This sources sought notice requests information from potential sources to upgrade the HVAC system for the Operational Trainer Complex at Building 7000 on Marine Corps Air Station Iwakuni in Japan. The Navy seeks a firm-fixed price design-bid-build contract between $10-25 million to modify the existing two-pipe hydronic system to a four-pipe system with independent load control. The successful contractor must be a U.S. company using U.S. persons and adhere to the base's construction security plan, including vetting all personnel and prohibiting the use of foreign labor or services. Interested sources must respond with qualifications by March 28, 2024.
The scope of work includes repairing and modifying the HVAC system for a four-pipe design with independent control of each zone, modifying mechanical rooms, removing existing heat exchanger units, upgrading the building automation system, addressing cybersecurity, and providing HVAC to flight simulator rooms configured for F-35 simulators. Electrical and architectural modifications must also support the HVAC work. The contractor must provide a revised construction phasing plan coordinating work with facility operations and simulator schedules. Secure area finish work requires U.S. citizens holding secret clearances. Considerations for TEMPEST shielding in protected areas are required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
L
K
J
I
H
G
E
D
F
C
B
A
Ia
21 3 4 4a 5 5a 6 7 8 9 10 11 12 13 14 152b
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DRAWFORM REVISION: 25 AUGUST 2020
OF
EPROJECT NO.:
CUI
CUI
GI006
5 0 5 10 15
1:200
AREA 4
AREA 7
AREA 1
AREA 4
A R
E A
A
R E
A
A R
E A
A
R E
A
AREA 4
AREA 7
AREA 5
AREA 8
AREA 5
AREA 8
AREA 6
AREA 9
AREA 1
AREA 4
AREA 2
AREA 5
AREA 2
AREA 5
AREA 3
AREA 6
A R
E A
A
R E
A
A R
E A
A
R E
A
PHASING
LEGEND:
PHASE 1
AHU-5: ALL
AHU-3: PARTIAL
H1 LOOP: PARTIAL
H4 LOOP: PARTIAL
H5 LOOP: PARTIAL
PHASE 6
AHU-4A: PARTIAL
H1 LOOP: PARTIAL
PHASE 5
AHU-1A: ALL
AHU-1B: PARTIAL
H2 LOOP: PARTIAL
PHASE 4
AHU-2: ALL
H3 LOOP: PARTIAL
PHASE 2
AHU-1B: PARTIAL
AHU-3: MAJORIITY
AHU-4A: PARTIAL
AHU-4B: ALL
AHU-6A: PARTIAL
H2 LOOP: PARTIAL
H4 LOOP: PARTIAL
PHASE 3
AHU-6A: MAJORITY
AHU-6B: ALL
H4 LOOP: PARTIAL
AREA 3
AREA 6
NOTES:
1. SEE SPECIFICATION
SECTION 01 11 00.00 33
SUMMARY OF WORK FOR
WORK SEQUENCE.
PHASE 4
PHASE 5
PHASE 2PHASE 3
PHASE 6
PHASE 2
Sirron.Vessels Text Box Enclosure 1
21 3 4 4a 5 5a 6 7 8 9 10 11 12 13 14 152b
M
L
K
J
I
H
A
G
E
Ia
D
F
C
B
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DRAWFORM REVISION: 25 AUGUST 2020
OF
EPROJECT NO.:
CUI
CUI
GI007
5 0 5 10 15
1:200
AREA 4
AREA 7
AREA 1
AREA 4
AREA 3
AREA 6
A R
E A
A
R E
A
A R
E A
A
R E
A
AREA 4
AREA 7
AREA 5
AREA 8
AREA 6
AREA 9
AREA 5
AREA 8
AREA 6
AREA 9
AREA 1
AREA 4
AREA 2
AREA 5
AREA 2
AREA 5
AREA 3
AREA 6
A R
E A
A
R E
A
A R
E A
A
R E
A
ROOF
ROOF
PHASING
LEGEND:
NOTES:
1. SEE SPECIFICATION
SECTION 01 11 00.00 33
SUMMARY OF WORK FOR
WORK SEQUENCE.
PHASE 1
AHU-5: ALL
AHU-3: PARTIAL
H1 LOOP: PARTIAL
H4 LOOP: PARTIAL
H5 LOOP: PARTIAL
PHASE 6
AHU-4A: PARTIAL
H1 LOOP: PARTIAL
PHASE 5
AHU-1A: ALL
AHU-1B: PARTIAL
H2 LOOP: PARTIAL
PHASE 4
AHU-2: ALL
H3 LOOP: PARTIAL
PHASE 2
AHU-1B: PARTIAL
AHU-3: MAJORIITY
AHU-4A: PARTIAL
AHU-4B: ALL
AHU-6A: PARTIAL
H2 LOOP: PARTIAL
H4 LOOP: PARTIAL
PHASE 3
AHU-6A: MAJORITY
AHU-6B: ALL
H4 LOOP: PARTIAL
PHASE 1
PHASE 2
PHASE 3
Sirron.Vessels Text Box Enclosure 1
| Enclosure 1 Drawings(CUI)MCASI Mod HVAC B7000 |
| Enclosure 1A Drawings(CUI)MCASI Mod HVAC B7000 |
File details come from the government source that posted it. Updated .