Enclosure 4. Blank BOQ.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- D/B Construct Boat Maintenance Facility Puerto Princesa, Palawan, Philippines Federal contract opportunity
- Solicitation number
- N6274225R6504
About this file
The document is a Blank Bill of Quantity (BOQ) Excel spreadsheet for Solicitation N6274225R6504, a Design-Build project to construct a Boat Maintenance Facility in Puerto Princesa, Palawan, Philippines, issued by the Department of the Navy Naval Facilities Engineering Command. The BOQ details three primary contract line items (CLINs): Base Bid Item for constructing the facility (CLIN 0001), an Optional Item for providing maintenance facility equipment (CLIN 0002), and a second Optional Item for repairing an existing boat ramp and performing mechanical and roof repairs (CLIN 0003).
The solicitation includes comprehensive line items covering construction elements such as foundations, superstructure, exterior closure, roofing, interior construction, plumbing, HVAC, fire protection, electrical systems, site preparation, and site improvements. A pre-solicitation site visit is scheduled for 17 July 2025 at 15:00 p.m. Philippines time at Naval Detachment Oyster Bay, with GPS coordinates provided. The proposal submission deadline is 14 August 2024, no later than 11:00 a.m. Thailand time. Contractors must be included in the base access request to attend the site visit, as referenced in the related Sources Sought document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment N6274225R6504_0001 toktr 080925.pdf | ||
| RFP N6274225R6504 Releaesd w attachments 070425 resized.pdf | ||
| Enclosure 1. Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank BOQ Form Bill of Quantity DATE SUBMITTED
| ACTIVITY AND LOCATION: | SOLICITATION NUMBER: |
| PUERTO PRINCESA, PALAWAN, PHILIPPINES | N6274225R6504 |
| PROJECT TITLE: | CONTRACTOR: | ||||||||
| D/B CONSTRUCT BOAT MAINTENANACE FACILITY | |||||||||
| QUANTITY | MATERIAL COST | LABOR COST | |||||||
| ITEM DESCRIPTION | NUMBER | UNIT | UNIT COST | TOTAL | UNIT COST | TOTAL | TOTAL, USD | ||
| Item # | ESR | ||||||||
| CLIN 0001: BASE BID ITEM 0001 – CONSTRUCTION OF BOAT MAINTENANCE FACILITY | |||||||||
| A10 | FOUNDATIONS | ||||||||
| A1010 | Standard Foundations | ||||||||
| 1 | Footing/Foundation (concrete) | cu.m. | |||||||
| 2 | Footing/Foundation (rebars) | kg | |||||||
| A1030 | Ground Floor Slabs | ||||||||
| 3 | Slab (concrete) | cu.m. | |||||||
| 4 | Slab (rebars) | kg | |||||||
| 5 | Floor moisture barrier | sq.m. | |||||||
| B10 | SUPERSTRUCTURE | ||||||||
| B1010 | Floor Construction | ||||||||
| 6 | Ramp (rebars) | kg | |||||||
| 7 | Ramp (concrete) | cu.m. | |||||||
| B1020 | Roof Construction | ||||||||
| 8 | Structural Mainframe of steel building | sq.m. | |||||||
| 9 | Forms and Scaffoldings | sq.m. | |||||||
| B20 | EXTERIOR CLOSURE | ||||||||
| B2010 | Exterior Walls | ||||||||
| 10 | CHB Grout Fill | cu.m. | |||||||
| 11 | Riprap/Retaining Walls | l.m. | |||||||
| 12 | Masonry (Rebars) | kg | |||||||
| 13 | CHB 6", 7MPa | sq.m. | |||||||
| 14 | Plastering | sq.m. | |||||||
