Enclosure (2) Navy Service PM Data Sheet 2023.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Turbine Marine Gas Turbine Generator Maintenance and Operation Support Services
Solicitation number
N6824624Q0018
Issued by

About this file

This document is a Navy Service PM Data Sheet for a 1MW Gas Turbine Generator (GTG) periodic maintenance service requirement. It provides a detailed checklist for conducting pre-run, during-run, and post-run inspections and tests on the generator set, including the turbine prime mover, electrical systems, and trailer/mobility components.

The related federal contract opportunity is a combined synopsis/solicitation for Turbine Marine Gas Turbine Generator Maintenance and Operation Support Services. This is a sole source requirement for Turbine Marine, Inc. to provide firm-fixed-price services in accordance with the Performance Work Statement. The contract will have a base period plus up to two option periods. The requirement is set aside for small businesses under NAICS code 333611 with a size standard of 1,500 employees. Quotations are due by the response date and time specified in the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Data Input Blank 10-9-23

GENERATOR SERVICE DESCRIPTION P/N: TMC56334801.1MW
Gas Turbine Generators (GTG) 1MW, 460Vac Primary 3-Phase 60 Hz.
Periodic Maintenance (PM) service Introduction, overview and check list.
Check all Generator components before (PM) service run.
Basic operational checks shall be conducted prior and during the (PM) runs of the Generators.
This shall include the primary equipment, and all associated equipment to demonstrate full functionality of the total equipment system.

Proper operation of all manual and automatic controls, prime-mover, and adjusting mechanisms and accessories shall be verified during this period.

The prime-mover de-rating chart must be used during Load testing.
The Turbine engines display air temperature indicator, will determine what ambient de-rating to use during required load testing. Reference operating manual for
ambinet de-rating.
GENERATOR AC 3-PHASE ELECTRICAL CHARACTERISTICS CHECKS:
1000 kW /1250 kVA Prime Minimum Rating at ISO 15C° / 59F° Ambient Conditions.
(De-rating chart will be used during testing for proper loading)
460Vac Primary Voltage +/- 20Vac.
60Hz. Ensure frequency regulation is +/- 5% of rated frequency of 60 Hz (57Hz - 63Hz)
3-phase ABC Rotation
Breaker status and operation function
Testing: (25% - 50% - 75% - 100% Load-steps per ambient de-rating schedule)
UN-GROUNDED POWER GROUND FAULT SYSTEMS CHECKS:
An active DC Ground Fault tester can be used during service runs if required, to ensure proper generator ground isolation during operation.
Generator Chassis Safety Grounding point must always be used during PM testing and Operation.
Pre- Running Notes:
Diesel fuel for the loaded runs, and JP fuels for flushing are also acceptable fuel combinations.
JP Fuels are preferred for the entirety of the Service runs.
Generator Controls Visual Checks:(Initial)
Pre-RunDuring-RunPost-Run

Visual Woodward 3400 XT Electrical Monitoring and Operating system checks.

Comments:

(Initial)
Pre-RunDuring-RunPost-Run
7” Woodward HMI remote monitoring screen suitcase, with generator Start, Stop and generator breaker Closure Function Test

Comments:

(Initial)
Pre-RunDuring-RunPost-Run
Generator Load-Sharing Can bus communications test
(Load-sharing test by request of customer only).
Comments:
(Initial)
Pre-RunDuring-RunPost-Run
Panels, Starters, Relays, Switches, and Wiring shall be in good and working order
Comments:
(Initial)
Pre-RunDuring-RunPost-Run
24V Battery Condition
Comments:
(Initial)
Pre-RunDuring-RunPost-Run
Check 24VDC Trickle charger battery maintainer
Comments:
(Initial)
Pre-RunDuring-RunPost-Run
Check control display information Error / Interlock messages
Comments:

Pre-Run Turbine Prime Mover Systems Check: (Initial)

Start Fuel Nozzles (4) replace with cleaned serviced nozzles every PM Test Cycle

Check for start fuel nozzle fuel leaks during start and run.
Comments:
Fuel tank and fuel line
Comments:
Fuel Pressure
Comments:
24V Electrical Starting System
Comments:
Date
24V Battery Condition Check. (Replace every 3 Years)/ /
Date of last replacement
Comments:
Check 24VDC Trickle Charger Battery Maintainer Output Test
Comments:
Exhaust system, mounting, hardware and heat Insulation
Comments:
Primary Fuel filter (Replace every 6 months)Date/ /
Date of last replacement
Comments:
Engine Air Intake Filters (Replace Every 12 Months or when indicated on Woodward Display)Date/ /
Date of last replacement
Comments:
Alternator Air Intake Filters (Replace Every 12 Months or when indicated on Woodward display)Date/ /
Date of last replacement
Comments:
Engine to Alternator Coupling bolts Re-Torque and Re-Grease (Every 12 months)Date/ /
Date of last replacement
Comments:

Check all Turbine engine sensors under pre-run static conditions, to detect any comunication failures.

Fuel Pressure Static(PSI)
Comments:
Fuel Level(Day Tank Fuel %)
Comments:
Oil Pressure Static(PSI)
Comments:
Oil Level (Visual)Date/ /
Top off when required.
Perform Oil Acid Level checks annually.
Replace Oil every 2 years.
Comments:
Oil Temperature Static(F°)
Comments:
Ambient Inlet Air Sensor Static
(F°)
Comments:
Turbine Exhaust Engine Temperature Static
(EGT-C°)
Comments:
Turbine RPM Static
N1% and N2%
Comments:

General generator status Warnings / Shutdowns / Interlocks / Permissive Logic errors etc.

Comments:

TRAILER AND MOBILITY

Tire Pressures(PSI)
Comments:
Axle lube oil
Comments:
Wheel Lug maintenance(Torque Ibs)
Comments:
Brake away Battery
Comments:
Leveling jacks
Comments:
TECHNICAL DATA UPDATES:
Updates and Replacements
(Update date)
Comments:
Operation procedure Updates
(Update date)

Hard Copies (Update date )

Digital Copies (Update date )

Comments:

Additional Comments:

Service Person Name (Printed)

Service Person Signature Date

&"Calibri (Body),Regular"&14Turbine Marine Inc.

PM Run Sheet 10-9-23

PM RUN SHEET

Date:

SN:
QuarterlyAnnually1 Rated for 1MW@59°F ISO
200KW500KWFull Ambient Corrected load1000KWAmbient Temperature
Volts (Ph to PH +/-0.5%):BatteryStatic VDc (24v-28v):
Frequency (60Hz +/- 0.5%):Running VDc:
Amps:Charging VDc:
Oil Pressure (0-100psi):In service date:
Oil Temp (Ambient - 190F):Mfg date Front:
EGT (Ambient - 650°C):Mfg date Rear:
Fuel Press (0 - 80psi):HoursHrs In:
N1 SpeedHrs Out:
(4) start fuel nozzles exchanged* Replace batteries 4 years from in service date.
Additional Comment:
1
2
3
4
5
Service Person Name (Printed)_______________________________
Service Person Signature_______________________________Date ____________

&G