ENERGY QAP E1.15 (SEP 2013) - Copy.pdf
PDF 2 MB Posted
- Attached to
- AVIATOR’S BEATHING OXYGEN (ABO) and LIQUID NITROGEN (LN2) PACIFIC Federal contract opportunity
- Solicitation number
- SPE601-20-R-0323
- Issued by
- Defense Logistics Agency Energy
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ENERGY QAP E35 (DEC 2011).pdf | ||
| SPE601-20-R-0323 07102020.pdf | ||
| ENERGY QAP E6 CERTIFICATE OF CONFORMANCE (AUG 2015).pdf | ||
| ENERGY QAP E22 (Apr 2016) - Copy.pdf | ||
| Contractor Performance Data Sheet.pdf | ||
| SOO PACIFIC 9.1E 07082020.pdf | ||
| H-14 TRANSPORT EQUIPMENT DELAY CERT.pdf | ||
| PRICING SPREADSHEET 20-R-0323 PACIFIC 9.1E 07082020.xlsx | XLSX spreadsheet | |
| Aerospace Contract Text SPE601-20-R-0323 Pacific 9.1E.pdf | ||
| ENERGY QAP C1.02 ASSIST (DEC 2016)-signed - Copy.pdf | ||
| ENERGY QAP E33.10 (JUL 2008) PACIFIC 9.1E.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PDF (DLA)DLA FORM 1889, OCT 2011
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
SHEET 1 OF 1PREVIOUS EDITION IS USABLE Add Continuation Page
Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us
REV DESCRIPTION DATE APPROVED
ENERGY QAP E1.15 September 2013
REVISIONS
E1.15 CONTRACTOR INSPECTION RESPONSIBILITIES (AEROSPACE ENERGY)
(a) QUALITY CONTROL PLAN.
(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan (QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.
(2) The QCP shall include--
(i) A schematic diagram of plant facilities pertinent to the inspection system indicating all inspection points;
(ii) Sampling procedures.
(iii) Sample testing methods/procedures;
(iv) Analytical and measuring equipment calibration program;
(v) Loading/shipping procedures;
(vi) Records maintenance and reports preparation/distribution; and
(vii) Corrective action procedures.
(3) The Contractor shall require subcontractors to provide and maintain inspection systems that adhere to the requirements in this contract provision.
(b) The Contractor shall perform all inspection tests required by the specification/item description, and any modifications thereof, on the supplies to be furnished under this contract or shall have such tests performed in a laboratory acceptable to the Government. The Contractor shall notify the QAR in sufficient time to permit inspection by the Government. When such tests are performed at origin on supplies to be accepted at destination, documentation that will enable verification of the original test results shall be provided to the Government at the time of acceptance.
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
DISTRIBUTION
STATEMENT - A
APPROVED FOR
PUBLIC RELEASE
DISTRIBUTION IS
"UNLIMITED"
DATE
07/28/2014
APPROVED BY
DATE
07/25/2014
REVIEWED BY
DATE
07/24/2014
PREPARED BY
DRAWING NUMBERSCALE
CODE ID NO.
52838
SIZE
NSN
MULTIPLE
ITEM
ENERGY QAP E1.15
DLA Land & Maritime DLA Troop Support DLA Aviation clear
DEFENSE ENERGY SUPPORT CENTER
8725 JOHN J. KINGMAN RD
FORT BELVOIR, VIRGINIA 22060-6222
DLA Energy
PDF (DLA)
DLA FORM 1889, OCT 2011
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
SHEET OF
PREVIOUS EDITION IS USABLE
REV
DESCRIPTION
DATE
APPROVED
REVISIONS
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
DISTRIBUTION STATEMENT - A
APPROVED FOR PUBLIC RELEASE
DISTRIBUTION IS "UNLIMITED"
REV
DESCRIPTION
DATE
APPROVED
REVISIONS
DISTRIBUTION STATEMENT - A
APPROVED FOR PUBLIC RELEASE
DISTRIBUTION IS "UNLIMITED"
SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)
Supplemental Quality Assurance Provision (SQAP) DSCC Form 2291, Feb 2004 online none standard Quality Assurance
DLA
1 + No Tech Qual Deskbook n/a No Supplemental Quality Assurance Provision (SQAP) interactive October 2011 (added Energy; updated supply center names)
| CurrentPage: |
| PageCount: |
| btnPrint: |
| btnEmail: |
| btnClear: |
| btnExport: |
| btnImport: |
| btnAbout: |
| btnChkVersion: |
| btnContactUs: |
| Button1: |
| rev: |
| description: ENERGY QAP E1.15 |
| revdate: September 2013 |
| revapproved: |
| revcomments: |
| apprdate: 2014-07-28 |
| apprBy: |
| reviewdate: 07/25/2014 |
| revBy: |
| prepdateA: 2014-07-24 |
| prepbyA: |
| drawingNum: |
| scale: |
| codeIDNo: 52838 |
| size: |
| nsn: MULTIPLE |
| itemdesc: ENERGY QAP E1.15 |
| btnDSCC: |
| btnDSCP: |
| btnDSCR: |
| line1: DEFENSE ENERGY SUPPORT CENTER |
| line2: 8725 JOHN J. KINGMAN RD |
| line3: FORT BELVOIR, VIRGINIA 22060-6222 |
| revcomments2: |
| totInstances: 0.00000000 |
File details come from the government source that posted it. Updated .