ENCL (5) Price Breakdown Worksheet (Blank).docx
DOCX document 24 KB Posted
- Attached to
- Z2LZ--Sources Sought Notice | Project # 612A4-23-011| Correct Parking Wall and Replace Grass| Mather, CA
- Solicitation number
- 36C26123R0025
About this file
This document contains a price breakdown worksheet template and a sources sought notice for a federal construction project. The price breakdown worksheet template includes line items for materials, labor, equipment, and other costs across multiple construction divisions. Offerors must provide a total proposed price along with separate line items for overhead, profit, bonds and insurance.
The sources sought notice is solicitation number 36C26123R0025 issued by the Department of Veterans Affairs to correct a retaining wall and parking area and replace grass at the Mather, CA VA hospital. This opportunity is set aside for verified service-disabled veteran-owned small businesses. Offerors must furnish all labor and materials to complete the demolition, replacement, installation and commissioning work required by the statement of work and specifications. Proposals are due by April 19, 2023 and award will be made to the lowest priced, technically acceptable offeror. The period of performance is 135 days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses to RFIs Received Sol No. 36C26123R0025.pdf | ||
| RFI Images.pdf | ||
| 36C26123R0025 0002.docx | DOCX document | |
| Catch Basin Drawing.pdf | ||
| 36C26123R0025 0001.docx | DOCX document | |
| 36C26123R0025.docx | DOCX document | |
| ENCL (1) SOW Mather Parking Wall and Grass V2 1_13.pdf | ||
| ENCL (3) Wage Determination CA20230007 3_10_2023.pdf | ||
| ENCL (6) Pre-Proposal Site Visit RFP 36C26123R0025 3_27_23.pptx | PPTX presentation | |
| ENCL (2) Specifications.pdf | ||
| ENCL (4) REQUEST FOR INFORMATION (RFI) FORM.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26123R0025 Attachment - Price Breakdown
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 02 – Existing Conditions |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 04 – Masonry |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 05 – Metals |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 09 - Finishes |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 31 - Earthwork |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 33 - Utilities |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| TOTAL Proposal |
| $ |
| $ |
| $ |
| $ |
| $ |
NOTE: All other costs may be included as a separate item and shall be specified in this breakdown.