.00 | EA/DAY | $ 3.30 | $ 8,250.00 | |
| 102-1652 | BARRICADE, Type I, II or Drum, (Temporary), Per FDOT Index No. 102-600 | 550.00 | EA/DAY | $ 5.50 | $ 3,025.00 | |
| 102-1655 | BARRICADE, Type III, (Temporary MOT), per FDOT Index No. 102-600 | 550.00 | EA/DAY | $ 8.80 | $ 4,840.00 | |
| 102-5000 | WATER, for Dust Control | 200.00 | THG | $ 55.00 | $ 11,000.00 | |
| 104-16 | TURBIDITY BARRIER, Floating | 3,000.00 | LF | $ 22.00 | $ 66,000.00 | |
| 104-17 | TURBIDITY BARRIER, Staked | 5,000.00 | LF | $ 6.60 | $ 33,000.00 | |
| 104-18 | FENCE, STAKED SILT, FDOT Type III | 8,000.00 | LF | $ 1.65 | $ 13,200.00 | |
| 104-20 | SOIL TRACKING PREVENTION DEVICE | 3.00 | EA | $ 3,300.00 | $ 9,900.00 | |
| 104-7 | INLET PROTECTION SYSTEMS | 10.00 | EA | $ 330.00 | $ 3,300.00 | |
| 104-99 | Prevention, control and Abatement of Erosion and Water Pollution | 4.00 | EA | $ 76,500.00 | $ 306,000.00 | |
| 110-0100-0001 | PIPE REMOVAL, 2" - 18", under or equal to 10' depth | 10.00 | LF | $ 44.00 | $ 440.00 | |
| 110-0100-0002 | PIPE REMOVAL, 2" - 18", over 10' depth | 10.00 | LF | $ 50.00 | $ 500.00 | |
| 110-0100-0005 | PIPE REMOVAL, >18" - 36", under or equal to 10' depth | 10.00 | LF | $ 46.20 | $ 462.00 | |
| 110-0100-0006 | PIPE REMOVAL, >18"-36", over 10' depth | 10.00 | LF | $ 52.00 | $ 520.00 | |
| 110-0100-0007 | PIPE REMOVAL, >36", under or equal to 10' depth | 10.00 | LF | $ 48.40 | $ 484.00 | |
| 110-0100-0008 | PIPE REMOVAL, >36", over 10' depth | 10.00 | LF | $ 54.00 | $ 540.00 | |
| 110-0100-0013 | CONCRETE, Removal | 500.00 | CY | $ 220.00 | $ 110,000.00 | |
| 110-0100-0015 | DRAINAGE STRUCTURE, Removal, under or equal to 10' depth | 20.00 | EA | $ 300.00 | $ 6,000.00 | |
| 110-0416 | TREE, REMOVE, INCLUDING STUMP, 4" to Under 16" Diameter (Diameter at 5' above the ground) | 25.00 | EA | $ 2,583.00 | $ 64,575.00 | |
| 110-1630 | TREE, REMOVE, INCLUDING STUMP, 16" to Under 30" Diameter (Diameter at 5' above the ground) | 15.00 | EA | $ 5,000.00 | $ 75,000.00 | |
| 110-3000 | TREE, REMOVE, INCLUDING STUMP, Equal to or Over 30" Diameter (Diameter at 5' above ground) | 10.00 | EA | $ 6,500.00 | $ 65,000.00 | |
| 110-0416-001 | STUMP, REMOVE, 4" to Under 16" Diameter (Diameter at top of the stump) | 25.00 | EA | $ 900.00 | $ 22,500.00 | |
| 110-1630-001 | STUMP, REMOVE, 16" to Under 30" Diameter (Diameter at top of the stump) | 15.00 | EA | $ 1,500.00 | $ 22,500.00 | |
| 110-3000-001 | STUMP, REMOVE, Equal to or Over 30" Diameter (Diameter at top of the stump) | 10.00 | EA | $ 2,000.00 | $ 20,000.00 | |
| 110-3701 | TREE trimming, w/Bucket Truck | 120.00 | HR | $ 158.00 | $ 18,960.00 | |
| 110-3703 | TREE trimming, Spot | 120.00 | HR | $ 75.00 | $ 9,000.00 | |
| 110-3704 | Certified Arborist | 50.00 | HR | $ 77.00 | $ 3,850.00 | |
| 110-4000 | FENCE, Removal, all types | 500.00 | LF | $ 18.70 | $ 9,350.00 | |
