This document is a Blank Bill of Quantities (BOQ) for a design-build construction project to construct a new clinic in Thanh Thinh Commune, Nghe An Province, Vietnam. The project, solicited by the Department of the Navy Naval Facilities Engineering Command under contract number N6274225R6507, involves creating a two-story clinic building with comprehensive infrastructure including foundations, superstructure, exterior enclosures, roofing, interior construction, plumbing, HVAC, electrical systems, medical equipment, and site improvements. The detailed BOQ breaks down construction elements into categories such as foundations, walls, floors, roofing, interior finishes, plumbing fixtures, electrical systems, and specialized medical equipment.

The project has an estimated performance period of 11 months (330 days) and includes specific requirements like a reinforced concrete frame, concrete masonry unit walls, ceramic tile floors, gypsum board ceilings, and medical-specific installations such as a water purification system, sterilization equipment, and various medical examination beds. A pre-proposal site visit is scheduled for June 17, 2025, at 1000am in Trung Thinh village. The BOQ indicates that local authorities will be responsible for existing structure demolition, and the project assumes no Value Added Tax (VAT) will be applied. While the BOQ shows line items for various construction elements, the total cost is currently listed as $0.00, suggesting pricing details will be finalized during the solicitation process.

View the file

Other files

File Type Posted
RELEASED_AMD1_25R6507.pdf PDF
SOL_N6274225R6507_RELEASED.pdf PDF
Enclosure1_PPI Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

DATE PREPARED:
FOUOBLANK BILL OF QUANTITIES
ACTIVITY AND LOCATION:CONSTRUCTION CONTRACT NUMBER:
Nghe An province, VietnamN6274225R6507
PROJECT TITLE:PREPARER:
D/B Construct Thanh Thinh Commune Clinic/Disaster shelter - OHASIS# 84466
ITEM DESCRIPTIONQUANTITYMATERIAL COST ($)LABOR COST ($)ENGINEERING ESTIMATE ($)
NUMBERUNITUNIT COSTTOTALUNIT COSTTOTALUNIT COSTTOTAL
CLIN 00001: DESIGN AND CONSTRUCTION WORKS OF THE THANH THINH COMMUNE CLINIC
A10FOUNDATIONS
A1010Standard Foundations
a. Excavation and Backfilling

