Enclosure (2) of CNRMCINST 4280.1B is a detailed instruction document outlining the Master Ship Repair Agreement (MSRA) eligibility requirements for naval ship repair contractors. The document establishes a four-tier vessel repair certification process categorized into MSRA Tiers I, II, and III, and the Agreement for Boat Repair (ABR), designed to ensure contractors can perform comprehensive ship maintenance and repair services for the U.S. Navy.

The instruction specifies rigorous qualifications for contractors, including demonstrating capabilities in administration, financial control, production management, technical support, material procurement, subcontractor management, quality control, safety, security, and environmental compliance. Contractors must be able to execute repair availabilities ranging from 1,040 to 22,000 man-days, perform at least 55% of work using their own resources, and undergo periodic recertification every five years. The agreement covers repair work for naval vessels, with specific requirements for facilities, equipment, workforce expertise, and technical competencies across multiple skill sets such as ship-fitting, welding, electrical systems, machinery repair, and electronic testing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NA VY

COMMANDER

NAVY REGIONAL MAINTENANCE CENTER

9170 SECOND STREET, SUITE 245

NORFOLK, VA 23511-2325

CNRMC INSTRUCTION 4280. lB

From: Commander, Navy Regional Maintenance Center

CNRMCINST 4280. lB C400

Subj: MASTER AGREEMENT FOR REPAIR AND ALTERATION OF VESSELS; MASTER

SHIP REPAIR AGREEMENT (MSRA) AND AGREEMENT FOR BOAT REPAIR

(ABR)

Ref: (a) DOD Federal Acquisition Regulation Supplement, Part 217, Subpart 217.71, Master

Agreement for Repair and Alteration of Vessels

Encl: (1) MSRA/ABR Notional Processing Timeline

(2) MSRA Eligibility Requirements

(3) ABR Eligibility Requirements

(4) MSRA Assessment Checklist

(5) ABR Assessment Checklist

1. Purpose. To revise the policy, guidelines, and procedures governing the application for and issuance of the Master Ship Repair Agreement (MSRA) and the Agreement for Boat Repair

(ABR), per enclosure (1), to firms meeting the eligibility requirements prescribed in enclosure

(2) and (3), with the RMCs utilizing enclosure (4) and (5) to support.

2. Cancellation. CNRMCINST 4280. lA.

3. Background. Coordinated by Commander, Navy Regional Maintenance Center (CNRMC) Naval Sea Systems Command (NA VSEA) issues all MSRA and ABR agreements in the continental United States plus Hawaii. CNRMC has overall responsibility for the management of the MSRA and ABR certification processes. This instruction provides clarification and updates to the requirements of MSRA and ABR certifications. Naval Supply Systems Command issues all MSRA and ABR agreements outside the continental United States to include Forward Deployed Regional Maintenance Center; and Ship Repair Facility-Japan

Regional Maintenance Center.

4. Discussion

a. The type of work that comprises ship repair, and the conditions under which it is performed, require that NA VSEA contract only with ship repair companies that are fully capable of conducting all aspects of shipboard work. The compact arrangement of machinery and systems aboard ship, the sophistication of systems installed in naval ships, and the Navy's

DISTRIBUTION STATEMENT D. Distribution authorized to DoD and U.S. DoD contractors only. Other requests shall be referred to CNRMC.

30 May 25

CNRMCINST 4280. l B absolute requirement for reliable operation, create a unique repair environment that demands special expertise and capability. Naval ships are designed and built with a high degree of interaction among components and systems. Repairs or modifications to a single system or component may have wide-spread effects on the operation of many other systems or components that are physically remote from the one being repaired. A thorough understanding of these effects and the ability to manage shipboard work as an integrated package are essential.

a. Successful accomplishment of ship repair work requires careful coordination of a work force possessing a wide mix of skills and trades. Even relatively minor repairs may entail the following, but not limited to:

(l) Advance planning;

(2) Engineering;

(3) Material identification and procurement;

( 4) Material management;

(5) Work site preparation;

(6) Rip-out and removal of interferences;

(7) Handling, removal and disposal of hazardous materials/wastes;

(8) Removal, disassembly, repair and reassembly;