| 110-9-1 | IRRIGATION SYSTEM TEMPORARY CAP | 25.00 | EA | $ 250.00 | $ 6,250.00 | |
| 110-9-2 | IRRIGATION SYSTEM, Installation | 1,000.00 | LF | $ 25.00 | $ 25,000.00 | |
| 120-0060-1 | BORROW / FILL MATERIAL | 21,977.00 | CY | $ 50.00 | $ 1,098,850.00 | |
| 120-0517 | LOAD, HAUL & DISPOSAL OF UNSUITABLE MATERIAL | 600.00 | CY | $ 70.00 | $ 42,000.00 | |
| 120-1101 | OPEN CHANNEL GRADING | 22,000.00 | SY | $ 50.00 | $ 1,100,000.00 | |
| 120-8-0031 | WORK ORDER EXCAVATION, (Detention Pond, Mitigation Area, Channel and/or Ditch) | 200.00 | CY | $ 50.00 | $ 10,000.00 | |
| 125-8-057 | BEDDING MATERIAL, Crushed Stone, Size #57 | 100.00 | TN | $ 105.00 | $ 10,500.00 | |
| 400-1-15 | CONCRETE CLASS I, Miscellaneous | 200.00 | CY | $ 1,540.00 | $ 308,000.00 | |
| 400-4-15 | CONCRETE CLASS IV, Miscellaneous | 200.00 | CY | $ 1,540.00 | $ 308,000.00 | |
| 400-4-2 | CONCRETE CLASS I, Endwalls | 100.00 | CY | $ 1,540.00 | $ 154,000.00 | |
| 401-70 | SPALL AREA REPAIR | 200.00 | SF | $ 110.00 | $ 22,000.00 | |
| 415-1-6 | REINFORCING STEEL, Miscellaneous | 200.00 | LB | $ 8.80 | $ 1,760.00 | |
| 425-5-4 | MANHOLE, ADJUST, 0" to 6", w/ EXISTING COVER | 5.00 | EA | $ 2,541.00 | $ 12,705.00 | |
| 425-5-5 | MANHOLE, ADJUST, 0" to 6", w/ NEW COVER | 5.00 | EA | $ 3,176.25 | $ 15,881.25 | |
| 425-86-5 | CONNECTING NEW PIPE to Existing Structures | 5.00 | EA | $ 1,500.00 | $ 7,500.00 | |
| 430-121-0015 | PIPE CULVERT, CONCRETE, Round, 15" ≤ 8' | 200.00 | LF | $ 116.60 | $ 23,320.00 | |
| 430-121-0016 | PIPE CULVERT, CONCRETE, Round, 15”ID, over 8’ depth | 100.00 | LF | $ 88.00 | $ 8,800.00 | |
| 430-121-0018 | PIPE CULVERT, CONCRETE, Round, 18" ID ≤ 8' | 200.00 | LF | $ 193.60 | $ 38,720.00 | |
| 430-121-0019 | PIPE CULVERT, CONCRETE, Round, 18”ID, over 8’ depth | 100.00 | LF | $ 110.00 | $ 11,000.00 | |
| 430-121-0024 | PIPE CULVERT, CONCRETE, Round, 24" ID ≤ 8' | 200.00 | LF | $ 194.70 | $ 38,940.00 | |
| 430-121-0025 | PIPE CULVERT, CONCRETE, Round, 24”ID, over 8’ depth | 100.00 | LF | $ 143.00 | $ 14,300.00 | |
| 430-121-0030 | PIPE CULVERT, CONCRETE, Round, 30" ID ≤ 8' | 100.00 | LF | $ 220.00 | $ 22,000.00 | |
| 430-121-0031 | PIPE CULVERT, CONCRETE, Round, 30”ID, over 8’ depth | 100.00 | LF | $ 264.00 | $ 26,400.00 | |
| 430-121-0036 | PIPE CULVERT, CONCRETE, Round, 36" ID ≤ 8' | 100.00 | LF | $ 330.00 | $ 33,000.00 | |
| 430-121-0037 | PIPE CULVERT, CONCRETE, Round, 36”ID, over 8’ depth | 100.00 | LF | $ 363.00 | $ 36,300.00 | |
| 430-121-0042 | PIPE CULVERT, CONCRETE, Round, 42" ID ≤ 8' | 100.00 | LF | $ 412.50 | $ 41,250.00 | |
| 430-121-0043 | PIPE CULVERT, CONCRETE, Round, 42”ID, over 8’ depth | 100.00 | LF | $ 412.50 | $ 41,250.00 | |
| 430-121-0048 | PIPE CULVERT, CONCRETE, Round, 48" ID ≤ 8' | 100.00 | LF | $ 440.00 | $ 44,000.00 | |
| 430-121-0049 | PIPE CULVERT, CONCRETE, Round, 48”ID, over 8’ depth | 100.00 | LF | $ 440.00 | $ 44,000.00 | |
