This document contains detailed specifications for the Federal Open Channel Drainage Repair Work Order Contract - Package 1 in Pinellas County, Florida, prepared by Pinellas County Public Works & Utilities Department. The specifications incorporate multiple technical standards including Pinellas County Standard Technical Specifications for Roadway and Related Construction (July 2019), Pinellas County Utilities Department Standard Technical Specifications (June 2018), and Florida Department of Transportation Standard Specifications for Road and Bridge Construction. The contract covers comprehensive drainage repair work including erosion control, clearing and grubbing, excavation, pipe cleaning, tree trimming, sodding, and various utility adjustments. The specifications provide extensive technical details on measurement, payment, and execution of specific work items, with pay items ranging from valve box adjustments to unspecified work allowances.
The contract includes specific provisions for erosion control, environmental protection, and detailed payment mechanisms for various construction activities. Contractors must submit comprehensive documentation including habitat permit applications, prevention and control plans for erosion and water pollution, and stormwater pollution prevention plans. Payment will be made on a unit price basis for specific work items, with measurements typically calculated in linear feet, square yards, cubic yards, or per each item. The specifications emphasize environmental compliance, with strict requirements for turbidity control, soil stabilization, and protection of existing infrastructure. Notably, the contract includes provisions for potential additional "unspecified work" that can be authorized by the engineer, providing flexibility for unforeseen project needs.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
ROAD AND STREET CONSTRUCTION
P.I.D. NO. 25-0537
Federal Open Channel Drainage Repair Work Order Contract - Package 1
In Pinellas County
TO ACCOMPANY PINELLAS COUNTY STANDARD TECHNICAL SPECIFICATIONS FOR ROADWAY AND RELATED CONSTRUCTION (July 2019), PINELLAS COUNTY UTILITIES DEPARTMENT STANDARD TECHNICAL SPECIFICATIONS FOR UTILITIES AND RELATED CONSTRUCTION (June 2018), AND FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION DIVISIONS II AND
III ONLY (FY 2023-2024):
Engineering & Technical Information: Public Works & Utilities - Pinellas County
Modified Pinellas County Standard Technical Specification Replace
PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION 104, July 2019 with the following:
The work specified under this Section consists of the furnishing and application of Best Management Practices (BMPs) required to control erosion to the maximum extent practicable for the duration of the construction period, in accordance with the requirements of Section 104 of the FDOT Specifications, as amended herein.
At the pre-construction conference or prior to any construction activity, the Contractor must submit a completed and signed Pinellas County Habitat Permit application, and supporting documents, the Contractor-generated project specific Prevention, Control and Abatement of Erosion and Water Pollution plan (which includes the proposed construction phasing and erosion control lay out for phasing), the Stormwater Pollution Prevention Plan (SWPPP), and the dewatering plan for inclusion in the Pinellas County Habitat Permit (Land Development Code Ch. 166 Environmental and Natural Resource Protection Article II Habitat Management & Landscaping Division 2: Permits). The Contractor must not commence earth-moving or land clearing prior to a habitat permit being issued. Commencement of any construction activity prior to issuance of a habitat permit is a violation of the Pinellas County Land Development Code and is subject to enforcement action.
The Engineer will meet with the Contractor in the field during erosion control abatement system installation to review the field conditions and employed Best Management Practices (BMPs) that address the field conditions.
A preconstruction field meeting must be conducted jointly with the pre-barricade meeting to discuss habitat permitting requirements, dewatering, and other outstanding issues.
104-10 Basis of Payment
The work and incidental costs specified as being covered under this Section must be paid for the unit price per Lump Sum (LS), for Prevention, Control and Abatement of Erosion and Water Pollution. If the bid sheets include a specific pay item from the list provided in FDOT Section 104- 10 Basis of Payment, then the work must be paid for at the contract unit price. Prices and payments will be full compensation for all work specified in this Section, including construction, routine maintenance, replacement, and removal of temporary erosion control devices, and not included in the contract unit price for a related item. If a pay item is not provided in the bid sheets from FDOT Section 104-10 Basis of Payment, then the cost for said item/work must be included in the “Prevention, Control and Abatement of Erosion and Water Pollution” (Lump Sum) pay item.
Payment will be made under:
Item No. 104-99 Prevention, control and Abatement of Erosion and Water Pollution -Lump Sum
NOTE: The Contractor will be fully responsible for maintaining compliance with all National Pollutant Discharge Elimination System (NPDES) standards. Failure to maintain erosion and/or sedimentation control measures or an illicit discharge may result in fines. Section 58-239 of the Pinellas County Code authorizes penalties of up to $10,000.00 for each offense.
Modified Pinellas County Standard Technical Specification Replace CLEARING & GRUBBING 110, July 2019 with the following:
The work specified under this Section consists of the clearing and preparation of sites for proposed construction, in accordance with the requirements of Section 110 of the FDOT Specifications, as amended herein. The work specified under this Section must include the removal and off-site disposal of all trees indicated on the plans to be removed, the removal and off-site disposal of all brush, stumps, roots, rubbish and debris, and all obstructions resting on or protruding through the surface of the existing ground and the surface of excavated areas, the removal and off-site disposal of all existing facilities, drainage structures, culverts, pipes, and pavement indicated on the plans to be removed, and the removal and off-site disposal of all buildings, structures, appurtenances, and other facilities necessary to prepare the area for the proposed construction.
No stock piling of material on the roadway, within tree protection zones (TPZ), or on the sidewalk is allowed. All extra dirt and/or debris must be removed daily as part of the daily clean-up process. The roadway and the sidewalks must be swept daily. All costs associated with daily clean-up process and sweeping must be included in the Lump Sum bid for Clearing and Grubbing. All buildings, structures, utilities, and other obstructions indicated on the plans to remain, must be carefully protected against displacement or damage. Materials and labor for this protection must be included in the Lump Sum cost of Clearing and Grubbing.