| 15 | Metal Wall Cladding and accessories | sq.m. | |||||||
| B2090 | Other Exterior Closure | ||||||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| B30 | ROOFING | ||||||||
| B3010 | Roof | ||||||||
| 16 | Maintenance Bay: Cliplock type roofing system including rockwool insulation, and accessories | sq.m. | |||||||
| 17 | Equipment/Conference Rooms: Cliplock type roofing system including rockwool insulation, and accessories | sq.m. | |||||||
| C10 | INTERIOR CONSTRUCTION | ||||||||
| C1010 | Partitions | ||||||||
| 18 | Partition Wall | sq.m. | |||||||
| Interior Windows | |||||||||
| 19 | Aluminum Windows | ea | |||||||
| C1020 | Interior Doors | ||||||||
| 20 | Door including hardwares | set | |||||||
| C30 | INTERIOR FINISHES | ||||||||
| C3010 | Wall Finishes | ||||||||
| 21 | Equipment/Conference Rooms - Skim coat | sq.m. | |||||||
| C3020 | Floor Finishes | ||||||||
| 22 | Floor diamond polished cement finish | sq.m. | |||||||
| C3030 | Ceiling Finishes | ||||||||
| 23 | Equipment/Conference Rooms - ficem/gypsum | sq.m. | |||||||
| C3040 | Painting | ||||||||
| 24 | Equipment/Conference Rooms | sq.m. | |||||||
| 25 | Maintenance Bay | sq.m. | |||||||
| D20 | PLUMBING | ||||||||
| D2010 | PLUMBING FIXTURE | ||||||||
| 26 | Water Closet | ea | |||||||
| 27 | Shower | ea | |||||||
| 28 | Vanity Mirror | ea | |||||||
| 29 | Lavatory faucet | ea | |||||||
| 30 | Faucet | ea | |||||||
| 31 | Hose Bibbs | ea | |||||||
| 32 | Mop Sink | ea | |||||||
| D2020 | DOMESTIC WATER DISTRIBUTION | ||||||||
| 33 | Domestic Water Equipment | ea | |||||||
| 34 | Domestic Pipe and Fitting | lot | |||||||
| D2030 | SANITARY WASTE | ||||||||
| 35 | Sanitary Waste Pipe and Fitting | lot | |||||||
| 36 | Sanitary Vent Pipe and Fitting | lot | |||||||
| 37 | Floor Drains | ea | |||||||
| D2040 | RAIN WATER DRAINAGE | ||||||||
| 38 | Pipe & Fittings | lot | |||||||
| 39 | Roof Drains | ea | |||||||
| D30 | HVAC | ||||||||
| D3030 | Cooling Generating Systems | ||||||||
| 40 | Ceiling fans | ea | |||||||
| 41 | Airconditioning Units (window-type) and Accessories | ea | |||||||
| D40 | FIRE PROTECTION | ||||||||
| D4010 | Fire Alarm and Detection | ||||||||
| 42 | Fire Alarm and manual pull station | ea | |||||||
| D4090 | Other Fire Protection Systems | ||||||||
| 43 | Portable Fire Extinguisher | ea | |||||||
| D50 | ELECTRICAL | ||||||||
| D5010 | Electrical Service and Distribution | ||||||||
| 44 | Rough-ins, wirings, conduits | lot | |||||||
| 45 | Panel boards and circuit breakers | lot | |||||||
| 46 | Disconnect Switch | ea | |||||||
| 47 | Transformer incl. accessories | lot | |||||||
| 48 | Electrical connection to base & Posts | lot | |||||||
| D5020 | Lighting & Branch Wiring | ||||||||
| 49 | Lights, fixures and wiring devices | lot | |||||||
| D5090 | Others | ||||||||
| 50 | Lightning protection | ea | |||||||
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | ||||||||
| 51 | Clearing, grubbing and Tree Cutting | sq.m. | |||||||
| G1030 | Site Earthwork | ||||||||
| 52 | Excavation | cu.m. | |||||||
| 53 | Backfilling and Compaction | cu.m. | |||||||