| 430-122-1218 | PIPE CULVERT, CONCRETE, Elliptical, 12" x 18" ID ≤ 8' | 100.00 | LF | $ 99.00 | $ 9,900.00 | |
| 430-122-1423 | PIPE CULVERT, CONCRETE, Elliptical, 14" x 23" ID ≤ 8' | 100.00 | LF | $ 111.10 | $ 11,110.00 | |
| 430-122-1930 | PIPE CULVERT, CONCRETE, Elliptical, 19" x 30" ID ≤ 8' | 100.00 | LF | $ 154.00 | $ 15,400.00 | |
| 430-122-2438 | PIPE CULVERT, CONCRETE, Elliptical, 24" x 38" ID ≤ 8' | 100.00 | LF | $ 283.80 | $ 28,380.00 | |
| 430-201-0600 | PIPE CULVERT, POLYVINYL CHLORIDE (PVC), Round, 6" ID ≤ 8' | 100.00 | LF | $ 33.00 | $ 3,300.00 | |
| 430-201-1500 | PIPE CULVERT, POLYVINYL CHLORIDE (PVC), Round, 15" ID ≤ 8' | 100.00 | LF | $ 38.50 | $ 3,850.00 | |
| 430-420-0015 | END SECTION, MITERED, Cross Drain, 15" RCP | 20.00 | EA | $ 1,854.60 | $ 37,092.00 | |
| 430-420-0018 | END SECTION, MITERED, Cross Drain, 18" RCP | 20.00 | EA | $ 1,320.00 | $ 26,400.00 | |
| 430-420-0024 | END SECTION, MITERED, Cross Drain, 24" RCP | 20.00 | EA | $ 2,926.00 | $ 58,520.00 | |
| 430-420-0030 | END SECTION, MITERED, Cross Drain, 30" RCP | 20.00 | EA | $ 3,850.00 | $ 77,000.00 | |
| 430-420-0036 | END SECTION, MITERED, Cross Drain, 36" RCP | 20.00 | EA | $ 4,400.00 | $ 88,000.00 | |
| 430-425-1218 | END SECTION, MITERED, Cross Drain, 12" x 18" ERCP | 20.00 | EA | $ 2,200.00 | $ 44,000.00 | |
| 430-425-1423 | END SECTION, MITERED, Cross Drain, 14" x 23" ERCP | 20.00 | EA | $ 2,310.00 | $ 46,200.00 | |
| 430-425-1930 | END SECTION, MITERED, Cross Drain, 19" x 30" ERCP | 20.00 | EA | $ 3,300.00 | $ 66,000.00 | |
| 430-425-2438 | END SECTION, MITERED, Cross Drain, 24" x 38" ERCP | 20.00 | EA | $ 3,850.00 | $ 77,000.00 | |
| 430-450-0018 | END SECTION, MITERED, Side Drain, 18" RCP | 20.00 | EA | $ 3,000.00 | $ 60,000.00 | |
| 430-450-0024 | END SECTION, MITERED, Side Drain, 24" RCP | 20.00 | EA | $ 3,424.30 | $ 68,486.00 | |
| 430-450-0030 | END SECTION, MITERED, Side Drain, 30" RCP | 20.00 | EA | $ 3,850.00 | $ 77,000.00 | |
| 430-450-0036 | END SECTION, MITERED, Side Drain, 36" RCP | 20.00 | EA | $ 4,400.00 | $ 88,000.00 | |
| 430-455-1218 | END SECTION, MITERED, Side Drain, 12" x 18" ERCP | 20.00 | EA | $ 2,750.00 | $ 55,000.00 | |
| 430-455-1423 | END SECTION, MITERED, Side Drain, 14" x 23" ERCP | 20.00 | EA | $ 2,750.00 | $ 55,000.00 | |
| 430-455-1930 | END SECTION, MITERED, Side Drain, 19" X 30" ERCP | 20.00 | EA | $ 3,300.00 | $ 66,000.00 | |
| 430-455-2438 | END SECTION, MITERED, Side Drain, 24" x 38" ERCP | 20.00 | EA | $ 3,850.00 | $ 77,000.00 | |
| 430-71-1601 | CONCRETE COLLAR FOR EXTENSION OF EXISTING PIPE CULVERTS, FDOT Index 430-001, 15" - 24" | 5.00 | EA | $ 1,320.00 | $ 6,600.00 | |
| 430-71-1602 | CONCRETE COLLAR FOR EXTENSION OF EXISTING PIPE CULVERTS, FDOT Index 430-001, 30" - 42" | 5.00 | EA | $ 1,650.00 | $ 8,250.00 | |