(9) Reinstallation and test;

( 10) Restoration and test of interferences;

(l 1) Work site restoration;

( 12) Quality Assurance;

( 13) Integrated system testing;

( 14) Updating of documentation;

( 15) Safety Requirements;

( 16) Physical and information assurance security;

( 17) Maintenance Support Computer Software and Hardware.

b. Timeliness, safety, and quality control are of utmost importance in the conduct of ship repair in order to return the ship to a mission-ready state as well as to provide maximum assurance that it will remain so while deployed until the next scheduled maintenance period.

c. The four-tier vessel repair certification process, MSRA (Tiers I, II, and III) and the ABR, has been established to ensure the Navy receives a satisfactory repair effort and to promote an active, competitive private sector industrial base to repair Navy ships. A Contractor may hold both an MSRA and an ABR, depending on their levels of expertise, capability and workload capacity.

5 . Policy

a. Master Ship Repair Agreement (MSRA)

( l) The MSRA is not a contract; it is a location specific contract agreement vehicle issued to those firms that have the facilities, management, organization and production capabilities to perform an entire repair and alteration package of varying levels of complexity. This written instrument contains clauses, terms and conditions applying to future contracts for repairs, alterations and/or additions to vessels. Additionally, it contemplates separate future contracts that will incorporate by reference or attachment the required and applicable clauses agreed upon in the master agreement. Contractors must submit separate applications for each location for which certification is desired.

(2) MSRA Tier I, II and III eligibility requirements are set forth in Enclosure (2).

(3) All MSRA tiers will be required to recertify every five (5) years; or earlier if required based on a significant change in a firm's status, e.g. mergers, novation agreements, company closure, etc. Recertification applications must be submitted to CNRMC a minimum of six months prior to expiration, submittals received any later and the contractor risks timely recertification before cancellation of the existing agreement. Major organizational shifts in a firm, including novation agreements, mergers, etc., require a firm to recertify within one ( l) year of finalization. Failure to re-certify will result in the cancellation of the existing MSRA.

(4) The Defense Contract Management Agency (DCMA) requires an annual financial capability evaluation, initiated by the cognizant Contracting Officer at the respective Regional Maintenance Center (RMC), on the annual anniversary of the MSRA approval.

(5) Contractors failing to meet the full minimum requirements for the MSRA Tier applied for are highly encouraged to apply for a lower MSRA Tier or ABR to maintain or build experience and participation in the surface ship repair environment while working to improve upon their desired MSRA Tier eligibility.

b. Agreement for Boat Repair (ABR)

( l) The ABR is not a contract; it is a location-specific contract agreement vehicle issued to those firms that demonstrate managerial capabilities to schedule and to control boat/craft repairs in a specific location. This written instrument contains clauses, terms, and conditions applying to future contracts for repairs, alterations and/or additions to vessels. Additionally, it contemplates separate future contracts that will incorporate by reference or attachment the required and applicable clauses agreed upon in the master agreement. Contractors must submit separate applications for each location for which certification is desired.

CNRMCINST 4280.1 B

(2) ABR eligibility requirements are set forth in Enclosure (3).

(3) The foundation for an ABR is validation that a firm has the management, production, organization and facilities to accomplish the technical and production capabilities to repair steel, aluminum, or fiberglass hulled vessels.

(4) ABR s will be recertified every five (5) years; or earlier if required based on a significant change in a firm's status, e.g. mergers, novation agreements, company closure, etc. Recertification applications must be submitted to CNRMC a minimum of six months prior to expiration, submittals received any later and the contractor risks timely recertification before cancellation of the existing agreement. Major organizational shifts in a firm, including novation agreements, mergers, etc., require a firm to recertify within one (I) year of finalization. Failure to re-certify will result in the cancellation of the existing ABR.

