ENG422005B Emergency Purchase Final Cost signed.pdf

PDF 1 MB Posted

Attached to
Emergency Final Cost - DNR Horseshoe Lake SP Pump Station Sheet Pile Material
Solicitation number
27-422DNR-DIREC-B-53348
Issued by
Madison County, Illinois

About this file

This document is an Emergency Purchase Final Cost Report issued by the State of Illinois Chief Procurement Office for General Services, filed by the Department of Natural Resources. The emergency procurement, referenced under BidBuy B-53121, involved the purchase of sheet pile material for the Horseshoe Lake State Park Pump Station project. The vendor selected for this emergency purchase was Hammer & Steel Intermediate Holdings LLC, located at 11916 Missouri Bottom Road, Hazelwood, Missouri 63042. The contract was authorized under 30 ILCS 500/20-30(b), which permits the publication of actual final costs for emergency declarations. Kyle Schweizer, a CE IV Agency Representative, signed the final cost report on July 15, 2026, certifying the completion of this emergency procurement for the Statewide Operations Division based in Springfield, Illinois.

The final total cost reported for this emergency purchase is $0, as indicated in the document. This unusual figure suggests either that the cost data was not yet finalized at the time of reporting, that the document serves as a formal notification of an emergency declaration without cost information populated, or that costs were absorbed through alternative funding mechanisms. The emergency purchase authorization was necessary to expedite the procurement of critical materials for the pump station infrastructure at Horseshoe Lake State Park, bypassing standard bidding procedures to address urgent operational needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMERGENCY PURCHASE FINAL COST

Page 1 of 1State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost v.26.1

Pursuant to 30 ILCS 500/20-30(b), the actual final cost shall be published.

Zip: 63042State:MOCity:HazelwoodAddress: 11916 Missouri Bottom Road

Vendor: Hammer & Steel Intermediate Holdings LLC

Zip: 6704State: ILCity:SpringfieldAddress: One Natural Resources Way

Division: Statewide OperationsAgency: Department of Natural Resources

Final Cost Original BidBuy Reference #: B- 53121

Final Cost BidBuy Reference # B- 53348

Final total cost ($) of supplies and services: 0

Printed Name: Kyle Schweizer

Title: CE IV

Agency Representative Signature:

Date: 7/15/2026

I am reporting the final cost for the referenced emergency contract to the CPO and the Auditor General.

Page of

EMERGENCY PURCHASE FINAL COST

State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost and Term v.25.1

EMERGENCY PURCHASE FINAL COST

Page of State of Illinois Chief Procurement Office for General Services Emergency Purchase Final Cost v.26.1 Pursuant to 30 ILCS 500/20-30(b), the actual final cost shall be published.

Final Cost I am reporting the final cost for the referenced emergency contract to the CPO and the Auditor General.

11.0.0.20130303.1.892433.887364

PageCount:
CurrentPage:
VendorZip: 63042
VendorState: MO
VendorCity: Hazelwood
VendorAddress: 11916 Missouri Bottom Road
Vendor: Hammer & Steel Intermediate Holdings LLC
AgencyZip: 6704
AgencyState: IL
AgencyCity: Springfield
AgencyAddress: One Natural Resources Way
AgencyDivision: Statewide Operations
AgencyUniversity: Department of Natural Resources
CurrentMasterPage:
MasterPageCount:
ReferenceNumber: 53121
TextField1: 53348
FinalTotalCost: 0
PrintedName: Kyle Schweizer
TitleField: CE IV
AuthorizedSignature:
Date: 7/15/2026