| 430-71-1603 | CONCRETE COLLAR FOR EXTENSION OF EXISTING PIPE CULVERTS, FDOT Index 430-001, 48” – 60” | 5.00 | EA | $ 2,750.00 | $ 13,750.00 | |
| 455-0008 | TEMPORARY STEEL SHEET PILE | 500.00 | SF | $ 55.00 | $ 27,500.00 | |
| 455-133-1 | PILING, SHEET, Steel | 1,000.00 | SF | $ 71.50 | $ 71,500.00 | |
| 460-101-0015 | Pipe Cleaning - Light Cleaning - 0 - 1/4 diameter of pipe depth (15" or less) | 400.00 | LF | $ 2.00 | $ 800.00 | |
| 460-101-1521 | Pipe Cleaning - Light Cleaning - 0 - 1/4 diameter of pipe depth (> 15" - 21") | 1,000.00 | LF | $ 3.00 | $ 3,000.00 | |
| 460-101-2142 | Pipe Cleaning - Light Cleaning - 0 - 1/4 diameter of pipe depth (> 21" - 42") | 400.00 | LF | $ 4.00 | $ 1,600.00 | |
| 460-101-4254 | Pipe Cleaning - Light Cleaning - 0 - 1/4" diameter of pipe depth (> 42" - 54") | 400.00 | LF | $ 7.00 | $ 2,800.00 | |
| 460-101-5499 | Pipe Cleaning - Light Cleaning - 0 - 1/4" diameter of pipe depth (> 54") | 400.00 | LF | $ 10.00 | $ 4,000.00 | |
| 460-102-0015 | Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe depth (15" or less) | 400.00 | LF | $ 3.00 | $ 1,200.00 | |
| 460-102-1521 | Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe depth (> 15" - 21") | 1,000.00 | LF | $ 3.00 | $ 3,000.00 | |
| 460-102-2142 | Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe depth (> 21" - 42") | 400.00 | LF | $ 5.00 | $ 2,000.00 | |
| 460-102-4254 | Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe (> 42" - 54") | 400.00 | LF | $ 6.00 | $ 2,400.00 | |
| 460-102-5499 | Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe (> 54") | 400.00 | LF | $ 9.00 | $ 3,600.00 | |
| 460-103-0015 | Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe debris (15" or less) | 400.00 | LF | $ 3.00 | $ 1,200.00 | |
| 460-103-1521 | Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe (> 15" - 21") | 1,000.00 | LF | $ 5.00 | $ 5,000.00 | |
| 460-103-2142 | Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe (> 21" - 42") | 400.00 | LF | $ 8.00 | $ 3,200.00 | |
| 460-103-4254 | Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe (> 42" - 54") | 400.00 | LF | $ 15.00 | $ 6,000.00 | |
| 460-103-5499 | Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe (> 54") | 400.00 | LF | $ 30.00 | $ 12,000.00 | |
| 522-0000 | PUMPING, Concrete | 200.00 | CY | $ 275.00 | $ 55,000.00 | |
| 524-4006 | DITCH PAVEMENT, Concrete, 6" Thick | 200.00 | SY | $ 220.00 | $ 44,000.00 | |
| 530-1100 | RIPRAP, Sand-Cement, w/Filter Fabric | 200.00 | CY | $ 858.00 | $ 171,600.00 | |
| 530-2200 | RIPRAP, Rubble, w/Filter Fabric | 500.00 | TN | $ 330.00 | $ 165,000.00 | |
| 530-3-12-1 | EROSION CONTROL MATTING, COIR MAT 70, F&I | 99,000.00 | SF | $ 20.00 | $ 1,980,000.00 | |
| 530-3-12-2 | EROSION CONTROL MATTING, COIR MAT 90, F&I | 99,000.00 | SF | $ 25.00 | $ 2,475,000.00 | |
| 550-2121 | FENCE, chain Link w/ top rail, In-Kind | 100.00 | LF | $ 10.00 | $ 1,000.00 | |