(5) The Defense Contract Management Agency (DCMA) requires an annual financial capability evaluation, initiated by the cognizant Contracting Officer at the respective Regional Maintenance Center (RMC), on the annual anniversary of the ABR approval.

c. The MSRA and ABR eligibility requirements reflect a generic work package requirement;

therefore, the Procuring Contracting Officer (PCO) of a ship repair contract may determine that a complete Pre-Award Survey is required prior to award of a job order to verify a contractor's managerial capabilities, financial status, production capacity, percentage of work subcontracted, and/or facilities capabilities and capacities among other factors. PCOs may determine not to award job orders to Contractors based solely on their MSRA / ABR certification. The PCO may determine to use specific MSRA / ABR certification requirements as an eligibility factor for contract award.

d. Neither an MSRA Tier, nor the ABR, is to be used to evaluate the qualification requirements for submarine repair work.

6. Responsibilities

a. Regional Maintenance Centers (RMC) will:

(1) Designate an MSRA/ABR Manager within the Contracts Department to be the single point of contact for MSRA/ ABR applications for their region. The Engineering, Quality Assurance, Safety, Security and Waterfront Operations departments will assign a point of contact to coordinate all required support to the MSRA / ABR Manager.

(2) Maintain records on all site survey results and command recommendations.

(3) Coordinate and schedule, via the MSRA / ABR Manager, the date and time for the site survey in support of application packages following the notional timeline in enclosure (I).

RMC site survey team members will include representatives from Engineering, Quality

Assurance, Safety, Security, Waterfront Operations, Contracting, and any other technical representatives needed. The site survey team will utilize enclosures (4) or (5), as determined by the submitted application, to perform the site survey.

CNRMCINST 4280.lB

(4) Communicate regularly with the CNRMC MSRA/ABR Program Manager regarding the scheduling and execution of site surveys.

(5) Provide to CNRMC MSRA/ABR Program Manager, on command letterhead, a recommendation to approve or hold in abeyance an application, along with the command's findings and assessment from the site survey supporting the recommendation.

b. Commander, Navy Regional Maintenance Center:

(1) The CNRMC Contracts Directorate (C400) will be the MSRA/ABR Program Office.

The MSRA/ABR Program Manager will be the point of contact for all applicants and will provide updates, as required, on processing of applications, including adherence to the processing timeline in enclosure (1). The MSRA/ABR Program Manager will receive and review all MSRA and ABR applications and will facilitate gathering from applicants any additional documentation required in support of their application prior to sending to the cognizant RMC for action.

(2) CNRMC will ensure RMCs understand their responsibilities in accordance with this instruction.

(3) The CNRMC MSRA/ABR Program Manager will maintain the overall MSRA/ABR database and notify cognizant RM Cs of pending applications and site surveys. The MSRA/ ABR Program Manager will maintain the necessary documentation and data in support of the survey team and RMC recommendations to facilitate contractor debriefings, media inquiries, or Congressional correspondence.

(4) All MSRA and ABR application site survey results and recommendation letters will be reviewed by the requisite CNRMC Department to ensure eligibility requirements have been met. Any eligibility discrepancies noted by the RMC will be presented to the applicant and the application will be held in abeyance for 90 days while the company makes the appropriate corrections. Contractors may request up to a 30-day extension (up to 120 days total). If corrections are not received within the allotted time period, the company will be required to submit a new application, and any active agreement will be cancelled.

(5) The MSRA/ ABR Program Manager will conduct briefings with MSRA/ ABR applicants on survey results and respond to media and/or Congressional inquiries on non contractual issues related to the program.

(6) The MSRA/ABR Program Manager will draft a recommendation letter to approve or hold in abeyance an application and forward to the CNRMC Executive Director or Deputy Director for signature.

(a) Positive endorsements of an application will be forwarded to NA VSEA Contracts

- Fleet Support (NAVSEA 024) for review and issuance of the requisite MSRA or ABR.

CNRMCINST 4280. lB

(b) For applications being held in abeyance, the MSRA/ABR Program Manager will prepare a Letter of Deficiency, addressed to the applicant, identifying all the discrepancies with the application or deficiencies noted by the RMC. Further action on the application will be suspended until all deficiencies have been corrected in accordance with paragraph b. (4) above.