Jessada: Added 20% of work for Generator & Battery Storage

m3
b. Soil Compactionm3
c. Foundations
Lean concrete for foundationm3
Formwork for foundationm2
Reinforcement for foundaionkg
Concrete for foundationm3
Others
Foundation for main gate and boundary wallLS
Foundation for medical waste storageLS
Foundation for parking areaLS
Sub-Total A10100.00
A1030Slab-on-Grade
a. Soil compactionm3
b. Compacted gravel
c. Reinforced concrete slab-on-grade
Slab on Gradem3
Lean concrete for ground slabm3
Formwork for ground slabm2
Reinforcement for ground slabkg
Concrete for ground slabm3
Others
Slab-on-grade for concrete yardm3
Slab-on-grade for parking aream3
Slab-on-grade for medical waste storageLS
Sub-Total A10300.00
B10SUPERSTRUCTURE
B1010Floor Construction
Formwork for floor slabm2
Reinforcement for floor slabkg
Concrete for floor slabm3
B1020Roof Construction
Formwork for roof slabm2
Reinforcement for roof slabkg
Concrete for roof slabm3
Steel structure for roofkg
Coloumn construction
Formwork for columnm2
Reinforcement for columnkg
Concrete for columnm3
Beam construction
Formwork for beamm2
Reinforcement for beamkg
Concrete for beamm3
Others
Superstructure for boundary wallLS
Superstructure for main gateLS
Superstructure for parking areaLS
Superstructure for medical waste storageLS
Sub-Total B100.00
B20EXTERIOR ENCLOSURE
B2010Exterior Walls
220mm double CMU wall with plasterm2
B201009Exterior Painting and Coatings
220mm double CMU wall paint finishm2
B2020Exterior Windows
Windows 1400x1500 with grille.a
Windows 2400x1500 with grille.a
Windows 1800x2600 with grille.a
Windows 1400x1000 with grille.a
Windows 1800x2000 with grille.a
B2030Exterior Doors
Double-leaf entrance door 2400x2400mme.a
Signle-leaf entrance door 1400x2400mme.a
Signle-leaf entrance door 900x2400mme.a
Others
Sub-Total B200.00
B30ROOFING
Clinic building roof coveringsm2
Others
Parking roof coveringsm2
Medical waste storage roof coveringsm2
Sub-Total B300.00
C10INTERIOR CONSTRUCTION
C1010Partitions
Interior brick infill wall with cement plaster and paint finishLS
Others
Boundary wallLS
Medical waste storage wallLS
Sub-Total C10100.00
C1020Interior Doors
Double-leaf entrance door 1200x2400mme.a
Signle-leaf entrance door 900x2400mme.a
Signle-leaf entrance door 750x1600mme.a
Sub-Total C10200.00
C20STAIRS
a. Main staire.a0.00
1. Reinforced concrete structure
2. Stair finishes and nosing
3. Handrails
Sub-Total C200.00
C30INTERIOR FINISHES
C3010Wall Finishes
Ceramic for wall tile 300x600mmm2- 0
C3020Floor Finishes
Ceramic floor tile 600x600mmm2- 0
Anti-skid floor tile 600x600mmm2- 0
C3030Ceiling Finishes
Gymsum ceilingm2- 0
Sub-Total C30100.00
D20PLUMBING
D2010Plumbing Fixtures
a. Water closet including partitionse.a
b. Rinsing spraye.a
c. Toilet paper holdere.a
d. Toilet shelfe.a
e. Washbasine.a
f. Towel hangere.a
g. Mirrore.a
h. Cloth hooke.a
j. Soap holdere.a
n. Urinale.a
Sub-Total D20100.00
D2020Domestic Water Distribution
D202001Pipe, fittings, and associated worksLS
a. Hose bibLS
b. Others
Sub-Total D20200.00
D2030Sanitary Waste
D203001Soil and waste pipe, fittings, and associated worksLS
D203002Vent pipe, fittings, and associated worksLS
D203003Floor drainLS
Sub-Total D20300.00
D2040Rain Water Drainage
D204001Rain pipe, fittings, and associated works
D204002Roof drain
Sub-Total D20400.00
D30HVAC
a. 18000 BTU cooling ACe.a
b. Oscillating fane.a
c. Exhaust fane.a
Sub-Total D300.00
D40FIRE PROTECTION
a. Fire extinguisherLS
Sub-Total D400.00
D50ELECTRICAL
D5010Electrical Service and Distribution
a. Incoming electrical supplyLS
D501002MDBLS
D501005Branch circuit panelboardsLS
Sub-Total D50100.00
D5020Lighting and Branching Wiring
D502001Branch wiringLS
D502002Lighting equipment
1. DownlightLS
2. Decorative/accent lighte.a
3. Wall washer and wall mounted lightse.a
a. Power supply system for the followings:
1. Telephone systemLS