Except as otherwise provided for in these specifications, the work to be performed under this Section must also include the clearing and grubbing necessary for the excavation of detention ponds, borrow pits, and the like, and the clearing and grubbing necessary for the construction of designated haul routes, and including the removal and off-site disposal of all product and debris except that which is to be salvaged or which is required to complete the construction of the project.
Where possible, all trenching or excavation within tree protection zones (TPZ) shall be done by hand or an air spade.
After excavation, all tree roots greater than one inch (1”) in diameter must be cleanly pruned or saw cut, not crushed or torn. Where it is not possible to hand trench, mechanical excavation may be approved by the Engineer. Trunk/root flare and soil/root protection measures in accordance with Pinellas County Standard Detail Index 1111 must be employed to prevent tree damage from mechanical excavation equipment. The Contractor must not cut tree roots greater than three inches (3”) in diameter within the critical root zone (CRZ) without prior approval of the Engineer, after the inspection of an International Society of Arborists (ISA) Certified Arborist, preferably ISA Tree Risk Assessment Qualified (TRAQ). All root pruning must conform to ANSI A300 (Part 8) Standard Practices (Root Management). After root pruning, cut roots should be covered and kept moist until final grade is established. Cutting tree roots greater than 3” in diameter in the critical root zone (CRZ) or tree roots greater than six inches (6”) in diameter within the TPZ shall be reviewed by a County Arborist to determine if a tree designated to remain may need to be removed to prevent future liability.
The Contractor must make his own inspection to determine the character, density and extent of trees, vegetation, and other items subject to removal and disposal under these provisions. The attention of the Contractor is directed to the fact that the burning of debris resulting from clearing and grubbing operations will not be permitted within County-owned lands or rights-of-way. Nothing in these provisions must be construed to authorize the removal or disturbance of any tree or other form of vegetation, or any marine, land or air creatures’ natural habitat, which may be subject to the jurisdiction of regulatory agencies. This Section must also include the cost for trimming of trees and disposal of the trimmings, as shown on the plans and/or required for construction of project. All tree trimming must be performed by or under the supervision of an ISA Certified Arborist and conform to ANSI A300 (Part 1) Standard Practices (Pruning), cost of which is included in the Clearing and Grubbing pay item.
This Section must also include the temporary relocation of mailboxes during construction and permanent relocation after construction has been completed. The work must also include the relocation of the mailbox foundation. The Contractor must coordinate with the Post Office to confirm the mailbox locations. Mailboxes must be restored to equal or better condition that existed prior to the commencement of construction activities, location of which must meet roadway clear zone requirements found in the FDOT Florida Green Book. Work related to mailboxes must be included in the Lump Sum pay item for Clearing and Grubbing
A. Ownership of Removals:
i. All removed materials not claimed by the County must become the property of the Contractor and must be disposed of by the Contractor in areas provided by the Contractor. This work must be included in the pay item Clearing and Grubbing.
ii. Transporting and placement of removed material must be paid for under and included in the pay item of Clearing and Grubbing.
B. Items in County Right-of-Way:
The Contractor must notify in writing all property owners to remove any items (landscaping, signs, irrigation systems, lighting, etc.) from the County Right-of-Way that owners wish to salvage a minimum of fourteen (14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. For irrigation systems that the owners wish to salvage, the contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County Right of Way. The price and payment for capping and removal of irrigation systems shall be paid for under Pay Item No. 110-9-1 IRRIGATION SYSTEM, CUT AND CAP of the irrigation feed in the Right-of-Way for a non-single family irrigation system. The price and payment for removal of other items must be included in the payment item of Clearing and Grubbing.
C. Irrigation/Sprinkler Systems for single family residential units:
The Contractor shall repair or replace irrigation components in the public Right-of-Way, including fittings, sprinkler heads, and minor related appurtenances adjacent to single family residential properties. The Contractor must verify the proper working order of sprinkler systems affected by Construction, both prior to and after construction. The limit of the repair shall be as directed by the Engineer. Repair or replacement and verification efforts shall be paid for under Pay Item No. 110-9-2 IRRIGATION SYSTEM, INSTALLATION.
D. Tree Protection: Trees not within the Clearing and Grubbing area and those specified to remain within County property/right of way, must be protected during construction with Tree Protection Barricades, in accordance with Pinellas County Standard Detail Index 1111. The payment for Tree Protection must be included in the Lump Sum pay item, “Clearing and Grubbing”.
E. Tree and Stump Removal: Unless otherwise indicated by the Engineer in the construction documents, all trees deemed in conflict with the construction activities must be marked by the Contractor for removal, and field validated by the Engineer and a County Arborist in advance of construction. The Contractor must not remove any trees without authorization from the Engineer, after inspection by an ISA Certified Arborist.
F. Subterranean Item Removal: Included in clearing and grubbing. Tree stumps, roots, debris, and other abandoned items must be removed from proposed sidewalk, drainage, roadway, and driveway areas to a minimum depth of four
(4) feet. Where proposed items, such as underground drainage, that are deeper than three feet six inches, an additional six (6) inches below those proposed elements shall be clear of debris. All backfill must be A-1 or A-3 soil material. The excavation and backfilling must be included in the Lump Sum cost of Clearing and Grubbing.
Basis of Payment
The work and incidental costs specified as being covered under this Section must be paid for at the contract unit price per Lump Sum (LS), for Clearing and Grubbing, except Irrigation. If the Schedule of Values includes a specific pay item from the list provided in FDOT Section 110-12.8, then the work must be paid for at the contract unit price.
IRRIGATION SYSTEM, TEMPORARY CAP work shall include all labor and material required as specified under the above Section B and must be paid for at the contract unit price per Each (EA) temporary cap installed and satisfactorily completed and accepted.