(7) The MSRNABR Program Manager will coordinate with NAVSEA 024 for the termination or cancellation of existing MSRAs or AB Rs, as required.

c. Naval Sea Systems Command, Contracts Directorate - Fleet Support (NA VSEA 024):

(l) NAVSEA 024 will review all recommendations to approve MSRA or ABR applications. If NA VSEA 024 concurs with the recommendations, they will issue an MSRA or ABR, providing a copy of the signed agreement to CNRMC's MSRA/ABR Program Manager, cognizant RMC, and coast wide naval repair organizations (Military Sealift Command/shipyards/RM Cs).

(2) If a recommendation is made to suspend or terminate an existing MSRA or ABR, NA VSEA 024 will coordinate with CNRMC for supporting documentation and information.

(3) NAVSEA 024 will be the point of contact for all MSRA and ABR contractual issues, as well as serve as liaison with the Military Sealift Command.

7. Format of the MSRA and the ABR. The format and content of all Master Agreements for Repair and Alteration of Vessels will be in accordance with Defense Acquisition Regulation Supplement (DFARS) Procedures, Guidance, and Information (PGI) Subpart 217.71.

8. Records Management. Records created as a result of this instruction, regardless of media and format, must be managed per Secretary of the Navy Manual 5210. l of September 2019.

9. Review and Effective Date. Per OPNA VINST 5215.17 A, CNRMC C400 will review this instruction around the anniversary of its issuance date to ensure applicability, currency, and consistency with Federal, Department of Defense, Secretary of the Navy, and Navy policy and statuary authority using OPNA V 5215/40 Review of Instruction. This instruction will be in effect for 10 years, unless revised or cancelled in the interim, and will be reissued by the 10-year anniversary date if it's still required, unless it meets one of the exceptions in OPNA VINST

5215.17 A, paragraph 9. Otherwise, if the instruction is no longer required, it will be processed for cancellation as soon as the need for cancellation is known following the guidance in OPNA V Manual 5215. l of May 2016.

C,JSl-,44-L ) 0 tvtA-y -z.s

D. L. LANNAMANN

CNRMCINST 4280. IB

Releasability and distribution: This instruction is cleared for release and available electronically only via CNRMC SharePoint Portal to users with a Flank Speed Email at https://flankspeed.sharepoint- mil.us/sites/NAVSEA CNRMC (choose "Sign in with CAC/PIV).

Go to the "CNRMC Instructions and Notices" folder under "Command Tools".

MSRA/ABR NOTIONAL PROCESSING TIMELINE

Upon receipt of an application, the CNRMC MSRA/ ABR Program Manager will document receipt, review the application for completeness and request any missing infonnation from the applicant. After review, the CNRMC MSRA/ABR Program Manager will upload the application and requisite documents to the CNRMC Share Point Site and notify the RMC MSRA/ ABR Manager of the pending application. The RMC MSRA/ ABR Manager will provide a notional timeline of completion to the CNRMC MSRA/ ABR Program Manager in accordance with the timeline below. This timeline is notional and assumes no significant issues with the application; actual processing time is dependent on the applicant's level of preparation, completeness of the application package, and schedule availability.

Action Responsible Office Time to Total Time

Complete (days)

Document receipt of

CNRMC C400 01 01

application

Complete Package

CNRMC C200, C300 & C400 10 11

Review

Receipt & Review of additional application

CNRMC C200, C300 & C400 10 21

information from

Contractor, if applicable

Submit Application

Package to RMC CNRMC 400 I 22

(Post to Share Point)

RMC Engineering, QA, Safety, RMC Complete Security, Waterfront Operations, 15 37

Application Review Contracting, & other Codes as needed

RMC Engineering, QA, Safety, Coordinate Site Survey Security, Waterfront Operations, 10 47 Contracting, & other Codes as needed & Contractor

RMC Engineering, QA, Safety, Execute Site Survey Security, Waterfront Operations, 30 77 Contracting, & other Codes as needed & Contractor

Enclosure (I)

Document Survey RMC Engineering /QA, Safety , Findings Deficiencies & Security, Waterfront Operations, 10 87

Issue RMC Contracting, & other Codes as

Recommendation needed

Review Site Survey and

CNRMC C200, C300 & C400 10 97

RMC Recommendation

Prepare CNRMC

CNRMC C400 5 102

Recommendation Letter

CNRMC

Recommendation CNRMC ED or DD IO 112

Approval

Provide CNRMC

Recommendation to CNRMCC400 I 113

NAVSEA024

Issue MSRA/ ABR NAVSEA024 15 123

Enclosure ( l)

CNRMCINST 4280.IB

Master Ship Repair Agreement <MSRA} Eligibility Requirements

I. The MSRA is a location specific contract agreement vehicle. Contractors must be recognized as engaged in ship repair work and submit a separate application for each location for which an agreement is desired.