| 54 | Soil Treatment | sq.m. | |||||||
| G20 | SITE IMPROVEMENTS | ||||||||
| 55 | Access Road | sq.m. | |||||||
| G30 | SITE CIVIL UTILITIES | ||||||||
| 56 | G3010 | Water Supply | lot | ||||||
| 57 | G3020 | Sanitary Sewer | lot | ||||||
| 58 | G3030 | Storm Sewer | lot | ||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| 59 | Site Electrical | lot | |||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| 60 | Mobilization/Demoblization | ls | |||||||
| 61 | Topographic Survey and Geotechnical Study, and other Predesign surveys, capability assessment, etc | ls | |||||||
| 62 | Detailed Engineering Design Package | ls | |||||||
| X20 | Office Overhead | ||||||||
| 63 | TempFacil, permits, and utilities months | ls | |||||||
| X90 | Others | ||||||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| SUBTOTAL CLIN 0001 |
| CLIN 0002: OPTION ITEM 0001 – PROVIDE MAINTENANCE FACILITY EQUIPMENT | ||||
| E10 | EQUIPMENT | |||
| E1090 | Other Equipment | |||
| 64 | GantryCrane | ea | ||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | |||
| X90 | Others | |||
| 1 | ||||
| 2 | ||||
| 3 | ||||
| SUBTOTAL CLIN 0002 |
CLIN 0003: OPTION ITEM 0002 – REPAIR OF EXISTING BOAT RAMP, REMOVAL OF MECHANICAL SYSTEM FOR CRANE, AND
ROOF REPLACEMENT/REPAIRS OF EXISTING BOAT HOUSE
| A10 | FOUNDATIONS | |||
| A1020 | Special Foundations | |||
| 65 | Riprap rockfill | kg | ||
| B10 | SUPERSTRUCTURE | |||
| B1010 | Floor Construction | |||
| 66 | Ramp (concrete) | cu.m. | ||
| 67 | Ramp (rebar) | kg | ||
| 68 | Epoxy | kg | ||
| 69 | Sheet Pile | sq.m. | ||
| B1020 | Roof Construction | |||
| 70 | Forms and Scaffoldings | sq.m. | ||
| B20 | EXTERIOR CLOSURE | |||
| B2010 | Exterior Walls | |||
| 71 | Riprap/Retaining Walls | sq.m. | ||
| B2090 | Other Exterior Closure | |||
| 72 | 1 Steel Mesh/Grills | m | ||
| 2 | ||||
| 3 | ||||
| B30 | ROOFING | |||
| B3010 | Roof | |||
| 73 | Gutters and Downspout | m | ||
| 74 | Roof Covering | sq.m. | ||
| C30 | INTERIOR FINISHES | |||
| C3040 | Painting | |||
| 75 | Columns, Beams | sq.m. | ||
| D50 | ELECTRICAL | |||
| D5010 | Electrical Service and Distribution | |||
| 76 | Rough-ins, wirings, conduits | lot | ||
| 77 | Panel boards and circuit breakers | lot | ||
| D5020 | Lighting & Branch Wiring | |||
| 78 | Lights, fixures and wiring devices | lot | ||
| G10 | SITE PREPARATION | |||
| G1010 | Site Clearing | |||
| 79 | Site Cleanup | lot | ||
| 80 | Selective Demolition - Roof | sq.m. | ||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | |||
| X10 | Field Requirements | |||
| 81 | Mobilization/Demolization | ls | ||
| 82 | Topographic Survey and Geotechnical Study, and other Predesign surveys, capability assessment, etc | ls | ||
| X20 | Office Overhead | |||
| 83 | TempFacil, permits, and utilities months | ls | ||
| X90 | Others | |||
| 1 | ||||
| 2 | ||||
| 3 | ||||
| SUBTOTAL CLIN 0003 |
TOTAL COST PROPOSAL
| CONTRACTOR AUTHORIZED SIGNATORY |
| (Sinature above printed name) |
| DATE: _________________________ | |
| NOTE: | |
| * Add any necessary line items for additional requirements in the RFP that are not already included in the BOQ form. |