IRRIGATION SYSTEM, INSTALLATION work shall include all labor and material required as specified under the above Section C and must be paid for at the contract unit price per Linear Foot (LF) measured along the center line of the road installed and satisfactorily completed and accepted.
If a pay item is not provided in the bid sheets from Section 110, then the cost for said item/work must be included in the “Clearing and Grubbing” (Lump Sum) pay item.
Payments will be made under:
Item No. 110-0100 Clearing and Grubbing - Lump Sum
Item No. 110-9-1 IRRIGATION SYSTEM, Temporary Cap - Each
Item No. 110-9-2 IRRIGATION SYSTEM, Installation - Linear Foot
SUPPLEMENTAL SPECIFICATIONS
(Amends the Pinellas County Standard Technical Specifications for Roadway and General Construction)
Technical Specs for Roadway and General Construction Jul 2019 - Pinellas County
Section 101 of the Pinellas County Roadway and Std. Tech. Specs. – Mobilization
Section 101-0100 Basis of Payment is hereby amended to include the additional: Emergency/Remobilization constitute separate pay items as follows:
Emergency/Remobilization is defined as emergency work requested by the Engineer and commenced by the Contractor within 48 hours of notification. Emergency/Remobilization may require Contractor to mobilize to a different location. This item shall cover the cost of mobilization for each Emergency/Remobilization requested by the County.
Emergency/Remobilization at County’s Request is defined as the remobilization in accordance with the definition of Mobilization outlined in the PC Standard Technical Specifications. This item shall cover the cost of mobilization for each emergency/remobilization requested by the County
There is no separate bid item for Mobilization. The cost for Mobilization shall be included in the items of work listed in the Bid Submittal Sheets.
PAY ITEM NO. 101-0310 EMERGENCY MOBILIZATION AT COUNTY’S REQUEST – per Each (EA)
PAY ITEM NO. 101-0311 REMOBILIZATION AT COUNTY'S REQUEST – per Each (EA)
Section 102 of the Pinellas County Roadway and Std. Tech. Specs. – Maintenance of Traffic
Section 102-1000 Basis for Payment is hereby amended to include the following pay items: The specification for MAINTENANCE OF TRAFFIC shall be incorporated to include Pay Item Numbers: 102-1600 – SIGN, WORK ZONE (Temporary), 102-1602 – FLAGGER – MOT per each flagger, 102-1651
– CONES, (Temporary), 102-1652 – BARRICADE, Type I, II, or Drum (Temporary), Per FDOT Index No. 102-600, 102-1655 – BARRICADE, Type III, (Temporary MOT), Per FDOT Index No. 102-600.
Pay Item 102-1074 CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE), FDOT 102-600. Use pedestrian Longitudinal Channelizing Devices (LCDs) in the following situations:
a) At each closed pedestrian way location, for the full width of the pedestrian way. The quantity is equal to the width of the pedestrian way that is being closed (e.g., a 5-foot-wide sidewalk will be paid for as 5 linear feet of pedestrian LCD, even if a longer LCD is used).
b) In locations where a drop-off hazard exists
c) When creating a temporary pedestrian walkway. When this is done, use pedestrian LCDs on both sides of the temporary pedestrian walkway.
Internal or external ballast shall be included in the unit cost for this item. Placement shall be in accordance with FDOT Index 102-660 of the Standard Plans
Pay Item 102-1602 FLAGGER, MOT per each flagger –Shall meet specifications in FDOT
Standard Specifications Sections 102 and 105. This item shall not be used for occasional flagging required for construction operations, such as, deliveries of materials. The use of this pay item must be associated with the MOT plan as approved by the Engineer.
PAY ITEM NO. 102-1074 CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL
CHANNELIZING DEVICE), FDOT 102-600 - per Linear Foot (LF)
PAY ITEM NO. 102-1076 ARROW BOARD/ADVANCED WARNING ARROW PANEL - per Each Day (EA/Day).
PAY ITEM NO. 102-1099 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) -TEMPORARY-
per Each Day (EA/Day)
PAY ITEM NO. 102-1100 OFF DUTY LAW ENFORCEMENT OFFICER - per Hour (HR)
PAY ITEM NO. 102-1250 COMMERCIAL MATERIALS FOR DRIVEWAY MAINTENANCE -
per Cubic Yard (CY)
PAY ITEM NO. 102-1600 – SIGN, WORK ZONE (Temporary) – per Each Day (EA/DAY)
PAY ITEM NO. 102-1602 FLAGGER, MOT per each flagger – per Hour (HR)
PAY ITEM NO. 102-1651 CONES, (Temporary), FDOT Index No. 102-600 – per Each Day (EA/DAY)
PAY ITEM NO. 102-1652 – BARRICADE, Type I, II, or Drum (Temporary), Per FDOT Index No. 102- 600 – per Each Day (EA/DAY)
PAY ITEM NO. 102-1655 - BARRICADE, Type III, (Temporary MOT), Per FDOT Index No. 102-600 – per Each Day (EA/DAY)
Section 104 of the Pinellas County Roadway and Std. Tech. Specs. – Prevention, Control and Abatement of Erosion and Water Pollution
This section shall be amended to include:
Contractor shall provide a certified Qualified Stormwater Management inspector(s) who shall be always on site to oversee all work.
Furnish all labor and equipment necessary for the installation, maintenance, and removal of all temporary Best Management Practices (BMPs) needed for sediment control and prevention of soil from eroding in or onto adjacent property, streets, drainage systems, and waterways.
Contractor may be required to modify the erosion control plan or BMPs to adapt to seasonal weather or changing site conditions. Contractor is responsible for maintaining site stabilization and avoiding illicit discharges until the project is accepted as complete by the County. Contractor shall furnish and install materials to stabilize all exposed soils and unvegetated earth prior to departure from the site each workday. Work includes the preparation of an erosion control plan.