2. The North American Industry Classification System (NAICS) was established in 1997, replacing the Standard Industrial Classification (SIC) system. The NAICS provides a standardized system for classifying businesses by industry and facilitating data comparability across North America. In the United States, the process is managed by the Office of Management and Budget's Economic Classification Policy Committee.

a. Prospective MSRA contractors must provide sufficient documentation to CNRMC to indicate they meet the general criteria of the following applicable NAICS codes. Documentation can include a copy of the contractors' Classifications within the System for Award Management.

( l ) 336611 Ship Building and Repairing. Establishments primarily engaged in operating shipyards. Shipyards are fixed facilities with drydocks and fabrication equipment capable of building a ship, defined as watercraft typically suitable or intended for other than personal or recreational use. Activities of shipyards include the construction of ships, their repair, conversion and alteration, the production of prefabricated ship and barge sections, and specialized services, such as ship scaling.

3. The MSRA program has been divided into three tiers based on complexity, duration and workload (man-days) of the availability and the contractor's ability to perform this work with organic resources and infrastructure. Contractors will submit one application for the highest level desired which will include the lower-level designations.

a. Tier l MSRA contractors must be capable of executing Selected Restricted Availabilities (SRA) of a vessel with these characteristics: length 387.6 feet, ( l 18.l meters); beam 57.7 feet, ( l 7.6 meters); displacement, approximately 3,450 MT full load; and draft 14. l feet, (4.3 meters), consisting of 22,000 man-days within 180 days, within their own facilities, perfonning 55% of a work package utilizing their own shops and work force. Tier I MSRAs must own or have a dedicated (i.e. sole use and access) lease of piers or NA VSEA certified dry-docks in which they perform work. The tenns of a Tier l MSRA for contractors with leased piers or dry docks will be tied to the lease expiration date or 5-year renewal date, whichever is sooner.

b. Tier 2 MSRA contractors must be capable of executing Selected Restricted Availabilities (SRA) consisting of 22,000 man-days within 180 days, utilizing government provided facilities

(piers and/or dry-dock), performing 55% of a work package using their own shops and work force.

Enclosure (2)

c. Tier 3 MSRA contractors must be capable of performing a Continuous Maintenance Availability (CMA V) consisting of 1,040 man-days within 40 days, utilizing either their own or government provided pier facilities, perfonning 55% of a work package using their own shops and work force.

4. The MSRA contractor's capabilities to perform the full scope of planning, estimating, engineering, quality control, shipboard/off ship production and component/system testing, and trials will be evaluated to determine eligibility. Further, the contractor must be capable of subcontracting for those elements beyond their managerial, technical, or physical capability or capacity while ensuring adequate oversight of subcontracting effort. MSRA contractors must also be capable of developing and executing an integrated schedule including the ability to manage the cost, quality, and timeliness of subcontractor performance.

5. Such an organization includes established organizational elements as set forth below. These characteristics will be evaluated via the application process to include a site visit to detennine a firm's eligibility for an MSRA:

a. Administration/Management Control. Applicants shall be established organizations geared toward ship repair. They will be evaluated on the size, workload, and complexity that can be accomplished using organic resources, as well as if they have the ability to identify problems and corrective actions using technology, innovation, and process improvement to prevent recurrence. The contractor's organization must have clear lines of authority, delegation of responsibility and mid-level managerial positions in place. The contractor must also have qualified and experienced employees with ship repair experience and the capability to develop and integrate planning, estimating and scheduling functions and defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.