| 550-2122 | FENCE, Wooden, In-kind | 100.00 | LF | $ 53.00 | $ 5,300.00 | |
| 550-2124 | FENCE, PVC, In-Kind | 100.00 | LF | $ 50.00 | $ 5,000.00 | |
| 571-1-07 | COCONUT MATTING, Furnishing & Install | 26,400.00 | SF | $ 15.00 | $ 8.00 | |
| 575-0103 | SODDING, Bahia, Includes clearing, grubbing, grading and compaction | 5,000.00 | SY | $ 26.40 | $ 132,000.00 | |
| 575-0112 | SODDING, St. Augustine, Includes clearing, grubbing, grating, and compaction | 264.00 | SY | $ 33.00 | $ 8,712.00 | |
| 575-0201 | SODDING, Bahia, Staked, Includes clearing, grubbing, grating, and compaction | 25,000.00 | SY | $ 40.00 | $ 1,000,000.00 | |
| 700-20-11 | SIGN, SINGLE POST- LESS THAN 12 SF | 10.00 | AS | $ 550.00 | $ 5,500.00 | |
| 700-46-11 | SIGN, REMOVE, SINGLE POST | 10.00 | AS | $ 77.00 | $ 770.00 | |
| 700-46-21 | SIGN, RELOCATE, SINGLE POST | 10.00 | AS | $ 220.00 | $ 8,800.00 | |
| 900-1062 | COFFER DAM, including pumping and water treatment, various locations | 10.00 | EA | $ 140,000.00 | $ 1,400,000.00 | |
| 900-1063 | WATER BYPASS PUMPING- MOBILIZATION | 10.00 | EA | $ 6,000.00 | $ 60,000.00 | |
| 900-1064 | WATER BYPASS PUMPING- OPERATION | 280.00 | EA/DY | $ 300.00 | $ 84,000.00 | |
| OPEN CHANNEL DRAINAGE REPAIR SUBTOTAL | $ 13,509,685.25 |
| WATER MAIN | |||||
| PW-331101-309-9002 | Adjust Valve Box to Finished Grade, (Outside of Pavement) | 5.00 | EA | $ 484.00 | $ 2,420.00 |
| PW-331101-313-9001 | Horizontal Adjustment of Potable Meter Box (> 6") | 5.00 | EA | $ 728.00 | $ 3,640.00 |
| PW-331101-313-9002 | Vertical Adjustment of Potable Meter Box (> 3") | 5.00 | EA | $ 605.00 | $ 3,025.00 |
| WATER MAIN SUBTOTAL | $ 9,085.00 |
| RECLAIMED WATER | |||||
| RW-331101-309-9002 | Adjust Valve Box to Finished Grade, (Outside of Pavement) | 5.00 | EA | $ 605.00 | $ 3,025.00 |
| RW-331101-313-9001 | Horizontal Adjustment of Reclaimed Meter Box (> 6") | 5.00 | EA | $ 363.00 | $ 1,815.00 |
| RW-331101-313-9002 | Vertical Adjustment of Reclaimed Meter Box (> 3") | 5.00 | EA | $ 363.00 | $ 1,815.00 |
| RECLAIMED WATER SUBTOTAL | $ 6,655.00 |
| SANITARY SEWER | |||||
| SS-333900-302-K002 | Adjust Manhole Rim & Cover to Finished Grade (Outside of Pavement) | 10.00 | EA | $ 605.00 | $ 6,050.00 |
| SANITARY SEWER SUBTOTAL | $ 6,050.00 |
| OTHER ITEMS | |||||
| 999-0000 | UNSPECIFIED WORK | 1,800,000.00 | EA | $ 1.00 | $ 1,800,000.00 |
| PW-999-0000 | UNSPECIFIED WORK (WATER) | 15,000.00 | EA | $ 1.00 | $ 15,000.00 |
| RW-999-0000 | UNSPECIFIED WORK (RECLAIMED WATER) | 15,000.00 | EA | $ 1.00 | $ 15,000.00 |
| SS-999-0000 | UNSPECIFIED WORK (SANITARY SEWER) | 15,000.00 | EA | $ 1.00 | $ 15,000.00 |
| 999-0003 | UNSPECIFIED WORK (SURVEY) | 90,000.00 | EA | $ 1.00 | $ 90,000.00 |
| OTHER ITEMS TOTAL | $ 1,935,000.00 |
TOTAL BID $ 15,466,475.25
Sheet2
| 216 | sf | $ 300.00 |
| 24 | sy | $ 12.50 |
File details come from the government source that posted it. Updated .