Contractor shall obtain turbidity measurements prior to and during construction to ensure illicit discharges do not occur. This will be required on most projects released under this Contract. Contractor shall immediately notify NPDES personnel in the event of an illicit discharge occurring. Any discharges 300 feet downstream of the project limit that are 29 Nephelometric Turbidity Units (NTU) above background upstream NTU is a violation and may be subject to enforcement action. The County may direct Contractor to stop work within the surface water until turbidity readings are in compliance. This work shall be considered part of the role of the on-site certified Stormwater Inspector and shall not be billed as a separate charge. All turbidity measurements shall be paid for by the Contractor.
Time is essential for placement of temporary and permanent soil stabilization methods and materials.
Contractor shall temporarily stabilize with straw matting, coconut matting or seed. Permanent stabilization shall occur by planting, sodding or hydro-seeding within three (3) working days of achieving final grade. Contractor shall phase work to minimize the areas that will be disturbed and to ensure that permanent stabilization will be achieved within the required timeframe.
Contractor shall remove any sediment that migrates off-site due to insufficient controls at no additional cost to the County.
Erosion control deficiencies identified during inspections by the Contractor and County staff shall be immediately corrected and action taken to install, adjust or maintain current BMPs or additional ones as necessary. The County may direct Contractor to stop work within the surface water until deficiencies are corrected.
Rainfall: Contractor shall stabilize all exposed soils daily prior to leaving the job site when rain is forecast. If sediment migrates, the Contractor shall be responsible for cleaning and repairing all areas regardless of where the sediment migrated to, and including areas outside the work limits, and shall stabilize and repair the area at no additional cost to the County. Clean up activities shall begin within 24 hours of the end of the rain event. Failure to correct deficiencies in a timely manner may subject the Contractor to a notice of violation and applicable fines in accordance with County and State regulations.
Method of Measurement: The number of BMP devices put in place, maintained and removed including an acceptable basic erosion control plan, inclusive of all labor including a certified stormwater inspector, in linear feet or per each as described below.
104-10 Basis of Payment
Shall be replaced with:
The work and incidental costs specified as being covered under this Section must be paid for the unit price per Each (EA) work order issued, for Prevention, Control and Abatement of Erosion and Water Pollution. If the bid sheets include a specific pay item from the list provided in FDOT Section 104-10 Basis of Payment, then the work must be paid for at the contract unit price. Prices and payments will be full compensation for all work specified in this Section, including construction, routine maintenance, replacement, and removal of temporary erosion control devices, and not included in the contract unit price for a related item. If a pay item is not provided in the bid sheets from FDOT Section 104-10 Basis of Payment, then the cost for said item/work must be included in the “Prevention, Control and Abatement of Erosion and Water Pollution” per Each (EA) work order issued.
Payment will be made under:
Item No. 104-99-1 Prevention, control and Abatement of Erosion and Water Pollution per Each (EA) work order issued.
NOTE: The Contractor will be fully responsible for maintaining compliance with all National Pollutant Discharge Elimination System (NPDES) standards. Failure to maintain erosion and/or sedimentation control measures or an illicit discharge may result in fines. Section 58-239 of the Pinellas County Code authorizes penalties of up to $10,000.00 for each offense.
Basis of Payment: Payment will be based on the contract unit prices as follows:
PAY ITEM NO. 104-16 – TURBIDITY BARRIER, Floating – per Linear Foot (LF)
PAY ITEM NO. 104-17 – TURBIDITY BARRIER, staked – per Linear Foot (LF)
PAY ITEM NO. 104-18 – FENCE, STAKED SILT, FDOT Type III – per Linear Foot (LF)
PAY ITEM NO. 104-20 – SOIL TRACKING PREVENTION DEVICE – per Each (EA)
PAY ITEM NO. 104-7 – INLET PROTECTION SYSTEMS – per Each (EA)
Section 110 of the Pinellas County Roadway and Std. Tech. Specs. – Clearing and Grubbing.
Section 110 Clearing and Grubbing - Section B Items in County Right-of-Way shall be removed and replaced with the following:
B. The Contractor must notify in writing all property owners to remove any items (landscaping, signs, irrigation systems, lighting, etc.) from the County right-of-way or easement that owners wish to salvage a minimum of fourteen (14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. For irrigation systems that the owners wish to salvage, the contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County right-of-way or easement. The contractor shall add a stake at the location of each capped pipe. The price and payment for cutting, capping and removal of irrigation systems shall be paid for under Pay Item No. 110-9-1 IRRIGATION SYSTEM, TEMPORARY CAP of the irrigation feed in the Right-of-Way for a non-single family irrigation system. The price and payment for removal of other items must be included in the payment item of Clearing and Grubbing.
The contractor shall cut and cap other PVC pipes (non-irrigation pipes) that are discharging into a drainage ditch and add a stake at the location of the cap, as directed by the Engineer. This will cover single family homes and non-single-family structures. Payment for this work will be paid for under Pay Item No. 110-9-1 IRRIGATION
SYSTEM, TEMPORARY CAP.