b. Financial Control {evaluated by DCMA). The cognizant Contracting Officer at the RMC will request the Defense Contract Management Agency (DCMA) perform a General Financial Capability evaluation as part of the site visit. At a minimum, DCMA will provide an evaluation of the firm's accounting system, their ability to segregate costs, aZ-Score, current and acid test ratios, credit availability or other source of financial income to support the work effort, and whether accounts payable are aging. Although MSRA renewal is performed every five (5) years, all MSRA holders must have a General Financial Capability evaluation conducted annually or sooner if a firm experiences a major financial shift in assets or a significant change in a firm's status, e.g. mergers, novation agreements, company closures etc.

c. Production Control. An applicant must have a production organization, on board ( or ability to obtain), with trade mix/skills to perform ship repair work. An applicant must also have the ability to control and integrate production efforts to include outside organizations' work and the ability to deconflict work teams and processes. Finally, an applicant must establish use of scheduling techniques and methods of progressing, tools and test equipment to support production work and subsequent component and system testing, and training available to trades employees.

d. Production Technical Support.

( l) Engineering and design support ability (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to the Navy for final approval.

(2) Engineering ability to evaluate inspection reports ( e.g. NDT results, clearance and alignment results, etc.) and recommend specific repair courses of action for final Navy approval.

(3) Engineering and technical writing ability to develop technical repair procedures in accordance with Navy governing documentation to submit to Navy for final approval.

(4) Ability to perform Engineering calculations to maintain ship stability throughout duration of availability execution.

e. Material/Procurement Control. A material purchasing department with staff.

Procedures for planning, control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, disposition and disposal). An inventory system - for ordering, tagging, warehousing, managing, and accounting for materials. Contractor Furnished Materials (CFM) I Government Furnished Materials (GFM) storage, control and protection. Existing environmentally- controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. Prospective MSRA holders must have an ISO 900 l Series compliant Quality Management System (QMS) and a quality control organization/department/staff. Written Quality Assurance procedures/manual, Calibration and metrology system, and test memo writing capability.

NOTE: An ISO 900 l Series certified system is not required. Additional QMS requirements may be required by specific contracts including NA VSEA Standard Item requirements.

h. Fire Safety. Fire Safety Organization (Hot Work Coordinator, Fire Watches, Temporary Service Coordinator, Shipyard Competent Person). Fire protection/procedures. Fire Safety Plan/ Fire response (internal/ external) Procedure, hot work and gas free procedures. Fire safety training and exercises.

i. Safety. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services.

j. Security. Meet the conditions for Force Protection Condition (FPCON) NORMAL as identified in 009-72 to include perimeter physical barriers, perimeter openings control, access and circulation control, armed security force, protective lighting, signs and posting of boundaries, security force communications and random antiterrorism measures (RAM).

k. Environmental Organization / Manager. Proper procedures, experience, training and facilities to meet the legal requirements for all federal, state and local environmental requirements including, but not limited to, removal, storage and disposal of hazardous waste, management of hazardous material, compliance with air pollution and water / stonnwater regulations. Segregated storage. Documentation of licensed and trained subcontractors responsible for control of hazardous waste removal, storage and disposal, air pollution requirements and water / stormwater requirements. Appropriate state/federal agency issued hazardous waste generator number and required environmental pennits / regulations. Disposal records which indicate type of material, date and place of disposal.

l. Facilities and capabilities. The MSRA applicants' facilities must be in the location for which they are applying for the agreement. If a company desires an MSRA in multiple ports, separate applications must be submitted for each locality and for the appropriate tier based on the facilities the company has in that specific location. The MSRA applicant must complete and submit a SF-17 as part of the application process for each desired location.

( 1) Tier 1 MSRA contractor must be capable of executing Selected Restricted Availabilities (SRA) of a vessel with these characteristics: length 387.6 feet, (118.1 meters);

beam 57.7 feet, (17.6 meters); displacement, approximately 3,450 MT full load; and draft 14. l feet, ( 4.3 meters), consisting of 22,000 man-days within 180 days, within their own facilities, performing 55% of a work package utilizing their own shops and work force.

(a) Tier I MSRAs must own or have a dedicated (i.e. sole use and access) lease of piers or NAVSEA certified dry-docks, with services in place, in which they perform work.

(b) The terms of a Tier l MSRA for contractors with leased piers or dry-docks will be tied to the lease expiration date or 5-year renewal date, whichever occurs first.

