ENCL (5) Price Breakdown Worksheet (Blank).docx

DOCX document 24 KB Posted

Attached to
Z2LZ--Sources Sought Notice | Project # 612A4-23-011| Correct Parking Wall and Replace Grass| Mather, CA
Solicitation number
36C26123R0025
Issued by

About this file

This document contains a price breakdown worksheet template and a sources sought notice for a federal construction project. The price breakdown worksheet template includes line items for materials, labor, equipment, and other costs across multiple construction divisions. Offerors must provide a total proposed price along with separate line items for overhead, profit, bonds and insurance.

The sources sought notice is solicitation number 36C26123R0025 issued by the Department of Veterans Affairs to correct a retaining wall and parking area and replace grass at the Mather, CA VA hospital. This opportunity is set aside for verified service-disabled veteran-owned small businesses. Offerors must furnish all labor and materials to complete the demolition, replacement, installation and commissioning work required by the statement of work and specifications. Proposals are due by April 19, 2023 and award will be made to the lowest priced, technically acceptable offeror. The period of performance is 135 days from notice to proceed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26123R0025 Attachment - Price Breakdown

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 04 – Masonry
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 05 – Metals
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 09 - Finishes
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 31 - Earthwork
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 33 - Utilities
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
TOTAL Proposal
$
$
$
$
$

NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.