Section 110 of the Pinellas County Roadway and Std. Tech. Specs. - Clearing and Grubbing shall be amended to Include:
This section shall follow the requirements listed in Section 110 Clearing and Grubbing. There is no separate bid item for Clearing and Grubbing. The cost for Clearing and Grubbing shall be included in the items of work listed in the Bid Submittal Sheets. Section 110 Basis of Payment is hereby amended to include the following exceptions to lump sum pay quantities as follows:
110-0100-0001 – PIPE REMOVAL, 2" - 18",
under or equal to 10' depth
Shall be paid for at the contract unit price per Linear Foot (LF)
110-0100-0002 – PIPE REMOVAL, 2”–18”, over 10’ depth
Shall be paid for at the contract unit price per Linear Foot (LF)
110-0100-0005 – PIPE REMOVAL, >18"- 36", under or equal to 10' depth
Shall be paid for at the contract unit price per Linear Foot (LF)
110-0100-0006 – PIPE REMOVAL, >18”- 36”, over 10’ depth
Shall be paid for at the contract unit price per Linear Foot (LF)
110-0100-0007 – PIPE REMOVAL, >36”, under or equal to 10’ depth
Shall be paid for at the contract unit price per Linear Foot (LF)
110-0100-0008– PIPE REMOVAL, >36”, over 10’ depth
Shall be paid for at the contract unit price per Linear Foot (LF)
110-0100-0013 – CONCRETE, Removal
Shall be paid for at the contract unit price per Cubic Yard (CY)
110-0100-0015 – DRAINAGE STRUCTURE, Removal, under or equal to 10’ depth
Shall be paid for at the contract unit price per Each (EA)
110-0416 – TREE, REMOVE, Including Stump, 4” to under 16” in Diameter (Diameter at 5’ above the ground)
Shall be paid for at the contract unit price per Each (EA)
110-1630 – TREE, REMOVE, Including Stump, 16” to Under 30” Diameter (Diameter at 5’ above the ground)
Shall be paid for at the contract unit price per Each (EA)
110-3000 – TREE, REMOVE, Including Stump, Equal to or Over 30” Diameter (Diameter at 5’ above ground)
Shall be paid for at the contract unit price per Each (EA)
110-3704 – Certified Arborist
Shall be paid for at the contract unit price per:
per Hour (HR)
110-4000 – FENCE, REMOVAL, All Types
Shall be paid for at the contract unit price per Linear Foot
(LF)
PAY ITEM No. 110-XXXX-XXX STUMP, REMOVE
Description: Provide all labor and equipment necessary to provide tree stump removal. Stump removal shall be removed up to 4’ of depth. Tree roots that extend outside the easement or right-of-way shall be cut to prevent any damage to the private property.
The resulting hole from the stump removal shall be filled, meet the requirements of, and paid for under Pay Item No. 120-0060-1 BORROW / FILL MATERIAL.
Measurement and Payment:
The work specified in this Section shall be paid for at the contract unit price per Each (EA), of the size specified in the appropriate pay item.
PAY ITEM NO. 110-0416-001 STUMP, REMOVE, 4" to Under 16" Diameter (Diameter at top of the stump) - per Each (EA)
PAY ITEM NO. 110-1630-001 STUMP, REMOVE, 16" to Under 30" Diameter (Diameter at top of the stump) - per Each (EA)
PAY ITEM NO. 110-3000-001 STUMP, REMOVE, Equal to or Over 30" Diameter (Diameter at top of stump) - per Each (EA)
PAY ITEM No. 110-37XX TREE TRIMMING
Description: Provide all labor and equipment necessary to provide tree trimming. The Contractor’s staff shall be skilled in the field of arboriculture in performing tree pruning and trimming of native species and shall have an International Society of Arboriculture (ISA) Certified Arborist on site to oversee tree trimming work. An arborist will not be required for general vegetation removal, stump grinding or Brazilian Pepper removal. All work shall be performed in accordance with the ISA or ANSI Publication A300 “Tree Care Operations – Tree, shrub and other woody plant maintenance – Standard Practices”, latest edition. Prior to making any cuts, suitable ropes, slings, guidelines and block and tackle shall be securely fastened to the section to be removed in a manner that will prevent free, rapid, uncontrolled descent of that section.
Contractor shall coordinate tree work with the County’s Ecological Services Section prior to implementing Urban Forestry practices such as tree trimming, tree removal, or other activities that may affect trees or other activities which could require additional evaluation by the Ecological Services staff.
Trimming shall provide the following clearances:
• 12’ vertical clearance measured from the top of bank or top of maintenance berm
• 6’ vertical clearance from the toe of slope
• 2’ horizontal clearance from back of sidewalks
• 10’ vertical clearance above sidewalks (applies to limbs originating from private property also)
• 16’ vertical clearance from ground in County right-of-way
Work includes removal of vegetative growth on fences, removing dead and/or broken branches, and chipping.
Tree chipping material may be dispersed on site upon authorization from the County. All debris that is not dispersed on site shall be disposed of properly (recycled or taken to a permitted landfill). Contractor is responsible for maintaining a safe, tidy work zone at all times.
Tree Trimming with Bucket Truck: Provide all labor and equipment (referred to as crew) to perform trimming, pruning and cutting of trees of various heights utilizing a bucket truck for hard-to-reach areas.
Tree Trimming, Spot (Non-Bucket Truck): Provide all labor and equipment (referred to as crew) to perform non-bucket truck light trimming of native trees This work effort is intended to be much lighter in nature with the majority of work accomplished from the ground.
Note: The cost of Debris Disposal shall be included in the cost of pay items PAY ITEM NO. 110-3701 TREE trimming, w/Bucket Truck and PAY ITEM NO. 110-3703 TREE trimming, Spot.
Measurement and Payment: The total quantity of hours per crew person to accomplish all work as described above in an hourly rate, inclusive of all equipment needs and incidental costs. Payable at the contract unit price per Hourly Rate (HR) per crew person.
PAY ITEM NO. 110-3701 TREE trimming, w/Bucket Truck - per Hour (HR)
PAY ITEM NO. 110-3703 TREE trimming, Spot - per Hour (HR)
Section 120 of the Pinellas County Roadway and Std. Tech. Specs. – EXCAVATION AND
EMBANKMENT
The specification for Excavation and Embankment shall be incorporated to include:
Description: All Borrow / Fill Material must meet the specifications of A-1 or A-3 soils as outlined in Section 120 - Excavation and Embankment of the Pinellas County Technical Specs for Roadway and General Construction.
Borrow / fill material is defined as fill material that comes from another job site, outside the limits of the work order, or from an offsite borrow area.
Borrow / fill material shall be dry material.