(c) Pier fire lanes and marking must be in accordance with Appendix (0) of NAVSEA Technical Publication S0570-AC-CCM-0 l 0/80 l 0 Industrial Ship Safety Manual for Fire Prevention and Response.

(2) Tier 2 MSRA contractors must be capable of executing Selected Restricted Availabilities (SRA) consisting of 22,000 man-days within 180 days, utilizing government provided facilities (piers and/or dry-dock), perfonning 55% of a work package using their own shops and work force.

(3) Tier 3 MSRA contractors must be capable of performing a Continuous Maintenance Availability (CMA V) consisting of 1,040 man-days within 40 days, utilizing either their own or government provided pier facilities. If they use their own piers, services must be in place.

6. It is up to the MSRA applicant to identify in their application package the shops and types of work, along with the percentage / man-days of work that they will perform organically to meet the organic requirement. Skill sets and production shops that will be evaluated include (but are not limited to):

a. Ship-fitting work. Rip out, alteration, repair, and installation of ship's hull and superstructure including hull plates, frame structure, metal deck plating and grating, hull fittings such as davits, fairleads, chocks, bollards, watertight doors, hatches, fittings, scuttles, sockets, and deck rails.

b. Sheet Metal work. Rip out, alteration, repair and installation of ventilation ducting, berthing and messing equipment, partitions, racks, shelving and bin storage, galley and refrigerated space equipment, joiner doors and bulkheads.

c. Non-Nuclear Welding. Welding of ferrous and nonferrous material using shielded metal arc, gas metal arc, gas tungsten arc, oxygen-acetylene, and resistance welding equipment as appropriate.

d. Non-Destructive Testing. Inspection and interpretation of ferrous and nonferrous welds using visual testing, liquid penetrant testing, magnetic particle testing, and ultrasonic testing equipment as appropriate.

e. Pipefitting. Manufacture and replace parts, fabricate piping assemblies, perform hydraulic testing on piping assemblies. Assist in alignment of pipe runs, removal of worn or defective piping components.

f. Outside Machine. Repair, troubleshooting, test, reinstall, and align main propulsion and auxiliary feed pumps, including steering, windlass, capstan, compressors, feed pumps, forced draft blowers, steam turbines, shaft seals, evaporators, turbo generators, tank level indicators, deck machinery, gallery and scullery equipment, and laundry equipment.

g. Pump Repair. Disassemble, overhaul, repair, reassemble, inspect and align all types of pumps (except hydraulic) including centrifugal, gear, rotary and reciprocating pumps and air compressors.

h. Electrical. In work center - recondition motors, rewind armatures and stators, load test motors, repair emergency diesel stators, small boat generators, submersible pumps, starters, signal search lights, Direct Current (DC) power supplies, and overhaul running light panels, Motor Generator (M/G) set control cabinets, reversing controllers, and automatic bus transfers.

i. Outside Electrical. Provide technical assistance, troubleshoot, and test operations of ship's electrical systems and machinery. Inspect, test, and repair onboard ship's electrical equipment such as motors, generators, motor generators, propulsion motors, magnetic clutches, cables, control panels, motor starters, switches, navigation lights, resistor banks, appliances, lighting equipment, and repair starters.

j. Electronic Test, Repair and Alignment. Test and Repair General Purpose Electronic Test Equipment (GPETE), test, disassemble, clean, repair, overhaul, reassemble, calibrate and align communication and radar equipment. Miniature/Microminiature repair and limited automatic circuit card testing.

k. Interior Communication Test and Repair. Troubleshoot, repair and test ship's interior communication systems, alann systems, machinery control and indicating system, tape recorders and record players, and ship's navigation and control systems.

I. Riggers Support Activity. Operate cranes, booms, deck winches, chain falls, and other rigging and weight handling equipment including rigging booms and securing guys for loading and off-loading equipment, material and boats.

CNRMC1NST 4280. lB

A2reement for Boat Repair CABR) Eli2ibility Requirements

1. The ABR is a location specific contract agreement vehicle. Contractors must be primarily engaged in craft and boat (C&B) repair. An ABR also includes repairs on messing and berthing barges (M&B). A separate application is required for each location for which an agreement is desired.