2. Water pumping systemLS
b. Emergency lightse.a
c. Illuminated exit lightse.a
d. Switch & SocketLS
e. Power supply for AC, ventilationLS
Sub-Total D50200.00
D5030Communications and Security
D503001Fire Alarm Systems
a. Addressable fire alarm systemLS
D503002Telecommunications Systems
a. Telephone systemLS
b. Wireless internet systemLS
D503004CCTV
a. CamerasLS
b. Recording systemLS
Sub-Total D5030
D5090Other Electrical Services
D509001Grounding systemLS
D509004Lightning protection system.LS
Sub-Total D50900.00
E10EQUIPMENT
RO water purification system 20L/he.a
Raw water fulter system 800L/he.a
Computer core i5 RAM 8Gb, HDD 500Gbe.a
Solar heater 300Le.a
Sterilizer 50Le.a
Desiccator 150Le.a
Sub-Total E10
E20FURNISHINGS
Swivel stoole.a
Medicine cabinet 2mx1.5mx0.5me.a
Wall-hung medicine cabinet 3mx1.5mx0.5me.a
Patient bed with matresse.a
Movable treatment bed (adjustable type)e.a
Bed side cabinetset
Hospital gurneyset
Instrument traye.a
IV stande.a
OBGYN (Obstetrics and Gynecology) examination bede.a
Bath tub for new born babye.a
Cabinet for laboratorye.a
Working table and chaire.a
Reception counter with 2 chair and filing cabinete.a
Storage cabinete.a
Chair (Waiting area and Vaccination room)e.a
Dustbin 20Le.a
Dustbin 120Le.a
Room key tagse.a
Key boxe.a
Sub-Total E200.00
G10SITE PREPARATION
G1010Site Clearing
G101001Remove above ground vegetation including stumps, and treesLS
GrubbingLS
G101006Disposal of materialsLS
Sub-Total G10100.00
G1030Site Earthwork
G1030001Leveling, flattening, and gradingLS
a. ExcavationLS
b. Filling / replacing material removed during excavationLS
- Filling the whole site +0.5mm2
- Filling for clinic building +0.75mm2
- Filling for parking area +0.25mm2
- Filling for medical waste storage +0.25mm2
c. Soil compactionLS
Sub-Total G10300.00
G20SITE IMPROVEMENT
a. WalkwayLS
b. Room signageLS
c. Dedication plaqueLS
d. Clinic signage at gateLS
Sub-Total G200.00
G30SITE CIVIL/MECHANICAL UTILITIES
G3010Water Supply
b. Non-potable water storage tankLS
c. Pumping stationLS
1. Water pump
2. Control panel
3. Piping and accessories
4. Pump house
Sub-Total G30100.00
G3020Sanitary Sewer
a. Sanitary sewer pipingLS
b. Sanitary sewer manholes and cleanoutsLS
c. Domestic wastewater treatment systemLS
d. Medical wastewater treatment systemLS
e. Effluent discharge systemLS
Sub-Total G30200.00
G3030Storm Sewer
a. Storm sewer collection systemLS
b. CulvertsLS
c. HeadwallsLS
d. Erosion and sediment control systemLS
Sub-Total G30300.00
X10FIELD REQUIREMENTS
a. Obtain all appropriate permits and clearance (if any)LS
b. Mobilization/DemobilizationLS
c. Temporary facilities
1. FencingLS
2. Site officeLS
3. StorageLS
4. Workers campLS
5. ToiletsLS
d. Soil investigationLS
e. Site accessLS
f. Professional feesLS
1. SuperintendentLS
2. Safety OfficerLS
3. Quality control
g. Temporary utilitiesLS
1. Electrical supplyLS
2. Water supplyLS
h. Safety implementationLS
i. Tests and commissioningLS
j. TransportationLS
k. Repair damagesLS
l. Technical training for the end userLS
Sub-Total X100.00
X20OFFICE OVERHEAD
a. Home office operations
1. Administrative feesmonth
2. Documentation and drawingsLS
3. TelecommunicationsLS
b. TransportationLS
c. Design fees
1. Engineering design feesLS
2. Architectural design feesLS
d. Post-award professional services
1. Engineering feesLS
2. Architectural feesLS
Sub-Total X200.00
X30PROFIT
a. Contractor's forecasted profit%
Sub-Total X200.00
TOTAL CLIN 000010.00
Period of performance:
Estimated 11 months (330 days) based on actual progress of similar projects with allowance of coordination with local authority
Remarks:
1Local authority is responsible for existing structure demolition
2Assumed no VAT will be applied
CLIN 00001: DESIGN AND CONSTRUCTION WORKS0.00
OF THE THANH THINH COMMUNE CLINIC

TOTAL 0.00

Enclosure 4 - BOQ &"Arial,Regular"&9N6274225R6507 &"Arial,Regular"&9Page &P of &N