Borrow / Fill Material must meet the requirements of FDOT Technical Specifications (FY2025-2026)
Contractor Borrow / Fill Material: Provide all labor and equipment necessary to furnish, transport, place and compact borrow/fill material Materials furnished by the Contractor shall be compactible, screened and free of sod, stumps, logs and other organic matter. Contractors borrow / fill includes loading, transport and offloading at the site, which may have private property constraints and not easily accessible.
Mixing of Borrow / Fill Material: Contractor shall provide all labor and equipment necessary to perform mixing of borrow fill material with native soil to achieve proper soil characteristics.
Measurement and Payment: Contractor borrow / fill material shall be measured in cubic yards furnished in a loose condition while in truck verified by truck cubic yard capacity and visual observation inclusive of all labor and equipment needs. Contractor shall provide receipts for all purchased borrow / fill material. County borrow / fill material shall be measured in cubic yards furnished in a loose condition while in truck verified by truck cubic yard capacity, visual observation, and documentation provided by County stockpile operator. Mixing shall be measured in cubic yards.
PAY ITEM NO. 120-0060-1 BORROW / FILL MATERIAL - per Cubic Yard (CY)
Section 120 of the Pinellas County Roadway and Std. Tech. Specs. - EXCAVATION AND EMBANKMENT shall be amended to Include:
Provide all labor and equipment necessary to load, haul, and dispose of all unsuitable material to a suitable site provided by the Contractor.
The Engineer shall determine if the soil is unsuitable.
The cost of the excavation shall be included in the Open Channel Grading Pay Item Number 120-1101.
Measurement and Payment:
PAY ITEM NO. 120-0517 LOAD, HAUL & DISPOSAL OF UNSUITABLE MATERIAL – per Cubic Yard (CY)
PAY ITEM NO. 120-8-0031 WORK ORDER EXCAVATION, (Detention Pond, Mitigation Area, Channel and/or Ditch) -per Cubic Yard (CY)
Section 120 of the Pinellas County Roadway and Std. Tech. Specs. – EXCAVATION AND EMBANKMENT shall be amended to Include:
Provide all labor and equipment necessary to accomplish handling dirt and grading of ditches, channels, ponds or mitigation areas, reshaping of slopes, recontouring, re-channelization of ditches and swales, stabilization of the banks, embankment and bottom of the ditches, channels, ponds, mitigation areas or other surfaces as may be needed in preparation for permanent stabilization. The majority of the grading may require handling dirt more than once.
This section covers other grading requirements not already included in other pay items as directed by the Engineer.
The total area of square yards graded prior to final stabilization of the ditch, channel, pond or mitigation area, constructed and accepted.
The open channel grading will require siltation devices and/or coffer dams and bypass pumping as required to construct the project.
PAY ITEM NO. 120-1101 Open Channel Grading – per Square Yard (SY).
FDOT SECTION 125 EXCAVATION FOR STRUCTURES AND PIPE.
The work specified under this Section is amended herein.
125-13 Method of Measurement
Work specified under this Section consists of the furnishing and installation of the crushed stone and the placement of the filter fabric wrapped bedding material, as required in 125-8.3.4 Backfill Under Wet Conditions. The quantity is to be paid by the weight of the material, installed and accepted, in Tons (TN).
125-8-14 Basis of Payment
Item No. 125-8-057 – BEDDING MATERIAL, Crushed Stone, Size #57 –Ton (TN).
Section 530-2000 of the Pinellas County Roadway Std. Tech. Specs. – RIPRAP
The specification for Riprap shall be amended to include:
• Filter fabric shall be required wherever riprap is placed.
• Broken stone shall be the only option allowed. Broken concrete is not allowed.
PAY ITEM NO. 530-2200 RIPRAP, Rubble, w/Filter Fabric - per Ton (TN), installed and accepted.
Section 570-575 of the Pinellas County Roadway Std. Tech. Spec. – SODDING.
Section 575 Sodding shall be amended to include:
• All sodding items shall include clearing, grubbing, grading, and compaction.
PAY TIEM NO. 575-0103 SODDING, Bahia, includes clearing, grubbing, grading, and compaction
– per Square Yard (SY).
PAY TIEM NO. 575-0112 SODDING, St. Augustine, Includes clearing, grubbing, grading, and compaction – per Square Yard (SY).
PAY TIEM NO. 575-0201 SODDING, Bahia, Staked, includes clearing, grubbing, grading, and compaction – per Square Yard (SY).
Section 900-1060 of the Pinellas County Roadway Std. Tech Specs. – Cofferdams The specification for Cofferdams shall be amended to include:
PAY ITEM NO. 900-1062 COFFERDAM, Including pumping and water treatment, various locations
• This pay item shall include all the labor and materials associated with installing one or two cofferdams, as required, and operating the pumping and water treatment necessary for dewatering the work areas.
• Water treatment must meet the requirements of any project related permits.
PAY ITEM NO. 900-1062 COFFERDAM, Including pumping and water treatment, various locations
- per Each (EA).
PAY ITEM NO. 900-1063 WATER BYPASS PUMPING- MOBILIZATION
This pay item shall include all the labor and materials associated with installing the pump and piping required to provide bypass pumping around the upstream and downstream cofferdam. This item includes the demobilization of the water bypass pumping system.
PAY ITEM NO. 900-1063 WATER BYPASS PUMPING- MOBILIZATION - per Each (EA) water bypass pumping system installed and accepted.
PAY ITEM NO. 900-1064 WATER BYPASS PUMPING - OPERATION
This pay item shall be used in conjunction with the Pay Item No. 900-1063 Water Bypass Pumping –Mobilization at a given location and shall include all the labor and materials associated with operating the pump and piping required to provide bypass pumping around the upstream and downstream cofferdam. The days will be counted for the entire time that the pumping bypass system is required.
PAY ITEM NO. 900-1064 WATER BYPASS PUMPING - OPERATION - per Each Day (EA/DAY) the water bypass pumping system is required.