2. The North American Industry Classification System (NAICS) was established in 1997, replacing the Standard Industrial Classification (SIC) system. The NAICS provides a standardized system for classifying businesses by industry and facilitating data comparability across North America. In the United States, the process is managed by the Office of Management and Budget's Economic Classification Policy Committee.

3. Prospective ABR contractors must provide sufficient documentation to CNRMC to indicate that they meet the general criteria of one of the following applicable NAICS codes.

Documentation can include a copy of the contractors' Classifications found on the System for Award Management or other similar publications.

a. 336611 Ship Building and Repairing. Establishments primarily engaged in operating shipyards. Shipyards are fixed facilities with drydocks and fabrication equipment capable of building a ship, defined as watercraft typically suitable or intended for other than personal or recreational use. Activities of shipyards include the construction of ships, their repair, conversion and alteration, the production of prefabricated ship and barge sections, and specialized services, such as ship scaling.

b. 336612 Boat Building. Establishments primarily engaged in building boats. Boats are defined as watercraft not built in shipyards and typically of the type suitable or intended for personal use. Included in this industry are establishments that manufacture heavy-duty inflatable rubber or inflatable plastic boats (RIBs).

4. The ABR contractor's capabilities to perform the full scope of planning, estimating, quality control, on-site/off-site production, component/system testing, and trials will be evaluated to determine eligibility. Further, the contractor must be capable of subcontracting for those elements beyond their managerial, technical, or physical capability or capacity while ensuring adequate oversight of subcontracting efforts. ABR contractors must also be capable of developing and executing an integrated schedule, including managing the cost, quality, and timeliness of subcontractor performance.

5. Such an organization includes established organizational elements as set forth below.

These characteristics will be evaluated via the application process to include a site visit to determine a finn's eligibility for an ABR:

a. Administration/Management Control. An established organization with clear lines of authority, qualified employees, rudimentary capability to develop schedules and defined managerial responsibilities

Enclosure (3)

b. Financial Control (evaluated by DCMA). The cognizant Contracting Officer at the respective RMC will request the Defense Contract Management Agency (DCMA) perfonn a General Financial Capability evaluation as part of the site visit. At a minimum, DCMA should provide an evaluation of the firm's accounting system, their ability to segregate costs, a Z-Score, current and acid test ratios, credit availability or other sources of financial income to support the work effort, and whether accounts payable are aging. Although ABR recertification is performed every five (5) years, all ABR holders must have a General Financial Capability evaluation conducted annually or sooner if a firm experiences a major financial shift in assets or a significant change in a firm's status, e.g. mergers, novation agreements, company closures etc.

c. Production Control. Applicants must have a production organization, on board ( or ability to obtain), with trade mix/skills to perfonn boat and craft repair work. Applicants must have the ability to control production efforts, including integration of outside organization work and ability to deconflict work teams and processes. Applicants must have established use of scheduling techniques and methods of progressing, tools and test equipment to support production work and subsequent component and system testing and training available to trades employees.

d. Production Technical Support. (in-house or subcontracted)

( l ) Engineering and design support ability with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to the Navy for final approval.

(2) Engineering ability to evaluate inspection reports (e.g. NOT results, clearance and alignment results, etc.) and recommend specific repair courses of action for final Navy approval.

(3) Ability to perform Engineering calculations to maintain C&B stability throughout duration of availability execution.

e. Material/Procurement Control. Applicants must have a material purchasing department with staff and procedures for planning, and control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, disposition and disposal) and an inventory system for ordering, tagging, warehousing, managing, and accounting for materials.

Contractor Furnished Materials (CFM) / Government Furnished Materials (GFM) storage including control and protection. Applicants must also have existing environmentally controlled warehouse space, material handling equipment and familiarity with the Navy logistics support system.

f. Subcontractor Control. Applicants must have procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. Applicants must have an identified quality control system documented in quality control procedures and manual. Applicants must also have

Enclosure (3)

M ay

30 May 25

Ty pe te xt h er e

M ay

M a

M ay

30 May 25

M ay ay ay ay ay ay

M ay ay ay ay ay ay ay ay ay ay ay

File details come from the government source that posted it. Updated .