Section 999-000 of the Pinellas County Roadway Std. Tech. Spec. – UNSPECIFIED WORK
Section 999-000 Basis of Payment is hereby amended to include the following pay items:
SURVEY WORK
The work specified in this section shall be amended to include:
All work shall be done in accordance with Section 005 Survey and Layout by Contractor.
The right of way and/or easements shall be staked out with a stake or marker every 100 feet on both sides of the channel.
All property corners and section corners shall be protected through the contract period by the contractor, if a property corner is damaged, they will be restored by a Florida registered Professional Land Surveyor at no additional cost to the County.
Professional liability insurance is required, see insurance requirements section in the Invitation to Bid.
PAY ITEM NO. 999-0003 UNSPECIFIED WORK (SURVEY) – per Each (EA)
SPECIAL PROVISIONS
(The following special provisions are in addition to the Pinellas County Standard Technical Specifications for Roadway and General Construction)
Technical Specs for Roadway and General Construction Jul 2019 - Pinellas County
ITEM NO. 401-70 SPALL AREA REPAIR
Description: Perform concrete repairs on concrete structure tops as directed by the Engineer. The repairs will consist of areas no larger than two (2) square feet.
Materials: Welded Wire Reinforcement: Galvanized welded wire reinforcement (WWR) shall conform to ASTM Specification A1064.
Repair/Patching Materials: Class IV Concrete; Class IV concrete with #89 aggregate shall be in accordance with FDOT Standard Specifications.
Bonding Agent: Bonding compound shall comply with FDOT Standard Specifications for Road and Bridge Construction – Section 926 – Type AB. The bonding compound used shall be suitable for application over concrete and reinforcement with a minimum application time of 1 hour after mixing. The bonding compound shall be mixed and applied as per manufacturer’s specifications. All bonding compounds shall be compatible with the patching material and applied in accordance with the manufacturer’s recommendations and these specifications.
Construction Method: Surface Preparation: Saw cut ¾” to 1" deep along the perimeter of the repair area.
Adjust depth of saw cut if shallow steel is encountered. Feathering of the patch material at the edges is not allowed. Remove all deteriorated concrete within the saw cut limits. Exercise extreme caution to avoid cutting or damaging the existing reinforcing steel and/or damaging sound concrete. Remove the concrete adjacent to exposed reinforcement to a depth of one (1") inch or to whatever additional depth is necessary to reach sound concrete. Extend the concrete removal two (2”) inches maximum beyond the spalled area.
Unsound concrete extending a depth of two (2”) inches or more beyond the reinforcement or if more than 20% of the cross-section area has deteriorated the Engineer shall be notified at once and the structure top shall be removed and replaced per contract pay items. Roughen and clean the exposed concrete surfaces, including the saw cut face around the perimeter of the repair area, and clean the reinforcement. Special attention shall be observed to ensure proper cleaning and preparation of the backside of the reinforcement.
All surfaces to receive patch material must be clean, sound and free of surface moisture, oil and grease.
Remove dust, residue, marine growth, laitance, grease, curing compounds, waxes, impregnation, foreign particles and other bond inhibiting materials from the surface.
Patch Procedure: If the depth of the repair exceeds two (2”) inches, place an approved Galvanized welded wire fabric over the area after the existing rebar has been cleaned. Tie the wire fabric at regular intervals, vertically and horizontally, not to exceed eight inches, or as directed by the Engineer. Field bend the welded wire fabric to conform to any changes in the concrete surface profile. Patch material shall be applied to the repair area within 72 hours after the area has been cleaned. If areas become contaminated after initial cleaning, they must be re-cleaned prior to applying the repair material. Just prior to applying the patch material apply a coat of bonding agent to all surfaces within the repair area in accordance with the manufacturer's recommendations. All repairs shall be made using methods to ensure the patch material is carefully worked into the repair area to achieve intimate uniform contact between the repair mortar and the concrete in accordance with manufactures recommendations.
Forms: Forms shall be used as required or as directed by the Engineer. All forms shall be removed. Stay-in-place formwork is not allowed.
Method of Measurement:
Concrete Repair: The quantity of concrete restoration to be paid for under this section shall be the contract unit price per Square Foot (SF) of repair material authorized, satisfactorily placed and accepted.
Welded Wire Reinforcement: No additional payment will be made for galvanized welded wire fabric. These items shall be considered incidental, and the cost should be included in the unit price for Restore Spalled Areas.
Basis of Payment: Payment for this work shall include all equipment, labor, concrete removal, surface preparation, bonding agent, forming, materials, galvanized welded wire fabric, and any incidental items necessary to complete the work. No additional payment will be made for galvanized welded wire fabric. These items shall be considered incidental, and the cost shall be included in the unit price for Restore Spalled Areas.
Payment shall be made under:
Item No. 401-70 SPALL AREA REPAIR – per Square Foot (SF)
ITEM NO. 460-1XX-XXXX – PIPE CLEANING
Description – This work consists of cleaning of gravity storm/sanitary sewer pipes to clean and prepare the existing pipes for rehabilitation. All labor, materials, equipment, and other items required to perform the work not included in other pay items are included in the work. The interior of the pipes shall be thoroughly cleaned to produce a clean interior surface free of all coatings, sand, rock, roots, sludge, or other materials. During the cleaning and preparation operations, all necessary precautions shall be taken to protect the public, all property and the sewer from damage. All material removed from the sewers shall be the Contractor's responsibility for prompt disposal in accordance with all regulatory agency requirements.
Levels of cleaning are defined as follows:
Light Cleaning: Removal of ¼ diameter of pipe depth or less of sand and/or debris from a section of pipe
Medium Cleaning: Removal of greater than ¼ to ½ diameter of pipe depth of sand and/or debris from a section of pipe.
Heavy Cleaning: Removal of greater than ½ diameter of pipe depth of sand and/or debris from a section of pipe.
Measurement – Pipe Cleaning is payable as a measured per linear footage of pipe cleaned and accepted.
Pay Item Number
Item Description Unit Measurement for Payment
460-101-0015 Pipe Cleaning - Light Cleaning - 0-1/4 diameter of pipe depth (15" or less)
LF
460-101-1521 Pipe Cleaning - Light Cleaning - 0 - 1/4 diameter of pipe depth (> 15" - 21")
LF
460-101-2142 Pipe Cleaning - Light Cleaning - 0 - 1/4 diameter of pipe depth (> 21" - 42")
LF
460-101-4254 Pipe Cleaning - Light Cleaning - 0 - 1/4" diameter of pipe depth (> 42" - 54")
LF
460-101-5499 Pipe Cleaning - Light Cleaning - 0 - 1/4" diameter of pipe depth (> 54")
LF
460-102-0015 Pipe Cleaning - Medium Cleaning - 1/4 – 1/2 diameter of pipe depth (15" or less)
LF
460-102-1521 Pipe Cleaning - Medium Cleaning - 1/4 -1/2 of pipe depth (> 15" - 21")
LF
460-102-2142 Pipe Cleaning - Medium Cleaning - 1/4 -1/2 diameter of pipe depth (> 21" - 42")
LF
460-102-4254 Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe (> 42" - 54")
LF
460-102-5499 Pipe Cleaning - Medium Cleaning - 1/4" - 1/2" diameter of pipe (> 54")
LF
460-103-0015
Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe debris (15" or less)
LF
460-103-1521 Pipe Cleaning - Heavy Cleaning - greater than 1/2 diameter of pipe (> 15" - 21")
LF
460-103-2142 Pipe Cleaning - Heavy Cleaning - greater than 1/2 diameter of pipe (> 21" - 42")
LF
460-103-4254 Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe (> 42" - 54")
LF
460-103-5499 Pipe Cleaning - Heavy Cleaning - greater than 1/2" diameter of pipe (> 54")
LF
PAY ITEM NO. 530-3-12-X EROSION CONTROL MATTING
Description: Furnish all materials and labor to install coir mats or blankets, Coir Mat 70 or 90 by One Clarion or approved equal. Erosion control matting with monofilament plastics will not be allowed.
Measurement and Payment: The work specified under this Section shall be paid for at the contract unit price per area Square Feet (SF) actually constructed and accepted.
Item No. 530-3-12-1 EROSION CONTROL MATTING, COIR MAT 70, F&I – per Square Foot (SF)
Item No. 530-3-12-2 EROSION CONTROL MATTING, COIR MAT 90, F&I – per Square Foot (SF)
PAY ITEM NO. 571-1-07 Coconut Matting, Furnishing & Install
Description: Furnish all materials and labor to install, per manufacturer’s specifications, erosion control matting and concrete cloth to protect disturbed slopes or embankment surfaces against erosion due to rainfall or flowing water.
Ground shall be in a stable and firm soil surface condition free of rocks and other obstructions with any seed, fertilizer, or mulches already in place ready to accept matting. Matting shall be secured to slope per manufacturer instructions and toed-in at least six (6) inches, and up to one (1) foot in some cases, at top of bank. Finished work shall be free of air pockets, voids, tears, or damage to matting with no water flow occurring underneath. These installed surfaces shall be sodded or planted within three
(3) working days of installation. Materials, Additional. Contractor will be required to re-install any matting with observed air pockets or voids or when permanent stabilization is not completed within three (3) days that result in undesirable vegetation growth surfacing through matting. Coconut Fiber Mat: shall be 100% coconut fiber between natural fiber nets with top leno-woven layers.
Measurement and Payment: The work specified under this Section shall be paid for at the contract unit price per area Square Feet (SF) actually constructed and accepted.
Item No 571-1-07 COCONUT MATTING, Furnishing & Install - per Square Foot (SF)
WATER MAIN SUPPLEMENTAL SPECIFICATIONS
ITEM NO. PW-331101-309-9xxx Adjustment of Valve Box & Cover
Description: The work consists of furnishing all labor, equipment, and materials for the vertical adjustment of an existing valve box and cover to match proposed finish grade. The unit price shall include placement of the valve cover to finish grade as shown on plans or directed by the Engineer.
Measurement: the quantity of valve box and cover adjustments to be paid for under this item shall be the number Each (EA) measured in place, on grade, inspected, and accepted.
Item No. PW-331101-309-9002 Adjust Valve Box to Finished Grade (Outside of Pavement)
ITEM NO. PW-331101-313-xxxx Adjustment of Water Meter Box – (Horizontal)
Description: The work consists of furnishing all labor, equipment, customer coordination, and materials for the horizontal adjustment greater than 6” of an existing meter box by the use of salvaged assembly or new assembly provided by the County. The unit price shall include placement of the meter and box to finish grade at proposed locations as shown on plans or directed by the Engineer. Horizontal adjustments less than 6” shall be considered incidental to the proposed work and no separate payment shall be made.
Measurement: The quantity of meter box adjustments to be paid for under this item shall be the number Each (EA) measured in place, inspected, and accepted. Payment for additional tubing, when required, shall be under a separate item.
Item No. PW-331101-313-9001 Horizontal Adjustment of Potable Meter Box (> 6”)
ITEM NO. PW-331101-313-xxxx Adjustment of Water Meter Box (Vertical)
Description: The work consists of furnishing all labor, equipment, customer coordination, and materials for the vertical adjustment greater than 3” of an existing meter box by the use of salvaged assembly, or new assembly provided by the County. The unit price shall include placement of the meter and box to finish grade as shown on plans or directed by the Engineer. Vertical adjustments less than 3” shall be considered incidental to the proposed work and no separate payment shall be made.
Measurement: The quantity of meter box adjustments to be paid for under this item shall be the number Each (EA) measured in place, inspected, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .